CN221030243U - Anchor rod construction auxiliary device - Google Patents

Anchor rod construction auxiliary device Download PDF

Info

Publication number
CN221030243U
CN221030243U CN202322584356.1U CN202322584356U CN221030243U CN 221030243 U CN221030243 U CN 221030243U CN 202322584356 U CN202322584356 U CN 202322584356U CN 221030243 U CN221030243 U CN 221030243U
Authority
CN
China
Prior art keywords
anchor rod
frame
sleeve
support
auxiliary device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322584356.1U
Other languages
Chinese (zh)
Inventor
于泳
鲍畅
孙占胜
李潘
曾繁亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd filed Critical China Third Metallurgical Group Co Ltd
Priority to CN202322584356.1U priority Critical patent/CN221030243U/en
Application granted granted Critical
Publication of CN221030243U publication Critical patent/CN221030243U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to an anchor rod construction auxiliary device which comprises a mounting locating frame, a support, a sleeve and an end anchor rod locating device, wherein the support is connected with the mounting locating frame through threads, the sleeve is connected with the support, the sleeve and the support can rotate relatively, the mounting locating frame is connected with a working platform of a drilling machine for locating, and the end anchor rod locating device is fixed at the end of the sleeve. Compared with the prior art, the utility model has the beneficial effects that: the auxiliary device can be used for rapidly carrying out anchor rod perforation operation after drilling, and the construction method of carrying out anchor rod perforation operation after drilling is finished is changed, so that the anchor rod perforation operation can be carried out immediately after drilling is finished, the construction operation efficiency is improved, the construction difficulty is reduced, the labor cost is greatly saved, and the construction quality is improved under the condition of ensuring the safety.

Description

Anchor rod construction auxiliary device
Technical Field
The utility model belongs to the technical field of side slope (foundation pit) supporting anchor rod construction, and particularly relates to an anchor rod construction auxiliary device.
Background
The anchor rod is an important component of slope (foundation pit) support in contemporary pipe gallery and construction engineering.
At present, the foundation pit support in foundation pit engineering such as pipe gallery adopts anchor bolt support form, and stock operation process is drilling machine, drilling operation first, after the drilling operation of a working face is accomplished, follow-up stock is perforated the operation, wherein the stock generally adopts the screw reinforcement more than 20mm in diameter, and length is all greater than 10 meters, every 2.5 kg/meter stock weight is more than 50kg, ordinary manpower is difficult to construct, the construction mode at present is 3 to 4 people lifts a reinforcing bar and carries out stock perforation operation, waste time and energy, when stock perforation operation position is higher than 3 meters, just need carry out the operation of ascending through the form of set up shelf or with the stool, foundation pit bottom soil texture can't guarantee the stability of shelf and stool that later stage set up, have very big potential safety hazard, foundation pit support belongs to linear engineering moreover, need constantly turnover shelf and stool, the trouble is hard.
The construction method of the anchor rod in the traditional foundation pit support is to drill holes by using a drilling machine, and then manually perform anchor rod perforation operation after drilling a working surface, so that time and labor cost are wasted.
Disclosure of utility model
The utility model aims to provide an anchor rod construction auxiliary device, which is a synchronous construction method for drilling and anchor rod perforation based on an auxiliary anchor rod construction device arranged on drilling machine equipment with liftable height, and can be used for rapidly carrying out anchor rod perforation operation directly after drilling.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
The utility model provides an anchor rod construction auxiliary device, includes installation locating rack, support, sleeve pipe, end anchor rod positioner, the support passes through threaded connection with the installation locating rack, sleeve pipe and leg joint, can relative rotation between sleeve pipe and the support, the installation locating rack is connected with drilling machine work platform and is fixed, end anchor rod positioner fixes at sheathed tube tip.
A pulley frame is fixed in the sleeve, and a pulley capable of freely rolling is arranged in the pulley frame.
The installation locating frame is a U-shaped steel plate frame, and locating bolts are arranged on two sides of the U-shaped steel plate frame.
The threaded connection part of the bracket and the installation locating frame is provided with a locking nut.
The end anchor rod positioning device comprises a U-shaped frame and a jacking screw, wherein the U-shaped frame is fixedly connected with the sleeve, the opening of the U-shaped frame is downward, and the jacking screw is arranged on one side surface or a plurality of side surfaces of the U-shaped frame.
Compared with the prior art, the utility model has the beneficial effects that:
1) Compared with the traditional process support erection for anchor rod perforation, the anchor rod perforation device is installed in drilling machine equipment through the auxiliary anchor rod construction device to conduct anchor rod perforation, construction measure cost is greatly reduced, and labor cost is reduced.
2) The traditional construction method can finish the perforation operation of the threaded steel bar anchor rod with the diameter of 10 meters and 20mm only by 3 to 4 persons, and the perforation operation of the anchor rod can be easily finished by only 1 to 2 persons, so that the labor intensity is greatly reduced; after the traditional construction method is improved to the drilling machine, the device is directly utilized to carry out anchor rod perforation construction, and the overall construction efficiency is improved by 30% -40%.
3) In the traditional construction anchor rod perforation operation, the support operation is needed, the support operation is carried out in the foundation pit just excavated, the stability of the support is difficult to ensure, the safety of the anchor rod operation in the manual climbing operation is also difficult to ensure, and the safety problem is easy to occur due to the fact that the support substrate is unstable or the worker is not well matched, and the like.
Drawings
Fig. 1 is a schematic view of the overall structure of the device of the present utility model.
Fig. 2 is a cross-sectional view of a sleeve of the present utility model.
Fig. 3 is a view in the A-A direction of fig. 2.
Fig. 4 is a schematic view of a pulley frame.
Fig. 5 is a schematic view of the present utility model mounted on a drilling platform.
In the figure: 1. installing a positioning frame; 2. positioning bolts; 3. a bracket; 4. a rotation mechanism; 5. a sleeve; 6. a bolt; 7. an end anchor positioning device; 7-1, a U-shaped frame; 7-2, tightly pushing the screw; 8. a pulley frame; 9. a pulley; 10. a working platform; 11. guard bars; 12. and (5) a drilling machine.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, an auxiliary device for anchor rod construction comprises a mounting and positioning frame 1, a support 3, a sleeve 5 and an end anchor rod positioning device 7, wherein the support 3 is connected with the mounting and positioning frame 1 through threads, the sleeve 5 is connected with the support 3, the sleeve 5 can rotate relative to the support 3, the mounting and positioning frame 1 is connected with a working platform 10 of a drilling machine 12 for positioning, and the end anchor rod positioning device 7 is fixed at the end of the sleeve 5. The sleeve 5 is connected with the bracket 3 through a rotating mechanism 4, the rotating mechanism 4 can be in threaded connection, and the sleeve is locked and positioned through a nut after the angle is determined; the device can also be connected through a rotating shaft for manual hand positioning.
A pulley frame 8 is fixed in the sleeve 5, and a pulley 9 capable of freely rolling is installed in the pulley frame 8.
The installation locating frame 1 is a U-shaped steel plate frame, and locating bolts 2 are arranged on two sides of the U-shaped steel plate frame. The U-shaped steel plate frame is placed at the upper end of the guardrail 11 of the working platform 10 of the drilling machine 12, and the two sides of the U-shaped steel plate frame are hooked by the transverse rods of the guardrail 11 through the positioning bolts 2, so that the installation positioning frame 1 can be fixedly connected with the working platform 10 of the drilling machine 12.
The screw thread connection part of the bracket 3 and the installation locating rack 1 is provided with a locking nut. The height of the bracket 3 can be finely adjusted up and down by threaded connection.
The end anchor rod positioning device 7 comprises a U-shaped frame 7-1 and a tightening screw 7-2, wherein the U-shaped frame 7-1 is fixedly connected with the sleeve 5, the opening of the U-shaped frame 7-1 is downward, and one side surface or a plurality of side surfaces of the U-shaped frame 7-1 are provided with the tightening screw 7-2. The end anchor rod positioning device 7 is used for temporarily fixing the anchor rod 6, so that the anchor rod 6 is prevented from moving in a stringing way when the height or the angle is adjusted, and danger is caused.
The utility model discloses a construction method using an anchor rod construction auxiliary device, which comprises the following method steps:
1) The installation locating rack 1 is fixed on a drilling machine working platform.
2) Starting the drilling machine and starting the drilling operation.
3) After the drilling operation is completed, the anchor rod 6 is penetrated into the sleeve 5, the anchor rod 6 is temporarily positioned through the end anchor rod positioning device 7, the operation height of the anchor rod 6 is adjusted through the lifting drilling machine, and the construction angle of the anchor rod 6 is adjusted to be aligned with the drilling hole through rotating the sleeve 5.
4) The end anchor rod positioning device 7 is loosened, friction resistance is reduced by means of the pulley 9 in the sleeve 5, the anchor rod 6 is pushed, and the anchor rod 6 perforation operation is completed.
Repeating the above procedures, drilling by a drilling machine, and then immediately performing anchor rod operation by an auxiliary anchor rod construction device until all anchor rod operations are completed.
After the drilling machine finishes the slope drilling operation, the equipment height is reduced to meet the construction position of a normal operation platform, after the anchor rod 6 penetrates into the sleeve 5, the anchor rod 6 is fixed in the sleeve 5 through the end screw fixing device 7, the next drilling machine is lifted to the perforation position of the anchor rod 6, the angle of the rotation shaft is adjusted, the anchor rod 6 is aligned with a drilled hole, after the adjustment is finished, the end anchor rod positioning device 7 is opened, the friction resistance of the anchor rod 6 is reduced by means of the pulley 9 in the sleeve 5, and the perforation operation of the anchor rod 6 is rapidly and accurately finished. The operation can be completed by only 1-2 persons.
Although the present utility model has been described with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements and changes may be made without departing from the spirit and principles of the present utility model.

Claims (5)

1. The utility model provides an anchor rod construction auxiliary device, its characterized in that, including installation locating rack, support, sleeve pipe, end anchor rod positioner, the support passes through threaded connection with the installation locating rack, sleeve pipe and leg joint, can rotate relatively between sleeve pipe and the support, the installation locating rack is connected with drilling machine work platform and is fixed, end anchor rod positioner fixes the tip at the sheathed tube.
2. An anchor rod construction auxiliary device according to claim 1, wherein a pulley frame is fixed in the sleeve, and a pulley capable of freely rolling is installed in the pulley frame.
3. The auxiliary device for anchor rod construction according to claim 1, wherein the installation positioning frame is a U-shaped steel plate frame, and positioning bolts are arranged on two sides of the U-shaped steel plate frame.
4. An auxiliary device for anchor rod construction according to claim 1, wherein a lock nut is arranged at the threaded connection part of the bracket and the installation positioning frame.
5. The auxiliary device for anchor rod construction according to claim 1, wherein the end anchor rod positioning device comprises a U-shaped frame and a tightening screw, the U-shaped frame is fixedly connected with the sleeve, the opening of the U-shaped frame is downward, and one side surface or a plurality of side surfaces of the U-shaped frame are provided with the tightening screw.
CN202322584356.1U 2023-09-22 2023-09-22 Anchor rod construction auxiliary device Active CN221030243U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322584356.1U CN221030243U (en) 2023-09-22 2023-09-22 Anchor rod construction auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322584356.1U CN221030243U (en) 2023-09-22 2023-09-22 Anchor rod construction auxiliary device

Publications (1)

Publication Number Publication Date
CN221030243U true CN221030243U (en) 2024-05-28

Family

ID=91136096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322584356.1U Active CN221030243U (en) 2023-09-22 2023-09-22 Anchor rod construction auxiliary device

Country Status (1)

Country Link
CN (1) CN221030243U (en)

Similar Documents

Publication Publication Date Title
CN101691815B (en) Fast hoisting-aligning method for Large-sized steel frames, and steel frame base structure
CN102787560B (en) Integrated construction method of support of large cantilevered capping beam and vertical column
CN212613769U (en) Outer wall formwork reinforcing bracket at connecting position of shear wall floors
CN110761411A (en) Large-span suspended spherical dome concrete pouring method
CN221030243U (en) Anchor rod construction auxiliary device
CN111456009A (en) Engineering pile guiding device in piling construction and using method thereof
CN111472789A (en) Pipe jacking construction process
CN113482344B (en) Adjustable aluminum die diagonal bracing device and construction method thereof
CN117144947A (en) Anchor rod construction auxiliary device and construction method
CN109592580A (en) Large-tonnage tower crane super large load attached wall structure method for rapidly mounting in a kind of strong wind atmosphere
CN219865095U (en) Repairing fitting for push rod of mine shield type hydraulic support
CN217518226U (en) Turbo generator base direct-burried sleeve adjusting device
CN201495556U (en) Structure for quickly hoisting and centering base of large steel frame
CN211897872U (en) Coastal environment high pier hydraulic self-creeping formwork
CN214615043U (en) Prefabricated component reserved steel bar positioning and correcting device
CN210033485U (en) Underground factory building rock anchor beam drilling positioning device
CN209244243U (en) A kind of fixed device of fashioned iron sizing tripod for builder's jack
CN111396076A (en) Pipe jacking construction equipment
CN112627493A (en) Scaffold bottom support rapid adjusting device and method
CN212298225U (en) Measuring instrument fixing support for high-rise frame steel structure
CN218027884U (en) Modularization positioner is used in stake construction
CN220479795U (en) Simple adjusting tool for local deformation of guardrail
CN215885954U (en) Construction elevator foundation supporting structure
CN218346722U (en) Door type scaffold for building construction
CN220768094U (en) Novel multifunctional steel support hanging plate

Legal Events

Date Code Title Description
GR01 Patent grant