CN221029665U - Side pier beam pouring structure - Google Patents

Side pier beam pouring structure Download PDF

Info

Publication number
CN221029665U
CN221029665U CN202323079269.7U CN202323079269U CN221029665U CN 221029665 U CN221029665 U CN 221029665U CN 202323079269 U CN202323079269 U CN 202323079269U CN 221029665 U CN221029665 U CN 221029665U
Authority
CN
China
Prior art keywords
side pier
standard
mould
standard beam
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323079269.7U
Other languages
Chinese (zh)
Inventor
张旭
陈泽富
王军
陈治平
王大双
郭攀峰
李彦彬
杨志宏
赵明明
齐龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing International Construction Engineering Branch Of China Railway 23rd Bureau Group Co ltd
Original Assignee
Beijing International Construction Engineering Branch Of China Railway 23rd Bureau Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing International Construction Engineering Branch Of China Railway 23rd Bureau Group Co ltd filed Critical Beijing International Construction Engineering Branch Of China Railway 23rd Bureau Group Co ltd
Priority to CN202323079269.7U priority Critical patent/CN221029665U/en
Application granted granted Critical
Publication of CN221029665U publication Critical patent/CN221029665U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an edge pier beam pouring structure, which comprises a standard beam bottom die, a standard beam outer die and an edge pier end die; the side pier end mould is inserted between the standard beam outer mould and the standard beam bottom mould, and the insertion depth is the length of the standard beam minus the length of the side pier beam. According to the utility model, pouring of the standard beam can be performed by inserting the side pier end mould between the standard beam outer mould and the standard beam bottom mould; the method is quick and efficient, does not need to additionally manufacture an outer die of the side pier beam, a bottom die of the side pier beam and a side pier sticking block, and has low cost.

Description

Side pier beam pouring structure
Technical Field
The utility model relates to the technical field of bridge pouring, in particular to a side pier beam pouring structure.
Background
As shown in fig. 1-3, in the prefabricated segment bridge, the side pier beam 2 is shorter than the standard beam 1, and in the existing pouring process, the side pier attaching block 7 is attached to the standard fixed end die of the side pier beam outer die 5 to form a side pier end die, and then a short bottom die 6 is independently manufactured to pour the side pier beam.
The disadvantages of the prior art are:
1. the standard fixed end die is provided with an edge pier end die sticking block, so that the workload is high;
2. And the cost is increased by additionally manufacturing a short bottom die.
Accordingly, there is a need to develop a side pier beam casting structure to solve the above problems.
Disclosure of Invention
The utility model aims to design a side pier beam pouring structure for solving the problems.
The utility model realizes the above purpose through the following technical scheme:
Side pier beam pouring structure includes:
A standard beam bottom die;
A standard beam outer mold;
A side pier end mould; the side pier end mould is inserted between the standard beam outer mould and the standard beam bottom mould, and the insertion depth is the length of the standard beam minus the length of the side pier beam.
Preferably, the side pier end mould is perpendicular to the length direction of the standard beam.
The utility model has the beneficial effects that:
According to the application, pouring of the standard beam can be performed by inserting the side pier end mould between the standard beam outer mould and the standard beam bottom mould; the method is quick and efficient, does not need to additionally manufacture an outer die of the side pier beam, a bottom die of the side pier beam and a side pier sticking block, and has low cost.
Drawings
FIG. 1 is a schematic illustration of a prefabricated segment bridge construction comprising side pier beams and standard beams;
FIG. 2 is a schematic diagram of a prior art poured side pier beam structure;
FIG. 3 is a schematic view of a prior art side pier attachment block;
FIG. 4 is a schematic diagram of the structure of the present application;
In the figure: 1. a standard beam; 2. side pier beams; 3. a standard beam outer mold; 4. a standard beam bottom die; 5. an outer mold of the side pier beam; 6. a side pier beam bottom die; 7. edge pier blocks; 8. and (5) edge pier end molds.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present utility model more clear, the technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. It will be apparent that the described embodiments are some, but not all, embodiments of the utility model. The components of the embodiments of the present utility model generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the utility model, as presented in the figures, is not intended to limit the scope of the utility model, as claimed, but is merely representative of selected embodiments of the utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
It should be noted that: like reference numerals and letters denote like items in the following figures, and thus once an item is defined in one figure, no further definition or explanation thereof is necessary in the following figures.
In the description of the present utility model, it should be understood that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "left", "right", etc. are based on the directions or positional relationships shown in the drawings, or the directions or positional relationships conventionally put in place when the inventive product is used, or the directions or positional relationships conventionally understood by those skilled in the art are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the apparatus or elements referred to must have a specific direction, be configured and operated in a specific direction, and therefore should not be construed as limiting the present utility model.
Furthermore, the terms "first," "second," and the like, are used merely to distinguish between descriptions and should not be construed as indicating or implying relative importance.
In the description of the present utility model, it should also be noted that, unless explicitly specified and limited otherwise, terms such as "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
The following describes specific embodiments of the present utility model in detail with reference to the drawings.
As shown in fig. 4, the side pier beam casting structure includes:
a standard beam bottom die 4;
A standard beam outer mold 3;
a side pier end mould 8; the side pier end mould 8 is inserted between the standard beam outer mould 3 and the standard beam bottom mould 4, and the insertion depth is the length of the standard beam 1 minus the length of the side pier beam 2.
The side pier end mould is vertical to the length direction of the standard beam.
When the standard beam outer die is in operation, the side part of the standard beam outer die is supported on the front end bracket; the standard beam bottom die is supported on the bottom bracket, and the side pier end die is respectively connected with the standard beam outer die and the standard beam bottom die through bolts.
The foregoing is merely a preferred embodiment of the present utility model, and it should be noted that it will be apparent to those skilled in the art that several modifications and variations can be made without departing from the technical principle of the present utility model, and these modifications and variations should also be regarded as the scope of the utility model.

Claims (2)

1. Side mound roof beam pouring structure, its characterized in that includes:
A standard beam bottom die;
A standard beam outer mold;
A side pier end mould; the side pier end mould is inserted between the standard beam outer mould and the standard beam bottom mould, and the insertion depth is the length of the standard beam minus the length of the side pier beam.
2. The side pier beam casting structure according to claim 1, wherein the side pier end mold is perpendicular to the length direction of the standard beam.
CN202323079269.7U 2023-11-14 2023-11-14 Side pier beam pouring structure Active CN221029665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323079269.7U CN221029665U (en) 2023-11-14 2023-11-14 Side pier beam pouring structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323079269.7U CN221029665U (en) 2023-11-14 2023-11-14 Side pier beam pouring structure

Publications (1)

Publication Number Publication Date
CN221029665U true CN221029665U (en) 2024-05-28

Family

ID=91176002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323079269.7U Active CN221029665U (en) 2023-11-14 2023-11-14 Side pier beam pouring structure

Country Status (1)

Country Link
CN (1) CN221029665U (en)

Similar Documents

Publication Publication Date Title
CN202894216U (en) Casting tooling for large-size and complicated framework type titanium alloy thin wall castings
CN103846392A (en) Casting method of steering knuckle of nodular cast iron
CN115402423B (en) Automobile floor, white automobile body and automobile
CN221029665U (en) Side pier beam pouring structure
CN102847880A (en) Special material co-casting cast mold and special material co-casting cast production process
CN100558523C (en) Tensioning force-separated movable casing sleeper mould
CN214640088U (en) Casting mould with adjusting mechanism
CN208088138U (en) A kind of suitable bridge is to large size, thin walled hollow vase pier steel form
CN210023663U (en) Casting mould
CN220492891U (en) Aluminum profile of solar bracket and extrusion die thereof
CN220782156U (en) Left support wax mould
CN219986155U (en) Core head positioning mechanism in sand casting mould and casting mould thereof
CN219052849U (en) Gravity casting die for aluminum alloy lower yoke plate of electric vehicle and motorcycle
CN212652644U (en) High stability casting mould
CN207915853U (en) A kind of casting L-shaped splicing structure
CN211888934U (en) Sprue runner of one-mold two-cavity large-shell die-casting mold
CN206509505U (en) A kind of aluminum alloy cylinder cover bottom filling metal pattern stripper apparatus
CN219254078U (en) Compressor support die casting die
CN220521967U (en) Fixed knot constructs and square round special steel pin-connected panel building mould
CN219902601U (en) Hole supporting die and prefabricated inspection well steel template
CN219881294U (en) Casting equipment is with mould of being convenient for installation
CN220372165U (en) Tool for preventing casting and pulling-off of high-carbon steel in continuous casting machine
CN215144449U (en) Water inlet and outlet section shaping tool
CN219132919U (en) Compound box culvert mould
CN219335918U (en) Core pulling structure with deformation prevention function for die casting mold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant