CN220927878U - Double-row pile anchor rod supporting structure for constructional engineering - Google Patents
Double-row pile anchor rod supporting structure for constructional engineering Download PDFInfo
- Publication number
- CN220927878U CN220927878U CN202322685642.7U CN202322685642U CN220927878U CN 220927878 U CN220927878 U CN 220927878U CN 202322685642 U CN202322685642 U CN 202322685642U CN 220927878 U CN220927878 U CN 220927878U
- Authority
- CN
- China
- Prior art keywords
- pile body
- fixedly connected
- threaded rod
- dead lever
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000001125 extrusion Methods 0.000 claims description 17
- 238000010276 construction Methods 0.000 claims description 7
- 238000005096 rolling process Methods 0.000 claims description 4
- 238000009434 installation Methods 0.000 abstract description 8
- 230000003014 reinforcing effect Effects 0.000 abstract 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a double-row pile anchor bolt supporting structure for constructional engineering, which comprises a first pile body, a second pile body and a cross beam, wherein the bottom of the cross beam is fixedly connected with the first pile body and the second pile body, a fixing rod is arranged between the first pile body and the second pile body, the bottom of the fixing rod is fixedly connected with a fixing device, and the fixing device is used for reinforcing a foundation. This a double row pile anchor bolt supporting structure for building engineering has reached the clearance of pile body and has set up the dead lever, and the top and the crossbeam of dead lever cup joint, and the bottom of dead lever sets up fixing device, and the staff of being convenient for utilizes fixing device and ground fixed mounting, and then carries out fixed mounting with the dead lever, improves dead lever installation stability, and first threaded rod cup joints the sleeve, utilizes the nut to carry out spacing to the sleeve with mounting panel and crossbeam fixed mounting, utilizes adjusting nut simultaneously, improves first threaded rod and crossbeam fixed stability.
Description
Technical Field
The utility model relates to the field of building construction, in particular to a double-row pile anchor rod supporting structure for building engineering.
Background
The double-row pile supporting structure is a supporting form commonly used in foundation pit engineering, a space structure similar to a portal is formed by connecting beams between front and rear rows of parallel reinforced concrete row piles and front and rear row pile tops, and compared with a dense single-row pile supporting structure, the double-row pile supporting structure has better stability and longer supporting period, and the quality of the foundation pit engineering is guaranteed. In order to further improve the strength of the double-row piles, anchor rod supports are additionally arranged in gaps of the double-row piles, so that the double-row piles are reinforced. At present, the existing double-row pile anchor rod supporting structure for constructional engineering is inconvenient for staff to carry out fixed mounting with stock and ground fast, and whole installation stability is poor, adopts single stock to fix, and then influences bulk strength, can't satisfy the user demand.
Disclosure of utility model
1. Technical problem to be solved
Aiming at the problems that the existing double-row pile anchor rod supporting structure for the constructional engineering in the prior art is inconvenient for workers to quickly fix the anchor rods and the foundation, the overall installation stability is poor, a single anchor rod is adopted for fixing, the overall strength is further influenced, and the use requirement cannot be met, the utility model aims to provide the double-row pile anchor rod supporting structure for the constructional engineering, which can realize that a fixing rod is arranged at a gap of a pile body, the top of the fixing rod is sleeved with a cross beam, the bottom of the fixing rod is provided with a fixing device, the workers can conveniently and fixedly install the fixing rod with the foundation by using the fixing device, the installation stability of the fixing rod is improved, a sleeve is sleeved with a first threaded rod, a mounting plate and the cross beam are fixedly installed by using a nut, meanwhile, the sleeve is limited by using an adjusting nut, the fixing stability of the first threaded rod and the cross beam is improved, the outer wall of the fixing rod is provided with a supporting device, the pile body is conveniently supported, the overall stability is further improved, and the use requirement is met.
2. Technical proposal
In order to solve the problems, the utility model adopts the following technical scheme.
The utility model provides a double row pile anchor bolt supporting structure for building engineering, includes first pile body, second pile body and crossbeam, the bottom and the first pile body of crossbeam, second pile body fixed connection, the clearance of first pile body, second pile body is provided with the dead lever, the bottom fixedly connected with fixing device of dead lever, fixing device consolidates the ground, the first threaded rod of top fixedly connected with of dead lever, first threaded rod cup joints with the crossbeam, sleeve has been cup jointed to first threaded rod, telescopic both sides fixedly connected with link, the one end fixedly connected with mounting panel of sleeve is kept away from to the link, the mounting panel passes through the top fixed connection of bolt and crossbeam, first threaded rod is located the equal threaded connection of telescopic upper and lower both sides has adjusting nut, first spacing to the sleeve through adjusting nut.
Preferably, the fixing device comprises a fixing frame, a second threaded rod, a rotating disc, a baffle, an anchor rod and helical blades, wherein the fixing frame is fixedly connected with the bottom of the fixing rod, the second threaded rod is connected with the bottom of the fixing frame in a threaded manner, the rotating disc is fixedly connected with the top of the second threaded rod, the baffle is fixedly connected with the bottom of the second threaded rod, the anchor rod is fixedly connected with the bottom of the baffle, and the helical blades are fixedly connected with the surface of the anchor rod.
Preferably, the number of the second threaded rods is two.
Preferably, the two sides of the fixing rod are fixedly connected with supporting devices, and the supporting devices support the surfaces of the first pile body and the second pile body.
Preferably, the supporting device comprises a fixed cylinder, a third threaded rod and an extrusion plate, wherein the fixed cylinder is fixedly connected with the side wall of the fixed rod, the third threaded rod is in threaded connection with the fixed cylinder, the extrusion plate is fixedly connected with the end part of the third threaded rod, and the extrusion plate supports the outer wall of the pile body.
Preferably, the surface of the extrusion plate is provided with bolts, and the extrusion plate is fixedly connected with the outer wall of the pile body through the bolts.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages that:
The clearance through the pile body sets up the dead lever, and the top and the crossbeam of dead lever cup joint, and the bottom of dead lever sets up fixing device, and the staff of being convenient for utilizes fixing device and ground fixed mounting, and then carries out fixed mounting with the dead lever, improves dead lever installation stability, and sleeve has been cup jointed to first threaded rod, utilizes the nut to carry out spacing to sleeve with mounting panel and crossbeam fixed mounting, utilizes adjusting nut simultaneously, improves first threaded rod and crossbeam fixed stability.
The outer wall through the dead lever sets up strutting arrangement, is convenient for support the pile body, further improves overall stability.
Drawings
FIG. 1 is a schematic view of the overall mounting structure of the present utility model;
FIG. 2 is a schematic view of a fixing frame and a supporting device according to the present utility model;
Fig. 3 is a schematic structural view of the fixing device of the present utility model.
The reference numerals in the figures illustrate:
1. A first pile body; 2. a second pile body; 3. a cross beam; 4. a fixed rod; 5. a fixing device; 51. a fixed frame; 52. a second threaded rod; 53. a rotating disc; 54. a baffle; 55. a bolt; 56. a helical blade; 6. a first threaded rod; 7. a sleeve; 8. a connecting frame; 9. a mounting plate; 10. an adjusting nut; 11. a support device; 111. a fixed cylinder; 112. a third threaded rod; 113. and extruding the plate.
Detailed Description
The drawings in the embodiments of the present utility model will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only a few embodiments of the present utility model; but not all embodiments. Based on the embodiments in the present utility model; all other embodiments obtained by those skilled in the art without undue burden; all falling within the scope of the present utility model.
Example 1:
Referring to fig. 1-3, the present utility model provides a technical solution: a double row pile anchor bolt supporting construction for building engineering, including first pile body 1, second pile body 2 and crossbeam 3, the bottom and the first pile body 1 of crossbeam 3, second pile body 2 fixed connection, first pile body 1, the clearance of second pile body 2 is provided with dead lever 4, the bottom fixedly connected with fixing device 5 of dead lever 4, fixing device 5 consolidates the ground, the first threaded rod 6 of top fixedly connected with of dead lever 4, first threaded rod 6 cup joints with crossbeam 3, sleeve 7 has been cup jointed to first threaded rod 6, sleeve 7's both sides fixedly connected with link 8, sleeve 7's one end fixedly connected with mounting panel 9 is kept away from to link 8, mounting panel 9 passes through the top fixed connection of bolt and crossbeam 3, first threaded rod 6 is located sleeve 7's equal threaded connection of upper and lower both sides adjusting nut 10, first threaded rod 6 carries out spacingly to sleeve 7 through adjusting nut 10. The clearance of pile body sets up dead lever 4, the top of dead lever 4 cup joints with crossbeam 3, the bottom of dead lever 4 sets up fixing device 5, be convenient for the staff utilize fixing device 5 and ground fixed mounting, and then carry out fixed mounting with dead lever 4, improve dead lever 4 installation stability, the top of dead lever 4 is first threaded rod 6, sleeve 7 has been cup jointed, utilize the nut to carry out spacing with mounting panel 9 and crossbeam 3 fixed mounting with mounting, utilize adjusting nut 10 to sleeve 7 simultaneously, improve first threaded rod 6 and crossbeam 3 fixed stability, the outer wall of dead lever 4 sets up strutting arrangement 11, be convenient for support the pile body, further improve overall stability.
Wherein, fixing device 5 includes fixed frame 51, second threaded rod 52, rolling disc 53, baffle 54, stock 55 and helical blade 56, and fixed frame 51 and the bottom fixed connection of dead lever 4, fixed frame 51 bottom threaded connection has second threaded rod 52, and the top fixedly connected with rolling disc 53 of second threaded rod 52, the bottom fixedly connected with baffle 54 of second threaded rod 52, the bottom fixedly connected with stock 55 of baffle 54, the surface fixedly connected with helical blade 56 of stock 55. The fixing device 5 is arranged, so that the foundation is conveniently and fixedly installed, the rotating disc 53 is rotated, the second threaded rod 52 is driven to rotate, the baffle 54 is driven to move, the anchor rod 55 is driven to rotate, the helical blade 56 is driven to rotate, the anchor rod 55 is screwed into the soil, and the overall installation stability is improved.
Wherein the number of second threaded rods 52 is two. Two second threaded rods 52 are provided and are fixed by two anchor rods 55, so that the overall installation stability is improved.
Wherein, the both sides fixedly connected with strutting arrangement 11 of dead lever 4, strutting arrangement 11 supports first pile body 1, second pile body 2 surface. The outer wall of dead lever 4 sets up strutting arrangement 11, is convenient for support the pile body, further improves overall stability.
The supporting device 11 includes a fixing cylinder 111, a third threaded rod 112 and an extrusion plate 113, the fixing cylinder 111 is fixedly connected with the side wall of the fixing rod 4, the fixing cylinder 111 is in threaded connection with the third threaded rod 112, the end part of the third threaded rod 112 is fixedly connected with the extrusion plate 113, and the extrusion plate 113 supports the outer wall of the pile body. A further 113 is provided to drive the third threaded rod 112 to rotate, and the positions of the third threaded rod 112 and the fixed cylinder 111 are adjusted, so that the extrusion plate 113 extrudes the pile body.
Wherein, the surface of the extrusion plate 113 is provided with bolts, and the extrusion plate 113 is fixedly connected with the outer wall of the pile body through the bolts. The surface of the extrusion plate 113 is provided with bolts, which are beneficial to fixedly connecting the bolts 113 with the outer wall of the pile body and further supporting the pile body.
The above; is only a preferred embodiment of the present utility model; the scope of the utility model is not limited in this respect; any person skilled in the art is within the technical scope of the present disclosure; equivalent substitutions or changes are made according to the technical proposal of the utility model and the improved conception thereof; are intended to be encompassed within the scope of the present utility model.
Claims (6)
1. A double row pile anchor bolt supporting construction for building engineering, includes first pile body (1), second pile body (2) and crossbeam (3), its characterized in that: the bottom of crossbeam (3) and first pile body (1), second pile body (2) fixed connection, the clearance of first pile body (1), second pile body (2) is provided with dead lever (4), the bottom fixedly connected with fixing device (5) of dead lever (4), fixing device (5) consolidates the ground, the top fixedly connected with first threaded rod (6) of dead lever (4), first threaded rod (6) cup joints with crossbeam (3), sleeve (7) have been cup jointed in first threaded rod (6), the both sides fixedly connected with link (8) of sleeve (7), the one end fixedly connected with mounting panel (9) of sleeve (7) are kept away from to link (8), the top fixedly connected with of mounting panel (9) through bolt and crossbeam (3), equal threaded connection has adjusting nut (10) in the upper and lower both sides of sleeve (7) are located to first threaded rod (6), first threaded rod (6) are spacing sleeve (7) through adjusting nut (10).
2. A double row pile anchor bolt support structure for construction engineering according to claim 1, wherein: fixing device (5) are including fixed frame (51), second threaded rod (52), rolling disc (53), baffle (54), stock (55) and helical blade (56), the bottom fixed connection of fixed frame (51) and dead lever (4), fixed frame (51) bottom threaded connection has second threaded rod (52), the top fixedly connected with rolling disc (53) of second threaded rod (52), the bottom fixedly connected with baffle (54) of second threaded rod (52), the bottom fixedly connected with stock (55) of baffle (54), the surface fixedly connected with helical blade (56) of stock (55).
3. A double row pile anchor bolt support structure for construction engineering according to claim 2, wherein: the number of the second threaded rods (52) is two.
4. A double row pile anchor bolt support structure for construction engineering according to claim 1, wherein: the two sides of the fixed rod (4) are fixedly connected with supporting devices (11), and the supporting devices (11) support the surfaces of the first pile body (1) and the second pile body (2).
5. A double row pile anchor bolt support structure for construction engineering according to claim 4, wherein: the supporting device (11) comprises a fixed cylinder (111), a third threaded rod (112) and an extrusion plate (113), wherein the fixed cylinder (111) is fixedly connected with the side wall of the fixed rod (4), the third threaded rod (112) is connected with the fixed cylinder (111) in a threaded manner, the extrusion plate (113) is fixedly connected with the end part of the third threaded rod (112), and the extrusion plate (113) supports the outer wall of the pile body.
6. A double row pile anchor bolt support structure for construction engineering according to claim 5, wherein: the surface of the extrusion plate (113) is provided with bolts, and the extrusion plate (113) is fixedly connected with the outer wall of the pile body through the bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322685642.7U CN220927878U (en) | 2023-10-08 | 2023-10-08 | Double-row pile anchor rod supporting structure for constructional engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322685642.7U CN220927878U (en) | 2023-10-08 | 2023-10-08 | Double-row pile anchor rod supporting structure for constructional engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220927878U true CN220927878U (en) | 2024-05-10 |
Family
ID=90934114
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322685642.7U Active CN220927878U (en) | 2023-10-08 | 2023-10-08 | Double-row pile anchor rod supporting structure for constructional engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220927878U (en) |
-
2023
- 2023-10-08 CN CN202322685642.7U patent/CN220927878U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214995805U (en) | Adjustable cantilever supporting device for building construction | |
CN220927878U (en) | Double-row pile anchor rod supporting structure for constructional engineering | |
CN221167823U (en) | Reinforced steel sheet pile foundation pit | |
CN212405242U (en) | Pipe gallery formwork support system | |
CN216130340U (en) | Large-span cross truss steel structure support system | |
CN215631887U (en) | Building structure design roof beam reinforced structure | |
CN212743384U (en) | High and large formwork supporting structure for building | |
CN213895005U (en) | Tower crane jacking reinforcing apparatus | |
CN209949014U (en) | Dead weight formula photovoltaic support | |
CN210946527U (en) | Composite assembling type bridge cantilever construction bracket | |
CN219794200U (en) | Reinforced steel structure of multimode installation | |
CN111335357A (en) | Pipe gallery formwork supporting system and construction method thereof | |
CN219041677U (en) | Desert soil photovoltaic support | |
CN221609452U (en) | Wall-attached support of attached lifting scaffold | |
CN211007764U (en) | High bearing capacity standard festival backs a strutting arrangement | |
CN219910313U (en) | Building construction guardrail reinforcing apparatus | |
CN218217220U (en) | Cadmium telluride photovoltaic support foundation and photovoltaic support | |
CN218990825U (en) | Externally hung socket type disc buckle type steel pipe support scaffold for special-shaped cantilever structure | |
CN220166946U (en) | Foundation pit diagonal bracing with compensation function | |
CN217973950U (en) | Formwork support is used in construction of road bridge road bed course | |
CN216866087U (en) | House reinforcing structure | |
CN221742132U (en) | Rear jacking device for reinforcing basement roof | |
CN218724537U (en) | Novel water level monitor for hydraulic engineering | |
CN219974055U (en) | Tower leg installation connection structure for transmission line iron tower | |
CN215104762U (en) | Flexible super-bearing supporting leg for bridge girder erection machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |