CN220886848U - Building material loader for building engineering - Google Patents

Building material loader for building engineering Download PDF

Info

Publication number
CN220886848U
CN220886848U CN202322792987.2U CN202322792987U CN220886848U CN 220886848 U CN220886848 U CN 220886848U CN 202322792987 U CN202322792987 U CN 202322792987U CN 220886848 U CN220886848 U CN 220886848U
Authority
CN
China
Prior art keywords
base
construction
welded
material loader
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322792987.2U
Other languages
Chinese (zh)
Inventor
贺正东
余婷婷
郑永飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Hangran Construction Engineering Co ltd
Original Assignee
Huainan Hangran Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Hangran Construction Engineering Co ltd filed Critical Huainan Hangran Construction Engineering Co ltd
Priority to CN202322792987.2U priority Critical patent/CN220886848U/en
Application granted granted Critical
Publication of CN220886848U publication Critical patent/CN220886848U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a building material loader for building engineering, which belongs to the technical field of building engineering and comprises a base, wherein a rectangular groove is formed in the middle of the base, a lower strip is welded below the bottom of the base and the rectangular groove vertically, a plurality of springs are welded at the top of the lower strip, a movable plate is welded at the top of the springs, one ends of steel wires are arranged at four corners of the top of the movable plate, the other ends of the steel wires pass through fixed pulleys and are wound on winding rolls on corresponding sides, and the fixed pulleys are arranged at the top of the inner side wall of a fixed frame fixedly connected to the top of the base.

Description

Building material loader for building engineering
Technical Field
The utility model relates to the field of constructional engineering, in particular to a building material loader for constructional engineering.
Background
The construction engineering refers to the construction entity formed by installing lines, pipelines, equipment and the like of a building, the construction materials are materials for building and decorating the building, after a general framework of the building is poured and molded, the construction materials on the ground are hung into a construction space in a tower crane mode and are used for covering and decorating a subsequent wall body, and because the construction materials are usually concentrated in a certain area, the construction space is limited, and a large-sized loader cannot go in, workers need to uniformly convey the materials in the construction space when taking the construction materials, and the construction materials are more, need to be conveyed back and forth for many times, so that the construction engineering is low in efficiency and high in labor intensity.
In order to solve the above-mentioned problem, a construction material loader for construction engineering is disclosed in CN202222299832.0, through placing construction material on the carrying plate, accessible pushing hands pulling whole device utilizes the gyro wheel to remove, conveniently carry construction material, if meet long board, long tube etc. construction material or when needing to load some construction material more, can outwards pull the subplate on both sides, make it remove from the rectangle mouth inside, and make slot and socket align, it inserts the slot inside to push up the inserted bar through the spring pulling mounting panel that has elasticity, can fix its position, make movable rod rotate through rotating carousel department simultaneously, owing to the existence of screw thread, can make the gag lever post on both sides slowly inwards remove, thereby squeeze the clamping with the construction material side of placing, play spacing fixed effect, reduce the loose risk of dropping during transportation, make things convenient for construction material's transport through this loader, reduce workman intensity of labour simultaneously, drive ball through controller start motor work, thereby control carrier plate carries out lifting adjustment, conveniently stack construction material from placing on the carrying plate, simultaneously, also make things convenient for stacking construction material on the carrying plate, when unloading on the carrying plate, the material is convenient for also stacking on the carrying plate, the material is stacked on the carrier plate, the material is stacked on the place when the material is stacked on the carrier, the cost is greatly reduced, the material is reduced when the material is stacked on the carrier is loaded on the floor, the floor is loaded on the floor when the floor is convenient for the floor, the floor has reduced the performance of the loading machine.
The building material loader for the building engineering disclosed in the patent drives the carrying plate to lift and adjust through the screw rod assembly, the threaded connection part of the screw rod and the screw rod sleeve is subjected to larger force, and the screw rod is easy to deform and damage due to long service time or heavier force.
Disclosure of utility model
The utility model aims to provide a building material loader for a building project, and the building material loader for the building project can automatically adjust the height of a movable plate, so that on the basis of reducing the bending times when workers load and unload, the movable plate is driven to lift by a steel wire rope lifting assembly as a driving assembly through the first step of bearing force of a spring, even if the movable plate is long in service time, the upper part of the movable plate is stacked with heavy goods, and the double bearing lifting assembly is not easy to damage, so that the problems in the prior art are solved.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
The utility model provides a building material loader of building engineering, includes the base, rectangular channel has been seted up at the base middle part, the welding of base bottom, rectangular channel vertical below has the lower strip, lower strip top welding has a plurality of spring, spring top welding has the fly leaf, wire rope one end is all installed in fly leaf top four corners, the wire rope other end all passes the fixed pulley rolling on the roller on corresponding limit, the fixed pulley is installed at fixed connection at the mount inside wall top at base top.
As a further scheme of the utility model: the roller box is fixedly installed at the left end and the right end of the base, and the inner side wall of the roller box is rotationally connected with a roller.
As a further scheme of the utility model: two groups of sliding strips are welded at the front end of the movable plate, the sliding strips are connected to the inner side wall of a sliding groove of the front plate in a sliding mode, limiting strips are welded at the end portions of the sliding strips, and the front plate is welded at the front end of the base.
As a further scheme of the utility model: the middle part of the front plate is welded with a handle, and the middle part of the handle is sleeved with a rubber sleeve.
As a further scheme of the utility model: the front end of the roller is provided with gears in a locking way, the outer side wall of each gear is connected with a chain in a meshed mode, and the power input end of the right gear is connected with the power output end of the motor.
As a further scheme of the utility model: the four corners of the bottom of the base are provided with self-locking universal wheels.
Compared with the prior art, the utility model has the beneficial effects that:
The building material loader for the building engineering disclosed by the utility model can automatically adjust the height of the movable plate, so that the number of bending times is reduced when workers load and unload the movable plate, the movable plate is driven to lift by the steel wire rope lifting assembly as the driving assembly through the first step bearing force of the spring, even if the movable plate is long in service time, the upper part of the movable plate is stacked with heavy goods, the double bearing force lifting assembly is not easy to damage, and the problem that the building material loader for the building engineering disclosed by the patent drives the carrying plate to lift and adjust through the screw rod assembly, the threaded connection part of the screw rod and the screw rod sleeve is stressed by larger force, and the screw threads are deformed and damaged easily due to long service time or heavier stress is solved.
Drawings
FIG. 1 is a schematic view of a construction material loader for construction engineering according to an embodiment of the present utility model;
FIG. 2 is a schematic view of a construction material loader for construction engineering according to an embodiment of the present utility model;
FIG. 3 is a schematic diagram of the structure shown at A in FIG. 2;
fig. 4 is a schematic structural view of a construction material loader for construction engineering according to an embodiment of the present utility model.
In the figure: 1. a base; 2. a fixing frame; 3. a roller box; 4. a roller; 5. rectangular grooves; 6. a spring; 7. a movable plate; 8. a chute; 9. a slide bar; 10. a limit bar; 11. a rubber sleeve; 12. a handle; 13. a chain; 14. a gear; 15. a motor; 16. a wire rope; 17. a fixed pulley; 18. self-locking universal wheels; 19. blanking; 20. a front plate.
Detailed Description
The present utility model will be further described with reference to the accompanying drawings and detailed description, wherein it is to be understood that, on the premise of no conflict, the following embodiments or technical features may be arbitrarily combined to form new embodiments. Materials and equipment used in this example are commercially available, except as specifically noted. Examples of such embodiments are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to like or similar elements throughout or elements having like or similar functionality. The embodiments described below by referring to the drawings are exemplary only for explaining the present utility model and are not to be construed as limiting the present utility model.
Referring to fig. 1 to 4, in an embodiment of the present utility model, a building material loader for a building project includes a base 1, a rectangular slot 5 is formed in the middle of the base 1, a lower bar 19 is welded vertically below the bottom of the base 1 and the rectangular slot 5, a plurality of springs 6 are welded at the top of the lower bar 19, a movable plate 7 is welded at the top of the springs 6, one end of a wire rope 16 is installed at four corners of the top of the movable plate 7, the other end of the wire rope 16 passes through a fixed pulley 17 and is wound on a winding roll 4 on the corresponding side, and the fixed pulley 17 is installed at the top of an inner side wall of a fixed frame 2 fixedly connected to the top of the base 1.
The roller boxes 3 are fixedly arranged at the left end and the right end of the base 1, the inner side walls of the roller boxes 3 are rotatably connected with the roller 4, and the roller 4 is convenient to install; wherein, the front end of the movable plate 7 is welded with two groups of sliding strips 9, the sliding strips 9 are connected on the inner side wall of a chute 8 of a front plate 20 in a sliding way, the end part of the sliding strips 9 is welded with a limit strip 10, the front plate 20 is welded on the front end of the base 1, and the sliding strips 9 slide on the inner side wall of the chute 8 to enable the movable plate 7 to translate stably; the middle part of the front plate 20 is welded with a handle 12, and the middle part of the handle 12 is sleeved with a rubber sleeve 11, so that the whole device is convenient to push and pull; the head ends of the winding rollers 4 are respectively provided with a gear 14 in a locking way, the outer side wall of each gear 14 is connected with a chain 13 in a meshed mode, and the power input end of each gear 14 on the right side is connected with the power output end of a motor 15, so that the winding rollers are convenient to drive; wherein, the self-locking universal wheels 18 are arranged at four corners of the bottom of the base 1, which is convenient for the movement or transportation of the whole device.
The working principle of the utility model is as follows: on the basis that the height of a movable plate 7 can be automatically adjusted, the bending times of workers are reduced when the workers load and unload the building materials, the steel wire rope 16 is used as a driving component to drive the movable plate 7 to lift through the first step of bearing force of the spring 6, even if the movable plate 7 is long in service time, the upper part of the building materials are stacked on the movable plate 7, the double bearing lifting component is not easy to damage, the movable plate 7 can be lifted to a higher height by the spring 6 before loading, an external power supply supplies power when loading the building materials, a motor 15 is opened through an external switch and controls the motor 15 to rotate positively, the motor 15 drives a right side gear 14 to rotate clockwise, as the outer side wall of the gear 14 is connected with a chain 13 in a meshed manner, the inner side wall of the chain 13 is connected with another gear 14, the other gear 14 also rotates clockwise synchronously, the two winding rollers 4 rotate clockwise synchronously and slowly to unwind the steel wire rope 16, a worker stacks the building materials on the movable plate 7 in a block process, the worker can slowly translate downwards in a sliding manner in a sliding way on the sliding groove 8, the sliding way, and the sliding bar 9 can smoothly slides downwards on the sliding groove 8 to enable the movable plate 7 to rotate downwards when the motor 15 is controlled to rotate positively and negatively (the motor 15 is controlled to rotate positively and reversely when the motor 15 is the motor is the prior art to rotate positively and reversely).
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (6)

1. Building material loader of building engineering, including base (1), its characterized in that: rectangular grooves (5) have been seted up at base (1) middle part, welding of base (1) bottom, rectangular groove (5) vertical below has down strip (19), down strip (19) top welding has a plurality of spring (6), spring (6) top welding has fly leaf (7), wire rope (16) one end is all installed at fly leaf (7) top four corners, wire rope (16) other end all passes fixed pulley (17) rolling on roller (4) on corresponding limit, fixed pulley (17) are installed at mount (2) inside wall top at base (1) top.
2. The construction material loader for construction works according to claim 1, wherein: the roller box (3) is fixedly installed at the left end and the right end of the base (1), and the inner side wall of the roller box (3) is rotationally connected with a roller (4).
3. The construction material loader for construction works according to claim 1, wherein: two groups of sliding strips (9) are welded at the front end of the movable plate (7), the sliding strips (9) are connected to the inner side wall of a sliding groove (8) of the front plate (20) in a sliding mode, limiting strips (10) are welded at the end portions of the sliding strips (9), and the front plate (20) is welded at the front end of the base (1).
4. A construction material loader for construction works according to claim 3, wherein: the middle part of the front plate (20) is welded with a handle (12), and the middle part of the handle (12) is sleeved with a rubber sleeve (11).
5. The construction material loader for construction works according to claim 1, wherein: the front end of the roller (4) is provided with gears (14) in a locking mode, the outer side walls of the gears (14) are connected with chains (13) in a meshed mode, and the power input end of the right gear (14) is connected with the power output end of a motor (15).
6. The construction material loader for construction works according to claim 1, wherein: self-locking universal wheels (18) are arranged at four corners of the bottom of the base (1).
CN202322792987.2U 2023-10-18 2023-10-18 Building material loader for building engineering Active CN220886848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322792987.2U CN220886848U (en) 2023-10-18 2023-10-18 Building material loader for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322792987.2U CN220886848U (en) 2023-10-18 2023-10-18 Building material loader for building engineering

Publications (1)

Publication Number Publication Date
CN220886848U true CN220886848U (en) 2024-05-03

Family

ID=90836977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322792987.2U Active CN220886848U (en) 2023-10-18 2023-10-18 Building material loader for building engineering

Country Status (1)

Country Link
CN (1) CN220886848U (en)

Similar Documents

Publication Publication Date Title
CN210508329U (en) Splicing type indoor and outdoor extensible building scaffold
CN105936441A (en) Cloth feeding lifting device for cloth paving machine
CN220886848U (en) Building material loader for building engineering
CN211173021U (en) Anti-falling device for attached lifting scaffold
CN218893378U (en) Steel construction section bar hoist device
CN111704025A (en) Building decoration material hoisting device
CN114014216A (en) Automatic equipment of stacking of slender section bar electromagnetism hoist and mount
CN214879380U (en) Novel heavy panel that building site was used promotes cargo airplane
CN210592018U (en) Flour packing box handling device
CN109941651B (en) Intelligent arranging and stacking equipment for new energy automobile lithium battery production
CN210370431U (en) Automatic conveying and isolating quick rolling shutter door
CN218149839U (en) Crane convenient to building templates installation
CN220664167U (en) Stacking device with lifting function
CN216336404U (en) Automatic equipment of stacking of slender section bar electromagnetism hoist and mount
CN218786497U (en) Roof steel structure vertical transportation device
CN220201218U (en) Packaging bag conveying device
CN112225099B (en) Hoisting apparatus for engineering construction
CN212799435U (en) Cantilever type lifting machine
CN219885560U (en) Material elevator for house building
CN212686571U (en) Building construction safety elevating gear
CN113955680B (en) High-efficient fork truck of getting thing repeatedly
KR101054857B1 (en) Mast of gantry
CN117508304B (en) Building construction prevents tong template transfer device
CN214166363U (en) Steel coil feeding trolley
CN220845141U (en) Storehouse material hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant