CN220886612U - Assembled elevator steel construction convenient to equipment - Google Patents
Assembled elevator steel construction convenient to equipment Download PDFInfo
- Publication number
- CN220886612U CN220886612U CN202322598293.5U CN202322598293U CN220886612U CN 220886612 U CN220886612 U CN 220886612U CN 202322598293 U CN202322598293 U CN 202322598293U CN 220886612 U CN220886612 U CN 220886612U
- Authority
- CN
- China
- Prior art keywords
- mounting
- base
- bracket
- connection
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 33
- 239000010959 steel Substances 0.000 title claims abstract description 33
- 238000010276 construction Methods 0.000 title claims description 7
- 238000009434 installation Methods 0.000 claims description 46
- 238000005452 bending Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Landscapes
- Cage And Drive Apparatuses For Elevators (AREA)
Abstract
The utility model discloses an assembled elevator steel structure convenient to assemble, and relates to the technical field of elevator steel structures. According to the assembled elevator steel structure convenient to assemble, the steel structure is assembled through the arranged base mounting frame, the steel structure formed by all the components is light in weight, high in section strength, strong in bending resistance and torsion resistance, structural stability and safety are greatly improved, the upper structure body and the lower structure body are convenient to align through the cooperation of the connecting support and the first connecting inserting column, the accuracy is improved, and meanwhile the steps are simplified.
Description
Technical Field
The utility model relates to the technical field of elevator steel structures, in particular to an assembled elevator steel structure convenient to assemble.
Background
In recent years, with the development of society, living environment of people is also greatly improved, meanwhile, the explosive development of building industry in China is also driven, so that super high-rise buildings in cities are more and more, elevators are widely applied as necessary construction machinery for vertical transportation of personnel and substances in the high-rise buildings, and elevator steel structures are important components of elevator construction and directly influence the installation process of the elevators, so that the design of the connection mode and the assembly mode of the elevator steel structures is extremely important.
Most of the existing elevator steel structures are integral when being installed and used, due to the fact that the weight of the elevator steel structures is heavy, and the weight of transported objects is added, the steel structures are easy to bend and even twist off, dangerous accidents are caused, the steel structures are low in accuracy in alignment, time and labor are wasted, the general steel structures are welded more, uneven welding seams, stress concentration and the like are easy to cause, the structural strength is reduced, certain adverse effects are brought to the using process of people, and in order to solve the defects of the prior art, the assembled elevator steel structure convenient to assemble is provided.
Disclosure of utility model
The utility model mainly aims to provide an assembled elevator steel structure which is convenient to assemble and can effectively solve the problems in the background technology.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
The utility model provides an assembled elevator steel construction convenient to equipment, includes the base support, the front end surface of base support is provided with two sets of first installation pieces, the inboard of base support is provided with first mounting hole, the rear side surface of base support is provided with the connection installation pole that can dismantle the connection, the rear side surface of connection installation pole is provided with another set of base support, the inboard of connection installation pole is provided with the screw hole, base support and connection installation pole can dismantle the connection through first fixation nut, the upper end surface of base support is provided with first connection spliced pole, the inboard of first connection spliced pole is provided with multiunit second mounting hole, the outside of first connection spliced pole is provided with the base mounting bracket that can dismantle the connection, the inboard of base mounting bracket is provided with multiunit third mounting hole, both ends surface all is provided with the second installation piece around the base mounting bracket, can dismantle the connection through the second fixation nut between base mounting bracket and the first connection spliced pole.
Preferably, the upper end surface of base mounting bracket is provided with the linking bridge that can dismantle the connection, the inboard of linking bridge is provided with multiunit fourth mounting hole, the upper end of linking bridge is provided with the second and connects the spliced pole, the upper end surface of linking bridge is provided with the upper mounting bracket, the inboard of upper mounting bracket is provided with multiunit connecting hole, the spliced pole can be dismantled through the second installation nut to upper mounting bracket and second connection spliced pole, linking bridge and first connection spliced pole can be dismantled through first installation nut and connect.
Preferably, the two groups of base supports are symmetrically arranged on the front outer surface and the rear outer surface of the two groups of connecting mounting rods, the multiple groups of first mounting blocks are symmetrically arranged on the opposite outer surfaces of the two groups of base supports, and the first fixing nuts penetrate through the first mounting holes and the threaded holes to be detachably connected with the base supports and the connecting mounting rods.
Preferably, the first connecting plug column penetrates through the connecting hole to be detachably connected with the base mounting frame, the second fixing nut penetrates through the third mounting hole and the second mounting hole to be detachably connected with the base mounting frame and the first connecting plug column, and the second mounting blocks are uniformly and symmetrically arranged on the outer surfaces of the front side and the rear side of the base mounting frame.
Preferably, the connecting bracket passes through the connecting hole and is detachably connected with the upper mounting frame.
Preferably, the first mounting nut passes through the second mounting hole and the fourth mounting hole to be detachably connected with the connecting bracket and the first connecting plug.
Advantageous effects
Compared with the prior art, the utility model has the following beneficial effects:
1. According to the utility model, the steel structure is assembled through the arranged base mounting frame, the steel structure formed by the components is light in weight, high in section strength and strong in bending resistance and torsion resistance, the structural stability and safety are greatly improved, the upper structure body and the lower structure body are convenient to align through the cooperation of the connecting bracket and the first connecting plug-in column, and the steps are simplified while the precision is improved.
2. According to the elevator steel structure well, the elevator steel structure is firmer through the first fixing nut, so that the elevator steel structure well is convenient to detach and install, welding trouble is omitted, assembly is quite convenient, and the elevator steel structure well is further convenient to detach and install.
Drawings
FIG. 1 is a schematic view of the overall structure of the present utility model;
FIG. 2 is a schematic view of a split construction of the present utility model;
FIG. 3 is a schematic view of the base mount structure of the present utility model;
fig. 4 is a schematic view of the structure of the base bracket of the present utility model.
In the figure: 1. a base bracket; 2. connecting the mounting rod; 3. a first mounting block; 4. a first mounting hole; 5. a first fixing nut; 6. a first connecting plug; 7. a second mounting hole; 8. a threaded hole; 9. a base mounting rack; 10. a connection hole; 11. a second mounting block; 12. a third mounting hole; 13. a second fixing nut; 14. a connecting bracket; 15. an upper layer mounting rack; 16. a fourth mounting hole; 17. a first mounting nut; 18. a second mounting nut; 19. the second connecting plug is connected with the post.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
First embodiment, as shown in fig. 1-4, an assembled elevator steel structure which is convenient to assemble comprises a base bracket 1, when in use, each component is transported to a place to be installed, after reaching the installation place, two groups of base brackets 1 are preferentially placed on two opposite sides of an elevator shaft respectively, then a connecting installation rod 2 is installed in the elevator shaft, a first fixing nut 5 is installed through a threaded hole 8 and a first installation hole 4, so that the base bracket 1 and the connecting installation rod 2 are fixedly connected, then a base installation frame 9 is installed at the upper ends of the two groups of base brackets 1, the base bracket 1 and the base installation frame 9 are connected through a first connecting plug post 6 passing through a connecting hole 10, and then a second fixing nut 13 is installed through a second installation hole 7 inside the first connecting plug post 6 and a third installation hole 12 inside the base installation frame 9, so that the base bracket 1 and the base installation frame 9 are fixedly connected.
In the second embodiment, as shown in fig. 1-4, after the installation of the lower-layer installation frame is completed, the connection bracket 14 is inserted into the upper ends of the four groups of first connection pins 6, the first installation nuts 17 are installed through the fourth installation holes 16 on the inner sides of the connection bracket 14 and the second installation holes 7 on the inner sides of the first connection pins 6, so that the connection bracket 14 and the first connection pins 6 are connected and fixed, then the upper-layer installation frame 15 is installed on the upper ends of the four groups of connection brackets 14, the connection holes 10 on the inner sides of the upper-layer installation frame 15 penetrate through the second connection pins 19 arranged on the upper ends of the connection bracket 14, so that the upper-layer installation frame 15 and the connection bracket 14 are connected, and the upper-layer installation frame 15 and the connection bracket 14 are connected and fixed by the installation holes arranged on the inner sides of the upper-layer installation frame 15 and the second connection pins 19, if the upper-layer installation frame 15 and the connection bracket 14 are required to be erected again and upwards, only the steps are required to be repeated.
Principle of operation
It should be noted that the present utility model is an assembled elevator steel structure which is convenient to assemble, in use, each assembly is transported to a place to be installed, after reaching the installation place, two groups of base brackets 1 are preferably placed on opposite sides of an elevator hoistway, then a connecting installation rod 2 is installed therein, a first fixing nut 5 is installed through a threaded hole 8 and a first installation hole 4, so that the base brackets 1 and the connecting installation rod 2 are connected and fixed, then a base installation frame 9 is installed at the upper ends of the two groups of base brackets 1, the base brackets 1 and the base installation frame 9 are connected through a first connecting plug post 6 through a connecting hole 10, then a second fixing nut 13 is installed through a second installation hole 7 inside the first connecting plug post 6 and a third installation hole 12 inside the base installation frame 9, so that the base brackets 1 and the base installation frame 9 are connected and fixed, after the installation of the lower mounting frame is completed, the connection brackets 14 are inserted into the upper ends of the four groups of first connection inserting columns 6, the first mounting nuts 17 are installed through the fourth mounting holes 16 on the inner sides of the connection brackets 14 and the second mounting holes 7 on the inner sides of the first connection inserting columns 6, so that the connection brackets 14 and the first connection inserting columns 6 are fixedly connected, then the upper mounting frame 15 is installed on the upper ends of the four groups of connection brackets 14, the connection holes 10 on the inner sides of the upper mounting frame 15 penetrate through the second connection inserting columns 19 arranged on the upper ends of the connection brackets 14, so that the upper mounting frame 15 and the connection brackets 14 are connected, the second mounting nuts 18 are installed through the mounting holes arranged on the inner sides of the upper mounting frame 15 and the mounting holes arranged on the inner sides of the second connection inserting columns 19, so that the upper mounting frame 15 and the connection brackets 14 are fixedly connected, if the upper mounting frame 15 is required to be erected again, the method can be realized by only repeating the steps.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (6)
1. Assembled elevator steel construction convenient to equipment, including base support (1), its characterized in that: the front end surface of base support (1) is provided with two sets of first installation piece (3), the inboard of base support (1) is provided with first mounting hole (4), the rear side surface of base support (1) is provided with connection installation pole (2) of dismantling the connection, the rear side surface of connection installation pole (2) is provided with another set of base support (1), the inboard of connection installation pole (2) is provided with screw hole (8), the connection can be dismantled through first fixation nut (5) with connection installation pole (2), the upper end surface of base support (1) is provided with first connection plug (6), the inboard of first connection plug (6) is provided with multiunit second mounting hole (7), the outside of first connection plug (6) is provided with base mounting bracket (9) of dismantling the connection, the inboard of base mounting bracket (9) is provided with multiunit connecting hole (10), the inboard of base mounting bracket (9) is provided with multiunit third mounting hole (12), the connection plug (9) can be dismantled through first fixation nut (13) between the first end surface (9) of base support (1).
2. The assembled elevator steel structure of claim 1, wherein: the utility model discloses a base mounting bracket, including base mounting bracket (9), connecting bracket (14) and connecting bracket (15), connecting bracket (14) and connecting bracket (6) are provided with first mounting nut (17), connecting bracket (14) and connecting bracket (6) are provided with upper mounting bracket (15), connecting bracket (15) are provided with multiunit connecting hole (10) in the inboard, upper mounting bracket (15) and second connecting post (19) can dismantle through second mounting nut (18) and connect, connecting bracket (14) and first connecting post (6) can dismantle through first mounting nut (17).
3. The assembled elevator steel structure of claim 1, wherein: the two groups of base supports (1) are uniformly and symmetrically arranged on the front outer surfaces and the rear outer surfaces of the two groups of connecting mounting rods (2), the multiple groups of first mounting blocks (3) are symmetrically arranged on the opposite outer surfaces of the two groups of base supports (1), and the first fixing nuts (5) penetrate through the first mounting holes (4) and the threaded holes (8) to be detachably connected with the base supports (1) and the connecting mounting rods (2).
4. The assembled elevator steel structure of claim 1, wherein: the first connecting plug column (6) penetrates through the connecting hole (10) to be detachably connected with the base mounting frame (9), the second fixing nut (13) penetrates through the third mounting hole (12) and the second mounting hole (7) to be detachably connected with the base mounting frame (9) and the first connecting plug column (6), and the second mounting blocks (11) are uniformly and symmetrically arranged on the outer surfaces of the front side and the rear side of the base mounting frame (9).
5. The assembled elevator steel structure of claim 1, wherein: the connecting bracket (14) penetrates through the connecting hole (10) and is detachably connected with the upper layer mounting frame (15).
6. The assembled elevator steel structure of claim 1, wherein: the first mounting nut (17) penetrates through the second mounting hole (7) and the fourth mounting hole (16) to be detachably connected with the connecting bracket (14) and the first connecting plug post (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322598293.5U CN220886612U (en) | 2023-09-25 | 2023-09-25 | Assembled elevator steel construction convenient to equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322598293.5U CN220886612U (en) | 2023-09-25 | 2023-09-25 | Assembled elevator steel construction convenient to equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220886612U true CN220886612U (en) | 2024-05-03 |
Family
ID=90878344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322598293.5U Active CN220886612U (en) | 2023-09-25 | 2023-09-25 | Assembled elevator steel construction convenient to equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220886612U (en) |
-
2023
- 2023-09-25 CN CN202322598293.5U patent/CN220886612U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220886612U (en) | Assembled elevator steel construction convenient to equipment | |
CN220319071U (en) | Suspension mechanism with adjustable distance of hanging basket | |
CN219569403U (en) | Box-shaped rotary stair with large-span hyperbola steel structure | |
CN210316214U (en) | Assembled steel construction building dysmorphism post | |
CN219528334U (en) | Scaffold for building construction | |
CN105152052B (en) | Glass curtain wall component installing method | |
CN212376021U (en) | Steel corbel and support-free installation connecting node comprising same | |
CN220486855U (en) | Component type glass curtain wall frame structure | |
CN220928197U (en) | Wood structure beam column connection node device | |
CN217232696U (en) | Construction frame convenient to rapid Assembly | |
CN219732565U (en) | Assembled prefabricated staircase for building | |
CN218715284U (en) | Structure is increaseed in counter-force wall loading hole installation module leveling | |
CN210316465U (en) | Guide rail and combined guide rail | |
CN219304311U (en) | Be used for transformer to overhaul safety device | |
CN214955359U (en) | Eight arris poles of general formula abnormal shape staple bolt structures | |
CN212583224U (en) | Scaffold for building assembles structure fast | |
CN220768756U (en) | Scaffold for standard components of preheaters | |
CN220521563U (en) | Steel structure non-welding connector | |
CN220868932U (en) | Temporary supporting structure for installation of steel truss diagonal web member | |
CN219826033U (en) | Scaffold convenient to splice for building engineering | |
CN220745193U (en) | Tower body standard knot and tower crane | |
CN221193693U (en) | High-strength steel structure | |
CN220080287U (en) | Energy-saving steel structure installation mechanism | |
CN218205592U (en) | Scaffold frame that construction was used | |
CN214696721U (en) | Quick assembly type constructional engineering scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |