CN220857518U - Cable cross construction protection architecture - Google Patents

Cable cross construction protection architecture Download PDF

Info

Publication number
CN220857518U
CN220857518U CN202322525963.0U CN202322525963U CN220857518U CN 220857518 U CN220857518 U CN 220857518U CN 202322525963 U CN202322525963 U CN 202322525963U CN 220857518 U CN220857518 U CN 220857518U
Authority
CN
China
Prior art keywords
cable
ground
supporting
supporting beams
protection structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322525963.0U
Other languages
Chinese (zh)
Inventor
赖声钢
韩芳玉
林炳城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Group Co Ltd
Original Assignee
Guangzhou Metro Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Group Co Ltd filed Critical Guangzhou Metro Group Co Ltd
Priority to CN202322525963.0U priority Critical patent/CN220857518U/en
Application granted granted Critical
Publication of CN220857518U publication Critical patent/CN220857518U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the technical field of protection devices, and provides a cable cross construction protection structure which is arranged in a construction groove and comprises the following components: the pile is inserted into four end corners of the groove, a supporting beam arranged above the pile and a suspender arranged below the supporting beam; the two supporting beams are arranged in parallel, the supporting beams are fixedly connected with the ground piles, and the two ends of the supporting beams extend to the outer sides of the grooves and are supported by the ground; the hanger rods are provided with a plurality of groups, each group of hanger rods is perpendicular to the supporting beam and extends into the groove, and the bottoms of the hanger rods are used for installing fixed cables. According to the utility model, the support beam is fixed by arranging the ground piles, the ground piles can be used for reinforcing the pavement at two sides of the cable, meanwhile, the suspenders are fixed by the support beam, and the suspenders are used for fixing the cable, so that the cable is protected, the lower part of the cable can be excavated after the hoisting is finished, and the excavated area can be greatly reduced.

Description

Cable cross construction protection architecture
Technical Field
The utility model belongs to the technical field of protection devices, and particularly relates to a cable cross construction protection structure.
Background
In the process of daily municipal maintenance, the underground pipeline is required to be maintained and replaced by excavating the pavement, but in the process, in order to ensure enough operation space and prevent the pavement on two sides of the pipeline from collapsing, the pavement on two sides of the pipeline is often required to be excavated in a large area so as to ensure normal work.
Disclosure of utility model
In order to overcome the problems in the prior art, the utility model aims to provide a cable crossing construction protection structure.
The technical scheme adopted for solving the technical problems is as follows: a cable crossover construction protection structure installed in a construction trench, comprising: the ground piles are inserted into the four end corners of the groove, the supporting beams are arranged above the ground piles, and the hanging rods are arranged below the supporting beams; the two supporting beams are arranged in parallel, the supporting beams are fixedly connected with the ground piles, and the two ends of the supporting beams extend to the outer sides of the grooves and are supported by the ground; the hanger rods are provided with a plurality of groups, each group of hanger rods is perpendicular to the supporting beam and extends into the groove, and the bottoms of the hanger rods are used for installing fixed cables.
The main working principle is as follows: in the working process, the ground piles used for fixing the supporting beams are inserted into the pre-dug grooves, then the hanging rods used for fixing the positions of the cables are arranged below the supporting beams, the cables are supported through the hanging rods, so that the lower parts of the cables can be dug, and the pipelines below the cables can be replaced.
Preferably, a backing plate is arranged between the two ends of the supporting beam and the ground.
Preferably, the pad is composed of a plurality of square wood pads arranged side by side.
Preferably, two groups of inserts are respectively arranged at two ends of the supporting beam, and the two groups of inserts are respectively vertically inserted into the ground and are fixedly connected with the supporting beam.
Preferably, each group of the plug-in components are provided with two I-steel, each I-steel is fixed with one group of the supporting beams, and the two I-steel are connected through a connecting piece.
Preferably, the hanger rods are provided with two rows, and the two rows of hanger rods are respectively arranged on the two supporting beams.
Preferably, the suspender is U-shaped, and two ends of the suspender are respectively arranged on the two supporting beams.
Preferably, a cross beam is arranged below the suspender, and two ends of the cross beam are connected with the ground piles.
Compared with the prior art, the utility model has the beneficial effects that:
Fix the supporting beam through setting up the ground stake, the ground stake can consolidate the road surface of cable both sides, and just cross the supporting beam simultaneously and fix the jib, the jib is fixed the cable to realize protecting the cable, can excavate the cable below after the hoist and mount finishes, can significantly reduce the area of excavation through this mode.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings required for the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present utility model, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a front view of the cable cross-over construction protection structure;
FIG. 2 is a top view of the cable cross-over construction protection structure;
1. a ground pile; 2. a support beam; 3. a boom; 4. a backing plate; 5. an insert; 6. a connecting piece; 7. a cross beam; 8. a groove.
Detailed Description
In order that the above-recited objects, features and advantages of the present utility model will be more clearly understood, a more particular description of the utility model will be rendered by reference to the appended drawings and appended detailed description. The embodiments of the present utility model and the features in the embodiments may be combined with each other without collision. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, and the described embodiments are merely some, rather than all, embodiments of the present utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the present utility model without making any inventive effort, are intended to fall within the scope of the present utility model.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this utility model belongs. The terminology used herein in the description of the utility model is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model.
As shown in fig. 1-2, the scheme specifically discloses a cable cross construction protection structure, which comprises a ground pile 1, a supporting beam 2 and a suspender 3. Firstly, the ground pile 1 is used for reinforcing the excavated groove 8 and preventing collapse of two sides of the excavated groove 8. Secondly, the upper part of the ground pile 1 is fixedly connected with the supporting beam 2 by a welding method, and finally, when the position of a cable is excavated, a suspender 3 is inserted, one end of the suspender 3 is fixed with the supporting beam 2 by a welding method, and the other end of the suspender 3 is fixed with the cable by an adhesive tape or a binding tape. In the operation process, the position of the cable is determined according to the exploration result, then the ground piles 1 are driven into the two sides of the cable, after the ground piles 1 are driven into the preset positions, the parts of the ground piles 1 exposed out of the ground are welded and fixed with the supporting beams 2, the supporting beams 2 are required to be kept in contact with the ground in the welding process, and the supporting beams 2 are required to extend out of the grooves 8 required to be excavated, so that the ground piles 1 are supported. Then, the excavation can be carried out along the area surrounded by the ground pile 1, when the position of the cable is excavated, the suspender 3 can be installed along the direction vertical to the ground, one end of the suspender 3 is fixed with the supporting beam 2, and the other end of the suspender 3 is fixed with the cable in a lifting manner. The cable after being fixed through the mode, even if excavation is continued below the cable, the position of the cable is not changed all the time. Along with the continuous excavation of the groove 8, the pipeline can be maintained until the pipeline below the cable is excavated, and the ground piles 1 are used for reinforcing the two sides of the groove 8, so that collapse can not occur in the continuous excavation process.
In other alternative embodiments, the pad 4 is arranged between the two ends of the supporting beam 2 and the ground, so that the acting area of the supporting beam 2 on the ground is increased, the sinking amplitude of the supporting beam 2 during supporting is reduced, and the overall stability of the structure is greatly improved.
In other alternative embodiments, the backing plate 4 is composed of a plurality of square timber mats arranged side by side, and the assembling difficulty of the backing plate 4 is reduced by utilizing the characteristics of convenient material taking, low cost, better toughness and random combination of the square timber mats.
In other alternative embodiments, two sets of inserts 5 are respectively provided at two ends of the support beam 2, and the two sets of inserts 5 are respectively inserted into the ground vertically and fixedly connected with the support beam 2. Because the stress of the supporting beam 2 can be changed along with the continuous change of the excavation depth of the groove 8 in the construction process, the two ends of the supporting beam 2 are required to be reinforced by the plug-in units 5, and the displacement of the supporting beam 2 is prevented.
In other alternative embodiments, since the i-beams have high strength and are easy to obtain materials, each group of the plug-in units 5 is provided with two i-beams, each i-beam is fixed with one group of the support beams 2, and the two i-beams are connected through the connecting piece 6, so that the support beams 2 are fixed.
In other alternative embodiments, the hanger rods 3 are provided with two rows, the two rows of hanger rods 3 are respectively installed on the two supporting beams 2, and two sides of the cable are respectively fixed through the two rows of hanger rods 3, so that a better protection effect is achieved on the cable.
In other alternative embodiments, the boom 3 is in a shape of a U, two ends of the boom 3 are respectively mounted on the two supporting beams 2, and two sides of the cable are respectively fixed through two ends of the boom 3, so that a better protection effect is achieved on the cable.
In other alternative embodiments, after the trench 8 is excavated to the pipeline below the cable, in order to better operate the pipeline, a distance needs to be continuously excavated to the lower part of the pipeline, the pipeline can be continuously dug down along with continuous excavation, so that subsequent construction is affected, a cross beam 7 is arranged below the boom 3, two ends of the cross beam 7 are connected with the ground pile 1, and the cross beam 7 can support and fix the pipeline below the cable, so that construction difficulty is reduced.
The present utility model is not limited to the preferred embodiments, and any modifications, equivalent variations and modifications made to the above embodiments according to the technical principles of the present utility model are within the scope of the technical proposal of the present utility model.

Claims (8)

1. A cable crossover construction protection structure installed in a construction trench, comprising:
The ground piles are inserted into the four end corners of the groove, the supporting beams are arranged above the ground piles, and the hanging rods are arranged below the supporting beams;
The two supporting beams are arranged in parallel, the supporting beams are fixedly connected with the ground piles, and the two ends of the supporting beams extend to the outer sides of the grooves and are supported by the ground;
the hanger rods are provided with a plurality of groups, each group of hanger rods is perpendicular to the supporting beam and extends into the groove, and the bottoms of the hanger rods are used for installing fixed cables.
2. A cable crossover construction protection structure according to claim 1, wherein,
And a backing plate is arranged between the two ends of the supporting beam and the ground.
3. A cable crossover construction protection structure according to claim 2, wherein,
The backing plate is composed of a plurality of square wood pads which are arranged side by side.
4. A cable crossover construction protection structure according to claim 1, wherein,
Two groups of inserts are respectively arranged at two ends of the supporting beam, and the two groups of inserts are respectively vertically inserted into the ground and are fixedly connected with the supporting beam.
5. A cable crossover construction protection structure according to claim 4, wherein,
Each group of the plug-in components are all provided with two I-steel, and each I-steel is fixed with a group of supporting beams, and two I-steel are connected through a connecting piece.
6. A cable crossover construction protection structure according to claim 1, wherein,
The hanger rods are provided with two rows, and the two rows of hanger rods are respectively arranged on the two supporting beams.
7. A cable crossover construction protection structure according to claim 1, wherein,
The suspender is U-shaped, and two ends of the suspender are respectively arranged on the two supporting beams.
8. A cable crossover construction protection structure according to claim 1, wherein,
And a cross beam is arranged below the suspender, and two ends of the cross beam are connected with the ground piles.
CN202322525963.0U 2023-09-15 2023-09-15 Cable cross construction protection architecture Active CN220857518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322525963.0U CN220857518U (en) 2023-09-15 2023-09-15 Cable cross construction protection architecture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322525963.0U CN220857518U (en) 2023-09-15 2023-09-15 Cable cross construction protection architecture

Publications (1)

Publication Number Publication Date
CN220857518U true CN220857518U (en) 2024-04-26

Family

ID=90745446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322525963.0U Active CN220857518U (en) 2023-09-15 2023-09-15 Cable cross construction protection architecture

Country Status (1)

Country Link
CN (1) CN220857518U (en)

Similar Documents

Publication Publication Date Title
CN106193054B (en) A kind of support system and its construction method for subway foundation pit
CN110158617B (en) Composite deep foundation pit supporting maintenance structure and method
CN213741111U (en) Building foundation pit supporting structure
CN107059882A (en) Arch anchor net and Anchor-Pile Retaining Structure structure
CN106436718A (en) Subway foundation pit large-span support system and construction method thereof
CN108118689B (en) Prefabricated underground diaphragm wall capable of being partially recycled, lifting appliance and construction method
CN220857518U (en) Cable cross construction protection architecture
CN208486272U (en) A kind of constructing structure of two-tube diagonal brace deep basal pit
CN213937393U (en) Modularization pipeline suspends protection architecture in midair
CN213508572U (en) Piping lane supporting construction
KR101135384B1 (en) Earth retaining structure having ring beam
CN212336038U (en) Support structure suitable for crossing foundation pit pipeline group
CN210262920U (en) Multi-functional water conservancy slope protection net
CN210141143U (en) Pipe curtain undercut multilayer suspension pull stand braced system
CN215105507U (en) Supporting and bearing integrated structure for underground engineering of cover excavation method
CN205188966U (en) But reuse's assembled earth anchor device
CN111503373A (en) Underground pipeline protection structure and construction method thereof
CN206034461U (en) Subway foundation pit large -span support system
CN111270681A (en) Construction method and structure of support structure suitable for crossing foundation pit pipeline group
CN217869929U (en) Steel trestle bridge abutment
CN215948218U (en) A construction support frame for narrow and small space
CN109610508B (en) Pipe gallery construction method for penetrating built pipe gallery and support replacing structure thereof
CN219315479U (en) Profile steel pile beam structure for pipeline protection
CN211081899U (en) Supporting structure for underground excavation tunnel in soft unconsolidated formation
CN218437085U (en) Trench excavation prestressing force assembled supporting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant