CN220839896U - Petrochemical pipeline docking equipment - Google Patents

Petrochemical pipeline docking equipment Download PDF

Info

Publication number
CN220839896U
CN220839896U CN202322174142.7U CN202322174142U CN220839896U CN 220839896 U CN220839896 U CN 220839896U CN 202322174142 U CN202322174142 U CN 202322174142U CN 220839896 U CN220839896 U CN 220839896U
Authority
CN
China
Prior art keywords
plate
clamping
threaded
wall
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322174142.7U
Other languages
Chinese (zh)
Inventor
陈艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sainaboko Petroleum Technology Service Co ltd
Original Assignee
Ningbo Sena Boke Enterprise Management Consulting Partnership LP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Sena Boke Enterprise Management Consulting Partnership LP filed Critical Ningbo Sena Boke Enterprise Management Consulting Partnership LP
Priority to CN202322174142.7U priority Critical patent/CN220839896U/en
Application granted granted Critical
Publication of CN220839896U publication Critical patent/CN220839896U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model relates to the technical field of pipeline butt joint and discloses petrochemical pipeline butt joint equipment, which comprises a bottom plate and universal wheels, wherein a clamping mechanism is arranged above the bottom plate and comprises a connecting plate, a first clamping plate, a first threaded rod, a threaded sleeve and a second clamping plate, the top of the connecting plate is fixedly connected with the bottom of the first clamping plate, the top of the first clamping plate is rotationally connected with the bottom of the first threaded rod through a bearing, the outer wall of the threaded rod is in threaded connection with the inner wall of the threaded sleeve, the outer wall of the threaded sleeve is fixedly connected with the inner wall of the second clamping plate, and a antiskid plate is fixedly arranged on the outer wall of the first clamping plate, so that pipelines with different specifications cannot be clamped and fixed in actual use, the problem that butt joint work cannot be performed is solved, the working efficiency of the butt joint equipment is improved, and the application range of the butt joint equipment is improved.

Description

Petrochemical pipeline docking equipment
Technical Field
The utility model relates to the technical field of pipeline butt joint, in particular to petrochemical pipeline butt joint equipment.
Background
The petroleum pipeline is composed of oil pipes and accessories thereof, and is provided with a corresponding oil pump unit according to the requirements of the technological process, a complete pipeline system is designed and installed for completing the tasks of oil receiving, unloading and transferring, the pipe of the petroleum pipeline is generally a steel pipe, the long-distance pipeline is connected by using a connecting device such as welding, flanges and the like, and the valve is used for opening and closing control and flow regulation, so that the petroleum pipeline is one of main conveying tools of petroleum at present.
When the existing butt joint equipment is used, the fixed-specification pipelines are clamped and fixed, and the butt joint operation is performed, but when the butt joint equipment is in actual use, the pipelines with different specifications and sizes cannot be clamped and fixed, so that the butt joint operation cannot be performed, the working efficiency of the butt joint equipment is reduced, and the use range of the butt joint equipment is reduced.
Disclosure of utility model
The utility model aims to provide petrochemical pipeline butt joint equipment which solves the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the petrochemical pipeline butt joint equipment comprises a bottom plate and universal wheels, wherein a clamping mechanism is arranged above the bottom plate and comprises a connecting plate, a first clamping plate, a first threaded rod, a threaded sleeve and a second clamping plate, the top of the connecting plate is fixedly connected with the bottom of the first clamping plate, the top of the first clamping plate is rotationally connected with the bottom of the first threaded rod through a bearing, the outer wall of the first threaded rod is in threaded connection with the inner wall of the threaded sleeve, the outer wall of the threaded sleeve is fixedly connected with the inner wall of the second clamping plate, and a antiskid plate is fixedly arranged on the outer wall of the first clamping plate;
An adjusting mechanism is arranged above the bottom plate.
Preferably, the adjustment mechanism comprises a mounting plate, a motor, a second threaded rod, a moving plate and a fixing plate, wherein one side of the mounting plate is fixedly connected with one end of the motor, the output end of the motor is fixedly connected with one end of the second threaded rod, the outer wall of the second threaded rod is in threaded connection with the inner wall of the moving plate, the top of the moving plate is fixedly connected with the bottom of the fixing plate, and an electric telescopic rod is fixedly installed at the top of the fixing plate.
Preferably, the number of the connecting plates is two, the connecting plates are symmetrically distributed at the tops of the bottom plates respectively, the first clamping plates are arc-shaped, the number of the first clamping plates is two, and the first clamping plates are symmetrically distributed at the tops of the two connecting plates respectively, so that pipelines with different specifications can be clamped and fixed.
Preferably, the number of the first threaded rods is four, the first threaded rods are symmetrically distributed at four corners of the top of the clamping plate respectively, the number of the threaded sleeves is four, the threaded sleeves are symmetrically distributed on the outer walls of the first threaded rods respectively, and the second clamping plate is arc-shaped, so that the position of the second clamping plate can be quickly and conveniently adjusted.
Preferably, the movable groove has been seted up at the bottom plate top, movable plate bottom and movable groove inner wall sliding connection, the quantity of mounting panel is two, the mounting panel is symmetrical distribution respectively at the bottom plate top to the stationarity when can increasing the removal, and the height of the convenient regulation pipeline of ability.
Preferably, the quantity of movable plate is two, the movable plate is symmetrical distribution respectively at the bottom plate top, electric telescopic handle top and connecting plate bottom fixed connection, electric telescopic handle's quantity is two, electric telescopic handle is symmetrical distribution respectively at the fixed plate top to can be fast convenient adjust the height of pipeline, better dock.
Preferably, the bottom plate bottom is fixedly connected with the top of the universal wheel, the top of the bottom plate is fixedly connected with the bottom of the mounting plate, the number of the universal wheels is four, and the universal wheels are symmetrically distributed at four corners of the bottom plate respectively.
The utility model provides petrochemical pipeline butt joint equipment. The petrochemical pipeline butt joint device has the following beneficial effects:
(1) In the utility model, the following components are added: according to the petrochemical pipeline butt joint equipment, the pipelines can be better clamped and fixed through the clamping mechanism arranged above the bottom plate, so that the problem that the butt joint work cannot be performed due to the fact that the pipelines with different specifications and sizes cannot be clamped and fixed in actual use is solved, the working efficiency of the butt joint equipment is improved, and the application range of the butt joint equipment is enlarged;
(2) In the utility model, the following components are added: this petrochemical pipeline docking equipment has realized adjusting the pipeline that can be better through installing the adjustment mechanism in the bottom plate top to can be quick convenient dock the pipeline, thereby can make things convenient for operating personnel to use more, improve docking equipment's convenience.
Drawings
FIG. 1 is a schematic perspective view of the device of the present utility model;
FIG. 2 is a schematic diagram of a clamping mechanism according to the present utility model;
FIG. 3 is a second schematic structural view of the clamping mechanism according to the present utility model;
fig. 4 is a schematic structural view of the adjusting mechanism of the present utility model.
In the figure: the device comprises a base plate 1, universal wheels 2, a clamping mechanism 3, a connecting plate 301, a clamping plate I302, a threaded rod I303, a threaded sleeve 304, a clamping plate II 305, a antiskid plate 306, an adjusting mechanism 4, a mounting plate 401, a motor 402, a threaded rod II 403, a moving plate 404, a fixed plate 405 and an electric telescopic rod 406.
Detailed Description
Embodiment one:
as shown in fig. 1-4, the present utility model provides a technical solution: the petrochemical pipeline butt joint device comprises a bottom plate 1 and universal wheels 2, wherein a clamping mechanism 3 is arranged above the bottom plate 1, the clamping mechanism 3 comprises a connecting plate 301, a first clamping plate 302, a first threaded rod 303, a threaded sleeve 304 and a second clamping plate 305, the top of the connecting plate 301 is fixedly connected with the bottom of the first clamping plate 302, the top of the first clamping plate 302 is rotationally connected with the bottom of the first threaded rod 303 through a bearing, the outer wall of the first threaded rod 303 is in threaded connection with the inner wall of the threaded sleeve 304, the outer wall of the threaded sleeve 304 is fixedly connected with the inner wall of the second clamping plate 305, and a antiskid plate 306 is fixedly arranged on the outer wall of the first clamping plate 302;
the number of the connecting plates 301 is two, the connecting plates 301 are symmetrically distributed at the top of the bottom plate 1 respectively, the first clamping plates 302 are arc-shaped, the number of the first clamping plates 302 is two, and the first clamping plates 302 are symmetrically distributed at the tops of the two connecting plates 301 respectively, so that pipelines with different specifications can be clamped and fixed;
The number of the first threaded rods 303 is four, the first threaded rods 303 are symmetrically distributed at four corners of the top of the first clamping plate 302, the number of the threaded sleeves 304 is four, the threaded sleeves 304 are symmetrically distributed on the outer walls of the first threaded rods 303, and the second clamping plate 305 is arc-shaped, so that the position of the second clamping plate 305 can be quickly and conveniently adjusted;
the bottom of the base plate 1 is fixedly connected with the top of the universal wheels 2, the top of the base plate 1 is fixedly connected with the bottom of the mounting plate 401, the number of the universal wheels 2 is four, and the universal wheels 2 are respectively symmetrically distributed at four corners of the bottom of the base plate 1;
When the butt joint is needed, an operator drives the threaded sleeve 304 to move by rotating the threaded rod I303 and drives the clamping plate II 305 to move by moving the threaded sleeve 304, at the moment, the pipeline is placed between the clamping plate I302 and the clamping plate II 305, and the steps are repeated, so that the clamping plate II 305 is contacted with the pipeline, clamping and fixing can be carried out according to the size of the pipeline, and the friction force between the clamping plate I302, the clamping plate II 305 and the pipeline can be increased by installing the anti-skid plate 306, so that falling can be prevented;
The pipeline clamping device has the advantages that the pipeline can be better clamped and fixed, the problem that the pipeline with different specifications and sizes cannot be clamped and fixed in actual use, so that the butt joint work cannot be performed is solved, the working efficiency of the butt joint equipment is improved, and the application range of the butt joint equipment is enlarged.
Embodiment two:
On the basis of the first embodiment, as shown in fig. 1 to 4, the present utility model provides a technical solution: the adjusting mechanism 4 comprises a mounting plate 401, a motor 402, a second threaded rod 403, a moving plate 404 and a fixed plate 405, wherein one side of the mounting plate 401 is fixedly connected with one end of the motor 402, the output end of the motor 402 is fixedly connected with one end of the second threaded rod 403, the outer wall of the second threaded rod 403 is in threaded connection with the inner wall of the moving plate 404, the top of the moving plate 404 is fixedly connected with the bottom of the fixed plate 405, and an electric telescopic rod 406 is fixedly arranged at the top of the fixed plate 405;
The top of the bottom plate 1 is provided with a moving groove, the bottom of the moving plate 404 is in sliding connection with the inner wall of the moving groove, the number of the mounting plates 401 is two, and the mounting plates 401 are symmetrically distributed on the top of the bottom plate 1 respectively, so that the stability during moving can be improved, and the height of a pipeline can be quickly and conveniently adjusted;
The number of the movable plates 404 is two, the movable plates 404 are respectively and symmetrically distributed at the top of the bottom plate 1, the top of the electric telescopic rods 406 are fixedly connected with the bottom of the connecting plate 301, the number of the electric telescopic rods 406 is two, and the electric telescopic rods 406 are respectively and symmetrically distributed at the top of the fixed plate 405, so that the height of a pipeline can be quickly and conveniently adjusted, and the butt joint can be better carried out;
When in butt joint, the second threaded rod 403 is driven to rotate by starting the motor 402, the moving plate 404 is driven to move by the rotation of the second threaded rod 403, the fixed plate 405 is driven to move by the movement of the moving plate 404, so that the distance between two pipelines can be adjusted, and the connecting plate 301 is driven to move by starting the electric telescopic rod 406, so that the height between the two pipelines can be adjusted, and the butt joint work can be better carried out;
Realize can be better adjust the pipeline to can dock the pipeline convenient fast, thereby can make things convenient for operating personnel to use more, improve docking equipment's convenience.

Claims (7)

1. Petrochemical pipeline docking equipment, including bottom plate (1), universal wheel (2), its characterized in that: the novel anti-skid device is characterized in that a clamping mechanism (3) is arranged above the bottom plate (1), the clamping mechanism (3) comprises a connecting plate (301), a first clamping plate (302), a first threaded rod (303), a threaded sleeve (304) and a second clamping plate (305), the top of the connecting plate (301) is fixedly connected with the bottom of the first clamping plate (302), the top of the first clamping plate (302) is rotationally connected with the bottom of the first threaded rod (303) through a bearing, the outer wall of the first threaded rod (303) is in threaded connection with the inner wall of the threaded sleeve (304), the outer wall of the threaded sleeve (304) is fixedly connected with the inner wall of the second clamping plate (305), and an anti-skid plate (306) is fixedly arranged on the outer wall of the first clamping plate (302);
an adjusting mechanism (4) is arranged above the bottom plate (1).
2. A petrochemical pipeline docking apparatus according to claim 1, wherein: adjustment mechanism (4) are including mounting panel (401), motor (402), threaded rod two (403), movable plate (404), fixed plate (405), mounting panel (401) one side and motor (402) one end fixed connection, motor (402) output and threaded rod two (403) one end fixed connection, threaded rod two (403) outer wall and movable plate (404) inner wall threaded connection, movable plate (404) top and fixed plate (405) bottom fixed connection, fixed plate (405) top fixed mounting has electric telescopic handle (406).
3. A petrochemical pipeline docking apparatus according to claim 1, wherein: the number of the connecting plates (301) is two, the connecting plates (301) are symmetrically distributed at the tops of the bottom plates (1) respectively, the first clamping plates (302) are arc-shaped, the number of the first clamping plates (302) is two, and the first clamping plates (302) are symmetrically distributed at the tops of the two connecting plates (301) respectively.
4. A petrochemical pipeline docking apparatus according to claim 1, wherein: the number of the first threaded rods (303) is four, the first threaded rods (303) are symmetrically distributed at four corners of the top of the first clamping plate (302), the number of the threaded sleeves (304) is four, the threaded sleeves (304) are symmetrically distributed on the outer walls of the first threaded rods (303), and the second clamping plate (305) is arc-shaped.
5. A petrochemical pipeline docking apparatus according to claim 2, characterized in that: the movable groove is formed in the top of the bottom plate (1), the bottom of the movable plate (404) is in sliding connection with the inner wall of the movable groove, the number of the mounting plates (401) is two, and the mounting plates (401) are symmetrically distributed on the top of the bottom plate (1) respectively.
6. A petrochemical pipeline docking apparatus according to claim 2, characterized in that: the number of the movable plates (404) is two, the movable plates (404) are symmetrically distributed at the top of the bottom plate (1) respectively, the top of the electric telescopic rod (406) is fixedly connected with the bottom of the connecting plate (301), the number of the electric telescopic rod (406) is two, and the electric telescopic rods (406) are symmetrically distributed at the top of the fixed plate (405) respectively.
7. A petrochemical pipeline docking apparatus according to claim 1, wherein: the bottom plate (1) bottom and universal wheel (2) top fixed connection, bottom plate (1) top and mounting panel (401) bottom fixed connection, the quantity of universal wheel (2) is four, universal wheel (2) symmetry respectively distributes in bottom four corners of bottom plate (1).
CN202322174142.7U 2023-08-14 2023-08-14 Petrochemical pipeline docking equipment Active CN220839896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322174142.7U CN220839896U (en) 2023-08-14 2023-08-14 Petrochemical pipeline docking equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322174142.7U CN220839896U (en) 2023-08-14 2023-08-14 Petrochemical pipeline docking equipment

Publications (1)

Publication Number Publication Date
CN220839896U true CN220839896U (en) 2024-04-26

Family

ID=90771821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322174142.7U Active CN220839896U (en) 2023-08-14 2023-08-14 Petrochemical pipeline docking equipment

Country Status (1)

Country Link
CN (1) CN220839896U (en)

Similar Documents

Publication Publication Date Title
CN110936317A (en) Engineering pipeline butt joint auxiliary frame
CN211220669U (en) Pipe fitting finished product shell surface marking device
CN211589125U (en) Positioning and supporting mechanism of manifold welding system
CN220839896U (en) Petrochemical pipeline docking equipment
CN107725891A (en) A kind of intelligent machine equipment with quick accurate laying function pipeline
CN220488461U (en) Pipeline lowering device for pipe network engineering
CN117961518A (en) Fixing mechanism
CN209764316U (en) Testing arrangement is pasted to corrosion
CN215358435U (en) Multi-degree-of-freedom continuous type robot arm capable of flexibly grabbing target
CN221066071U (en) Butt joint device for valve installation
CN213004958U (en) Pipeline connecting device who facilitates use
CN217529885U (en) Butt joint device for mounting anti-corrosion pipeline
CN211589126U (en) Supporting and positioning device of manifold welding system
CN209407874U (en) Connecting rod screw fastening apparatus
CN218476593U (en) Water conservancy pipeline docking mechanism
CN219082428U (en) Socket pipe auxiliary docking rack
CN220241373U (en) Steel pipe screw butt joint device
CN211940739U (en) Tool for butting corrugated pipes
CN219581728U (en) Multi-station steel product drilling device
CN214109404U (en) Improved welding positioner
CN219852991U (en) Pipe orifice butt joint fixing device
CN219966843U (en) Pressure pipeline welding device
CN210878244U (en) Square steel pipe is mouth of pipe cutting device for multi-angle welding
CN220028307U (en) Small pipe bending equipment
CN221621331U (en) Welding fixing mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240430

Address after: No. 1012, 10th Floor, Building 5, No. 722, Middle Section of Yizhou Avenue, Chengdu High tech Zone, China (Sichuan) Pilot Free Trade Zone, Chengdu, Sichuan Province, 610000

Patentee after: Sainaboko Petroleum Technology Service Co.,Ltd.

Country or region after: China

Address before: 908, Building A, Changjiang International Building, No. 731 Mingzhou Road, Beilun District, Ningbo City, Zhejiang Province, 315000

Patentee before: Ningbo Sena Boke Enterprise Management Consulting Partnership (Limited Partnership)

Country or region before: China