CN220824651U - Flue gas treatment equipment of industrial boiler pipeline - Google Patents

Flue gas treatment equipment of industrial boiler pipeline Download PDF

Info

Publication number
CN220824651U
CN220824651U CN202322005448.XU CN202322005448U CN220824651U CN 220824651 U CN220824651 U CN 220824651U CN 202322005448 U CN202322005448 U CN 202322005448U CN 220824651 U CN220824651 U CN 220824651U
Authority
CN
China
Prior art keywords
flue gas
water tank
industrial boiler
boiler pipeline
gas treatment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322005448.XU
Other languages
Chinese (zh)
Inventor
顾本勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Ganghua Boiler Co ltd
Original Assignee
Nantong Ganghua Boiler Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Ganghua Boiler Co ltd filed Critical Nantong Ganghua Boiler Co ltd
Priority to CN202322005448.XU priority Critical patent/CN220824651U/en
Application granted granted Critical
Publication of CN220824651U publication Critical patent/CN220824651U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model discloses a flue gas treatment device of an industrial boiler pipeline, which comprises a treatment box, wherein a flue gas inlet pipeline is arranged on one side of the treatment box, a water tank is arranged on one side of the treatment box, and a driving motor is arranged above the water tank; this smoke treatment equipment of industrial boiler pipeline uses through the cooperation of water tank, driving motor, transfer line, stirring leaf, water pump, conveyer pipe and shower head, when the flue gas of boiler pipeline gets into the processing incasement, needs to spray the processing, and simple spraying processing mode, and can not be fine with the carbon dioxide in the flue gas handle, through adding medicament and water simultaneously in the water tank, utilize transfer line and stirring leaf in the water tank, it is easy to the abundant stirring of medicament and water, the fusion medicament that makes the blowout sprays the processing to the flue gas in the processing case, such setting has improved flue gas treatment effect, the purifying effect is better, the flue gas has played important part for later stage emission.

Description

Flue gas treatment equipment of industrial boiler pipeline
Technical Field
The utility model relates to the technical field related to industrial boilers, in particular to a flue gas treatment device for an industrial boiler pipeline.
Background
The industrial boiler products are divided into two types, namely steam for generating electricity or supplying gas, such as steam vaporization used in a fertilizer plant, coal is used as a raw material, chemical fertilizers are synthesized, the industrial boiler is a typical industrial boiler, coal is used for the majority, a waste heat boiler is used for recycling waste heat in general of fuel gas, a circulating fluidized bed boiler is a common thermal energy power device of the industrial boiler, flue gas discharged by an industrial boiler pipeline is discharged after being treated, environmental pollution caused by directly discharging the flue gas is avoided, and the flue gas in the boiler pipeline is subjected to spray treatment when being treated by the flue gas treatment device, so that impurities and carbon dioxide in the flue gas are treated, and the treated flue gas reaches the standard and is discharged.
In the existing chinese issued patent publication No. CN214182343U, an industrial boiler flue gas treatment device includes: the treatment device comprises treatment equipment, wherein a spray pipe is arranged in the treatment equipment, one end of the spray pipe extends to the outer side of the treatment equipment, a plurality of spray heads are fixedly arranged at the bottom end of the spray pipe, a T-shaped hole is formed in one side of the treatment equipment, a T-shaped seat is fixedly sleeved on the spray pipe, the T-shaped seat is matched with the T-shaped hole, two symmetrically arranged first grooves are formed in one side of the treatment equipment, sliding plates are slidably arranged in the first grooves, one ends, far away from each other, of fixing springs are fixedly arranged at one sides of the two sliding plates, the other ends of the fixing springs are fixedly arranged on the inner wall of the first grooves, two symmetrically arranged fixing grooves are formed in one side inner wall of the first grooves, and a second groove is formed in one side, close to each other, so that the spray heads are convenient to detach.
Disclosure of utility model
The utility model aims to provide a flue gas treatment device for an industrial boiler pipeline, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a flue gas treatment facility of industrial boiler pipeline, includes the treatment box, one side of treatment box is provided with into the cigarette pipeline, one side of treatment box is provided with the water tank, the top of water tank is provided with driving motor, driving motor's one end fixed mounting has the transfer line, the outside of transfer line is provided with the stirring leaf, the top of water tank is provided with the water pump, one side of water pump is provided with the conveyer pipe, the outside of conveyer pipe is provided with the shower head, the inside below of treatment box is provided with the basin, the top of treatment box is provided with carries the tobacco pipe, the one end of carrying the tobacco pipe is provided with active carbonization storehouse.
Preferably, a chute is formed in the inner surface of the treatment box, a collecting box is movably connected in the chute, a filter screen is arranged in the collecting box, and a handle is fixedly arranged on one side of the collecting box.
Preferably, the collecting box and the processing box form a sliding structure through a sliding chute, and the size of the collecting box is matched with the size of one side of the processing box.
Preferably, the stirring blades and the water tank form a rotary structure through a transmission rod, and the stirring blades are arranged on the transmission rod at equal intervals.
Preferably, a sliding rail is arranged in the active carbonization bin, and an active carbon plate is movably connected in the sliding rail.
Preferably, the activated carbon plates and the activated carbonization bin form a sliding structure through sliding rails, and the activated carbon plates are arranged on the activated carbonization bin at equal intervals.
Preferably, a blower is arranged on one side of the active carbonization bin, and a smoke exhaust pipe is arranged on one side of the blower.
Compared with the prior art, the utility model has the beneficial effects that:
1. According to the flue gas treatment equipment for the industrial boiler pipeline, through the cooperation of the water tank, the driving motor, the driving rod, the stirring blade, the water pump, the conveying pipe and the spray header, when flue gas of the boiler pipeline enters the treatment tank, spraying treatment is needed, and a simple spraying treatment mode cannot well treat carbon dioxide in the flue gas, and through adding a medicament and water into the water tank at the same time, the driving rod and the stirring blade are utilized to sufficiently stir the medicament and the water in the water tank, so that the sprayed fused medicament sprays the flue gas in the treatment tank, the flue gas treatment effect is improved, the purification effect is better, and an important part is played for later-stage flue gas emission;
2. According to the flue gas treatment equipment for the industrial boiler pipeline, through the cooperation of the collecting box, the filter screen, the handle, the water tank and the spray header, when mixed medicaments are pumped out and conveyed into the spray header through the arrangement of the water pump, the flue gas of the boiler is purified, in the purification process, the mixed medicaments can be attached to particles and impurities on the surface of the flue gas and then flow into the collecting box below, and through the arrangement of the filter screen in the collecting box, residues are reserved in the collecting box for collecting and storing, and the arrangement is convenient for workers to collect and uniformly treat the residues;
3. This smoke treatment facility of industrial boiler pipeline through carrying tobacco pipe, active carbomorphism storehouse, slide rail and the setting of active carbon board, after the flue gas passes through mixed medicament and sprays, can enter into the active carbomorphism storehouse through carrying the tobacco pipe in, and the active carbon board in the active carbomorphism storehouse can absorb the moisture in the flue gas, adsorbs remaining carbon dioxide in the flue gas on the active carbon board surface simultaneously, and the flue gas reaches the standard and discharges at last.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of the structure of the collecting box of the present utility model;
FIG. 3 is a schematic view of the structure of the stirring blade of the present utility model;
FIG. 4 is a schematic view of the interior of the treatment tank of the present utility model;
FIG. 5 is a schematic structural view of the active carbonization bin of the present utility model.
In the figure: 1. a treatment box; 2. a smoke inlet pipeline; 3. a chute; 4. a collection box; 5. a filter screen; 6. a handle; 7. a water tank; 8. a driving motor; 9. a transmission rod; 10. stirring the leaves; 11. a water pump; 12. a delivery tube; 13. a spray header; 14. a water tank; 15. a conveying smoke pipe; 16. an active carbonization bin; 17. a slide rail; 18. an activated carbon plate; 19. a blower; 20. and a smoke exhaust pipe.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, the present utility model provides the following technical solutions: the utility model provides a flue gas treatment facility of industrial boiler pipeline, including handling case 1, one side of handling case 1 is provided with into cigarette pipeline 2, one side of handling case 1 is provided with water tank 7, the top of water tank 7 is provided with driving motor 8, driving motor 8's one end fixed mounting has transfer line 9, the outside of transfer line 9 is provided with stirring leaf 10, water tank 7's top is provided with water pump 11, one side of water pump 11 is provided with conveyer pipe 12, the outside of conveyer pipe 12 is provided with shower head 13, the inside below of handling case 1 is provided with basin 14, handling case 1's top is provided with carries tobacco pipe 15, the one end of carrying tobacco pipe 15 is provided with active carbomorphism storehouse 16.
In this embodiment, the chute 3 has been seted up to the internal surface of processing case 1, and the inside swing joint of chute 3 has collection box 4, and the inside of collection box 4 is provided with filter screen 5, and one side fixed mounting of collection box 4 has handle 6, through the setting of the filter screen 5 in the collection box 4, leaves these residues in collection box 4 and collects the deposit, and such setting is convenient for the staff collect these residues unified processing.
In this embodiment, the collecting box 4 and the processing box 1 form a sliding structure through the chute 3, the size of the collecting box 4 is identical to the size of one side of the processing box 1, and the setting of the chute 3 is used to facilitate the extraction of the staff to pour out the impurities and dust in the collecting box 4.
In this embodiment, the stirring vane 10 forms a rotary structure with the water tank 7 through the transmission rod 9, the stirring vane 10 is arranged on the transmission rod 9 at equal intervals, the stirring of the medicament and water is easy by utilizing the transmission rod 9 and the stirring vane 10 in the water tank 7, and the sprayed fusion medicament sprays the flue gas in the treatment tank 1, so that the flue gas treatment effect is improved.
In this embodiment, the inside of active carbonization storehouse 16 is provided with slide rail 17, and the inside swing joint of slide rail 17 has active carbon plate 18, enters into active carbonization storehouse 16 through carrying tobacco pipe 15, and the active carbon plate 18 in the active carbonization storehouse 16 can absorb the moisture in the flue gas, adsorbs the carbon dioxide that remains in the flue gas on active carbon plate 18 surface simultaneously, and the flue gas reaches the standard and discharges at last.
In this embodiment, the activated carbon plate 18 and the activated carbonization bin 16 form a sliding structure through the sliding rail 17, the activated carbon plate 18 is arranged on the activated carbonization bin 16 at equal intervals, and the activated carbon plate 18 is conveniently pulled out by a worker to replace and clean through the form of the sliding rail 17.
In this embodiment, a blower 19 is disposed on one side of the active carbonization bin 16, a smoke exhaust pipe 20 is disposed on one side of the blower 19, and the purified smoke is sucked out and exhausted by the blower 19.
Working principle: when the flue gas treatment equipment of the industrial boiler pipeline is used, an external power supply is firstly connected, then water and medicament are simultaneously added into the water tank 7, then the switch of the driving motor 8 is turned on, the transmission rod 9 and the stirring blade 10 are driven to sufficiently stir and fuse the water and the medicament in the water tank 7, then the flue gas of the boiler pipeline enters the treatment box 1 from the flue gas inlet pipeline 2, at the moment, the switch of the water pump 11 is turned on, the medicament fully fused in the water tank 7 enters the conveying pipe 12, and then the medicament is conveyed into the spray header 13 for spraying, the sprayed medicament is attached to large particle impurities and dust on the surface of the flue gas, then the impurities and the dust are simultaneously dropped into the collecting box 4 below, then, the large-particle impurities and dust are left in the collecting box 4 through the filter screen 5, when the purified flue gas is conveyed into the active carbonization bin 16 from the conveying smoke pipe 15, the active carbon plate 18 in the active carbonization bin 16 can absorb moisture in the flue gas, meanwhile, the residual carbon dioxide in the flue gas is adsorbed on the surface of the active carbon plate 18, the flue gas is purified to reach the emission standard, then, the switch of the air blower 19 is turned on, the flue gas in the active carbonization bin 16 is sucked out and conveyed into the smoke exhaust pipe 20 to be exhausted, when the device is not used, the switch of the water pump 11 is turned off, the switch of the driving motor 8 is turned off, finally, the external power supply is cut off, then the collecting box 4 is pulled out from the processing box 1, the dust and the impurities in the collecting box 4 are poured out, and the model number of the driving motor 8 is: YE2-132S-4, the model of the water pump 11 is: PW-175EAH, blower 19 is of the type: TE-14080-K1, the use process of the flue gas treatment equipment of the industrial boiler pipeline is completed.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a flue gas treatment facility of industrial boiler pipeline, includes treatment box (1), its characterized in that: one side of handling case (1) is provided with into cigarette pipeline (2), one side of handling case (1) is provided with water tank (7), the top of water tank (7) is provided with driving motor (8), the one end fixed mounting of driving motor (8) has transfer line (9), the outside of transfer line (9) is provided with stirring leaf (10), the top of water tank (7) is provided with water pump (11), one side of water pump (11) is provided with conveyer pipe (12), the outside of conveyer pipe (12) is provided with shower head (13), the inside below of handling case (1) is provided with basin (14), the top of handling case (1) is provided with carries tobacco pipe (15), the one end of carrying tobacco pipe (15) is provided with active carbomorphism storehouse (16).
2. The flue gas treatment device of the industrial boiler pipeline according to claim 1, wherein a chute (3) is formed in the inner surface of the treatment box (1), a collecting box (4) is movably connected in the chute (3), a filter screen (5) is arranged in the collecting box (4), and a handle (6) is fixedly arranged on one side of the collecting box (4).
3. The flue gas treatment device of an industrial boiler pipeline according to claim 2, wherein the collecting box (4) and the treatment box (1) form a sliding structure through the sliding groove (3), and the size of the collecting box (4) is matched with the size of one side of the treatment box (1).
4. The flue gas treatment device of an industrial boiler pipeline according to claim 1, wherein the stirring blades (10) and the water tank (7) form a rotary structure through a transmission rod (9), and the stirring blades (10) are arranged on the transmission rod (9) at equal intervals.
5. The flue gas treatment device of an industrial boiler pipeline according to claim 1, wherein a sliding rail (17) is arranged in the active carbonization bin (16), and an active carbon plate (18) is movably connected in the sliding rail (17).
6. The flue gas treatment device of an industrial boiler pipeline according to claim 5, wherein the activated carbon plates (18) and the activated carbonization bin (16) form a sliding structure through sliding rails (17), and the activated carbon plates (18) are arranged on the activated carbonization bin (16) at equal intervals.
7. The flue gas treatment device of an industrial boiler pipeline according to claim 5, wherein a blower (19) is arranged on one side of the active carbonization bin (16), and a flue gas discharge pipe (20) is arranged on one side of the blower (19).
CN202322005448.XU 2023-07-28 2023-07-28 Flue gas treatment equipment of industrial boiler pipeline Active CN220824651U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322005448.XU CN220824651U (en) 2023-07-28 2023-07-28 Flue gas treatment equipment of industrial boiler pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322005448.XU CN220824651U (en) 2023-07-28 2023-07-28 Flue gas treatment equipment of industrial boiler pipeline

Publications (1)

Publication Number Publication Date
CN220824651U true CN220824651U (en) 2024-04-23

Family

ID=90726726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322005448.XU Active CN220824651U (en) 2023-07-28 2023-07-28 Flue gas treatment equipment of industrial boiler pipeline

Country Status (1)

Country Link
CN (1) CN220824651U (en)

Similar Documents

Publication Publication Date Title
WO2017045602A1 (en) Coke oven flue gas desulfurization and denitrification combined purification process and apparatus
CN102120130B (en) Complete set of device and method for treating tail gas from sludge incineration through semidry method
CN204996310U (en) Coke oven flue gas SOx/NOx control unites purifier
CN113499656A (en) Waste gas zero discharge system based on sludge drying and control method thereof
CN201899980U (en) Complete device for treating sludge incineration tail gas in semidry method
CN203663677U (en) Smoke elimination, dust removal, deodorization and desulfurization equipment
CN109654504A (en) A kind of full-automatic house refuse low temperature pyrogenation device and its control method
CN220824651U (en) Flue gas treatment equipment of industrial boiler pipeline
CN105289178A (en) Exhaust purification treatment device for environment-friendly printing and dyeing setting machine
CN210993415U (en) Flue gas desulfurization denitration dust collector
CN217092602U (en) Boiler harmful gas optimizes dust removal discharging equipment
CN208726993U (en) A kind of rubber waste gas pollution control and treatment complete set of equipments
CN105935531A (en) Industrial solid waste cracking burning tail gas treatment method
CN110898595A (en) Power plant exhaust treatment device
CN216170725U (en) High-efficient sack cleaner
CN202511309U (en) Smoke spraying purification and heat recovery system for coal-fired boiler
CN212236584U (en) Boiler flue gas sprays purification unit
CN215027284U (en) Waste gas dust collector of thermal power plant
CN112299406B (en) Negative electrode material graphitization preparation process
CN210699382U (en) Environment-friendly flue gas desulfurization device
CN206935084U (en) A kind of low emission incineration flue gas of household garbage processing system
CN208204984U (en) A kind of biomass boiler
CN203043778U (en) Dust and exhaust gas treatment system in workshop
CN206474481U (en) A kind of municipal solid waste incinerator room vacuum cleaning system
CN208161327U (en) A kind of stemming production waste gas purification apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant