CN220815131U - Power transmission tower foundation connection remedying base - Google Patents

Power transmission tower foundation connection remedying base Download PDF

Info

Publication number
CN220815131U
CN220815131U CN202322622663.4U CN202322622663U CN220815131U CN 220815131 U CN220815131 U CN 220815131U CN 202322622663 U CN202322622663 U CN 202322622663U CN 220815131 U CN220815131 U CN 220815131U
Authority
CN
China
Prior art keywords
bearing
connecting plate
plate
tower
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322622663.4U
Other languages
Chinese (zh)
Inventor
杜连喜
张帝起
罗海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Zengli Steel Structure Co ltd
Original Assignee
Guangzhou Zengli Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Zengli Steel Structure Co ltd filed Critical Guangzhou Zengli Steel Structure Co ltd
Priority to CN202322622663.4U priority Critical patent/CN220815131U/en
Application granted granted Critical
Publication of CN220815131U publication Critical patent/CN220815131U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a power transmission tower foundation connection remedying base which is applied to the field of power transmission tower installation.

Description

Power transmission tower foundation connection remedying base
Technical Field
The utility model belongs to the field of installation of power transmission towers, and particularly relates to a power transmission tower foundation connection remediation base.
Background
At present, in a power transmission line, pit digging is generally needed, well-stirred concrete is buried, an iron tower foundation is formed after the concrete is solidified, and then the iron tower and the iron tower foundation are fixed; in the prior art, the connection between the iron tower and the iron tower foundation generally adopts the following modes: the bottom of the iron tower is provided with the tower foot plate, and the tower foot plate is installed on the foundation bolt, wherein the foundation bolt is preset in the iron tower foundation, however, when the power transmission iron tower is installed in a construction mode, the condition that the foundation connection position is not connected and cannot be installed is often caused, and the problems of construction unit foundation construction errors, production and processing errors of a tower factory, design errors of a design institute and the like exist in multiple aspects, so that inconvenience is brought to production and installation.
Disclosure of utility model
The utility model aims to provide a power transmission tower foundation connection remedying base, which has the advantage of increasing the function of convenient installation and connection.
The technical aim of the utility model is realized by the following technical scheme: the utility model provides a transmission tower foundation connection remedy base, includes the remedy base body, the remedy base includes bearing connecting plate one, bearing connecting plate two, bearing reinforcing plate one and bottom plate one, bearing connecting plate one and bearing connecting plate two's top fixed mounting have the tower foot connecting plate, mutual fixed connection between bearing connecting plate one and bearing connecting plate two's both sides and the bearing reinforcing plate one, the top of tower foot connecting plate is equipped with the tower foot connecting bolt that runs through to the bottom, the top of bottom plate one is equipped with the rag bolt that runs through to the bottom.
The technical scheme is adopted: in the use of the transmission tower foundation connection remediation base, the corresponding tower foot center is correspondingly correct with the foundation connection center position, but when the distance or specification of the foundation bolts is wrong, the first foundation bolts are connected with the tower foot bottom plates of the transmission tower through the first foundation bolt holes on the tower foot connecting plates, the third foundation bolts corresponding to the foundation connection positions are connected with the first foundation bolts, so that when the positions are correspondingly correct, the installation of the transmission tower and the foundation connection positions is completed, the installation accuracy is reduced, the installation and the use are facilitated, the corresponding error of the corresponding tower foot center and the foundation connection center position is facilitated, and when the distance or specification of the foundation bolts are correct, the installation can not be realized through the first foundation bolt holes on the tower foot connecting plates, the connection with the tower foot connecting bolts are adopted between the tower foot bottom plates of the transmission tower, the third foundation bolts corresponding to the foundation connection positions are connected, and therefore when the positions are correspondingly wrong, the installation of the transmission tower and the foundation connection positions is completed.
The repairing base body further comprises a third bearing connecting plate, a fourth bearing connecting plate, a second bearing reinforcing plate, a third bearing reinforcing plate and a second bottom plate, wherein the tops of the third bearing connecting plate and the fourth bearing connecting plate are fixedly connected with the tower foot connecting plate, and both sides of the third bearing connecting plate and the fourth bearing connecting plate are fixedly installed with the second bearing reinforcing plate and the third bearing reinforcing plate respectively.
The technical scheme is adopted: when the corresponding positions of the center of the tower foot and the foundation connection center are wrong, and whether the distance or the specification of the foundation bolts is correct or not, the first bolt holes on the tower foot connecting plates can be connected and installed with the tower foot bottom plates of the iron towers by adopting the tower foot connecting bolts, the tower foot connecting plates, the third bearing connecting plates, the fourth bearing connecting plates, the second bearing reinforcing plates, the third bearing reinforcing plates and the second bottom plates are fixedly connected into a whole, the third bolt holes on the second bottom plates are connected with the foundation bolts corresponding to the foundation connection positions, and therefore, when the corresponding positions are wrong, the installation of the power transmission iron towers and the foundation connection positions is completed.
The utility model further provides that a threaded hole I matched with the tower foot connecting bolt for installation is formed in the tower foot connecting plate.
The technical scheme is adopted: the installation and the use are carried out through the first threaded hole matched with the tower foot connecting bolt.
The utility model further provides that a threaded hole II matched with the foundation bolt for installation is formed in the bottom plate I.
The technical scheme is adopted: and the second threaded hole is matched with the foundation bolt for installation and use.
The utility model is further characterized in that the bottoms of the first bearing connecting plate, the second bearing connecting plate and the first bearing reinforcing plate are fixedly arranged with the first bottom plate.
The technical scheme is adopted: the first bearing connecting plate, the second bearing connecting plate, the first bearing reinforcing plate and the first bottom plate are integrally formed through fixed installation.
The utility model is further arranged that the bottoms of the bearing connecting plate III, the bearing connecting plate IV, the bearing reinforcing plate II and the bearing reinforcing plate III are fixedly connected with the bottom plate II.
The technical scheme is adopted: and the bearing connecting plate III, the bearing connecting plate IV, the bearing reinforcing plate II, the bearing reinforcing plate III and the bottom plate II are integrally formed through fixed connection.
The utility model is further arranged that a threaded hole III is formed in the bottom plate II.
The technical scheme is adopted: and the third threaded hole is matched with the second bottom plate for installation and use.
The utility model further provides that the threaded holes are matched with foundation bolts for installation and use.
The technical scheme is adopted: and the foundation bolts are matched with the foundation connection positions through threaded holes in three modes to install and use.
In summary, the utility model has the following beneficial effects:
1. In the use of the power transmission tower foundation connection remediation base, the positions of the corresponding tower foot center and the foundation connection center are correct correspondingly, but when the distance or specification of foundation bolts is wrong, the foundation bolts are connected with the tower foot bottom plate of the power transmission tower by adopting the tower foot connection bolts through the first bolt holes on the tower foot connection plates, and the third bolt holes on the bottom plate are connected with the foundation bolts corresponding to the foundation connection positions, so that when the positions are correct correspondingly, the installation of the power transmission tower and the foundation connection positions is completed, the installation precision is reduced, and the installation and use are facilitated;
2. According to the utility model, when the positions of the corresponding tower foot center and the foundation connection center are in corresponding error, and no matter whether the distance or the specification of the foundation bolts is correct or not, the first bolt hole on the tower foot connecting plate can be used for connecting and installing the foundation bolts corresponding to the foundation connection position with the tower foot bottom plate of the iron tower, the third bolt hole on the bottom plate is connected with the foundation bolt corresponding to the foundation connection position, so that the installation of the connection position of the power transmission tower and the foundation is completed when the positions are in corresponding error.
Drawings
FIG. 1 is a schematic view showing the overall structure of embodiment 1 of the present utility model;
FIG. 2 is a schematic front view of embodiment 1 of the present utility model;
FIG. 3 is a left side schematic view of embodiment 1 of the present utility model;
FIG. 4 is a schematic top view of embodiment 1 of the present utility model;
FIG. 5 is a schematic overall structure of embodiment 2 of the present utility model;
FIG. 6 is a schematic front view of embodiment 2 of the present utility model;
FIG. 7 is a left side schematic view of embodiment 2 of the present utility model;
Fig. 8 is a schematic top view of embodiment 2 of the present utility model.
Reference numerals: 1. a tower foot connecting plate; 2. the bearing connecting plate I; 3. a bearing connecting plate II; 4. a first bearing reinforcing plate; 5. a first bottom plate; 6. a bearing connecting plate III; 7. a bearing connecting plate IV; 8. a bearing reinforcing plate II; 9. bearing reinforcing plates III; 10. a second base plate; 11. a tower foot connecting bolt; 12. foundation bolts.
Detailed Description
The present utility model will be described in further detail with reference to the accompanying drawings.
Example 1:
Referring to fig. 1, fig. 2, fig. 3 and fig. 4, a power transmission tower foundation connection remediation base comprises a remediation base body, the remediation base body comprises a first bearing connecting plate 2, a second bearing connecting plate 3, a first bearing reinforcing plate 4 and a first bottom plate 5, a first tower foot connecting plate 1 is fixedly installed at the top of the first bearing connecting plate 2 and the second bearing connecting plate 3, two sides of the first bearing connecting plate 2 and the second bearing connecting plate 3 are fixedly connected with the first bearing reinforcing plate 4, a tower foot connecting bolt 11 penetrating to the bottom is arranged at the top of the first tower foot connecting plate 1, an anchor bolt 12 penetrating to the bottom is arranged at the top of the first bottom plate 5, in the use of the power transmission tower foundation connection remediation base, the corresponding tower foot center and the foundation connection center position are correct, but when the interval or specification of the anchor bolts 12 is wrong, the first tower foot connecting bolt 11 is adopted between the tower foot bottom plates of the power transmission tower, the third anchor bolts 12 corresponding to the foundation connection position are connected, so that when the positions are correct correspondingly, the installation of the power transmission tower and the foundation connection position is completed, and installation accuracy is reduced, and installation is facilitated.
Referring to fig. 2, a first threaded hole for installing and using the tower foot connecting bolt 11 is formed in the tower foot connecting plate 1, and the first threaded hole is matched with the tower foot connecting bolt 11 for installing and using.
Referring to fig. 3, a second threaded hole for installing and using the foundation bolt 12 is formed in the first bottom plate 5, and the foundation bolt 12 is installed and used through the second threaded hole.
Referring to fig. 1, the bottoms of the first bearing connecting plate 2, the second bearing connecting plate 3 and the first bearing reinforcing plate 4 are fixedly installed with the first bottom plate 5, and the first bearing connecting plate 2, the second bearing connecting plate 3, the first bearing reinforcing plate 4 and the first bottom plate 5 are formed into a whole through the fixed installation.
The use process is briefly described: in the use of the power transmission tower foundation connection remediation base, the corresponding tower foot center is corresponding correct with the foundation connection center position, but when the distance or specification of the foundation bolts 12 is wrong, the first bolts are connected with the tower foot bottom plate of the power transmission tower through the first bolts holes on the tower foot connecting plates 1, the first bearing connecting plates 2, the second bearing connecting plates 3, the first bearing reinforcing plates 4 and the first bottom plates 5 are fixedly connected into a whole, the third bolts on the first bottom plates 5 are connected with the foundation bolts 12 corresponding to the foundation connection position, so that the installation of the power transmission tower and the foundation connection position is completed when the position is corresponding correct, the installation accuracy is reduced, and the power transmission tower foundation connection remediation base is beneficial to installation and use.
Example 2:
Referring to fig. 5, 6, 7 and 8, a power transmission tower foundation connection remediation base, the remediation base body further comprises a third bearing connecting plate 6, a fourth bearing connecting plate 7, a second bearing reinforcing plate 8, a third bearing reinforcing plate 9 and a second bottom plate 10, the tops of the third bearing connecting plate 6, the fourth bearing connecting plate 7 and the tower foot connecting plate 1 are fixedly connected with each other, the third bearing connecting plate 6, the two sides of the fourth bearing connecting plate 7 are fixedly installed with the second bearing reinforcing plate 8 and the third bearing reinforcing plate 9 respectively, the center of the corresponding tower foot and the center of the foundation connection are in error, and in case of the fact that the distance between foundation bolts 12 and the specification are correct or not, through the first bolt holes on the tower foot connecting plate 1, the tower foot connecting plate 1 and the third bearing connecting plate 6, the fourth bearing connecting plate 7, the second bearing reinforcing plate 8, the third bearing reinforcing plate 9 and the second bottom plate 10 are fixedly connected into a whole, the third bolt holes on the second bottom plate 10 are connected with bolts 12 corresponding to the foundation connection positions, so that the power transmission tower foot is installed in error corresponding to the foundation connection positions when the positions are in error.
Referring to fig. 5, the bottoms of the third bearing connecting plate 6, the fourth bearing connecting plate 7, the second bearing reinforcing plate 8 and the third bearing reinforcing plate 9 are fixedly connected with the second base plate 10, and the third bearing connecting plate 6, the fourth bearing connecting plate 7, the second bearing reinforcing plate 8, the third bearing reinforcing plate 9 and the second base plate 10 are integrally formed through the fixed connection.
Referring to fig. 6, a third threaded hole is formed in the second base plate 10, and the second base plate 10 is mounted and used through the third threaded hole.
Referring to fig. 7, the threaded hole three is used in combination with the anchor bolt 12, and the anchor bolt 12 is used in combination with the foundation connection position.
The use process is briefly described: when the corresponding positions of the center of the tower leg and the base connection center are wrong, and whether the distance or the specification of the foundation bolts 12 is correct or not, the first bolt holes on the tower leg connecting plate 1 can be used for connecting and installing the tower leg bottom plates of the iron towers by adopting the tower leg connecting bolts 11, the tower leg connecting plate 1, the third bearing connecting plate 6, the fourth bearing connecting plate 7, the second bearing reinforcing plate 8, the third bearing reinforcing plate 9 and the second bottom plate 10 are fixedly connected into a whole, the third bolt holes on the second bottom plate 10 are connected with the foundation bolts 12 corresponding to the base connection positions, so that the installation of the power transmission towers and the base connection positions is completed when the positions are wrong correspondingly.
The present embodiment is only for explanation of the present utility model and is not to be construed as limiting the present utility model, and modifications to the present embodiment, which may not creatively contribute to the present utility model as required by those skilled in the art after reading the present specification, are all protected by patent laws within the scope of claims of the present utility model.

Claims (8)

1. The utility model provides a transmission tower foundation connection remedying base, includes remedying base body, its characterized in that: the remediation base body comprises a first bearing connecting plate (2), a second bearing connecting plate (3), a first bearing reinforcing plate (4) and a first bottom plate (5), wherein a first tower leg connecting plate (1) is fixedly arranged at the top of the first bearing connecting plate (2) and the top of the second bearing connecting plate (3), two sides of the first bearing connecting plate (2) and the second bearing connecting plate (3) are fixedly connected with the first bearing reinforcing plate (4), a tower leg connecting bolt (11) penetrating to the bottom is arranged at the top of the first tower leg connecting plate (1), and a foundation bolt (12) penetrating to the bottom is arranged at the top of the first bottom plate (5).
2. A pylon foundation connection remediation base according to claim 1 wherein: the remediation base body further comprises a bearing connecting plate III (6), a bearing connecting plate IV (7), a bearing reinforcing plate II (8), a bearing reinforcing plate III (9) and a bottom plate II (10), wherein the top of the bearing connecting plate III (6), the top of the bearing connecting plate IV (7) and the tower foot connecting plate (1) are fixedly connected with each other, and both sides of the bearing connecting plate III (6) and the bearing connecting plate IV (7) are fixedly installed with the bearing reinforcing plate II (8) and the bearing reinforcing plate III (9) respectively.
3. A pylon foundation connection remediation base according to claim 1 wherein: the inside of the tower foot connecting plate (1) is provided with a first threaded hole which is matched with the installation of the tower foot connecting bolt (11).
4. A pylon foundation connection remediation base according to claim 1 wherein: the inside of the first bottom plate (5) is provided with a first threaded hole which is matched with the foundation bolt (12) for installation.
5. A pylon foundation connection remediation base according to claim 1 wherein: the bottoms of the first bearing connecting plate (2), the second bearing connecting plate (3) and the first bearing reinforcing plate (4) are fixedly arranged with the first bottom plate (5) mutually.
6. A pylon foundation connection remediation base according to claim 2 wherein: the bottoms of the third bearing connecting plate (6), the fourth bearing connecting plate (7), the second bearing reinforcing plate (8) and the third bearing reinforcing plate (9) are fixedly connected with the second bottom plate (10).
7. A pylon foundation connection remediation base according to claim 2 wherein: and a threaded hole III is formed in the bottom plate II (10).
8. A pylon foundation connection remediation base of claim 7 wherein: the threaded holes are matched with foundation bolts (12) for installation and use.
CN202322622663.4U 2023-09-27 2023-09-27 Power transmission tower foundation connection remedying base Active CN220815131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322622663.4U CN220815131U (en) 2023-09-27 2023-09-27 Power transmission tower foundation connection remedying base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322622663.4U CN220815131U (en) 2023-09-27 2023-09-27 Power transmission tower foundation connection remedying base

Publications (1)

Publication Number Publication Date
CN220815131U true CN220815131U (en) 2024-04-19

Family

ID=90701957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322622663.4U Active CN220815131U (en) 2023-09-27 2023-09-27 Power transmission tower foundation connection remedying base

Country Status (1)

Country Link
CN (1) CN220815131U (en)

Similar Documents

Publication Publication Date Title
CN220815131U (en) Power transmission tower foundation connection remedying base
CN203096721U (en) Novel cofferdam fore shaft steel sheet pile
CN212957000U (en) Connecting corner fitting of prefabricated house
CN203079591U (en) Crane wall-attaching steel-structure switch connection support
CN204751937U (en) Jack -up owner end beam connection structure
CN220169003U (en) Reinforcing apparatus of thrust mechanism basis
CN218437170U (en) Framework lifting seat for transformer substation and cable terminal station
CN214941101U (en) Horizontal sliding connection structure of girder steel and steel column
CN220504670U (en) Conversion support for quickly repairing and recovering transmission line pole tower
CN219351250U (en) Hydropower installation engineering piping lane mount
CN217114988U (en) Plug-in type pipe joint for wiring
CN211621957U (en) Tolerance connector
CN219606431U (en) Pre-buried rag bolt
CN209817118U (en) Side-fixed type pre-buried channel
CN220150371U (en) Anchor plate for wind power
CN219993356U (en) Assembled foundation ditch temporary guardrail
CN217482285U (en) HDPE double-wall corrugated pipe with anti-corrosion function
CN212715377U (en) Steel column rag bolt structure
CN215799091U (en) Firm-structure tank body
CN214402739U (en) Plate-type structure for engineering design building
CN216957381U (en) Plastic steel mark pile
CN219548556U (en) High-pressure single-return steel pipe pole
CN216536694U (en) Fire hydrant case mounting structure
CN218911110U (en) Basin type support capable of being replaced quickly
CN220620484U (en) Steel construction side fascia mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant