CN219351250U - Hydropower installation engineering piping lane mount - Google Patents

Hydropower installation engineering piping lane mount Download PDF

Info

Publication number
CN219351250U
CN219351250U CN202320453793.7U CN202320453793U CN219351250U CN 219351250 U CN219351250 U CN 219351250U CN 202320453793 U CN202320453793 U CN 202320453793U CN 219351250 U CN219351250 U CN 219351250U
Authority
CN
China
Prior art keywords
fixing
clamping
sliding block
plate
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320453793.7U
Other languages
Chinese (zh)
Inventor
卢沈杰
王丽双
李亚娇
刘志豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Hanchen Construction Technology Co ltd
Original Assignee
Hangzhou Hanchen Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Hanchen Construction Technology Co ltd filed Critical Hangzhou Hanchen Construction Technology Co ltd
Priority to CN202320453793.7U priority Critical patent/CN219351250U/en
Application granted granted Critical
Publication of CN219351250U publication Critical patent/CN219351250U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of pipe gallery fixing equipment, in particular to a pipe gallery fixing frame for hydropower installation engineering, which comprises a fixing frame main body, wherein a connecting plate is fixedly arranged in the middle of a bottom fixing plate, fixing grooves are formed in the left side and the right side of the connecting plate, a movable screw rod I is arranged in the fixing grooves, clamping components I are arranged on the left side and the right side of the movable screw rod I on the two sides, and each clamping component I comprises a screw rod II, a clamping plate, a sliding groove, a fixing column, a butterfly fastener, a fastening groove, a sliding block I and a sliding block II. According to the clamping assembly, the screw rod II, the clamping plate, the sliding groove, the fixing column, the butterfly fastener, the fastening groove, the sliding block I and the sliding block II are arranged in the clamping assembly, the sliding groove formed by the sliding block I can clamp a cable, the sliding block I can move up and down and left and right, and the disassembly and the movement are convenient.

Description

Hydropower installation engineering piping lane mount
Technical Field
The utility model relates to the technical field of pipe gallery fixing equipment, in particular to a pipe gallery fixing frame for hydropower installation engineering.
Background
In wind, water and electricity installation engineering, a pipe gallery plays an important role, namely an underground urban pipeline comprehensive corridor, namely a tunnel space is built underground, various engineering pipelines such as electric power, communication, fuel gas, heat supply, water supply and drainage and the like are integrated, a special overhaul port, a hoisting port and a monitoring system are arranged, unified planning, unified design, unified construction and management are implemented, and the system is an important infrastructure for guaranteeing urban operation.
The existing wind-water-electricity installation engineering pipe gallery fixing frame is troublesome to install and detach, inconvenient to maintain and inconvenient to limit cables.
Accordingly, a hydropower installation engineering pipe rack is provided by a person skilled in the art to solve the problems set forth in the background art.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a hydropower installation engineering pipe gallery fixing frame, which comprises a fixing frame main body;
the middle part of the bottom fixing plate is fixedly provided with a connecting plate, the left side and the right side of the connecting plate are provided with fixing grooves, the inside of each fixing groove is provided with a movable screw rod I, the left side and the right side of each movable screw rod I on two sides are respectively provided with a clamping assembly I, each clamping assembly I comprises a screw rod II, a clamping plate, a sliding groove, a fixing column, a butterfly fastener, a fastening groove, a sliding block I and a sliding block II;
the inside of cardboard has seted up the spout, and the inside of spout is equipped with the fixed column, and fastening groove has been seted up to the inside of fixed column, is equipped with slider one between two fixed columns, and slider one's left side is equipped with slider one on the cardboard.
Preferably: the bottom of mount main part is provided with the bottom fixed plate, and the left and right sides of bottom fixed plate is equipped with fixing bolt.
Preferably: the second screw is provided with two clamping plates which are symmetrically distributed.
Preferably: the chute is square.
Preferably: the number of the fixing columns is two, and butterfly fasteners are arranged on the fixing columns.
Preferably: the left side of the connecting plate is provided with a second clamping component, and the lower side of the second clamping component is provided with a third clamping component.
Preferably: and a clamping component IV is arranged on the right side of the clamping component III.
The utility model has the technical effects and advantages that:
1. according to the clamping assembly, the screw rod II, the clamping plate, the sliding groove, the fixing column, the butterfly fastener, the fastening groove, the sliding block I and the sliding block II are arranged in the clamping assembly, the sliding groove formed by the sliding block I can clamp a cable, the sliding block I can move up and down and left and right, and the disassembly and the movement are convenient.
2. Be provided with the bottom fixed plate, carry out fixed connection with bottom fixed plate and piping lane, be equipped with fixing bolt in the left and right sides of bottom fixed plate, then consolidate fastening nut, can be with piping lane and pre-buried bottom fixed plate installation success, easy to assemble.
Drawings
Fig. 1 is a schematic structural view of a pipe rack for hydroelectric installation engineering according to an embodiment of the present application;
fig. 2 is a schematic structural view II of a pipe rack for hydroelectric installation engineering according to an embodiment of the present application;
fig. 3 is a schematic structural view III of a pipe rack for hydroelectric installation engineering according to an embodiment of the present application;
fig. 4 is a schematic structural view of a top view of a pipe rack for hydropower installation engineering according to an embodiment of the application;
fig. 5 is a schematic structural view of a right side view of a pipe rack for hydropower installation engineering according to an embodiment of the application;
FIG. 6 is a schematic view of a first clamping assembly in a pipe rack for hydropower installation projects according to an embodiment of the application;
fig. 7 is a schematic structural view of a fixing rack of a pipe rack of a hydropower installation project in fig. 1 according to an embodiment of the application;
fig. 8 is a schematic structural view of the fixing rack B in fig. 6 for a pipe rack for hydropower installation engineering according to an embodiment of the application;
fig. 9 is a schematic structural view of the fixing rack C in fig. 5 for a pipe rack for hydropower installation engineering according to an embodiment of the application.
In the figure: 1. a fixing frame main body; 2. a bottom fixing plate; 3. a fixing bolt; 4. a splice plate;
5. a movable screw I;
6. a clamping assembly I; 61. a second screw; 62. a clamping plate; 63. a chute; 64. fixing the column; 65. butterfly fasteners; 66. a fastening groove; 67. a first sliding block; 68. a second sliding block;
7. a second clamping assembly; 8. a clamping assembly III; 9. and a clamping assembly IV.
Detailed Description
The utility model will be described in further detail with reference to the drawings and the detailed description. The embodiments of the utility model have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the utility model in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, and to enable others of ordinary skill in the art to understand the utility model for various embodiments with various modifications as are suited to the particular use contemplated.
Example 1
Referring to fig. 1 to 9, in this embodiment, a fixing rack for a pipe rack of a hydropower installation project is provided, which includes a fixing rack main body 1, a bottom fixing plate 2 is provided at the bottom of the fixing rack main body 1, and the bottom fixing plate 2 can be pre-buried underground;
the left side and the right side of the bottom fixing plate 2 are provided with fixing bolts 3, the middle part of the bottom fixing plate 2 is fixedly provided with a connecting plate 4, the left side and the right side of the connecting plate 4 are provided with fixing grooves, the inside of each fixing groove is provided with a movable screw rod I5, the left side and the right side of each movable screw rod I5 are respectively provided with a clamping component I6, each clamping component I6 comprises a screw rod II 61, a clamping plate 62, a sliding groove 63, a fixing column 64, a butterfly fastener 65, a fastening groove 66, a sliding block I67 and a sliding block II 68, the screw rod II 61 is provided with clamping plates 62, the number of the clamping plates 62 is two, and the clamping plates 62 are symmetrically distributed;
the inside of the clamping plate 62 is provided with a sliding groove 63, the sliding groove 63 is square, the inside of the sliding groove 63 is provided with two fixed columns 64, the fixed columns 64 are provided with butterfly fasteners 65, the inside of the fixed columns 64 is provided with a fastening groove 66, a sliding block I67 is arranged between the two fixed columns 64, and a sliding block II 68 is arranged on the left side of the sliding block I67 on the clamping plate 62;
the left side of the joint plate 4 is provided with a second clamping component 7, the lower side of the second clamping component 7 is provided with a third clamping component 8, and the right side of the third clamping component 8 is provided with a fourth clamping component 9.
The working principle of the utility model is as follows: when the wind-water-electricity installation engineering pipe gallery fixing frame body 1 convenient for limiting cables is used, the bottom fixing plate 2 is fixedly connected with the pipe gallery, fixing bolts 3 are arranged on the left side and the right side of the bottom fixing plate 2, the clamping component I6 is taken out, the clamping component I6, the clamping component II 7, the clamping component III 8 and the clamping component IV 9 are mutually aligned, then the movable screw I5 is moved to the inner connection of the fixing groove, a sliding groove formed by the sliding block I67 can clamp the cables, the sliding block I67 can move up and down and left and right, and the disassembly and the movement are convenient.
It will be apparent that the described embodiments are only some, but not all, embodiments of the utility model. All other embodiments, which can be made by those skilled in the art and which are included in the embodiments of the present utility model without the inventive step, are intended to be within the scope of the present utility model. Structures, devices and methods of operation not specifically described and illustrated herein, unless otherwise indicated and limited, are implemented according to conventional means in the art.

Claims (7)

1. The utility model provides a water and electricity installation engineering piping lane mount, includes mount main part (1), its characterized in that, the middle part of bottom fixed plate (2) is fixed to be equipped with joint board (4), the fixed slot has been seted up to the left and right sides of joint board (4), the inside of fixed slot is equipped with movable screw rod one (5), the left and right sides of the movable screw rod one (5) of both sides all is equipped with clamping assembly one (6), clamping assembly one (6) includes screw rod two (61), cardboard (62), spout (63), fixed column (64), butterfly fastener (65), fastening groove (66), sliding block one (67) and sliding block two (68);
a sliding groove (63) is formed in the clamping plate (62), a fixed column (64) is arranged in the sliding groove (63), a fastening groove (66) is formed in the fixed column (64), a sliding block I (67) is arranged between the two fixed columns (64), and a sliding block II (68) is arranged on the left side of the sliding block I (67) on the clamping plate (62).
2. A hydropower installation engineering pipe gallery fixing frame according to claim 1, characterized in that a bottom fixing plate (2) is arranged at the bottom of the fixing frame main body (1), and fixing bolts (3) are arranged at the left side and the right side of the bottom fixing plate (2).
3. The pipe rack for hydroelectric installation engineering according to claim 1, wherein two clamping plates (62) are arranged on the second screw rod (61), the number of the clamping plates (62) is two, and the clamping plates (62) are symmetrically distributed.
4. A hydropower installation project piping lane fixing rack according to claim 1, wherein the chute (63) is "square".
5. A hydropower installation engineering pipe rack according to claim 1, wherein the number of the fixing columns (64) is two, and butterfly fasteners (65) are arranged on the fixing columns (64).
6. A hydropower installation engineering pipe gallery fixing frame according to claim 1, wherein the left side of the connecting plate (4) is provided with a second clamping component (7), and the lower side of the second clamping component (7) is provided with a third clamping component (8).
7. A hydropower installation project pipe rack according to claim 6, wherein the right side of the third clamping component (8) is provided with a fourth clamping component (9).
CN202320453793.7U 2023-03-03 2023-03-03 Hydropower installation engineering piping lane mount Active CN219351250U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320453793.7U CN219351250U (en) 2023-03-03 2023-03-03 Hydropower installation engineering piping lane mount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320453793.7U CN219351250U (en) 2023-03-03 2023-03-03 Hydropower installation engineering piping lane mount

Publications (1)

Publication Number Publication Date
CN219351250U true CN219351250U (en) 2023-07-14

Family

ID=87078164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320453793.7U Active CN219351250U (en) 2023-03-03 2023-03-03 Hydropower installation engineering piping lane mount

Country Status (1)

Country Link
CN (1) CN219351250U (en)

Similar Documents

Publication Publication Date Title
CN204424739U (en) A kind of multi-section combined box-type substation
CN203229965U (en) 10 kV box-type substation basic standard module
CN110984222A (en) Urban rail transit pipeline integrated system
CN219351250U (en) Hydropower installation engineering piping lane mount
CN109162351B (en) Concrete beam column connecting node assembled by high-strength bolts
CN204167849U (en) Cable trough and cover plate thereof
CN203632117U (en) A rotary type insulation lift
CN205617425U (en) Prefabricated structure of assembling of utility tunnel
CN110004978A (en) Piping lane route right-angled intersection connects hinge cabin
CN214579282U (en) Building electromechanical pipeline module frame
CN210369037U (en) Cross-connection pivot cabin for pipe gallery circuit
CN203701282U (en) Pre-buried channel and support structure matched with same
CN207904963U (en) Prefabricated part piping lane connecting node
CN210684774U (en) Assembled concrete utility tunnel is connected to slot type
CN203213428U (en) Connecting device for fixing photovoltaic assembly on corrugated III type color plate metal roof
CN216976016U (en) Pipe burying device for hydraulic and hydroelectric engineering
CN211118028U (en) Pre-buried groove that city piping lane used
CN111472390A (en) Prefabricated well of pin-connected panel cable
CN201766312U (en) Adjustable supporting frame
CN213741458U (en) Fixing device is used in municipal works drainage pipe construction
CN203174674U (en) Foreign-shaped pipe duct structure for circulating water of power plant
CN213572046U (en) Sponge city underground pipe gallery splicing mechanism
CN212802104U (en) Novel assembled strength wall
CN219157762U (en) Prefabricated utility tunnel mosaic structure
CN213629331U (en) Pipeline auxiliary fixing structure for hydraulic engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant