CN207904963U - Prefabricated part piping lane connecting node - Google Patents

Prefabricated part piping lane connecting node Download PDF

Info

Publication number
CN207904963U
CN207904963U CN201721869728.3U CN201721869728U CN207904963U CN 207904963 U CN207904963 U CN 207904963U CN 201721869728 U CN201721869728 U CN 201721869728U CN 207904963 U CN207904963 U CN 207904963U
Authority
CN
China
Prior art keywords
piping lane
steel
prefabricated part
steel wood
connecting node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721869728.3U
Other languages
Chinese (zh)
Inventor
路海涛
邓博团
白贝贝
杨腾飞
白亮
马宗源
冯林杰
刘彬
郎亚超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hancheng Weili Ambitious Construction Industry Co Ltd
Original Assignee
Hancheng Weili Ambitious Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hancheng Weili Ambitious Construction Industry Co Ltd filed Critical Hancheng Weili Ambitious Construction Industry Co Ltd
Priority to CN201721869728.3U priority Critical patent/CN207904963U/en
Application granted granted Critical
Publication of CN207904963U publication Critical patent/CN207904963U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of prefabricated part piping lane connecting node, prefabricated part piping lane is at least connected by 2 prefabricated component piping lanes, it is machined with through-hole on the end face of prefabricated component piping lane, steel wood coupled pole is provided in through-hole, it is provided with connector on the end face of steel wood coupled pole, two steel wood coupled poles are connected by connector, and rubber gasket is arranged in the junction of two prefabricated component piping lanes.The utility model passes through the through-hole of prefabricated component piping lane to connect multiple piping lanes by steel wood coupled pole, is sealed with hydro-expansive rubber sealing cushion between the end face of each piping lane, is capable of safety and the globality of effective guarantee Pipe rack system;The compound existing steel material of rod piece of steel wood has wooden unit, steel material that there is pull resistance, wooden unit to have compressive property again, the non-deformability and shock resistance of junction are improved, the compound rod piece of steel wood is connected using assembled steel wood mixed structure, and production quality is high, scene quick assembling can be achieved, save the duration.

Description

Prefabricated part piping lane connecting node
Technical field
The utility model belongs to precast concrete piping lane technical field, and in particular to arrives a kind of connection of prefabricated component piping lane Node.
Background technology
Comprehensive prefabricated component piping lane is underground urban duct synthesis corridor, and a tunnel space is built in Urban Underground, will be electric Power, communication, the various utilities pipelines such as combustion gas, heat supply, plumbing are integrated in one, and are equipped with special access hole, hoisting port and monitoring System implements unified planning, Uniting, unified construction and management, is the important infrastructure and " life for ensureing city operations Line ", it is the direction of urban lifeline engineering foundation facility development.China is in urbanization fast-developing period, underground base Infrastructure construction lags, and Urban Underground is promoted to integrate prefabricated component piping lane construction, plans as a whole all kinds of municipal pipeline planning, construction and pipe Reason solves repeatedly excavated pavement, makes somebody a mere figurehead the problems such as intensive gauze, pipeline Frequent Accidents, is conducive to ensure urban safety, improves city City's function, beautifying city landscape promote the intensive efficient and Transformation Development in city, are conducive to improve urban carrying capacity and city Town development quality.
Currently, the connecting node of prefabricated component piping lane, in earthquake, prefabricated component piping lane node point connection can be by serious broken It is bad, and the prefabricated component piping lane being embedded in soil-structure interactions is more subject to destroy than the prefabricated component piping lane in rock, prefabricated component piping lane Deformability, antidetonation energy, security performance of the node point connection in earthquake and fire are all poor.
Invention content
The technical problem to be solved by the utility model is to overcome the above-mentioned prior art, a kind of shock resistance is provided It can high, the preferably prefabricated part piping lane connecting node of non-deformability.
Technical solution is used by solving above-mentioned technical problem:Prefabricated part piping lane is at least by a prefabricated component piping lane It connects, is machined with through-hole on the end face of the prefabricated component piping lane, steel wood coupled pole, the end face of steel wood coupled pole are provided in through-hole On be provided with connector, two steel wood coupled poles are connected by connector, and the junction setting rubber of two prefabricated component piping lanes is close Packing.
The cross section of the rubber gasket of the utility model is rectangle, and rubber gasket is hydro-expansive rubber sealing cushion.
The steel wood coupled pole of the utility model is:It is connected by bolts wooden unit in two side channel of steel I-beam.
The steel I-beam of the utility model is rolled section steel.
The connector of the utility model is gasket, and an arm of gasket is connected by bolts the end face of two wooden units, gasket An other arm is connected by bolts wooden unit and steel I-beam.
The gasket of the utility model is the high-strength steel disc of L-type.
The bolt of the utility model is steel galvanized bolt.
The utility model uses steel wood coupled pole and connects multiple prefabricated component piping lanes across the through-hole of prefabricated component piping lane, often It is sealed with hydro-expansive rubber sealing cushion between the end face of a prefabricated component piping lane, it being capable of effective guarantee prefabricated component Pipe rack system Safety and globality;The compound existing steel material of rod piece of steel wood has wooden unit, steel material that there is pull resistance, wooden unit to have again Compressive property, improves the non-deformability and shock resistance of junction, and the compound rod piece of steel wood is connected using assembled steel wood mixed structure It connects, production quality is high, it can be achieved that live quick assembling, saves the duration;Angle steel gasket and bolt are stainless steel, enhance steel The ductility and deformability of join domain.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model one embodiment.
Fig. 2 is the right view of Fig. 1.
Fig. 3 is the structural schematic diagram of steel wood coupled pole 3 in Fig. 2.
Fig. 4 is the A-A sectional views of Fig. 3.
Fig. 5 is the right view of Fig. 3.
Specific implementation mode
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
As shown in Figs. 1-5, a kind of prefabricated part piping lane connecting node of the present embodiment, by prefabricated component piping lane 1, rubber Gasket 2, steel wood coupled pole 3, steel I-beam 3-1, wooden unit 3-2, the connection of connector 4 are constituted.
Prefabricated part piping lane is connected by two prefabricated component piping lanes 1, and four angles of the end face of prefabricated component piping lane 1 add respectively Work has a through-hole a, the centerline parallel of through-hole a and prefabricated component piping lane 1, and steel wood coupled pole 3, steel wood coupled pole 3 are equipped in through-hole a End face on connector 4 is installed, two prefabricated component piping lanes 1 are connected by the connector 4 on steel wood coupled pole 3, and two are prefabricated Rubber gasket 2, the rectangular cross-section of rubber gasket 2 are installed in 1 end face junction of part piping lane, and rubber gasket 2 is that chance water is swollen Swollen rubber gasket, rubber gasket 2 are capable of safety and the globality of 1 structure of effective guarantee prefabricated component piping lane.
Steel wood coupled pole 3 is:Wooden unit 3-2 has been connected by bolts in two side channels of steel I-beam 3-1, connector 4 is gasket, One arm of gasket is connected by bolts the end face of two wooden unit 3-2, and an other arm for gasket is connected by bolts wooden unit 3-2 and work Word girder steel 3-1, connector 4 are the high-strength steel discs of L-type, and bolt is steel galvanized bolt, and connector 4 and bolt enhance join domain Ductility, steel I-beam 3-1 is rolled section steel, and 3 existing steel material of steel wood coupled pole has wooden unit, steel material to have tension again Property, wooden unit has compressive property, can improve the non-deformability and shock resistance of junction, the use assembly of steel wood coupled pole 3 Formula steel wood mixed structure connects, and production quality is high, it can be achieved that live quick assembling, saves the duration.
The above, the only preferred embodiment of the utility model, are not intended to limit the protection of the utility model Range.

Claims (7)

1. a kind of prefabricated part piping lane connecting node, prefabricated part piping lane is at least connected by 2 prefabricated component piping lanes (1) It connects, it is characterised in that:Through-hole (a) is machined on the end face of the prefabricated component piping lane (1), it is compound to be provided with steel wood in through-hole (a) Bar (3) is provided with connector (4) on the end face of steel wood coupled pole (3), and two steel wood coupled poles (3) pass through connector (4) phase Even, the junction setting rubber gasket (2) of two prefabricated component piping lanes (1).
2. prefabricated part piping lane connecting node according to claim 1, it is characterised in that:The rubber gasket (2) cross section is rectangle, and rubber gasket (2) is hydro-expansive rubber sealing cushion.
3. prefabricated part piping lane connecting node according to claim 1, it is characterised in that the steel wood coupled pole (3) it is:It is connected by bolts wooden unit (3-2) in two side channel of steel I-beam (3-1).
4. prefabricated part piping lane connecting node according to claim 3, it is characterised in that:The steel I-beam (3-1) is rolled section steel.
5. prefabricated part piping lane connecting node according to claim 3, it is characterised in that:The connector (4) It is gasket, an arm of gasket is connected by bolts the end face of two wooden units (3-2), and an other arm for gasket is connected by bolts wood Block (3-2) and steel I-beam (3-1).
6. prefabricated part piping lane connecting node according to claim 5, it is characterised in that:The gasket is L-type High-strength steel disc.
7. prefabricated part piping lane connecting node according to claim 5, it is characterised in that:The bolt is steel Galvanized bolt.
CN201721869728.3U 2017-12-28 2017-12-28 Prefabricated part piping lane connecting node Active CN207904963U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721869728.3U CN207904963U (en) 2017-12-28 2017-12-28 Prefabricated part piping lane connecting node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721869728.3U CN207904963U (en) 2017-12-28 2017-12-28 Prefabricated part piping lane connecting node

Publications (1)

Publication Number Publication Date
CN207904963U true CN207904963U (en) 2018-09-25

Family

ID=63569341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721869728.3U Active CN207904963U (en) 2017-12-28 2017-12-28 Prefabricated part piping lane connecting node

Country Status (1)

Country Link
CN (1) CN207904963U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318422A (en) * 2019-07-19 2019-10-11 长沙如洋环保科技有限公司 A kind of Urban Underground pipe gallery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318422A (en) * 2019-07-19 2019-10-11 长沙如洋环保科技有限公司 A kind of Urban Underground pipe gallery

Similar Documents

Publication Publication Date Title
CN104032839B (en) Syndeton and the construction method thereof of friction damper assembling frame node
CN203924363U (en) The syndeton of friction damper assembling frame node
CN203546912U (en) Penetrating rib type node of channel steel connected rectangular concrete filled steel tubular column and steel girder
CN207904963U (en) Prefabricated part piping lane connecting node
CN204098241U (en) Trapezoidal steel plate interpolation type rectangular steel-tube concrete column and steel beam connecting joint
CN203452195U (en) Double-pre-buried-plate opposite-pulling-type built-in fitting
CN203514533U (en) Inner partition plate-outer partition plate square concrete filled steel tubular column and steel beam cross-shaped joint structure
WO2017071111A1 (en) Underground pipe gallery protection structure
CN203947593U (en) A kind of safety type steel structure node member
CN203514531U (en) Square steel tube concrete column and steel beam node connecting structure with internal diaphragms
CN203632117U (en) A rotary type insulation lift
CN205617425U (en) Prefabricated structure of assembling of utility tunnel
CN201771070U (en) Externally hung wallboard connection part
CN111173130A (en) Assembled concrete column beam dry-type connecting structure
CN204001220U (en) A kind of steel structure node member
CN109629602A (en) A kind of assembled underground pipe gallery with T-section point of changeable layout
CN203514323U (en) Connection component
CN208105315U (en) A kind of steel construction composite steel-concrete and combined reinforced bar concrete pipe gallery
CN111733882A (en) Assembled underground utility tunnel cross connected node
CN203475920U (en) Flange assembled type power transformation framework column
CN210264016U (en) Assembled antidetonation reinforced structure of brick concrete structure wall body
CN209816915U (en) Double-circular shield construction comprehensive pipe gallery
CN207904966U (en) Assembled piping lane
CN208088343U (en) A kind of assembled piping lane component and piping lane
CN207048035U (en) A kind of faced wall steel beam structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant