CN220814772U - Decoration engineering ceramic tile installation device - Google Patents
Decoration engineering ceramic tile installation device Download PDFInfo
- Publication number
- CN220814772U CN220814772U CN202322654292.8U CN202322654292U CN220814772U CN 220814772 U CN220814772 U CN 220814772U CN 202322654292 U CN202322654292 U CN 202322654292U CN 220814772 U CN220814772 U CN 220814772U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- ceramic tile
- platform
- decoration engineering
- fixed platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000919 ceramic Substances 0.000 title claims abstract description 71
- 238000005034 decoration Methods 0.000 title claims abstract description 67
- 238000009434 installation Methods 0.000 title claims abstract description 30
- 230000000149 penetrating effect Effects 0.000 claims abstract description 7
- 238000000034 method Methods 0.000 abstract description 5
- 239000002585 base Substances 0.000 description 13
- 230000005540 biological transmission Effects 0.000 description 3
- 238000010521 absorption reaction Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 229910044991 metal oxide Inorganic materials 0.000 description 2
- 125000006850 spacer group Chemical group 0.000 description 2
- 239000006004 Quartz sand Substances 0.000 description 1
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 239000002253 acid Substances 0.000 description 1
- 239000003513 alkali Substances 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000000227 grinding Methods 0.000 description 1
- 150000004706 metal oxides Chemical class 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 239000003870 refractory metal Substances 0.000 description 1
- 238000005245 sintering Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model belongs to the technical field of tile installation, in particular to a decoration engineering tile installation device, which comprises a base; an arc column is fixedly connected to the top of the base; a fixed platform is fixedly connected to the top of the arc-shaped column; the fixed platform is connected with a push rod in a penetrating way; the fixed platform is in sliding fit with the ejector rod; a gasket is fixedly connected to the end part of the ejector rod; the side wall of the gasket is fixedly connected with a spring; the end part of the spring is fixedly connected with the side wall of the fixed platform; the spring is sleeved in the middle of the ejector rod; the ejector rods are arranged on the fixed platform in a plurality of groups; a control platform is fixedly connected to the top of the base; and the gasket is pushed by the control platform to finish the installation of the decoration engineering ceramic tile. When the decoration engineering ceramic tile is installed, the ejector rod can reset due to the elastic tension of the spring. The problem that the decoration engineering ceramic tile is poor in fixing stability caused by inapplicability of the specification of the decoration engineering ceramic tile when the decoration engineering ceramic tile is installed and carried is solved, and the problem that the decoration engineering ceramic tile is easy to fall off and damage in the process of carrying the ceramic tile is solved.
Description
Technical Field
The utility model relates to the technical field of tile installation, in particular to a tile installation device for decoration engineering.
Background
The ceramic tile is made of refractory metal oxide and semi-metal oxide, and through grinding, mixing, pressing, glazing and sintering, and is one kind of ceramic, stone, etc. with acid and alkali resistance. The raw materials are mostly mixed by clay, quartz sand and the like. Tiles are almost used in building areas such as: walls, floors, ceilings, fireplaces, wall paintings, exterior walls of buildings, and the like. When a building is constructed, a large number of tiles need to be installed and laid, and a decoration engineering tile installation device is needed.
When the tile installation device in the prior art is used for installing the decoration engineering tiles, because most specifications of the decoration engineering tiles are not unified when the decoration engineering tiles with new specifications are replaced, the decoration engineering tiles with the new specifications are required to be placed on the tile installation device, when the decoration engineering tiles are installed and carried, the existing tile installation device can cause poor fixation stability of the decoration engineering tiles caused by inapplicability of the specifications of the existing tile installation device, and the problems of falling and damage of the decoration engineering tiles easily occur in the process of carrying the tiles
Accordingly, a decorative engineering tile installation device is proposed to solve the above problem.
Disclosure of utility model
To overcome the defects in the prior art, at least one technical problem in the prior art is solved
The technical scheme adopted for solving the technical problems is as follows: the utility model relates to a decoration engineering ceramic tile installation device, which comprises a base; an arc column is fixedly connected to the top of the base; a fixed platform is fixedly connected to the top of the arc-shaped column; the fixed platform is connected with a push rod in a penetrating way; the fixed platform is in sliding fit with the ejector rod; a gasket is fixedly connected to the end part of the ejector rod; the side wall of the gasket is fixedly connected with a spring; the end part of the spring is fixedly connected with the side wall of the fixed platform; the spring is sleeved in the middle of the ejector rod; the ejector rods are arranged on the fixed platform in a plurality of groups; a control platform is fixedly connected to the top of the base; the middle part of the control platform is connected with a sliding block in a sliding way; the middle part of the sliding block is connected with a pull rod in a penetrating way; and a supporting platform is fixedly connected to the side end of the pull rod. And the gasket is pushed by the control platform to finish the installation of the decoration engineering ceramic tile. When the decoration engineering ceramic tile is installed, the ejector rod can reset due to the elastic tension of the spring. The problem that the decoration engineering ceramic tile is poor in fixing stability caused by inapplicability of the specification of the decoration engineering ceramic tile when the decoration engineering ceramic tile is installed and carried is solved, and the problem that the decoration engineering ceramic tile is easy to fall off and damage in the process of carrying the ceramic tile is solved.
Preferably, a first hole is formed in the middle of the pull rod; the first holes are provided with a plurality of groups on the pull rod; the side wall of the control platform is provided with a second hole; the second holes are provided with a plurality of groups on the control platform; the second hole is connected with a limit bolt in a sliding way; the limit bolt is in sliding fit with the control platform and the sliding block. The limiting bolts can pass through the first holes and the second holes to limit when the pull rod and the supporting platform are adjusted. The stability of installing the decorative engineering tile can be further realized when installing the engineering tile. The problem that the stability of the decoration engineering ceramic tile is poor when the decoration engineering ceramic tile is installed and carried is solved.
Preferably, the top end and the side end of the fixed platform are fixedly connected with clamping sleeves; the top end of the clamping sleeve is fixedly connected with a second connecting block; the side wall of the clamping sleeve is connected with a movable block in a sliding manner; the top end of the movable block is fixedly connected with a first connecting block; and a tension spring is connected between the first connecting block and the second connecting block. The first connecting block and the second connecting block are in transmission connection through a tension spring and are used for adjusting the distance between the clamping sleeve and the movable block. Thus, the decorative engineering tile can be better fixed on the fixed platform during carrying and mounting, and the stability of the mounting engineering tile is further reduced. The problems that the fixing stability of the decoration engineering ceramic tile is poor and the decoration engineering ceramic tile is easy to fall off and damage caused by inapplicability of the specification of the decoration engineering ceramic tile are reduced when the decoration engineering ceramic tile is installed and carried.
Preferably, the top of each ejector rod is fixedly connected with a sucker; the diameter of the sucker is equal to that of the ejector rod. Through increasing there is the sucking disc on ejector pin top, can be when decorating engineering ceramic tile and placing at the fixed platform top, the sucking disc contacts with decorating engineering ceramic tile middle part, realizes decorating the absorption of engineering ceramic tile, and the setting of sucking disc can be spaced between ejector pin tip and decorating engineering ceramic tile simultaneously to reduce the damage problem that ejector pin tip and decorating engineering ceramic tile contact lead to.
Preferably, the side end of the pull rod is fixedly connected with a holding platform; the side end of the holding platform is fixedly connected with a handle. The holding platform is additionally arranged at the side end of the pull rod, and the handle is fixedly connected at the side end of the holding platform. The handle can be held when the ejector rod is adjusted so that the adjustment is more stable.
Preferably, the bottom end of the base is fixedly connected with a connecting column; the bottom end of the connecting column is fixedly connected with a hubcap; the wheel hub cover is internally connected with wheels. The base can be enabled to have the moving capability through the wheels, and the ceramic tile mounting is stable during decoration engineering ceramic tile mounting.
The utility model has the advantages that:
1. The utility model completes the installation of the decoration engineering ceramic tile by pushing the gasket through the control platform. When the decoration engineering ceramic tile is installed, the ejector rod can reset due to the elastic tension of the spring. The problem that the decoration engineering ceramic tile is poor in fixing stability caused by inapplicability of the specification of the decoration engineering ceramic tile when the decoration engineering ceramic tile is installed and carried is solved, and the problem that the decoration engineering ceramic tile is easy to fall off and damage in the process of carrying the ceramic tile is solved.
2. The utility model can limit the pull rod and the supporting platform by passing through the first hole and the second hole through the limit bolt when the pull rod and the supporting platform are adjusted. The stability of installing the decorative engineering tile can be further realized when installing the engineering tile. The problem that the stability of the decoration engineering ceramic tile is poor when the decoration engineering ceramic tile is installed and carried is solved.
Drawings
The utility model is further described below with reference to the accompanying drawings.
FIG. 1 is a perspective view of the present utility model;
FIG. 2 is a top view of the present utility model;
FIG. 3 is a cross-sectional view of the present utility model;
FIG. 4 is a schematic view of the structure of the base and the fixed platform of the present utility model;
FIG. 5 is a schematic view of the cooperation structure of a plurality of ejector pins according to the present utility model;
1, a base; 11. an arc column; 12. a fixed platform; 13. a push rod; 14. a gasket; 15. a spring; 16. a control platform; 17. a slide block; 18. a pull rod; 19. a support platform; 2. a limit bolt; 20. a first hole; 21. a second hole; 3. a cutting sleeve; 31. a movable block; 32. a first connection block; 33. a tension spring; 34. a second connection block; 4. a suction cup; 5. a holding platform; 51. a grip; 6. a wheel; 61. a hubcap; 62. and (5) connecting the columns.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1
Referring to fig. 1 to 4, a tile installation device for decoration engineering comprises a base 1; an arc column 11 is fixedly connected to the top of the base 1; the top of the arc-shaped column 11 is fixedly connected with a fixed platform 12; the fixed platform 12 is connected with a push rod 13 in a penetrating way; the fixed platform 12 is in sliding fit with the ejector rod 13; a gasket 14 is fixedly connected to the end part of the ejector rod 13; the side wall of the gasket 14 is fixedly connected with a spring 15; the end part of the spring 15 is fixedly connected with the side wall of the fixed platform 12; the spring 15 is sleeved in the middle of the ejector rod 13; the ejector rods 13 are provided with a plurality of groups on the fixed platform 12; the top of the base 1 is fixedly connected with a control platform 16; the middle part of the control platform 16 is connected with a sliding block 17 in a sliding way; a pull rod 18 is connected in a penetrating manner at the middle part of the sliding block 17; the side end of the pull rod 18 is fixedly connected with a supporting platform 19. The independently telescopic ejector rod 13 can realize that when the decoration engineering ceramic tile is placed at the top of the fixed platform 12, the problem of damage caused by poor stability and falling off of the decoration engineering ceramic tile during carrying due to the specification of the decoration engineering ceramic tile is not easy to occur, and the position of the supporting platform 19 can be adjusted by controlling the platform 16 to be linked through the sliding block 17 and the pull rod 18 during installation, so that the stability of the decoration engineering ceramic tile during installation is maintained; the installation of the decorative engineering tile is completed by pushing the spacer 14 by the control platform 16. When the decoration engineering ceramic tile is installed, the ejector rod 13 can reset due to the elastic tension of the spring 15. The problem that the decoration engineering ceramic tile is poor in fixing stability caused by inapplicability of the specification of the decoration engineering ceramic tile when the decoration engineering ceramic tile is installed and carried is solved, and the problem that the decoration engineering ceramic tile is easy to fall off and damage in the process of carrying the ceramic tile is solved.
A first hole 20 is formed in the middle of the pull rod 18; the first holes 20 are provided with a plurality of groups on the pull rod 18; the side wall of the control platform 16 is provided with a second hole 21; the second holes 21 are provided with a plurality of groups on the control platform 16; the second hole 21 is connected with a limit bolt 2 in a sliding way; the limit bolt 2 is in sliding fit with the control platform 16 and the sliding block 17. A plurality of groups of first holes 20 are formed in the side end of the ejector rod 13, a plurality of groups of second holes 21 are formed in the side end of the control platform 16, the middle part of the sliding block 17 penetrates through the pull rod 18, and the first holes 20 are formed in the side end of the sliding block 17; the limiting can be performed by the limiting bolt 2 passing through the first hole 20 and the second hole 21 when adjusting the pull rod 18 and the supporting platform 19. The stability of installing the decorative engineering tile can be further realized when installing the engineering tile. The problem that the stability of the decoration engineering ceramic tile is poor when the decoration engineering ceramic tile is installed and carried is solved.
The top end and the side end of the fixed platform 12 are fixedly connected with a clamping sleeve 3; a second connecting block 34 is fixedly connected to the top end of the clamping sleeve 3; the side wall of the clamping sleeve 3 is connected with a movable block 31 in a sliding manner; the top end of the movable block 31 is fixedly connected with a first connecting block 32; a tension spring 33 is connected between the first connecting block 32 and the second connecting block 34. The first connecting block 32 and the second connecting block 34 are connected in a transmission manner by a tension spring 33 for adjusting the distance between the clamping sleeve 3 and the movable block 31. This allows the decorative engineered tile to be better secured to the mounting platform 12 during handling and installation, further reducing the stability of the installed engineered tile. The problems that the fixing stability of the decoration engineering ceramic tile is poor and the decoration engineering ceramic tile is easy to fall off and damage caused by inapplicability of the specification of the decoration engineering ceramic tile are reduced when the decoration engineering ceramic tile is installed and carried.
The top of each ejector rod 13 is fixedly connected with a sucker 4; the diameter of the sucker 4 is equal to that of the ejector rod 13. Through increasing there is sucking disc 4 on ejector pin 13 top, can be when decorating engineering ceramic tile and placing at fixed platform 12 top, sucking disc 4 and decorating engineering ceramic tile middle part contact realize decorating engineering ceramic tile's absorption, the setting of sucking disc 4 can be spaced between ejector pin 13 tip and decorating engineering ceramic tile simultaneously to reduce the damage problem that ejector pin 13 tip and decorating engineering ceramic tile contact lead to.
The side end of the pull rod 18 is fixedly connected with a holding platform 5; the side end of the holding platform 5 is fixedly connected with a grip 51. The holding platform 5 is added to the side end of the pull rod 18, and the grip 51 is fixedly connected to the side end of the holding platform 5. The grip 51 can be held when the jack 13 is adjusted so that the adjustment is smoother.
A connecting column 62 is fixedly connected to the bottom end of the base 1; the bottom end of the connecting column 62 is fixedly connected with a hub cap 61; the wheel 6 is connected to the inside of the hub cap 61. The base 1 can be provided with the mobility through the wheels 6, so that the tile mounting is more stable in the decoration engineering.
The working principle is that the independently telescopic ejector rod can realize that when the decoration engineering ceramic tile is placed at the top of the fixed platform 12, the problem of damage caused by poor stability and falling off of the decoration engineering ceramic tile during carrying due to the specification of the decoration engineering ceramic tile is not easy to occur, and the position of the supporting platform 19 can be adjusted by controlling the platform 16 to be linked through the sliding block 17 and the pull rod 18 during installation, so that the stability of the decoration engineering ceramic tile during installation is maintained; the installation of the decorative engineering tile is completed by pushing the spacer 14 by the control platform 16. When the decoration engineering ceramic tile is installed, the ejector rod 13 can reset due to the elastic tension of the spring 15. A plurality of groups of first holes 20 are formed in the side end of the ejector rod 13, a plurality of groups of second holes 21 are formed in the side end of the control platform 16, the middle part of the sliding block 17 penetrates through the pull rod 18, and the first holes 20 are formed in the side end of the sliding block 17; the limiting can be performed by the limiting bolt 2 passing through the first hole 20 and the second hole 21 when adjusting the pull rod 18 and the supporting platform 19. The first connecting block 32 and the second connecting block 34 are connected in a transmission manner by a tension spring 33 for adjusting the distance between the clamping sleeve 3 and the movable block 31. By adding the sucker 4 at the top end of the ejector rod 13, when the decoration engineering ceramic tile is placed at the top of the fixed platform 12, the sucker 4 is contacted with the middle part of the decoration engineering ceramic tile, so that the decoration engineering ceramic tile is adsorbed; the holding platform 5 is added to the side end of the pull rod 18, and the grip 51 is fixedly connected to the side end of the holding platform 5. The grip 51 can be held when the jack 13 is adjusted so that the adjustment is smoother. The base 1 can be provided with the mobility through the wheels 6, so that the tile mounting is more stable in the decoration engineering.
In the description of the present specification, the descriptions of the terms "one embodiment," "example," "specific example," and the like, mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present utility model. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiments or examples. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims.
Claims (6)
1. The utility model provides a decoration engineering ceramic tile installation device which characterized in that: comprises a base (1); an arc column (11) is fixedly connected to the top of the base (1); a fixed platform (12) is fixedly connected to the top of the arc column (11); the fixed platform (12) is connected with a push rod (13) in a penetrating way; the fixed platform (12) is in sliding fit with the ejector rod (13); a gasket (14) is fixedly connected to the end part of the ejector rod (13); a spring (15) is fixedly connected to the side wall of the gasket (14); the end part of the spring (15) is fixedly connected with the side wall of the fixed platform (12); the spring (15) is sleeved at the middle part of the ejector rod (13); the ejector rods (13) are provided with a plurality of groups on the fixed platform (12); a control platform (16) is fixedly connected to the top of the base (1); a sliding block (17) is connected to the middle part of the control platform (16) in a sliding manner; a pull rod (18) is connected in a penetrating way at the middle part of the sliding block (17); and a supporting platform (19) is fixedly connected to the side end of the pull rod (18).
2. A decorative engineering tile installation device according to claim 1, wherein: a first hole (20) is formed in the middle of the pull rod (18); the first holes (20) are provided with a plurality of groups on the pull rod (18); a second hole (21) is formed in the side wall of the control platform (16); the second holes (21) are provided with a plurality of groups on the control platform (16); the second hole (21) is connected with a limit bolt (2) in a sliding way; the limit bolt (2) is in sliding fit with the control platform (16) and the sliding block (17).
3. A decorative engineering tile installation device according to claim 2, wherein: the top end and the side end of the fixed platform (12) are fixedly connected with a clamping sleeve (3); a second connecting block (34) is fixedly connected to the top end of the clamping sleeve (3); the side wall of the clamping sleeve (3) is connected with a movable block (31) in a sliding manner; a first connecting block (32) is fixedly connected to the top end of the movable block (31); a tension spring (33) is connected between the first connecting block (32) and the second connecting block (34).
4. A decorative engineered tile installation device as in claim 3, wherein: the top of each ejector rod (13) is fixedly connected with a sucker (4); the diameter of the sucker (4) is equal to that of the ejector rod (13).
5. A decorative engineered tile installation device as in claim 4, wherein: a holding platform (5) is fixedly connected to the side end of the pull rod (18); the side end of the holding platform (5) is fixedly connected with a handle (51).
6. A decorative engineered tile installation device as in claim 5, wherein: a connecting column (62) is fixedly connected to the bottom end of the base (1); the bottom end of the connecting column (62) is fixedly connected with a hubcap (61); the wheel hub cover (61) is internally connected with wheels (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322654292.8U CN220814772U (en) | 2023-09-27 | 2023-09-27 | Decoration engineering ceramic tile installation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322654292.8U CN220814772U (en) | 2023-09-27 | 2023-09-27 | Decoration engineering ceramic tile installation device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220814772U true CN220814772U (en) | 2024-04-19 |
Family
ID=90708036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322654292.8U Active CN220814772U (en) | 2023-09-27 | 2023-09-27 | Decoration engineering ceramic tile installation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220814772U (en) |
-
2023
- 2023-09-27 CN CN202322654292.8U patent/CN220814772U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109138386B (en) | Clamping method with function of placing multiple ceramic tiles at one time | |
CN107859340A (en) | A kind of construction site ceramic tile conveying arrangement | |
CN220814772U (en) | Decoration engineering ceramic tile installation device | |
CN105643816B (en) | A kind of hand-powered cutter with mosaic brick cutting function | |
CN112575990B (en) | Leveling frame structure and installation method thereof | |
CN211548650U (en) | Construction assembly for paving square floor tiles | |
CN218264799U (en) | Decorate engineering ceramic tile installation auxiliary structure | |
CN114837383B (en) | Rubber ceramic tile laying device convenient to location is laid | |
CN112443141A (en) | Vertical automatic wall tile sticking device for building construction | |
CN210598058U (en) | Ware is inlayed to interior outer wall ceramic tile for building | |
CN209907879U (en) | Fixing device for pasting and leveling inner wall bricks | |
CN211313269U (en) | Height elevator for decorating ceramic tiles | |
CN222140616U (en) | Decoration engineering ceramic tile auxiliary installation structure | |
CN212002119U (en) | Vertical automatic wall tile sticking device for building construction | |
CN218438074U (en) | Decorate engineering ceramic tile installation auxiliary structure | |
CN110206326B (en) | Floor brick tiling is with handling device | |
CN222333215U (en) | A ceramic tile mosaic automatic paving device | |
CN221481450U (en) | Curtain wall mounting and placing rack | |
CN220747533U (en) | Foaming ceramic moulding | |
CN214364783U (en) | Laying device for green tile construction | |
CN112482716A (en) | Green's ceramic tile laying auxiliary device for interior decoration | |
CN219471472U (en) | Floor tile pasting equipment | |
CN221972929U (en) | Wall tile laying device with adjustable size | |
CN211030737U (en) | Novel simple and easy cutting of pottery brick device | |
CN220486991U (en) | Leveling device for tile installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: Room 1106, 11th Floor, No. 298-1, Guangshen Avenue West, Xintang Town, Zengcheng District, Guangzhou City, Guangdong Province, 510000 Patentee after: Guangzhou Tianyu Construction Engineering Co.,Ltd. Country or region after: China Address before: Room 408, No. 4326 Huangpu East Road, Huangpu District, Guangzhou City, Guangdong Province, 510700 (Office only) Patentee before: Guangzhou Yanjia Electromechanical Decoration Engineering Co.,Ltd. Country or region before: China |