CN220777602U - Novel engineering cost budgeting toolbox - Google Patents

Novel engineering cost budgeting toolbox Download PDF

Info

Publication number
CN220777602U
CN220777602U CN202322510726.7U CN202322510726U CN220777602U CN 220777602 U CN220777602 U CN 220777602U CN 202322510726 U CN202322510726 U CN 202322510726U CN 220777602 U CN220777602 U CN 220777602U
Authority
CN
China
Prior art keywords
connecting block
box body
box
project cost
fixedly arranged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322510726.7U
Other languages
Chinese (zh)
Inventor
区景贤
林冰蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Design Institute Group Co ltd
Original Assignee
Guangzhou Design Institute Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Design Institute Group Co ltd filed Critical Guangzhou Design Institute Group Co ltd
Priority to CN202322510726.7U priority Critical patent/CN220777602U/en
Application granted granted Critical
Publication of CN220777602U publication Critical patent/CN220777602U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Workshop Equipment, Work Benches, Supports, Or Storage Means (AREA)

Abstract

The utility model discloses a novel engineering cost budget tool box, which comprises a main body unit, wherein the main body unit comprises a box body and a plurality of handles fixedly arranged on two sides of the box body, one side of the box body is connected with a tool cabinet in a sliding manner, the lifting adjusting unit comprises a motor mounting seat fixedly arranged at the bottom of one side of the box body far away from the tool cabinet, a driving assembly is arranged on the motor mounting seat, a connecting block is fixedly arranged at one end of the driving assembly far away from the motor mounting seat, a plurality of rotating assemblies are fixedly connected at one end of the connecting block far away from the driving assembly, and a workbench is fixedly arranged at one end of the rotating assemblies far away from the connecting block together. According to the utility model, the height and the angle of the workbench are adjusted, so that the workers can adjust according to personal use requirements, the comfort level of the workers in work is increased, and the working strength of the workers is reduced.

Description

Novel engineering cost budgeting toolbox
Technical Field
The utility model relates to the technical field of engineering cost equipment, in particular to a novel engineering cost budget tool box.
Background
The project cost refers to all costs for carrying out a certain project construction, and the main task of the project cost is that according to drawing, quota and list specification, the project cost budget needs to be based on the result of field investigation, and the work of measurement, recording, drawing and the like needs to be carried out in the field investigation process, so that the project cost budget tool box needs to be carried in the field investigation process.
When various drawing data, measuring tools, recording tools and the like are placed in the project cost budget tool box, a supporting workbench is needed when drawing, recording and other works are carried out, otherwise, only the upper end face of the project cost budget tool box can carry out drawing, recording and other works, in the prior art, in the project cost budget of the project cost, workers need to carry the project cost budget tool box to conduct on-site investigation, real-time data recording is needed, however, in the process of on-site investigation, due to the lack of the workbench, the workers do on the upper side wall of the tool box in the operation of drawing, real-time data recording and the like, and because the height of the tool box is fixed, the workers cannot adjust the height of the upper side wall of the tool box according to personal use requirements, and the workers record data and drawing on the tool box for a long time, so that great physical fatigue is easily brought to the workers.
Disclosure of Invention
This section is intended to outline some aspects of embodiments of the utility model and to briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section as well as in the description summary and in the title of the application, to avoid obscuring the purpose of this section, the description summary and the title of the utility model, which should not be used to limit the scope of the utility model.
The present utility model has been made in view of the above-mentioned problems with existing new engineering cost budgeting tool boxes.
Therefore, the utility model aims to provide a novel engineering cost budget tool box, which is suitable for solving the problems that due to the lack of a workbench, the tool box is highly fixed, and workers record data and drawings on the tool box for a long time, and great physical fatigue is easily brought to the workers.
In order to solve the technical problems, the utility model provides the following technical scheme: a novel project cost budgeting kit comprising:
the main body unit comprises a box body and a plurality of handles fixedly arranged on two sides of the box body, and one side of the box body is connected with a tool cabinet in a sliding manner;
the lifting adjusting unit comprises a motor installation seat fixedly installed at the bottom of one side of the box body far away from the tool cabinet, a driving assembly is installed on the motor installation seat, a connecting block is fixedly installed at one end of the driving assembly far away from the motor installation seat, a plurality of rotating assemblies are fixedly connected at one end of the connecting block far away from the driving assembly, and a plurality of work tables are fixedly installed at one ends of the rotating assemblies far away from the connecting block together.
As a preferred scheme of the novel engineering cost budget tool case, the utility model comprises the following steps: the driving assembly comprises a servo motor fixedly mounted on a motor mounting seat, a screw rod is connected to the output end of the servo motor, a movable sleeve which is in vertical sliding connection with the box body is connected to the screw rod in a threaded manner, and one end, far away from the servo motor, of the movable sleeve is fixedly connected with the connecting block.
As a preferred scheme of the novel engineering cost budget tool case, the utility model comprises the following steps: every rotating assembly all includes the U type frame with connecting block fixed connection, the both ends inboard that the connecting block was kept away from to the U type frame is fixed mounting respectively has the concave gear piece that corresponds, the one end that the connecting block was kept away from to the U type frame runs through and is provided with the spliced pole, a plurality of concave gear pieces, spliced pole one end fixed mounting has the screens piece, and spliced pole other end fixedly connected with limiting plate, rotate the cover on the spliced pole and be equipped with the convex gear piece with concave gear piece meshing, a plurality of convex gear pieces are connected with the workstation jointly through the linking arm that corresponds.
As a preferred scheme of the novel engineering cost budget tool case, the utility model comprises the following steps: the box body is internally provided with a drawing storage tank, a cover plate matched with the drawing storage tank is hinged at the opening of the drawing storage tank, and a limiting pin corresponding to the cover plate is fixedly arranged at the lower end of the opening of the drawing storage tank.
As a preferred scheme of the novel engineering cost budget tool case, the utility model comprises the following steps: a plurality of drawing frames are fixedly installed in the drawing storage tank, and the drawing frames are regularly and orderly arranged.
As a preferred scheme of the novel engineering cost budget tool case, a stool is slidably arranged at the lower part of the inner cavity of the case, the stool and the case are slidably connected with a chute through a sliding block, and a plurality of rotation limiting blocks are rotatably arranged at two sides of the opening of the case close to the stool.
The utility model has the beneficial effects that: after the engineering cost budgeting toolbox is placed, the servo motor is started, the servo motor positively rotates to drive the movable sleeve to lift, the movable sleeve enables the workbench to lift along with the movable sleeve through the connecting block, when the movable sleeve is lifted to a proper height, the clamping block is opened, the inclination of the workbench is adjusted, after the movable sleeve is adjusted to a proper angle, the workbench is fastened to the clamping block, the workbench can be fixed, the worker can adjust according to personal use requirements by adjusting the height and the angle of the workbench, the comfort level of the worker in the working process is increased, and the working strength of the worker is reduced.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings required for the description of the embodiments will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art. Wherein:
FIG. 1 is a schematic diagram of the overall structure of a novel project cost budgeting tool box according to the present utility model;
FIG. 2 is a schematic diagram of a lifting adjusting unit of a novel project cost budgeting tool box according to the present utility model;
FIG. 3 is a schematic diagram of a rotating assembly of a novel project cost budgeting kit according to the present utility model;
FIG. 4 is a schematic front view of a novel project cost budgeting kit according to the present utility model.
FIG. 5 is a schematic diagram showing the structure of the U-shaped frame and the connecting column of the novel project cost budget tool case according to the present utility model
Description of the drawings: 100 main body units, 101 boxes, 102 handles, 103 tool cabinets, 104 drawing storage tanks, 105 cover plates, 106 limit pins, 107 stools, 108 drawing frames, 200 lifting adjusting units, 201 motor installation seats, 202A driving components, 2021 servo motors, 2022 screw rods, 2023 movable sleeves, 2024 limit blocks, 203 connecting blocks, 204A rotating components, 2041U-shaped frames, 2042 concave gear blocks, 2043 clamping blocks, 2044 connecting columns, 2045 limit plates, 2046 convex gear blocks and 205 work tables.
Detailed Description
In order that the above-recited objects, features and advantages of the present utility model will become more readily apparent, a more particular description of the utility model will be rendered by reference to specific embodiments thereof which are illustrated in the appended drawings.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, but the present utility model may be practiced in other ways other than those described herein, and persons skilled in the art will readily appreciate that the present utility model is not limited to the specific embodiments disclosed below.
Further, reference herein to "one embodiment" or "an embodiment" means that a particular feature, structure, or characteristic can be included in at least one implementation of the utility model. The appearances of the phrase "in one embodiment" in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments.
Further, in describing the embodiments of the present utility model in detail, the cross-sectional view of the device structure is not partially enlarged to a general scale for convenience of description, and the schematic is only an example, which should not limit the scope of protection of the present utility model. In addition, the three-dimensional dimensions of length, width and depth should be included in actual fabrication.
Referring to fig. 1 to 5, for one embodiment of the present utility model, a novel construction cost budget kit is provided, which includes a main body unit 100 and a lifting adjusting unit 200.
The main body unit 100 comprises a box body 101 and a plurality of handles 102 fixedly arranged on two sides of the box body 101, one side of the box body 101 is slidably connected with a tool cabinet 103, a drawing storage groove 104 is formed in the box body 101, a cover plate 105 matched with the drawing storage groove 104 is hinged at the opening of the drawing storage groove 104, a limiting pin 106 corresponding to the cover plate 105 is fixedly arranged at the lower end of the opening of the drawing storage groove 104, a plurality of drawing frames 108 are fixedly arranged in the drawing storage groove 104 and can not mix with tools, the plurality of drawing frames 108 are regularly and orderly arranged, the drawn drawing can be rolled up and sleeved on the drawing frames 108 through the arrangement of the drawing frames 108, the drawing can not mix together, a stool 107 is slidably arranged at the lower part of an inner cavity of the box body 101, a plurality of rotation limiting blocks are rotatably arranged on two sides of the opening of the box body 101 close to the stool 107, and a worker can draw in a working state through the arrangement of the stool 107;
the lifting adjusting unit 200 comprises a motor mounting seat 201 fixedly mounted at the bottom of one side of the box body 101 far away from the tool cabinet 103, a driving component 202A is mounted on the motor mounting seat 201, the driving component 202A comprises a servo motor 2021 fixedly mounted on the motor mounting seat 201, the output end of the servo motor 2021 is connected with a screw rod 2022, a movable sleeve 2023 which is vertically and slidingly connected with the box body is connected with the screw rod 2022 through threads, one end of the movable sleeve 2023 far away from the servo motor 2021 is fixedly connected with a connecting block 203, the height of the workbench 205 can be adjusted through the arrangement of the driving component 202A, the connecting block 203 is fixedly mounted at one end of the driving component 202A far away from the motor mounting seat 201, a plurality of rotating components 204A are fixedly connected at one end of the connecting block 203 far away from the driving component 202A, each rotating component 204A comprises a U-shaped frame 2041 fixedly connected with the connecting block 203, the U-shaped frame 2041 is made of metal material, the metal has higher toughness and better elasticity, ductility and plasticity, the angle adjustment is carried out by matching with the clamping blocks 2043, the U-shaped frame 2041 is in sliding connection with the connecting column 2044, the corresponding concave gear blocks 2042 are respectively and fixedly arranged at the inner sides of the two ends of the U-shaped frame 2041 far away from the connecting block 203, the connecting column 2044 is arranged at one end of the U-shaped frame 2041 far away from the connecting block 203 in a penetrating way, the plurality of concave gear blocks 2042 are fixedly arranged at one end of the connecting column 2044, the clamping blocks 2043 consist of two cylinders with different centers, the clamping blocks 2043 can realize the position adjustment of the connecting column 2044 through the two cylinders with different centers, so that the two ends of the U-shaped frame 2041 are pressed or loosened, the limiting disc 2045 is fixedly connected at the other end of the connecting column 2044, the convex gear blocks 2046 meshed with the concave gear blocks 2042 are sleeved on the connecting column 2044 in a rotating way, the plurality of cam gear blocks 2046 are commonly connected to the table 205 by corresponding connecting arms.
In the use process, after the engineering cost budgeting toolbox is placed, the servo motor 2021 is started, the servo motor 2021 rotates forward to drive the screw rod 2022 fixedly arranged on the servo motor 2021 to rotate forward, the screw rod 2022 rotates forward to drive the movable sleeve 2023 which is in sliding connection with the box body 101 to move upwards, the movable sleeve 2023 enables the workbench 205 to rise along with the movable sleeve 2023 through the connecting block 203, when the movable sleeve is lifted to a proper height, the clamping block 2043 is opened, the concave gear blocks 2042 fixedly arranged on the inner sides of the two ends of the U-shaped frame 2041 are separated from the convex gear blocks 2046 on the connecting column 2044, the convex gear blocks 2046 can rotate on the connecting column 2044, the inclination angle of the workbench 205 is adjusted, after the movable sleeve is adjusted to a proper angle, the clamping block 2043 can enable the workbench 205 to be fixed, then the workbench 205 can be reset after the work is completed, the workbench 205 is adjusted according to personal use requirements, the comfort of a worker is improved, and the work strength of the worker is reduced.
It should be noted that the above embodiments are only for illustrating the technical solution of the present utility model and not for limiting the same, and although the present utility model has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the technical solution of the present utility model may be modified or substituted without departing from the spirit and scope of the technical solution of the present utility model, which is intended to be covered in the scope of the claims of the present utility model.

Claims (6)

1. A novel project cost budgeting toolbox, comprising:
the main body unit (100) comprises a box body (101) and a plurality of handles (102) fixedly arranged on two sides of the box body (101), wherein one side of the box body (101) is connected with a tool cabinet (103) in a sliding manner;
lifting adjustment unit (200), it includes fixed mounting keeps away from motor mount pad (201) of tool cabinet (103) one side bottom at box (101), install drive assembly (202A) on motor mount pad (201), drive assembly (202A) keep away from one end fixed mounting of motor mount pad (201) have connecting block (203), drive assembly (202A) were kept away from to connecting block (203) one end fixedly connected with a plurality of rotating assemblies (204A), a plurality of rotating assemblies (204A) are kept away from connecting block (203) one end common fixed mounting has workstation (205).
2. A novel project cost budgeting kit as claimed in claim 1, wherein: the driving assembly (202A) comprises a servo motor (2021) fixedly mounted on a motor mounting seat (201), a screw rod (2022) is connected to the output end of the servo motor (2021), a movable sleeve (2023) which is in vertical sliding connection with the box body is connected to the screw rod (2022) in a threaded mode, and one end, away from the servo motor (2021), of the movable sleeve (2023) is fixedly connected with the connecting block (203).
3. A novel project cost budgeting kit as claimed in claim 1, wherein: every rotating assembly (204A) all include with connecting block (203) fixed connection's U type frame (2041), the both ends inboard that connecting block (203) was kept away from to U type frame (2041) is fixed mounting respectively has corresponding concave gear piece (2042), and the one end that connecting block (203) was kept away from to U type frame (2041) runs through and is provided with spliced pole (2044), spliced pole (2044) one end fixed mounting has clamping piece (2043), and spliced pole (2044) other end fixedly connected with limiting plate (2045), rotate on spliced pole (2044) cover be equipped with concave gear piece (2046) of meshing, a plurality of convex gear pieces (2046) are connected with workstation (205) jointly through corresponding linking arm.
4. A novel project cost budgeting kit as claimed in claim 1, wherein: a drawing storage groove (104) is formed in the box body (101), a cover plate (105) matched with the drawing storage groove (104) is hinged to the opening of the drawing storage groove (104), and a limiting pin (106) corresponding to the cover plate (105) is fixedly arranged at the lower end of the opening of the drawing storage groove (104).
5. A novel project cost budgeting kit as recited in claim 4, wherein: a plurality of drawing frames (108) are fixedly arranged in the drawing storage groove (104), and the drawing frames (108) are regularly and orderly arranged.
6. A novel project cost budgeting kit as claimed in claim 1, wherein: the box (101) inner chamber lower part slidable mounting has stool (107), stool (107) pass through slider and spout sliding connection with box (101), box (101) opening is close to stool (107) both sides and rotates and install a plurality of rotation stopper.
CN202322510726.7U 2023-09-15 2023-09-15 Novel engineering cost budgeting toolbox Active CN220777602U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322510726.7U CN220777602U (en) 2023-09-15 2023-09-15 Novel engineering cost budgeting toolbox

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322510726.7U CN220777602U (en) 2023-09-15 2023-09-15 Novel engineering cost budgeting toolbox

Publications (1)

Publication Number Publication Date
CN220777602U true CN220777602U (en) 2024-04-16

Family

ID=90655570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322510726.7U Active CN220777602U (en) 2023-09-15 2023-09-15 Novel engineering cost budgeting toolbox

Country Status (1)

Country Link
CN (1) CN220777602U (en)

Similar Documents

Publication Publication Date Title
CN210996578U (en) Double-end boring machine
CN210500147U (en) Positioning device for aluminum alloy door and window processing
CN220777602U (en) Novel engineering cost budgeting toolbox
CN214816716U (en) Horizontal boring and milling machining clamp
CN214816718U (en) Positioning device for processing aluminum alloy doors and windows
CN213729611U (en) Automatic change integral type milling machine
CN218875004U (en) Oversized aluminum alloy frame surface treatment equipment
CN114831417B (en) Construction engineering cost accounting system
CN206781387U (en) Engraving machine and its charging positioning device
CN216175511U (en) Adjusting device for numerical control bending machine
CN215660098U (en) Medical joint fixing device convenient to clamp
CN215114446U (en) Panel roughness detection device
CN211465243U (en) Multifunctional welding workbench
CN211539272U (en) Be applied to last work or material rest of bender
CN210981712U (en) Switch pendulum impact testing machine
CN209717219U (en) A kind of Large size Aluminium plate cold pressing trimmer
CN219881355U (en) Processing equipment is used in water pump production
CN214924347U (en) Auxiliary device is used in multi-functional auto repair
CN217195753U (en) Perforating device convenient to store for office
CN212600458U (en) Carving mills machine convenient to fixed work piece
CN221023035U (en) Numerical control engraving machine for wooden artware
CN213632118U (en) A adjustable mapping device for real estate survey and drawing
CN218541440U (en) Triangular hanging rack for straight wall
CN221020312U (en) High-precision grinding machine convenient to adjust
CN221064960U (en) Precise welding tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant