CN220769472U - Excavation scaffold for tunnel blasting - Google Patents

Excavation scaffold for tunnel blasting Download PDF

Info

Publication number
CN220769472U
CN220769472U CN202322464170.2U CN202322464170U CN220769472U CN 220769472 U CN220769472 U CN 220769472U CN 202322464170 U CN202322464170 U CN 202322464170U CN 220769472 U CN220769472 U CN 220769472U
Authority
CN
China
Prior art keywords
slide
rod
sliding
hole
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322464170.2U
Other languages
Chinese (zh)
Inventor
张富钧
陈炳杉
辛东财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baishan Jin'an Blasting Engineering Co ltd
Original Assignee
Baishan Jin'an Blasting Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baishan Jin'an Blasting Engineering Co ltd filed Critical Baishan Jin'an Blasting Engineering Co ltd
Priority to CN202322464170.2U priority Critical patent/CN220769472U/en
Application granted granted Critical
Publication of CN220769472U publication Critical patent/CN220769472U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an excavation construction frame for tunnel blasting, which comprises a frame, wherein the frame comprises a six-way connecting piece, a vertical supporting rod, a horizontal supporting rod, a sliding rod and a diagonal supporting rod, the vertical supporting rod, the horizontal supporting rod and the sliding rod are respectively arranged in a vertical through hole of the six-way connecting piece, a horizontal left end through hole and a horizontal right end through hole and a horizontal front end through hole and a horizontal rear end through hole, two pairs of sliding drums are sleeved outside the sliding rod, a pair of sliding drums at two ends are fixedly arranged on the sliding rod tightly attached to the wall surface of the six-way connecting piece, and a central pair of sliding drums are movably arranged on the sliding rod.

Description

Excavation scaffold for tunnel blasting
Technical Field
The utility model relates to the technical field of tunnel construction, in particular to an excavation construction frame for tunnel blasting.
Background
In the tunnel construction process, the method is often required to be applied to a tunnel construction frame, and the tunnel construction frame is used for supporting the inner wall of a tunnel or connecting other supporting steel frames.
Currently, in order to provide a safe aerial work platform for construction workers, criss-cross steel pipes are required to be connected into various forms of safe work frames by fasteners, but the fasteners (particularly the screws thereof) are easy to lose, and the connection quality of the fastener nodes is obviously affected by the quality of the fasteners and the operation of workers.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides an excavation construction frame for tunnel blasting, which solves the problems in the prior art.
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the utility model provides a tunnel blasting is with excavation scaffold, includes the frame, the frame includes six-way connecting piece, vertical bracing piece, horizontal bracing piece, slide bar and diagonal bracing piece, the vertical bracing piece the horizontal bracing piece with the slide bar install respectively in the vertical direction through-hole of six-way connecting piece, in the horizontal direction left and right sides end through-hole and in the horizontal direction front and back end through-hole, the slide bar overcoat is equipped with two pairs of smooth drums, a pair of both ends smooth drum fixed mounting in hugging closely six-way connecting piece wall the slide bar is last, central a pair of smooth drum activity in on the slide bar, a pair of diagonal bracing piece's bottom adopts fixing bolt to install respectively on the smooth drum that the slide bar both ends are fixed, a pair of diagonal bracing piece is crossed the back top respectively adopts fixing bolt installs in last layer slide bar central authorities are movable a pair of smooth drum.
Preferably, the vertical support rod, the horizontal support rod and the sliding rod are all in cylindrical steel pipe structures, two ends of the vertical support rod, the horizontal support rod and the sliding rod are all screwed in the through hole of the six-way connecting piece in a threaded fit mode, and the inner diameter of the sliding cylinder is equal to the outer diameter of the sliding rod.
Preferably, the inclined support rod adopts a hollow square steel structure with a rectangular section, and the fixing bolt penetrates through the wall surface of the inclined support rod and is screwed on the sliding cylinder.
Preferably, the sliding cylinder is rotatably connected with the fixing bolt in the direction of the other side of the inclined supporting rod, and the fixing bolt penetrates through the surface of the sliding cylinder wall to be in contact with the sliding rod.
Preferably, the sliding barrels fixedly arranged at the two ends of the sliding rod are fixed in a welding mode.
Preferably, the sliding barrels are not mounted at the two ends of the topmost sliding rod.
Preferably, the bottom layer of the through hole vertically downward of the six-way connecting piece is internally provided with a self-locking universal wheel.
Advantageous effects
The utility model provides an excavation construction frame for tunnel blasting, which has the following beneficial effects: the device has the advantages of simple structure, folding and storing when not in use, convenient installation while saving space, stretching of the sliding rod when in installation, fixing through the screwing of the vertical supporting rod and the horizontal supporting rod, difficulty in losing parts, simple operation, stable connection quality and convenient installation of workers.
Drawings
Fig. 1 is a schematic structural view of an excavation construction frame for tunnel blasting according to the present utility model.
In the figure: 1. a six-way connecting piece; 2. a vertical support bar; 3. a horizontal support bar; 4. a slide bar; 5. a slide cylinder; 6. a slide cylinder fixing bolt; 7. a diagonal support bar; 8. and fixing bolts for the inclined support rods.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are only some, but not all embodiments of the utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1, the present utility model provides a technical scheme of an excavation construction frame for tunnel blasting, which comprises: the utility model provides a tunnel blasting is with excavation scaffold, includes the frame, the frame includes six-way connecting piece 1, vertical support pole 2, horizontal support pole 3, slide bar 4 and diagonal brace 7, vertical support pole 2 horizontal support pole 3 with slide bar 4 install respectively in six-way connecting piece 1's vertical direction through-hole, horizontal direction left and right ends through-hole and horizontal direction front and back end through-hole, slide bar 4 overcoat is equipped with two pairs of slide drums 5, a pair of both ends slide drum 5 fixed mounting in hugs closely on the slide bar 4 of six-way connecting piece 1 wall, central a pair of slide drum 5 activity in on the slide bar 4, a pair of diagonal brace 7's bottom adopts fixing bolt 6 to install respectively the slide bar 4 both ends are fixed on the slide drum 5, a pair of diagonal brace 7 is crossed the back top respectively adopted fixing bolt 6 installs in last layer slide bar 4 central authorities move a pair of slide drum 5.
Furthermore, the vertical support rod 2, the horizontal support rod 3 and the slide rod 4 are all in cylindrical steel pipe structures, two ends of the vertical support rod 2, the horizontal support rod 3 and the slide rod 4 are all screwed in the through hole of the six-way connecting piece 1 in a threaded fit mode, and the inner diameter of the slide cylinder 5 is equal to the outer diameter of the slide rod 4.
Furthermore, the inclined support rod 7 adopts a hollow square steel structure with a rectangular section, and the fixing bolt 6 penetrates through the wall surface of the inclined support rod 7 and is then screwed on the sliding cylinder 5.
Further, the sliding cylinder 5 is screwed with the fixing bolt 6 at the other side direction of the diagonal support rod 7, and the fixing bolt 6 passes through the wall surface of the sliding cylinder 5 to be in contact with the sliding rod 4.
Furthermore, the sliding drums 5 fixedly mounted at the two ends of the sliding rod 4 are fixed in a welding mode.
Further, the sliding cylinders 5 are not installed at the two ends of the sliding rod 4 at the topmost layer.
Further, a self-locking universal wheel is inserted in the vertically downward through hole of the six-way connecting piece 1 at the bottommost layer.
Examples: before the device is used, a plurality of sliding rods 4 are in a folding state, and the sliding rods 4 are folded together for storage through movable sliding cylinders 5 and movable connection between the sliding cylinders 5 and the inclined supporting rods 7.
When the sliding rod fixing device is used, the six-way connecting piece 1 is arranged at the two ends of the sliding rod 4, the sliding rods 4 are lifted layer by layer from top to bottom, after each layer is lifted to a certain height, the vertical supporting rods 2 are screwed in the vertical through holes of the six-way connecting piece 1, the sliding rods 4 are fixed in the vertical direction, and the horizontal supporting rods 3 are used for connecting and fixing the sliding rods 4 of a plurality of groups according to requirements.
After the whole frame is completed, the fixing bolts 6 at all positions are screwed and fixed, the sliding cylinder 5 is fixed on the sliding rod 4 after the fixing bolts 6 on the sliding cylinder 5 are screwed, and the angle between the inclined support rod 7 and the sliding cylinder 5 is fixed after the fixing bolts 6 on the inclined support rod 7 are screwed, so that the frame is supported.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions.

Claims (7)

1. The utility model provides a tunnel blasting is with excavation scaffold, includes the frame, its characterized in that, the frame includes six-way connecting piece (1), vertical support pole (2), horizontal support pole (3), slide bar (4) and diagonal bracing pole (7), vertical support pole (2) horizontal support pole (3) with slide bar (4) install respectively in the vertical direction through-hole of six-way connecting piece (1), in horizontal direction left and right sides end through-hole and horizontal direction front and back end through-hole, slide bar (4) overcoat is equipped with two pairs of slide drums (5), a pair of slide drum (5) fixed mounting at both ends in hugging closely on slide bar (4) of six-way connecting piece (1) wall, a pair of in the center slide drum (5) activity in on slide bar (4), a pair of diagonal bracing pole (7) bottom adoption fixing bolt (6) are installed respectively slide drum (5) both ends are fixed, a pair of diagonal bracing pole (7) are crossed the back top respectively adopt fixing bolt (6) install on a pair of slide bar (4) on the activity slide bar (5).
2. The tunnel blasting excavation construction frame according to claim 1, wherein the vertical support rod (2), the horizontal support rod (3) and the sliding rod (4) are of cylindrical steel pipe structures, two ends of the vertical support rod, the horizontal support rod and the sliding rod (4) are screwed into the through hole of the six-way connecting piece (1) in a threaded fit mode, and the inner diameter of the sliding cylinder (5) is equal to the outer diameter of the sliding rod (4).
3. The tunnel blasting excavation construction frame according to claim 1, wherein the inclined support rod (7) adopts a hollow square steel structure with a rectangular cross section, and the fixing bolt (6) penetrates through the wall surface of the inclined support rod (7) and is then screwed on the sliding cylinder (5).
4. The tunnel blasting excavation construction frame according to claim 1, wherein the slide cylinder (5) is screwed with the fixing bolt (6) in the other side direction of the diagonal support rod (7), and the fixing bolt (6) passes through the wall surface of the slide cylinder (5) to be in contact with the slide rod (4).
5. The tunnel blasting excavation construction frame according to claim 1, wherein the slide barrels (5) fixedly mounted at two ends of the slide rod (4) are fixed in a welding manner.
6. An excavation construction frame for tunnel blasting according to claim 1, wherein the slide bars (4) at the topmost layer are not provided with the slide drums (5) at both ends.
7. The tunnel blasting excavation construction frame according to claim 1, wherein the six-way connecting piece (1) at the bottommost layer is inserted with a self-locking universal wheel in a vertically downward through hole.
CN202322464170.2U 2023-09-12 2023-09-12 Excavation scaffold for tunnel blasting Active CN220769472U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322464170.2U CN220769472U (en) 2023-09-12 2023-09-12 Excavation scaffold for tunnel blasting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322464170.2U CN220769472U (en) 2023-09-12 2023-09-12 Excavation scaffold for tunnel blasting

Publications (1)

Publication Number Publication Date
CN220769472U true CN220769472U (en) 2024-04-12

Family

ID=90620657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322464170.2U Active CN220769472U (en) 2023-09-12 2023-09-12 Excavation scaffold for tunnel blasting

Country Status (1)

Country Link
CN (1) CN220769472U (en)

Similar Documents

Publication Publication Date Title
CN211286566U (en) Wall-attached support of attached lifting scaffold
CN206530056U (en) Construction beam adjustable supporting device
CN220769472U (en) Excavation scaffold for tunnel blasting
CN216616798U (en) Retractable triangle stores pylon
CN212224668U (en) System is assembled on super large box steel column regularization ground
CN220394859U (en) Steel structure upright post with adjustable supporting node
CN220058310U (en) Assembled steel structure frame
CN214117444U (en) Assembled is from riveting node aluminum alloy pylon
CN219909867U (en) Good scaffold frame for construction of stability
CN220704540U (en) Detachable support device for construction
CN219087935U (en) Repair greenhouse capable of being quickly installed and detached
CN219993083U (en) Building construction engineering scaffold
CN220336381U (en) Adjustable scaffold
CN212019827U (en) Steel construction welding operation platform
CN215407589U (en) Assembled architectural design support roof beam board
CN110541558A (en) Building construction scaffold fastener
CN215483549U (en) Connecting device suitable for modularization steel construction
CN220014375U (en) Adjustable construction platform of bracing
CN219220954U (en) Reinforced steel structure of steel structure joint
CN217001042U (en) Temporary support for building construction
CN219952626U (en) Novel overhanging scaffold
CN219411730U (en) Steel structure bracket for house construction engineering
CN213329972U (en) Fixing base for building scaffold
CN215107359U (en) Aluminum mould roof strutting arrangement
CN216641459U (en) Vibrating beam with adjustable foundation construction