CN220768707U - Ceramic tile dry hanging structure - Google Patents

Ceramic tile dry hanging structure Download PDF

Info

Publication number
CN220768707U
CN220768707U CN202322557909.4U CN202322557909U CN220768707U CN 220768707 U CN220768707 U CN 220768707U CN 202322557909 U CN202322557909 U CN 202322557909U CN 220768707 U CN220768707 U CN 220768707U
Authority
CN
China
Prior art keywords
fixedly connected
wall
keel frame
hanging structure
structure according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322557909.4U
Other languages
Chinese (zh)
Inventor
王凯琳
蒋达军
方晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Juntian Architectural Decoration Engineering Co ltd
Original Assignee
Zhejiang Juntian Architectural Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Juntian Architectural Decoration Engineering Co ltd filed Critical Zhejiang Juntian Architectural Decoration Engineering Co ltd
Priority to CN202322557909.4U priority Critical patent/CN220768707U/en
Application granted granted Critical
Publication of CN220768707U publication Critical patent/CN220768707U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to the technical field of tile dry hanging, and discloses a tile dry hanging structure which comprises a first keel frame, wherein a plurality of first screws are connected with the inner threads of the first keel frame, a plurality of first angle aluminum are connected with the upper end of the outer wall of the first keel frame in a sliding mode, a plurality of second screws are connected with the inner threads of the first angle aluminum in a threaded mode, one end of each second screw is connected with the inner portion of the first keel frame in a threaded mode, a supporting plate is fixedly connected with the outer wall of the first keel frame, a buffer plate is fixedly connected with the upper surface of the supporting plate, a plurality of glue injection holes are formed in the buffer plate, a fixing assembly is arranged on one side of the first keel frame, and a buffer side plate is fixedly connected with the outer wall of the fixing assembly. According to the utility model, the elastic gasket, the buffer plate and the buffer side plate are matched in the corner aluminum clamping groove, so that the effect of buffering and protecting the ceramic tile is achieved.

Description

Ceramic tile dry hanging structure
Technical Field
The utility model relates to the technical field of tile dry hanging, in particular to a tile dry hanging structure.
Background
The ceramic tile is made of refractory metal oxide and semi-metal oxide through grinding, mixing, pressing, glazing and sintering, and is one kind of acid and alkali resisting ceramic or stone material for building and decoration. The structure can keep a certain gap between the ceramic tile and the building, and the ceramic tile is fixed on the wall body through a special suspension system, so that a uniform and attractive appearance effect is realized.
The search shows a tile dry hanging structure in the bulletin number CN 218406200U; comprises keels and ceramic tiles, wherein a plurality of keels are connected to the installation wall body at intervals; further comprises: the first dry hanging piece and the second dry hanging piece are connected to the upper end of the ceramic tile, and the second dry hanging piece is connected to the lower end of the ceramic tile to form a ceramic tile dry hanging assembly; the first and second dry hangers are each hung on the keel to form a two-point support structure for the tile assembly.
The mode that adopts the double-hanging in this application articulates the ceramic tile subassembly on fossil fragments, can guarantee that the ceramic tile subassembly can be more stable, but does not solve most and hang the structure futilely and make by aluminum alloy material usually, when using, when the ceramic tile receives outside impact, causes the problem of ceramic tile damage risk easily.
Disclosure of Invention
In order to overcome the defects, the utility model provides a tile dry hanging structure, which aims to improve that most corner aluminum is usually made of aluminum alloy materials when tiles are subjected to external impact. Easily causes the problem of ceramic tile damage risk.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a ceramic tile hangs structure futilely, includes first keel frame, the inside threaded connection of first keel frame has a plurality of first screws, the outer wall upper end sliding connection of first keel frame has a plurality of first angle aluminium, the inside equal threaded connection of first angle aluminium has a plurality of second screws, the one end threaded connection of second screw is in the inside of first keel frame, the outer wall fixedly connected with backup pad of first keel frame, the upper surface fixedly connected with buffer board of backup pad, a plurality of injecting glue holes have been seted up to the inside of buffer board, one side of first keel frame is provided with fixed subassembly, the outer wall fixedly connected with buffering curb plate of fixed subassembly, the outer wall right side fixedly connected with of buffering curb plate two second keel frames of upper and lower symmetry, the equal fixedly connected with second angle aluminium of outer wall of second keel frame, the inside fixedly connected with elasticity gasket of first angle aluminium.
Through above-mentioned technical scheme, through set up the elastic gasket in the inside of angle aluminium draw-in groove, reach and cushion and protect the effect to the ceramic tile, solved the problem that most angle aluminium was made by aluminum alloy material generally, when the ceramic tile received outside impact. Easily causes the problem of ceramic tile damage risk.
Further, the fixed subassembly includes connecting plate and third screw, the inside threaded connection of connecting plate has the third screw, outer wall one side fixed connection of connecting plate is in the outer wall of first keel frame, the outer wall opposite side of connecting plate can be dismantled and be connected the outer wall of buffering curb plate, the outer wall threaded connection of third screw is in the inside of buffering curb plate.
Through above-mentioned technical scheme, reach the effect of fixed connection board and buffering curb plate through the third screw.
Further, the outer wall fixedly connected with a plurality of second fixed blocks of second dragon skeleton, the outer wall fixedly connected with solar panel of second fixed block.
Further, the outer wall of the second fixed block is fixedly connected with a storage battery, and the second fixed block is electrically connected with the storage battery.
Through above-mentioned technical scheme, reach the effect of illumination and energy saving through solar panel, battery and led lamp.
And the lower end of the outer wall of the second fixed block is fixedly connected with an led lamp, and the led lamp is electrically connected with a storage battery.
Through above-mentioned technical scheme, reach the effect of illumination and energy saving through solar panel, battery and led lamp.
Further, the upper surface fixedly connected with basin of second dragon skeleton, the inside fixedly connected with pipe of basin, the bottom fixedly connected with bin of pipe.
Through above-mentioned technical scheme, reach the effect of collecting rainwater and saving water resource through basin, pipe and bin.
Further, the bottom fixedly connected with a plurality of drain pipes of bin, the inside of drain pipe is all fixedly connected with ooff valve.
Through above-mentioned technical scheme, the play water of controlling the drain pipe through the ooff valve.
Further, the upper surface fixedly connected with first fixed block of bin, the upper surface fixed connection of first fixed block is in the lower surface of second keel frame.
Through above-mentioned technical scheme, reach the effect of fixed bin through first fixed block.
The utility model has the following beneficial effects:
1. according to the utility model, the elastic gasket, the buffer plate and the buffer side plate are arranged in the corner aluminum clamping groove to realize the functions of buffering and protecting the ceramic tile, so that the problem that most of corner aluminum is usually made of aluminum alloy materials when the ceramic tile is impacted externally is solved. Easily causes the problem of ceramic tile damage risk.
2. According to the utility model, solar energy is absorbed by the solar panel in half a day, the solar panel is stored by the storage battery, and the led lamp strip is powered by the storage battery in the evening, so that the effect of solar power generation is achieved, the lighting effect of the ceramic tile dry-hanging structure is realized, a unique night visual effect is created, and the aesthetic property and individuation of a building are improved.
Drawings
Fig. 1 is a schematic front perspective view of a tile hanging structure according to the present utility model;
fig. 2 is a schematic structural view of a second keel portion of a tile dry hanging structure according to the present utility model;
fig. 3 is a schematic structural view of a buffer plate part of a tile dry hanging structure according to the present utility model.
Legend description:
1. a first keel frame; 2. a first screw; 3. a buffer plate; 4. a glue injection hole; 5. a first corner aluminum; 6. an elastic pad; 7. a second screw; 8. a connecting plate; 9. a third screw; 10. a buffer side plate; 11. a water tank; 12. a storage tank; 13. a second aluminum angle; 14. a first fixed block; 15. a drain pipe; 16. opening and closing a valve; 17. a second fixed block; 18. a second keel frame; 19. a conduit; 20. a support plate; 21. a solar panel; 22. a storage battery; 23. led lamp.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, one embodiment provided by the present utility model is: the utility model provides a ceramic tile hangs structure futilely, including first keel frame 1, the inside threaded connection of first keel frame 1 has a plurality of first screws 2, the outer wall upper end sliding connection of first keel frame 1 has a plurality of first angle aluminium 5, the inside equal threaded connection of first angle aluminium 5 has a plurality of second screws 7, the one end threaded connection of second screw 7 is in the inside of first keel frame 1, the outer wall fixedly connected with backup pad 20 of first keel frame 1, the upper surface fixedly connected with buffer board 3 of backup pad 20, a plurality of injecting glue holes 4 have been seted up to the inside of buffer board 3, one side of first keel frame 1 is provided with fixed subassembly, fixed subassembly's outer wall fixedly connected with buffering curb plate 10, the outer wall right side fixedly connected with of buffering curb plate 10 two second keel frames 18 of upper and lower symmetry, the equal fixedly connected with second angle aluminium 13 of outer wall of second keel frame 18, the inside fixedly connected with elastic gasket 6 of first angle aluminium 5.
Specifically, rotate second screw 7 and be connected first angle aluminium 5 and first keel frame 1, then rotate third screw 9, fix first keel frame 1, second keel frame 18 and buffering curb plate 10, then install first screw 2, fix first keel frame 1 and second keel frame 18 and wall body respectively, the effect of assembling whole device has been reached, be connected first through glue with first angle aluminium 5 with elastic gasket 6 when the installation, when the ceramic tile receives outside impact, at first play the cushioning effect through buffer plate 3 and elastic gasket, then carry out the buffering of lateral wall through buffering curb plate 10, the effect of protecting the ceramic tile has been reached.
The fixed subassembly includes connecting plate 8 and third screw 9, and the inside threaded connection of connecting plate 8 has third screw 9, and outer wall one side fixed connection of connecting plate 8 is at the outer wall of first keel frame 1, and the outer wall opposite side of connecting plate 8 can be dismantled and be connected at the outer wall of buffering curb plate 10, and the outer wall threaded connection of third screw 9 is in the inside of buffering curb plate 10.
Specifically, the third screw 9 is turned to connect the connecting plate 8 with the buffering side plate 10, so that the functions of fixing the connecting plate 8 and the buffering side plate 10 are achieved.
The outer wall fixedly connected with a plurality of second fixed blocks 17 of second keel frame 18, the outer wall fixedly connected with solar panel 21 of second fixed block 17, the outer wall fixedly connected with battery 22 of second fixed block 17, solar panel 21 electric connection battery 22.
Specifically, solar energy is converted into electric energy by the solar panel 21, and stored in the battery 22.
The lower end of the outer wall of the second fixed block 17 is fixedly connected with a led lamp 23, and the led lamp 23 is electrically connected with a storage battery 22.
Specifically, the storage battery 22 supplies power to the led lamp 23, so that the lighting effect of the ceramic tile dry-hanging structure is realized, a unique night visual effect is created, and the aesthetic property and individuation of the building are improved.
The upper surface fixedly connected with basin 11 of second dragon skeleton 18, the inside fixedly connected with pipe 19 of basin 11, the bottom fixedly connected with bin 12 of pipe 19.
Specifically, rainwater is collected through the water tank 11 and is conveyed to the inside of the storage box 12 through the guide pipe 19 for storage, so that the effect of saving water resources is achieved.
The bottom fixedly connected with a plurality of drain pipes 15 of bin 12, the inside of drain pipe 15 all fixedly connected with ooff valve 16.
Specifically, a plurality of potted plants are cultivated under the storage box 12, rainwater in the storage box 12 is discharged by rotating the switch valve 16, and the potted plants are watered.
The upper surface of the storage box 12 is fixedly connected with a first fixed block 14, and the upper surface of the first fixed block 14 is fixedly connected with the lower surface of a second keel frame 18.
Specifically, the first fixing block 14 is used to fix the storage box 12.
Working principle: when the device is needed to be used, the first keel frame 1 and the second keel frame 18 are spliced with the buffer side plate 10, the first corner aluminum 5 is connected with the first keel frame 1 through the second screw 7, then the third screw 9 is rotated, the first keel frame 1 and the second keel frame 18 are fixed with the buffer side plate 10, then the assembled structure is attached to the wall surface on which tiles are needed to be installed, the structure is kept horizontal, the first screw 2 is installed, the first keel frame 1 and the second keel frame 18 are respectively fixed with the wall body, the effect of assembling the whole device is achieved, the surface of the buffer plate 3 is fully coated with glue, the glue injection holes 4 in the buffer plate 3 improve the bonding effect of the buffer plate 3 and the tiles, one side of the ceramic tile is attached to the buffering side plate 10, then the groove on the other side is connected with the first corner aluminum 5, the bottom is spliced with the second corner aluminum 13, the ceramic tile is spliced, when the ceramic tile is impacted externally, the buffering effect is achieved through the buffering plate 3 and the elastic gasket 6, then the side wall buffering is achieved through the buffering side plate 10, the ceramic tile protection effect is achieved, the buffering plate 3, the elastic gasket 6 and the buffering side plate 10 are made of polystyrene plastic materials, when the device is outdoors, solar energy is absorbed in half a day through the solar panel 21 and is converted into electric energy to be stored in the storage battery 22, and power is supplied to the led lamp 23 through the storage battery 22 at night, so that the lighting effect is achieved. When raining, carry out the collection of rainwater through basin 11, the inside certain slope that has of basin 11, make things convenient for the inside that the rainwater flowed into pipe 19, carry the inside of bin 12 through pipe 19 and store, can once support cultivated in a pot in the below of bin 12, discharge the rainwater of bin 12 inside through rotating switch valve 16, water cultivated in a pot, reached the effect of water economy resource.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (8)

1. The utility model provides a ceramic tile hangs structure futilely, includes first keel frame (1), its characterized in that: the inside threaded connection of first keel frame (1) has a plurality of first screws (2), the outer wall upper end sliding connection of first keel frame (1) has a plurality of first angle aluminium (5), the inside equal threaded connection of first angle aluminium (5) has a plurality of second screws (7), the one end threaded connection of second screw (7) is in the inside of first keel frame (1), the outer wall fixedly connected with backup pad (20) of first keel frame (1), the upper surface fixedly connected with buffer board (3) of backup pad (20), a plurality of injecting glue hole (4) have been seted up to the inside of buffer board (3), one side of first keel frame (1) is provided with fixed subassembly, the outer wall fixedly connected with buffering curb plate (10) of fixed subassembly, the outer wall right side fixedly connected with of buffering curb plate (10) two second keel frames (18) of upper and lower symmetry, the outer wall equal fixedly connected with second angle aluminium (13) of second keel frame (18), the inside fixedly connected with elastic gasket (6) of first keel frame (5).
2. A tile dry-hanging structure according to claim 1, wherein: the fixing assembly comprises a connecting plate (8) and a third screw (9), wherein the third screw (9) is connected with the inner thread of the connecting plate (8), one side of the outer wall of the connecting plate (8) is detachably connected with the outer wall of the first keel frame (1), the other side of the outer wall of the connecting plate (8) is fixedly connected with the outer wall of the buffering side plate (10), and the outer wall of the third screw (9) is connected with the inner part of the buffering side plate (10) in a threaded mode.
3. A tile dry-hanging structure according to claim 1, wherein: the outer wall of second keel frame (18) fixedly connected with a plurality of second fixed blocks (17), the outer wall fixedly connected with solar panel (21) of second fixed block (17).
4. A tile dry hanging structure according to claim 3, wherein: the outer wall of the second fixed block (17) is fixedly connected with a storage battery (22), and the solar panel (21) is electrically connected with the storage battery (22).
5. A tile dry hanging structure according to claim 4, wherein: the LED lamp (23) is fixedly connected to the lower end of the outer wall of the second fixed block (17), and the LED lamp (23) is electrically connected with the storage battery (22).
6. A tile dry-hanging structure according to claim 1, wherein: the upper surface fixedly connected with basin (11) of second keel frame (18), the inside fixedly connected with pipe (19) of basin (11), the bottom fixedly connected with bin (12) of pipe (19).
7. The tile dry hanging structure according to claim 6, wherein: the bottom fixedly connected with a plurality of drain pipes (15) of bin (12), the inside of drain pipe (15) is all fixedly connected with ooff valve (16).
8. A tile dry-hanging structure according to claim 7, wherein: the upper surface of bin (12) fixedly connected with first fixed block (14), the upper surface of first fixed block (14) fixed connection is in the lower surface of second keel frame (18).
CN202322557909.4U 2023-09-20 2023-09-20 Ceramic tile dry hanging structure Active CN220768707U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322557909.4U CN220768707U (en) 2023-09-20 2023-09-20 Ceramic tile dry hanging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322557909.4U CN220768707U (en) 2023-09-20 2023-09-20 Ceramic tile dry hanging structure

Publications (1)

Publication Number Publication Date
CN220768707U true CN220768707U (en) 2024-04-12

Family

ID=90614185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322557909.4U Active CN220768707U (en) 2023-09-20 2023-09-20 Ceramic tile dry hanging structure

Country Status (1)

Country Link
CN (1) CN220768707U (en)

Similar Documents

Publication Publication Date Title
CN211850455U (en) Energy-saving environment-friendly building device
CN204676745U (en) The reflective daylighting unit glass curtain wall of integrated self-adaptive
CN220768707U (en) Ceramic tile dry hanging structure
CN209723414U (en) Roofing solar energy light collecting ejection device
CN214090477U (en) Cambered surface light-transmitting concrete landscape wall structure
CN101654989B (en) Energy-saving casement window
CN202530609U (en) Installation structure of argil plate combined curtain wall
CN208733886U (en) A kind of double glass solar energy photoelectric curtain walls
CN201539188U (en) Energy-saving casement window
CN113310016A (en) Scenic spot is with formula street lamp and subassembly that catchments
CN208088594U (en) A kind of intelligent green curtain wall water-tight device
CN208095342U (en) A kind of green building roof for facilitating plantation
CN203177494U (en) Window type solar heat collector
CN207079778U (en) A kind of novel energy-saving construction curtain wall
CN201771091U (en) Connection structure of curtain wall and ceiling using hook type hidden frame in connection
CN109339351A (en) Roofing solar energy light collecting ejection device
CN201991151U (en) Aluminum-alloy profile for assembled-type mobile sunlight-house eaves girder
CN215759855U (en) Waterproof heat-preserving energy-saving building curtain wall
CN213395109U (en) Novel greenbelt view street lamp
CN208955954U (en) The connection structure of photovoltaic panel
CN205189181U (en) Environmental protection decorative aluminum material for aluminum -alloy curtain wall
CN210740212U (en) Novel solar street lamp
CN113455950B (en) Self-cleaning frameless landscape glass window system
CN217734712U (en) Decorative edge for sunlight room
CN215442529U (en) Green building energy-saving wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant