CN220767129U - Scaffold hot galvanizing hanger - Google Patents

Scaffold hot galvanizing hanger Download PDF

Info

Publication number
CN220767129U
CN220767129U CN202322120569.9U CN202322120569U CN220767129U CN 220767129 U CN220767129 U CN 220767129U CN 202322120569 U CN202322120569 U CN 202322120569U CN 220767129 U CN220767129 U CN 220767129U
Authority
CN
China
Prior art keywords
hanger
scaffold
main part
main body
hot dip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322120569.9U
Other languages
Chinese (zh)
Inventor
刘小川
刘猛
李龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Qingye Zhengxing Metal Products Co ltd
Original Assignee
Chengdu Qingye Zhengxing Metal Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Qingye Zhengxing Metal Products Co ltd filed Critical Chengdu Qingye Zhengxing Metal Products Co ltd
Priority to CN202322120569.9U priority Critical patent/CN220767129U/en
Application granted granted Critical
Publication of CN220767129U publication Critical patent/CN220767129U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coating With Molten Metal (AREA)

Abstract

The utility model discloses a scaffold hot galvanizing hanger, which belongs to the technical field of hangers, and comprises a hanger frame, wherein two connecting crossbars are symmetrically arranged on the hanger frame, a hanger main body is arranged below the two connecting crossbars, the two hanger main bodies are symmetrically arranged, each hanger main body consists of a top base rod, a connecting block, a main body vertical plate, a connecting transverse plate and a hook structure, the connecting blocks are three and uniformly arranged at the lower ends of the top base rods, the main body vertical plates are three and respectively arranged at the lower ends of the three connecting blocks, the connecting transverse plates are a plurality of and are symmetrically arranged at the left end and the right end of the three main body vertical plates, and by arranging the two hanger main bodies, a plurality of scaffold main bodies are simultaneously arranged on the two hanger main bodies, the scaffold main bodies can be prevented from mutually colliding when hot galvanizing is simultaneously carried out, so that the probability of generating defects of the scaffold main bodies can be reduced, and the quality of finished scaffolds of the scaffold main bodies is finally improved.

Description

Scaffold hot galvanizing hanger
Technical Field
The utility model relates to the technical field of hangers, in particular to a hot galvanizing hanger for a scaffold.
Background
The most widely used iron and steel materials in industry are corroded to different degrees when used in the environments such as atmosphere, seawater, soil, building materials and the like. It is counted that the loss of iron and steel material due to corrosion each year worldwide can account for approximately 1/3 of its total production. In order to ensure the normal use of steel products and prolong the service life of the steel products, the corrosion protection technology of steel has been widely paid attention to. Hot dip galvanization is one of the most effective means for retarding the corrosion of the environment of steel materials, and is to immerse the steel products with the surfaces cleaned and activated in molten zinc liquid, and plate zinc alloy plating layers with good adhesion on the surfaces of the steel products through the reaction and diffusion between iron and zinc. Compared with other metal protection methods, the hot dip galvanizing process has incomparable advantages in the protection characteristic of combining physical barrier and electrochemical protection of the plating layer, the bonding strength of the plating layer and a matrix, the compactness, durability, maintenance-free property and economy of the plating layer and the adaptability of the plating layer to the shape and the size of products. The current hot dip galvanized products mainly comprise steel plates, steel strips, steel wires, steel pipes and the like, wherein the proportion of the hot dip galvanized steel plates is the largest. For a long time, the hot dip galvanizing process is favored by people because of low plating cost, excellent protection characteristics and beautiful appearance, and is widely applied to the fields of automobiles, buildings, household appliances, chemical industry, machinery, petroleum, metallurgy, light industry, traffic, electric power, aviation, ocean engineering and the like. The scaffold is a working platform which is erected to ensure that each construction process is carried out smoothly. The wooden scaffold, the bamboo scaffold and the steel pipe scaffold can be divided according to different materials. Wherein, in order to prolong the service life of the steel pipe scaffold, hot galvanizing processing is required to be carried out in the production process.
In the hot dip galvanizing process of the scaffold, the scaffold is required to be hung on the hanger and then sent into the hot dip aqueduct, and when a plurality of scaffolds are hung on the conventional hanger, each scaffold is independently hung through two independent metal wires, so that along with the movement of the hanger, the plurality of scaffolds hung on the scaffold are easy to independently shake, so that collision is easy to occur, dent flaws are easy to occur on the scaffold, the quality of a scaffold finished product can be reduced, and finally the hot dip galvanizing hanger for the scaffold for avoiding collision of the plurality of scaffolds is required.
Disclosure of Invention
The utility model mainly aims to provide a scaffold hot galvanizing hanger which can effectively solve the problems in the background technology.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides a scaffold frame hot dip galvanizing hanger, includes the hanger frame, two connection crossbrace are installed to the symmetry on the hanger frame, two a hanger main part is all installed to the below of connecting the crossbrace, two the hanger main part is the symmetry setting, the hanger main part comprises top stock, connecting block, main part riser, connection diaphragm and couple structure, the connecting block has three and evenly installs the lower extreme at top stock, the main part riser has three and installs the lower extreme at three connecting block respectively, the connection diaphragm has a plurality of and two bilateral symmetry to install the left and right sides both ends at three main part riser, couple structure has a plurality of and installs the inner at a plurality of connection diaphragm respectively, two hang a plurality of scaffold main part between the hanger main part.
Preferably, two hanging rings are symmetrically arranged at the upper end of the hanger frame, and the hanging rings are fixedly arranged at the upper end of the hanger frame in a welding mode.
Preferably, the connecting cross brace is fixedly arranged on the inner wall of the hanger frame in a welding mode, and a plurality of metal ropes are uniformly and fixedly arranged at the lower end of the connecting cross brace.
Preferably, the top base rod and the connecting block on the hanger main body are of an integrated structure, and the top base rod is fixedly arranged on the metal rope.
Preferably, the main body vertical plate and the connecting transverse plate on the hanger main body are of an integrated structure, the main body vertical plate is fixedly arranged at the lower end of the connecting block in a welding mode, and the hook structure is fixedly arranged on the inner wall of the connecting transverse plate in a welding mode.
Preferably, the scaffold main body is composed of a main body steel pipe and a mounting connecting ring, the mounting connecting ring is sleeved on the main body steel pipe, the mounting connecting ring and the main body steel pipe are fixedly mounted together in a welding mode, and the mounting connecting ring is hung on a hook structure on the hanger main body.
Compared with the prior art, the utility model has the following beneficial effects:
through setting up two hanger main parts, install a plurality of scaffold main parts in two hanger main parts simultaneously, when carrying out hot galvanizing processing, a plurality of scaffold main parts can only produce simultaneously along with two hanger main parts and rock to can avoid a plurality of scaffold main parts to produce the collision when carrying out hot galvanizing processing simultaneously, and then can reduce the probability that scaffold main part produced the dent flaw, finally promote scaffold main part finished product's quality.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is an enlarged view of the utility model at A of FIG. 1;
fig. 3 is a schematic structural view of a hanger body according to the present utility model.
In the figure: 1. a hanger frame; 2. a hanger main body; 3. a scaffold body; 4. connecting a cross brace; 5. hoisting a hanging ring; 6. a metal rope; 7. a top base bar; 8. a connecting block; 9. a main body riser; 10. a connecting transverse plate; 11. a hook structure; 12. a main body steel pipe; 13. and installing a connecting ring.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
Referring to fig. 1, 2 and 3, the hot dip galvanizing hanger for scaffold comprises a hanger frame 1, two hanging rings 5 are symmetrically arranged at the upper end of the hanger frame 1, the hanging rings 5 are fixedly arranged at the upper end of the hanger frame 1 in a welding manner, two connecting cross braces 4 are symmetrically arranged on the hanger frame 1, the connecting cross braces 4 are fixedly arranged on the inner wall of the hanger frame 1 in a welding manner, a plurality of metal ropes 6 are uniformly and fixedly arranged at the lower end of the connecting cross braces 4, a plurality of scaffold main bodies 3 are hung between the two hanger main bodies 2, the scaffold main bodies 3 are composed of main body steel pipes 12 and mounting connecting rings 13, the mounting connecting rings 13 are sleeved on the main body steel pipes 12, the mounting connecting rings 13 are fixedly arranged together in a welding manner, the mounting connecting rings 13 are hung on a hook structure 11 on the hanger main bodies 2, and when the scaffold main bodies 3 are subjected to hot dip galvanizing, the hanger frame 1 can be lifted by equipment, and then the scaffold main bodies 2 hung below the scaffold main bodies are sent into a hot dip galvanizing bath.
Please see fig. 1, fig. 2, fig. 3, a hanger main part 2 is all installed to the below of two connection crossbrace 4, two hanger main parts 2 are symmetrical setting, hanger main part 2 is by top stock 7, connecting block 8, main part riser 9, connect diaphragm 10 and couple structure 11 are constituteed, connecting block 8 has three and evenly installs the lower extreme at top stock 7, main part riser 9 has three and installs the lower extreme at three connecting block 8 respectively, connect diaphragm 10 has a plurality of and two symmetries to install the left and right sides both ends at three main part riser 9, couple structure 11 has a plurality of hot dip galvanizing and installs the inner at a plurality of connection diaphragm 10 respectively, top stock 7 and connecting block 8 in the hanger main part 2 are integrated into one piece structure, main part riser 9 and connecting diaphragm 10 on the hanger main part 2 are integrated into one piece structure, main part riser 9 passes through welded mode fixed mounting at the lower extreme at 8, couple structure 11 passes through welded mode fixed mounting and connects at the lower extreme at three connecting block 8, two scaffold main part 3 can produce simultaneously in the scaffold main part 3 and the scaffold main part 3 can produce the multiple collision frame 3 simultaneously, the quality can be reduced simultaneously in the scaffold main part 3 and the scaffold main part 3 is carried out simultaneously.
When the scaffold hot dip galvanizing hanger is used, a plurality of scaffold bodies 3 are firstly hung on two hanger bodies 2, at the moment, only the mounting connection rings 13 on the scaffold bodies 3 are needed to be hung on the hanging hook structures 11 on the hanger bodies 2, after the scaffold bodies 3 are hung, the hanger frames 1 can be hung by using equipment, and then the scaffold bodies 3 hung on the hanger bodies 2 are sent into a hot dip galvanizing tank for hot dip galvanizing, and because the hanger bodies 2 are of an integral rigid structure, the scaffold bodies 3 are limited by the hanger bodies 2 and can only shake at the same time when the hanger bodies are hung and moved, so that the occurrence of collision among the plurality of scaffold bodies 3 is avoided, the probability of generating dent flaws on the scaffold bodies 3 can be reduced, and finally the quality of finished products of the scaffold bodies 3 can be improved.
The foregoing description is only a preferred embodiment of the present utility model, and is not intended to limit the present utility model, but although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the technical solutions described in the foregoing embodiments, or that equivalents may be substituted for part of the technical features thereof. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. Scaffold frame hot dip galvanizing hanger, including hanger frame (1), install two connection crossbrace (4) on hanger frame (1) symmetry, its characterized in that: two hanger main part (2) are all installed to the below of connecting stull (4), two hanger main part (2) are the symmetry setting, hanger main part (2) are by top stock (7), connecting block (8), main part riser (9), connect diaphragm (10) and couple structure (11) are constituteed, connecting block (8) have three and evenly install the lower extreme at top stock (7), main part riser (9) have three and install the lower extreme at three connecting block (8) respectively, connect diaphragm (10) have a plurality of and two bilateral symmetry install the left and right sides both ends at three main part riser (9), couple structure (11) have a plurality of and install the inner at a plurality of connection diaphragm (10) respectively, two hang a plurality of scaffold main part (3) between hanger main part (2).
2. The scaffold hot dip galvanizing hanger according to claim 1, wherein: two hoisting hanging rings (5) are symmetrically arranged at the upper end of the hanging tool frame (1), and the hoisting hanging rings (5) are fixedly arranged at the upper end of the hanging tool frame (1) in a welding mode.
3. The scaffold hot dip galvanizing hanger according to claim 2, wherein: the connecting cross brace (4) is fixedly arranged on the inner wall of the hanger frame (1) in a welding mode, and a plurality of metal ropes (6) are uniformly and fixedly arranged at the lower end of the connecting cross brace (4).
4. The scaffold hot dip galvanizing hanger according to claim 3, wherein: the top base rod (7) and the connecting block (8) on the hanger main body (2) are of an integrated structure, and the top base rod (7) is fixedly arranged on the metal rope (6).
5. The scaffold hot dip galvanizing hanger according to claim 4, wherein: main part riser (9) and connection diaphragm (10) on hanger main part (2) are integrated into one piece structure, main part riser (9) are through welded mode fixed mounting in the lower extreme of connecting block (8), couple structure (11) are through welded mode fixed mounting on the inner wall of connection diaphragm (10).
6. The scaffold hot dip galvanizing hanger according to claim 5, wherein: the scaffold main body (3) is composed of a main body steel pipe (12) and a mounting connecting ring (13), the mounting connecting ring (13) is sleeved on the main body steel pipe (12), the mounting connecting ring (13) and the main body steel pipe (12) are fixedly mounted together in a welding mode, and the mounting connecting ring (13) is hung on a hook structure (11) on the hanger main body (2).
CN202322120569.9U 2023-08-08 2023-08-08 Scaffold hot galvanizing hanger Active CN220767129U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322120569.9U CN220767129U (en) 2023-08-08 2023-08-08 Scaffold hot galvanizing hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322120569.9U CN220767129U (en) 2023-08-08 2023-08-08 Scaffold hot galvanizing hanger

Publications (1)

Publication Number Publication Date
CN220767129U true CN220767129U (en) 2024-04-12

Family

ID=90610082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322120569.9U Active CN220767129U (en) 2023-08-08 2023-08-08 Scaffold hot galvanizing hanger

Country Status (1)

Country Link
CN (1) CN220767129U (en)

Similar Documents

Publication Publication Date Title
CN202187457U (en) Suspension apparatus of lower suspended ceiling of steel grating
CN113152873A (en) Heightening hanging basket system
CN220767129U (en) Scaffold hot galvanizing hanger
CN102864935A (en) Novel purline mounting method
CN213682741U (en) Ceiling conversion layer construction structure
CN207608834U (en) A kind of nacelle device of bridge construction
CN211499434U (en) Reinforced structure of precast concrete board
CN210640652U (en) Wear pre-buried device of electric crane span structure of roof beam
CN210065880U (en) Novel hot-dip galvanizing hanger
CN208234379U (en) A kind of special hanger lifting easy deformable member
CN216690312U (en) Spider man safety hoisting point and rope support mounting system
CN215160355U (en) Traveling device of electroplating up-down hanging crane
CN213521128U (en) Novel cable bridge
CN216893069U (en) Truss building carrier plate convenient to hoist and mount
CN209974102U (en) Corrosion-resistant gallows for pickling bath
CN215169205U (en) Improved aluminum alloy section bar
CN213236354U (en) Counter-current cooling tower water distribution pipe hanger
CN218117146U (en) Assembled building outer wall protection frame
CN219933170U (en) Detachable fixed hanger
CN217581332U (en) Adaptor of steel structure beam
CN216274438U (en) Steel wire coil hanging tool
CN214884703U (en) Outer hanging installation device of super large glass curtain wall
CN212426792U (en) A safe environmental protection tray for hanging basket construction
CN214220485U (en) Steel construction equipment integration area connection structure
CN212271731U (en) Lattice light steel factory building structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant