CN220766084U - Building construction paying-off equipment - Google Patents
Building construction paying-off equipment Download PDFInfo
- Publication number
- CN220766084U CN220766084U CN202322337741.6U CN202322337741U CN220766084U CN 220766084 U CN220766084 U CN 220766084U CN 202322337741 U CN202322337741 U CN 202322337741U CN 220766084 U CN220766084 U CN 220766084U
- Authority
- CN
- China
- Prior art keywords
- rod
- reel
- paying
- frame
- building construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 16
- 238000010276 construction Methods 0.000 description 13
- 238000000034 method Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a building construction paying-off device, which relates to the technical field of paying-off devices and comprises a frame and a paying-off disc, wherein two inclined rods are arranged side by side at the rear part of the frame, an electric telescopic rod is arranged in the inclined rod, an arc rod seat is driven by the telescopic of the electric telescopic rod to obliquely slide along a chute so as to realize the up-and-down adjustment of the paying-off disc, and therefore, the paying-off disc can be automatically taken up and paid off.
Description
Technical Field
The utility model relates to the technical field of paying-off equipment, in particular to building construction paying-off equipment.
Background
The building construction refers to the production activity of engineering construction implementation stage, which is the construction process of various buildings, and can be said to be the process of changing various lines on a design drawing into real objects at a designated place. The method comprises foundation engineering construction, main body structure construction, roof engineering construction, decoration engineering construction and the like. The construction site is called a building construction site or a construction site, and a cable or a pipeline is required to be paid off in the process of building construction, and is generally wound on a wire coil (or a wire wheel).
Through retrieving, patent grant publication number CN 216235260U, the disclosed construction unwrapping wire equipment, it is "when needing to change the unwrapping wire wheel body, drive the carousel through the second motor and rotate, the carousel drives the connecting rod and removes, the connecting rod passes through the fixed block and drives the sliding plate and remove, sliding plate rethread connecting block drives the second mount and removes, the second mount passes through the second axis of rotation and drives second limiting plate and fixture block and unwrapping wire wheel body separation, thereby can be convenient change the unwrapping wire wheel body, and a whole device simple structure, and convenient to use, not only can automatic unwrapping wire, but also change unwrapping wire wheel is comparatively convenient, work load and working strength have been alleviateed greatly, but, still need the manual work to carry the unwrapping wire wheel to the mount or remove from the mount when installing with the unwrapping wire wheel in the above-mentioned prior art, and general unwrapping wire wheel is big in most size, heavy weight, need many people to cooperate during the transport, and be injured easily in the handling.
Disclosure of Invention
The utility model aims to provide building construction paying-off equipment for solving the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a construction unwrapping wire equipment, includes frame and drawing drum, two diagonal rods are installed at the rear portion of frame, set up the pole groove on the diagonal rod, electric telescopic handle is installed to the pole inslot, arc pole seat is installed to electric telescopic handle's bottom piston end, the drawing drum sets up on two arc pole seats through the dish axle of its both ends installation, threaded hole has been seted up on the preceding terminal surface of frame, threaded hole installs the tractive subassembly, tractive subassembly includes threaded rod and traction ring, threaded rod and threaded hole threaded connection, traction ring is installed to the outer end of threaded rod.
As a further scheme of the utility model: the front part of the frame is embedded with a bearing, a steering rod is arranged in the middle of the bearing, front wheels are arranged at the bottom end of the steering rod, and a steering handle is arranged at the top end of the steering rod.
As still further aspects of the utility model: two rear wheels are arranged on two sides of the rear part of the frame.
As still further aspects of the utility model: the pay-off reel comprises a reel shaft and a reel body, wherein the reel shaft penetrates through two ends of the reel body, and the reel shaft is connected with the reel body in a rotating mode.
As still further aspects of the utility model: the arc-shaped rod seat is in limit sliding connection with the inner walls of the two sides of the rod groove in the rod groove.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the two inclined rods are arranged side by side at the rear part of the frame, the electric telescopic rod is arranged in the inclined rod, and the arc rod seat is driven to slide obliquely along the inclined groove by the telescopic action of the electric telescopic rod, so that the up-and-down adjustment of the pay-off reel is realized, and the pay-off reel can be automatically retracted and released.
2. According to the utility model, the traction assembly, the steering rod and the steering handle are arranged, the steering rod and the steering handle are mutually matched, so that a person can conveniently push and pull the equipment to move the pay-off reel manually, the traction assembly can conveniently pull the equipment through traction machinery such as automobiles, and the like.
Drawings
Fig. 1 is a schematic perspective view of a construction paying-off apparatus.
Fig. 2 is an enlarged view of the construction of the building construction paying-off apparatus at a in fig. 1.
Fig. 3 is a connection diagram of the pulling assembly and the frame of the building construction paying-off device in fig. 1.
1. A frame; 2. a rear wheel; 3. a diagonal rod; 4. a rod groove; 5. an electric telescopic rod; 6. an arc-shaped rod seat; 7. a pay-off reel; 8. a front wheel; 9. a pulling assembly; 901. a threaded rod; 902. a traction ring; 10. a bearing; 11. a steering lever; 12. a directional handle; 13. and (3) a threaded hole.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1, in the embodiment of the utility model, a building construction paying-off device comprises a frame 1 and a paying-off disc 7, wherein two inclined rods 3 are installed at the rear part of the frame 1, rod grooves 4 are formed in the inclined rods 3, electric telescopic rods 5 are installed in the rod grooves 4, arc rod seats 6 are installed at the bottom piston ends of the electric telescopic rods 5, the arc rod seats 6 are in limit sliding connection with inner walls at two sides of the rod grooves 4 in the rod grooves 4, so that the arc rod seats 6 slide on the inclined rods 3 more stably due to the design, the paying-off disc 7 comprises a disc shaft and a disc body, the disc shaft penetrates through two ends of the disc body and is in rotary connection with the disc body, and the paying-off disc 7 is arranged on the two arc rod seats 6 through disc shafts installed at two ends of the disc shaft;
through the description, the pay-off reel 7 can be automatically wound and unwound, and compared with the existing pay-off equipment which needs to manually lift the pay-off reel 7 onto the frame 1, the pay-off reel 7 can be automatically wound and unwound, so that time and labor are saved, and paying-off is safer.
Referring to fig. 1-3, a threaded hole 13 is formed in the front end surface of a frame 1, a traction assembly 9 is installed in the threaded hole 13, the traction assembly 9 comprises a threaded rod 901 and a traction ring 902, the threaded rod 901 is in threaded connection with the threaded hole 13, the traction ring 902 is installed at the outer end of the threaded rod 901, a bearing 10 is installed at the front part of the frame 1 in an embedded manner, a steering rod 11 is installed in the middle of the bearing 10, a front wheel 8 is installed at the bottom end of the steering rod 11, a steering handle 12 is installed at the top end of the steering rod 11, and two rear wheels 2 are installed at two sides of the rear part of the frame 1;
the utility model provides two traction modes of mechanical traction and manual traction, and a user can select the traction mode according to actual needs, so that the use is more flexible and convenient.
The working principle of the utility model is as follows:
when the wire paying-off device is used, the frame 1 is pushed to move to the front of the wire paying-off disc 7 under the driving of wheels, the wire paying-off disc 7 is located in the middle of the frame 1, disc shafts at two ends of the wire paying-off disc 7 are tightly attached to the inclined rod 3, then two electric telescopic rods 5 are started, the electric telescopic rods 5 shrink to drive the arc rod seat 6 to slide obliquely upwards from the bottom of the rod groove 4, disc shafts at two ends of the wire paying-off disc 7 can be supported by the arc rod seat 6 in the sliding process, after the wire paying-off disc 7 is lifted to a certain height, personnel pull one end of a wire harness on the wire paying-off disc 7 backwards, the wire paying-off disc 7 can be driven to rotate to pay off wires, so that the wire harness is paved on a construction site, after the wire harness is used, the electric telescopic rods 5 stretch to drive the arc rod seat 6 to move downwards to the bottom of the rod groove 4, then the wire paying-off disc 7 can be automatically separated from the arc rod seat 6 and land, and then the wire paying-off disc 7 can be rolled out of the frame 1 along the ground, and then replaced.
Although the present utility model has been described with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements and changes may be made without departing from the spirit and principles of the present utility model.
Claims (5)
1. Building construction unwrapping wire equipment, including frame (1) and pay off reel (7), its characterized in that: two diagonal rods (3) are installed at the rear portion of frame (1), set up pole groove, (4) on diagonal rod (3), install electric telescopic handle (5) in pole groove (4), arc pole seat (6) are installed to electric telescopic handle's (5) bottom piston end, coil axis setting that pay-off reel (7) were installed through its both ends is on two arc pole seats (6), threaded hole (13) have been seted up on the preceding terminal surface of frame (1), install in threaded hole (13) and pull subassembly (9), pull subassembly (9) include threaded rod (901) and traction ring (902), threaded rod (901) and threaded hole (13) threaded connection, traction ring (902) are installed to the outer end of threaded rod (901).
2. A building construction paying-off apparatus according to claim 1, wherein: the front part of the frame (1) is embedded with a bearing (10), a steering rod (11) is arranged in the middle of the bearing (10), front wheels (8) are arranged at the bottom end of the steering rod (11), and a steering handle (12) is arranged at the top end of the steering rod (11).
3. A building construction paying-off apparatus according to claim 1, wherein: two rear wheels (2) are arranged on two sides of the rear part of the frame (1).
4. A building construction paying-off apparatus according to claim 1, wherein: the pay-off reel (7) comprises a reel shaft and a reel body, wherein the reel shaft penetrates through two ends of the reel body, and the reel shaft is connected with the reel body in a rotating mode.
5. A building construction paying-off apparatus according to claim 1, wherein: the arc-shaped rod seat (6) is in limit sliding connection with the inner walls at two sides of the rod groove (4) in the rod groove (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322337741.6U CN220766084U (en) | 2023-08-30 | 2023-08-30 | Building construction paying-off equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322337741.6U CN220766084U (en) | 2023-08-30 | 2023-08-30 | Building construction paying-off equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220766084U true CN220766084U (en) | 2024-04-12 |
Family
ID=90613784
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322337741.6U Active CN220766084U (en) | 2023-08-30 | 2023-08-30 | Building construction paying-off equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220766084U (en) |
-
2023
- 2023-08-30 CN CN202322337741.6U patent/CN220766084U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109510115B (en) | Cable laying auxiliary device | |
CN209554495U (en) | A kind of power ampere puts line apparatus | |
CN111200256B (en) | Cable laying equipment for power engineering and implementation method thereof | |
CN210608313U (en) | Cable laying auxiliary device | |
CN220766084U (en) | Building construction paying-off equipment | |
KR200163244Y1 (en) | A wiring apparatus of an electric wire | |
CN109132732B (en) | Winding and unwinding device for field line erection | |
CN219123815U (en) | Wire laying device for electric power construction | |
CN215516109U (en) | Multifunctional cable laying device | |
CN209467974U (en) | A kind of Portable conducting wire spooler | |
CN214692719U (en) | Adjustable pay-off is used in electric power construction | |
CN110905270B (en) | Erecting rod straightening device for power grid erection | |
CN111362074A (en) | Large-diameter cable reel paying-off device and construction method thereof | |
CN218778507U (en) | Cable wire barrow | |
CN109713614B (en) | Multifunctional cable laying vehicle frame | |
CN217769283U (en) | Low-voltage overhead cable protection structure | |
CN104577884A (en) | Tool for assisting cable laying | |
CN219585515U (en) | Buried pipe paying-off device for laying water conservancy construction cables | |
CN219058091U (en) | Auxiliary paying-off device for electric power construction | |
CN219576460U (en) | Wire erecting device for power engineering construction | |
CN216190121U (en) | Efficient pay-off platform | |
CN219238903U (en) | Auxiliary device special for geophysical exploration | |
CN111764453B (en) | Wire embedding device for mounting electric wire | |
CN212050017U (en) | Large-diameter cable reel paying-off device | |
KR100320278B1 (en) | A Wiring Apparatus of an Electric Wire |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |