CN220704514U - Quick-separating pile head of concrete filling pile - Google Patents
Quick-separating pile head of concrete filling pile Download PDFInfo
- Publication number
- CN220704514U CN220704514U CN202321221969.2U CN202321221969U CN220704514U CN 220704514 U CN220704514 U CN 220704514U CN 202321221969 U CN202321221969 U CN 202321221969U CN 220704514 U CN220704514 U CN 220704514U
- Authority
- CN
- China
- Prior art keywords
- groups
- reinforcement cage
- clamping seat
- clamping
- quick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000002787 reinforcement Effects 0.000 claims abstract description 50
- 230000001681 protective effect Effects 0.000 claims abstract description 10
- 238000005192 partition Methods 0.000 claims description 16
- 230000010412 perfusion Effects 0.000 abstract description 5
- 238000000926 separation method Methods 0.000 abstract description 5
- 229910000831 Steel Inorganic materials 0.000 description 34
- 239000010959 steel Substances 0.000 description 34
- 238000005553 drilling Methods 0.000 description 3
- 230000007423 decrease Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model provides a quick-separation pile head of a concrete filling pile, belongs to the technical field of constructional engineering, and solves the problems that when a reinforcement cage is placed, the reinforcement cage is easy to rub against a pile casing and the inner wall of a drilled hole to cause deformation of the reinforcement cage and inconvenience in disassembly of a filling pipe, and comprises a fixing ring and the pile casing; the fixed ring is arranged on the ground; the protective cylinder is buried underground; when the reinforcement cage is installed, the ball rotates along with the descending of the reinforcement cage, so that the reinforcement cage can be prevented from sliding friction with the inner wall of the drill hole, and the reinforcement cage is prevented from being damaged; the motor is controlled to rotate so that the motor drives the first gear box to rotate through the second gear box, the threaded rod rotates at the moment, the sliding frame moves up and down along with the rotation of the threaded rod, the height of the clamping piece changes at the moment, the perfusion tube can be lowered or pulled out, the hydraulic rod is controlled to stretch and retract, and the three groups of clamping blocks can be used for loosening or clamping the perfusion tube, so that the perfusion tube can be conveniently disassembled.
Description
Technical Field
The utility model belongs to the technical field of constructional engineering, and particularly relates to a quick-separation pile head of a bored concrete pile.
Background
The utility model relates to a pile which is made by forming pile holes in foundation soil by means of mechanical drilling, steel pipe soil squeezing or manual digging on an engineering site, placing a reinforcement cage in the pile holes and pouring concrete.
Based on the above, traditional bored concrete pile needs to place the steel reinforcement cage in the drilling when pouring, and when placing the steel reinforcement cage, the steel reinforcement cage is liable to rub with the inner wall of a section of thick bamboo and drilling, leads to the steel reinforcement cage to warp even damage, in addition, after accomplishing pouring, the pipe of pouring is dismantled inconveniently.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a quick-separation pile head of a concrete filling pile, which aims to solve the problems that when a reinforcement cage is placed, the reinforcement cage is easy to rub against a pile casing and the inner wall of a drilled hole, so that the reinforcement cage is deformed and a filling pipe is inconvenient to detach.
The utility model discloses a quick-separation concrete filling pile head, which is characterized by comprising the following concrete technical means:
a quick-release concrete bored concrete pile head which characterized in that: comprises a fixed ring and a protective cylinder; the fixing ring is arranged on the ground, four groups of support posts are fixed on the fixing ring, two groups of first partition boards and two groups of second partition boards are fixed at the upper ends of the support posts, two groups of threaded rods are connected between the first partition boards and the fixing ring in a shaft mode, the sliding frame is arranged on the threaded rods and is in threaded fit with the threaded rods, the brackets are fixed on the sliding frame, and clamping pieces are arranged at the upper ends of the two groups of brackets; the pile casing is buried underground.
Further, two groups of first gear boxes are installed on the first partition plate through bolts, the two groups of first gear boxes are connected through connecting shafts, the lower ends of the two groups of first gear boxes are respectively connected with the two groups of threaded rods, the second gear boxes are installed on the second partition plate through bolts, the second gear boxes are respectively connected with the first gear boxes on the left side and the right side of the second partition plate through connecting shafts, and motors are installed on the second gear boxes through bolts.
Further, the front and back ends of the sliding frame are fixedly provided with support plates, threaded holes are formed in the left side and the right side of the support plates, adjusting bolts are screwed in the threaded holes, shaft connecting plates are installed on the support plates, waist-shaped grooves are formed in the shaft connecting plates, rollers are connected to the shaft connecting plates in a shaft-connecting mode, and the rollers are in contact with the support columns.
Further, a reinforcement cage is arranged in the protection cylinder, and balls are arranged on the reinforcement cage and are in contact with the inner wall of the protection cylinder.
Further, the clamping piece comprises a first clamping seat, a second clamping seat, a fixing cylinder and a fixing ring, wherein the first clamping seat is connected with the second clamping seat through a bolt, the fixing ring is installed on the fixing cylinder through a screw, and the first clamping seat and the second clamping seat are clamped on the fixing ring.
Further, the fixed cylinder upper end is equipped with three sets of inclined grooves, installs the clamp splice in the inclined groove, installs the go-between on the fixed cylinder, and the go-between is connected with the afterbody of three sets of clamp splice, installs the buckle seat on the go-between, is equipped with waist type through groove on the No. two clamp seats, installs the hydraulic stem between No. two clamp seats and the right-hand member of buckle seat, installs the filling pipe between three sets of clamp splice, and the control valve is installed to the upper end of filling pipe, and the funnel is installed to the upper end of control valve.
The utility model at least comprises the following beneficial effects:
1. the steel reinforcement cage is arranged in the cylinder, the balls are arranged on the steel reinforcement cage and are in contact with the inner wall of the protective cylinder, when the steel reinforcement cage is arranged, the balls on the steel reinforcement cage are in contact with the inner wall of the protective cylinder, along with the descending of the height of the steel reinforcement cage, the balls on the steel reinforcement cage are in contact with the inner wall of the drill hole below the protective cylinder, and the balls rotate along with the descending of the steel reinforcement cage, so that the sliding friction between the steel reinforcement cage and the inner wall of the drill hole can be prevented, and the damage of the steel reinforcement cage is avoided.
2. When the clamping piece is used, the motor is controlled to rotate so that the clamping piece drives the first gear box to rotate through the second gear box, the threaded rod rotates at the moment, the sliding frame moves up and down along with the rotation of the threaded rod, the height of the clamping piece changes at the moment, and therefore the pouring pipe can be lowered or pulled out, the three groups of clamping blocks can be loosened or clamped by controlling the hydraulic rod to stretch and retract, and the pouring pipe is convenient to detach.
Drawings
Fig. 1 is a schematic structural view of the present utility model.
Fig. 2 is an enlarged schematic view of the structure of fig. 1 a according to the present utility model.
Fig. 3 is a schematic structural view of the reinforcement cage of the present utility model.
Fig. 4 is an enlarged schematic view of the structure of fig. 3B according to the present utility model.
Fig. 5 is a schematic view of the structure of the clamping member of the present utility model.
Fig. 6 is an enlarged schematic view of the structure of fig. 5C according to the present utility model.
Fig. 7 is a schematic structural diagram of a second clip seat according to the present utility model.
In the figure, the correspondence between the component names and the drawing numbers is:
1. a fixing ring; 11. a support post; 111. a threaded rod; 112. a carriage; 113. a support plate; 114. an adjusting bolt; 115. a shaft connection plate; 116. a roller; 12. a first partition board; 121. a first gear box; 13. a second separator; 131. a second gear box; 132. a motor; 2. a protective barrel; 21. a reinforcement cage; 211. a ball; 22. a perfusion tube; 23. a control valve; 24. a funnel; 25. a clamping member; 251. a first clamping seat; 252. a second clamping seat; 253. a fixed cylinder; 2531. clamping blocks; 2532. a connecting ring; 2533. a clamping seat; 2534. a hydraulic rod; 254. and a fixing ring.
Detailed Description
Embodiments of the present utility model are described in further detail below with reference to the accompanying drawings and examples.
Examples:
as shown in fig. 1 to 7:
the utility model provides a quick-separation pile head of a concrete filling pile, which comprises a fixed ring 1 and a pile casing 2; the fixed ring 1 is arranged on the ground, four groups of support posts 11 are fixed on the fixed ring 1, two groups of first partition plates 12 and two groups of second partition plates 13 are fixed at the upper ends of the support posts 11, two groups of threaded rods 111 are connected between the first partition plates 12 and the fixed ring 1 in a shaft way, a sliding frame 112 is arranged on each threaded rod 111, the sliding frame 112 is in threaded fit with each threaded rod 111, brackets are fixed on the sliding frame 112, and clamping pieces 25 are arranged at the upper ends of the two groups of brackets; the casing 2 is buried under the ground.
Wherein, install two sets of No. one gear boxes 121 through the bolt on the baffle 12, no. one gear boxes 121 of two sets of are connected through the connecting axle, and No. one gear boxes 121's lower extreme is connected with two sets of threaded rods 111 respectively, install No. two gear boxes 131 through the bolt on No. two baffles 13, no. two gear boxes 131 are connected with No. one gear boxes 121 of its left and right sides through the connecting axle respectively, install motor 132 through the bolt on No. two gear boxes 131, the front and back end of carriage 112 is fixed with extension board 113, the left and right sides of extension board 113 is equipped with the screw hole, threaded hole internal screw thread has adjusting bolt 114, install the splice plate 115 on the extension board 113, be equipped with waist type groove on the splice plate 115, and the splice plate 115 goes up the coupling and has roller 116, roller 116 and pillar 11 contact, its effect is: the motor 132 is controlled to rotate so as to drive the first gear box 121 to rotate through the second gear box 131, at this time, the threaded rod 111 rotates, the sliding frame 112 moves up and down along with the rotation of the threaded rod 111, at this time, the height of the clamping piece 25 changes, and therefore the pouring tube 22 can be lowered or pulled out, and the roller 116 can keep stable when the sliding frame 112 moves.
Wherein install steel reinforcement cage 21 in the pile casing 2, install ball 211 on the steel reinforcement cage 21, ball 211 and the inner wall contact of pile casing 2, its effect is: when installing the steel reinforcement cage 21, the ball 211 on the steel reinforcement cage 21 contacts with the inner wall of the protective cylinder 2, along with the decline of the steel reinforcement cage 21 height, the ball 211 on the steel reinforcement cage 21 contacts with the inner wall of the drill hole below the protective cylinder 2, and the ball 211 rotates along with the decline of the steel reinforcement cage 21, so that the steel reinforcement cage 21 and the inner wall of the drill hole can be prevented from sliding friction, and the steel reinforcement cage 21 is prevented from being damaged.
The clamping piece 25 comprises a first clamping seat 251, a second clamping seat 252, a fixing cylinder 253 and a fixing ring 254, wherein the first clamping seat 251 is connected with the second clamping seat 252 through bolts, the fixing ring 254 is installed on the fixing cylinder 253 through bolts, the first clamping seat 251 and the second clamping seat 252 are clamped on the fixing ring 254, three groups of inclined grooves are formed in the upper end of the fixing cylinder 253, clamping blocks 2531 are installed in the inclined grooves, a connecting ring 2532 is installed on the fixing cylinder 253, the connecting ring 2532 is connected with the tail portions of the three groups of clamping blocks 2531, a buckling seat 2533 is installed on the connecting ring 2532, a waist-shaped through groove is formed in the second clamping seat 252, a hydraulic rod 2534 is installed between the right end of the second clamping seat 252 and the right end of the buckling seat 2533, a filling pipe 22 is installed between the three groups of clamping blocks 2531, a control valve 23 is installed at the upper end of the filling pipe 22, and a funnel 24 is installed at the upper end of the control valve 23, and the function is as follows: the three groups of clamping blocks 2531 can be loosened or clamped by controlling the hydraulic rods 2534 to stretch and retract, so that the perfusion tube 22 is convenient to disassemble.
Specific use and action of the embodiment:
in the utility model, when the steel reinforcement cage 21 is installed, the steel reinforcement cage 21 is contacted with the inner wall of the steel reinforcement cage 2, the balls 211 on the steel reinforcement cage 21 are contacted with the inner wall of the steel reinforcement cage 2 along with the descending of the height of the steel reinforcement cage 21, the balls 211 on the steel reinforcement cage 21 are contacted with the inner wall of the hole below the steel reinforcement cage 2, the balls 211 rotate along with the descending of the steel reinforcement cage 21, the sliding friction between the steel reinforcement cage 21 and the inner wall of the hole can be prevented, the steel reinforcement cage 21 is prevented from being damaged, the hydraulic rods 2534 are controlled to stretch and retract, the three groups of clamping blocks 2531 can loosen or clamp the pouring pipe 22, the pouring pipe 22 is convenient to detach, the motor 132 is controlled to rotate, the first gear box 121 is driven to rotate by the second gear box 131, the threaded rod 111 rotates, the sliding frame 112 moves up and down along with the rotation of the first gear box 121, the height of the clamping piece 25 changes, the pouring pipe 22 can be lowered or pulled out, the setting of the roller can keep the sliding frame 112 stable when moving, and concrete flows into the pouring hopper 22 through the pouring pipe 116, and the concrete is poured into the pouring pipe 116.
Claims (6)
1. A quick-release concrete bored concrete pile head which characterized in that: comprises a fixed ring (1) and a protective cylinder (2); the fixing ring (1) is installed on the ground, four groups of support posts (11) are fixed on the fixing ring (1), two groups of first partition boards (12) and two groups of second partition boards (13) are fixed at the upper ends of the support posts (11), two groups of threaded rods (111) are connected between the first partition boards (12) and the fixing ring (1) in a shaft mode, sliding frames (112) are installed on the threaded rods (111), the sliding frames (112) are in threaded fit with the threaded rods (111), brackets are fixed on the sliding frames (112), and clamping pieces (25) are installed at the upper ends of the two groups of brackets; the protective cylinder (2) is buried underground.
2. A quick-release concrete bored pile head according to claim 1, wherein two groups of first gear boxes (121) are mounted on the first partition plate (12) through bolts, the two groups of first gear boxes (121) are connected through connecting shafts, the lower ends of the two groups of first gear boxes (121) are respectively connected with the two groups of threaded rods (111), a second gear box (131) is mounted on the second partition plate (13) through bolts, the second gear boxes (131) are respectively connected with the first gear boxes (121) on the left side and the right side of the second partition plate through connecting shafts, and a motor (132) is mounted on the second gear boxes (131) through bolts.
3. The quick-release bored concrete pile head according to claim 1, wherein the front and rear ends of the carriage (112) are fixed with support plates (113), threaded holes are formed in the left and right sides of the support plates (113), adjusting bolts (114) are screwed into the threaded holes, a shaft connecting plate (115) is mounted on the support plates (113), waist-shaped grooves are formed in the shaft connecting plate (115), rollers (116) are connected to the shaft connecting plate (115) in a shaft-connected mode, and the rollers (116) are in contact with the support columns (11).
4. A quick release pile head according to claim 1, characterized in that a reinforcement cage (21) is mounted in the casing (2), and balls (211) are mounted on the reinforcement cage (21), the balls (211) being in contact with the inner wall of the casing (2).
5. The quick-release pile head according to claim 1, wherein the clamping member (25) comprises a first clamping seat (251), a second clamping seat (252), a fixing cylinder (253) and a fixing ring (254), the first clamping seat (251) is connected with the second clamping seat (252) through bolts, the fixing ring (254) is mounted on the fixing cylinder (253) through bolts, and the first clamping seat (251) and the second clamping seat (252) are clamped on the fixing ring (254).
6. The quick-release bored concrete pile head according to claim 5, wherein three groups of inclined grooves are formed in the upper end of the fixing cylinder (253), clamping blocks (2531) are installed in the inclined grooves, a connecting ring (2532) is installed on the fixing cylinder (253), the connecting ring (2532) is connected with the tail portions of the three groups of clamping blocks (2531), a clamping seat (2533) is installed on the connecting ring (2532), a waist-shaped through groove is formed in the second clamping seat (252), a hydraulic rod (2534) is installed between the second clamping seat (252) and the right end of the clamping seat (2533), a pouring pipe (22) is installed between the three groups of clamping blocks (2531), a control valve (23) is installed at the upper end of the pouring pipe (22), and a funnel (24) is installed at the upper end of the control valve (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321221969.2U CN220704514U (en) | 2023-05-19 | 2023-05-19 | Quick-separating pile head of concrete filling pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321221969.2U CN220704514U (en) | 2023-05-19 | 2023-05-19 | Quick-separating pile head of concrete filling pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220704514U true CN220704514U (en) | 2024-04-02 |
Family
ID=90439974
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321221969.2U Active CN220704514U (en) | 2023-05-19 | 2023-05-19 | Quick-separating pile head of concrete filling pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220704514U (en) |
-
2023
- 2023-05-19 CN CN202321221969.2U patent/CN220704514U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220704514U (en) | Quick-separating pile head of concrete filling pile | |
CN112575791B (en) | Foundation pit supporting structure and construction method thereof | |
CN115217120B (en) | Assembled foundation pit supporting device and installation method thereof | |
CN214783978U (en) | Large-scale deep basal pit supporting construction | |
CN110805292B (en) | Assembly type building wallboard pc diagonal bracing member | |
CN219710329U (en) | Pipe groove support | |
CN214695678U (en) | Additional strengthening that water conservancy construction cofferdam was used | |
CN214883597U (en) | Steel reinforcement cage positioner is used in building engineering construction | |
CN212956525U (en) | Bridge construction is with pile device | |
CN219343210U (en) | Multifunctional installation device for pile foundation reinforcement cage | |
CN214738203U (en) | Pile foundation mechanism convenient to install | |
CN218208114U (en) | Variable angle push bench jack leans on steel box behind | |
CN217811090U (en) | Foundation pit supporting structure | |
CN217517592U (en) | Connecting structure of supporting beam and upright post pile in building engineering | |
CN212508113U (en) | Side slope presplitting blasting drilling auxiliary stand | |
CN217176632U (en) | Working face stretching type underground cavern working trolley | |
CN216641459U (en) | Vibrating beam with adjustable foundation construction | |
CN212957604U (en) | Concrete form for hydraulic engineering | |
CN216445984U (en) | Tunnel top foundation pit reinforcing structure | |
CN219973226U (en) | Adjustable purlin transverse support suitable for ditch groove support | |
CN218027706U (en) | Detachable ramp supporting device | |
CN219863395U (en) | Beam column steel structure connecting member | |
CN220414203U (en) | Waterproof supporting construction of ground | |
CN221030135U (en) | Pile driving equipment for foundation construction | |
CN219034010U (en) | Scaffold connecting assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |