CN220667017U - Temporary supporting and grading unloading device for steel structure roof - Google Patents

Temporary supporting and grading unloading device for steel structure roof Download PDF

Info

Publication number
CN220667017U
CN220667017U CN202322166088.1U CN202322166088U CN220667017U CN 220667017 U CN220667017 U CN 220667017U CN 202322166088 U CN202322166088 U CN 202322166088U CN 220667017 U CN220667017 U CN 220667017U
Authority
CN
China
Prior art keywords
unloading
grading
jack
protection mechanism
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322166088.1U
Other languages
Chinese (zh)
Inventor
张鑫煌
朱惠勇
林峰
安杰
吕杨
梁凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Zhongxing Yuanchuang Construction Engineering Co ltd
Original Assignee
Shaanxi Zhongxing Yuanchuang Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Zhongxing Yuanchuang Construction Engineering Co ltd filed Critical Shaanxi Zhongxing Yuanchuang Construction Engineering Co ltd
Priority to CN202322166088.1U priority Critical patent/CN220667017U/en
Application granted granted Critical
Publication of CN220667017U publication Critical patent/CN220667017U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a steel structure roof temporary support grading unloading device, which relates to the technical field of roof temporary support unloading and comprises a grading unloading protection mechanism, a support column and a jack arranged on the support column, wherein the grading unloading protection mechanism and the support column are respectively arranged on a jig frame top beam, and the grading unloading protection mechanism and an upper end support truss lower chord of the jack are respectively arranged on the jig frame top beam; the beneficial effects are that: after the steel structure of the roof is welded to form a complete stable system, a jack is adopted to carry out grading synchronous unloading, so that the bearing balance of the supporting jig frame is ensured, and the instantaneous change of the internal force of the roof structure is small; in the construction, a grading unloading protection mechanism is arranged on the top beam of the jig frame at the unloading point, and grading unloading of the jack is realized through jack lifting and removal of each layer of steel gasket, so that the unloading process is stable and safe, and the construction is simple.

Description

Temporary supporting and grading unloading device for steel structure roof
Technical Field
The utility model relates to the technical field of temporary roof support unloading, in particular to a temporary roof support grading unloading device with a steel structure.
Background
In modern building construction, many roofs are arranged to be of an integral dome steel structure, are installed in a mode of erecting lattice type supporting jig frames, and after the roof is installed, roof unloading and supporting jig frame dismantling work are needed. While the temporary support unloading process is a structural system transition process in which the structure transitions from a construction state to a design state. The stress state in the construction stage is very different from the final design stress state: in the state of the supporting jig frame, the dead weight of the supporting jig frame is basically born by the supporting jig frame; when the support frame is disassembled, the structure is displaced downwards due to dead weight, and the internal force of the rod piece is redistributed, so that the structure is changed greatly in the moment. In addition, in the actual construction process, all temporary supporting jig frames cannot be synchronously dismantled, and the internal force born by the supporting jig frames after being dismantled one by one can possibly undergo a gradual increasing process, so that the requirement on the structural strength of the supporting jig frames is high, and the construction is difficult.
Disclosure of Invention
The utility model aims to solve the problems and provide a temporary support grading unloading device for a steel structure roof.
The utility model realizes the above purpose through the following technical scheme:
the utility model provides a steel construction roof temporary support stage uninstallation device, includes stage uninstallation protection mechanism, support column and the jack of installing on the support column, stage uninstallation protection mechanism with the support column is installed respectively on the bed-jig back timber, stage uninstallation protection mechanism with the upper end of jack supports the truss bottom chord member.
Preferably: the number of the grading unloading protection mechanisms is two, and the grading unloading protection mechanisms are respectively arranged on two sides of the support column.
Preferably: the grading unloading protection mechanism comprises an upright post, a first top plate, a steel gasket, a second top plate, a supporting plate and a supporting plate, wherein the lower end of the upright post is fixedly arranged on the upper surface of a top beam of the jig, the first top plate is fixedly arranged on the upper end of the upright post, the steel gasket is stacked on the first top plate, the second top plate is arranged above the steel gasket, the supporting plate is fixedly arranged on the upper surface of the second top plate, and the supporting plate is fixedly arranged on the upper end of the supporting plate.
Preferably: the upper surface of the supporting plate is an arc surface which is convenient for stably supporting the lower chord member of the truss.
Compared with the prior art, the utility model has the beneficial effects that: after the steel structure of the roof is welded to form a complete stable system, a jack is adopted to carry out grading synchronous unloading, so that the bearing balance of the supporting jig frame is ensured, and the instantaneous change of the internal force of the roof structure is small; in the construction, a grading unloading protection mechanism is arranged on the top beam of the jig frame at the unloading point, and grading unloading of the jack is realized through jack lifting and removal of each layer of steel gasket, so that the unloading process is stable and safe, and the construction is simple.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions of the prior art, the drawings that are necessary for the description of the embodiments or the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model and that other drawings can be obtained according to these drawings without inventive faculty for a person skilled in the art.
Fig. 1 is a schematic view of a front view of a temporary support grading unloading device for a steel structure roof according to the present utility model.
Fig. 2 is a perspective view of a hierarchical unloading protection mechanism of a temporary support hierarchical unloading device for a steel structure roof according to the present utility model.
Fig. 3 is a schematic diagram of the operation of a temporary support grading unloading device for a steel structure roof according to the present utility model.
The reference numerals are explained as follows:
1. a hierarchical unloading protection mechanism; 11. a column; 12. a first top plate; 13. a steel gasket; 14. a second top plate; 15. a supporting plate; 16. a supporting plate; 2. a support column; 3. a jack; 4. a bed-jig top beam; 5. truss bottom chords.
Detailed Description
In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on the drawings, are merely for convenience in describing the present utility model and simplifying the description, and do not indicate or imply that the apparatus or element in question must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model, and furthermore, the terms "first", "second", etc. are used for descriptive purposes only and should not be construed to indicate or imply relative importance or implying a number of the indicated technical features, whereby the features defining "first", "second", etc. may explicitly or implicitly include one or more of such features.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; either directly or indirectly through intermediaries, or by communication between two elements, the specific meaning of the terms in the present disclosure will be understood by those skilled in the art in view of the specific circumstances.
The utility model is further described below with reference to the accompanying drawings:
as shown in fig. 1-2, the temporary support grading unloading device for the steel structure roof comprises a grading unloading protection mechanism 1, a support column 2 and a jack 3 arranged on the support column 2, wherein the grading unloading protection mechanism 1 and the support column 2 are respectively arranged on a jig frame top beam 4, and the upper ends of the grading unloading protection mechanism 1 and the jack 3 support a truss lower chord 5.
The number of the grading unloading protection mechanisms 1 is two, and the grading unloading protection mechanisms are respectively arranged on two sides of the supporting column 2, so that the stress balance of the roof rod piece is ensured when the stress of the jack 3 and the grading unloading protection mechanisms 1 is switched.
The grading unloading protection mechanism 1 comprises a vertical column 11, a first top plate 12, a steel gasket 13, a second top plate 14, supporting plates 15 and supporting plates 16, wherein the vertical column 11 is vertically arranged I-shaped steel, the lower end of the vertical column 11 is fixedly arranged on the upper surface of a jig top beam 4, the first top plate 12 is fixedly arranged on the upper end of the vertical column 11, the steel gasket 13 is stacked on the first top plate 12, the second top plate 14 is arranged above the steel gasket 13, 3 supporting plates 15 which are vertically arranged are fixedly arranged on the upper surface of the second top plate 14, each supporting plate 15 is parallel to each other, and the supporting plates 16 are fixedly arranged on the upper ends of the supporting plates 15.
The upper surface of the supporting plate 16 is an arc surface which is convenient for stably supporting the truss lower chord member 5, and the truss lower chord member 5 automatically slides to a middle position on the supporting plate 16, so that the support is more stable.
Working principle: when the roof structure is installed, personnel, machinery and detection equipment are in place and are ready for carrying out grading synchronous unloading of the roof structure, the jack 3 is lifted upwards to fully bear force, the first steel gasket 13 is removed, the jack 3 falls back to unload, after 6 hours, the process is repeated until the last steel gasket 13 is removed, the truss lower chord 5 is supported by a house body and is stressed in a non-contact manner with the supporting plate 16 after 24 hours, the jack 3 and the grading unloading protection mechanism 1 are removed, and grading unloading is completed.
While there have been shown and described what are at present considered to be fundamental principles, main features and advantages of the present utility model, it will be understood by those skilled in the art that the present utility model is not limited to the foregoing embodiments, but rather, the foregoing embodiments and description illustrate only the principles of the utility model, and that various changes and modifications may be made therein without departing from the spirit and scope of the utility model as defined by the appended claims.

Claims (4)

1. The utility model provides a steel construction roof temporary support stage uninstallation device which characterized in that: the device comprises a grading unloading protection mechanism (1), a support column (2) and a jack (3) arranged on the support column (2), wherein the grading unloading protection mechanism (1) and the support column (2) are respectively arranged on a jig frame top beam (4), and the grading unloading protection mechanism (1) and the upper end of the jack (3) support a truss lower chord member (5).
2. A steel structure roof temporary support staged unloading device as defined in claim 1, wherein: the number of the grading unloading protection mechanisms (1) is two, and the grading unloading protection mechanisms are respectively arranged on two sides of the supporting column (2).
3. A steel structure roof temporary support grading unloading device according to claim 2, characterized in that: the grading unloading protection mechanism (1) comprises an upright post (11), a first top plate (12), a steel gasket (13), a second top plate (14), a supporting plate (15) and a supporting plate (16), wherein the lower end of the upright post (11) is fixedly arranged on the upper surface of a jig top beam (4), the first top plate (12) is fixedly arranged on the upper end of the upright post (11), the steel gasket (13) is stacked on the first top plate (12), the second top plate (14) is arranged above the steel gasket (13), the supporting plate (15) is fixedly arranged on the upper surface of the second top plate (14), and the supporting plate (16) is fixedly arranged on the upper end of the supporting plate (15).
4. A steel structure roof temporary support staged unloading device as defined in claim 3, wherein: the upper surface of the supporting plate (16) is an arc surface which is convenient for stably supporting the lower chord member (5) of the truss.
CN202322166088.1U 2023-08-14 2023-08-14 Temporary supporting and grading unloading device for steel structure roof Active CN220667017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322166088.1U CN220667017U (en) 2023-08-14 2023-08-14 Temporary supporting and grading unloading device for steel structure roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322166088.1U CN220667017U (en) 2023-08-14 2023-08-14 Temporary supporting and grading unloading device for steel structure roof

Publications (1)

Publication Number Publication Date
CN220667017U true CN220667017U (en) 2024-03-26

Family

ID=90332188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322166088.1U Active CN220667017U (en) 2023-08-14 2023-08-14 Temporary supporting and grading unloading device for steel structure roof

Country Status (1)

Country Link
CN (1) CN220667017U (en)

Similar Documents

Publication Publication Date Title
CN201116267Y (en) Externally hung supporting device for internally climbing tower crane
CN112663971A (en) Steel structure roof pre-assembly sliding installation device and installation method
CN220667017U (en) Temporary supporting and grading unloading device for steel structure roof
CN115045325B (en) Assembling method of offshore wind power booster station foundation
CN112049235A (en) High-altitude large-span cantilever structure construction platform and method
CN217461612U (en) Jig frame for ground pre-assembly of latticed shell components
CN210524289U (en) Jig frame for welding H-shaped steel
CN209704036U (en) Large-span truss segmental hoisting high-altitude closes up measure device
CN219972947U (en) Steel bridge installation auxiliary device
CN217808432U (en) Indoor portable lifting device
CN215926791U (en) I-steel truss is from hoisting device
CN218371433U (en) Eight-brace rod structure of tower crane lower support
CN216446025U (en) Asymmetric tower crane foundation structure
CN218931529U (en) Lifting device for column top steel beam
CN116335185B (en) Accurate positioning and folding method for middle section folding opening of offshore wind power jacket
CN217126858U (en) Truss type boiler furnace overhaul platform
CN220035197U (en) Be used for pier shaft article reinforcing bar installation bed-jig
CN214220549U (en) Novel but fix even scaffold frame I-steel that encorbelments of roof beam
CN219839956U (en) Precise positioning device for sliding type segmental beam
CN215561946U (en) Door opening type support for installing and adjusting pre-buried steel plate of arch support
CN218952732U (en) Heavy support platform combination system
CN218323967U (en) Steel construction roof truss goes up and down and stop device
CN217299006U (en) Platform foundation structure of ballast tower crane
CN214615508U (en) Steel construction roof is assembled installation device that slides in advance
CN220845205U (en) Vehicle overhauling platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant