CN214615508U - Steel construction roof is assembled installation device that slides in advance - Google Patents

Steel construction roof is assembled installation device that slides in advance Download PDF

Info

Publication number
CN214615508U
CN214615508U CN202120133256.5U CN202120133256U CN214615508U CN 214615508 U CN214615508 U CN 214615508U CN 202120133256 U CN202120133256 U CN 202120133256U CN 214615508 U CN214615508 U CN 214615508U
Authority
CN
China
Prior art keywords
hoisting
roof
steel
fixedly connected
rectangular frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120133256.5U
Other languages
Chinese (zh)
Inventor
刘鹏迪
梁海涛
戴连双
李秀峰
司永波
彭峥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Xinxing Construction Engineering Co ltd
Original Assignee
China Xinxing Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Xinxing Construction Engineering Co ltd filed Critical China Xinxing Construction Engineering Co ltd
Priority to CN202120133256.5U priority Critical patent/CN214615508U/en
Application granted granted Critical
Publication of CN214615508U publication Critical patent/CN214615508U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A steel structure roof pre-assembly sliding installation device. The utility model comprises a track and a crane boom, wherein mutually parallel tracks are respectively laid on the two transverse sides of a roof with a dome steel structure to be installed, and the tracks are spaced from the side surface of the roof; the hoisting frame arranged on the track slides along the track; the main body of the hoisting frame is a rectangular frame structure, the rectangles of the rectangular frame structures on the 2 rails are arranged in opposite directions, the lower end of the rectangular frame structure is fixedly provided with a bottom beam, and two sides of the bottom beam are fixedly provided with crane end beams which slide along the rails; a hoisting block is mounted on a cross beam at the upper end of the hoisting frame. The construction method has the advantages that the structural design is reasonable, the construction operation is convenient, the safety of the structure in the construction process is effectively ensured, and the construction cost is reduced; the occupied area is small, other work type operations cannot be hindered, the construction efficiency is effectively improved, and the construction quality is guaranteed.

Description

Steel construction roof is assembled installation device that slides in advance
Technical Field
The utility model relates to a steel construction room lid installation technique especially relates to a steel construction room lid is assembled installation device that slides in advance, belongs to construction technical field.
Background
With the rapid development of economy in China, the traditional large-scale public building project roof adopts a reinforced concrete single structure form, and the requirements of people can not be met in terms of both functional requirements and aesthetic properties, so that the production of the large-span dome steel structure roof is promoted. At present, the construction process of traditional crane hoisting and manual positioning installation is mostly adopted in the construction of the large-span steel structure roof, and the construction process has great limitation. When steel structure room lid volume is big, and the construction site is limited, when far away from the hoisting point distance, conventional crane can't satisfy the hoist and mount requirement, adopts large-scale hoisting machinery construction can occupy the site operation road for a long time, hinders other work kind constructions.
SUMMERY OF THE UTILITY MODEL
In order to overcome current large-span steel construction room lid construction, it is big when steel construction room lid volume, and the construction site is limited, adopts large-scale jack-up machinery construction can occupy the site operation road for a long time, hinders the not enough of other worker kinds of construction, the utility model provides a steel construction room lid is assembled installation device that slides in advance.
The utility model provides a technical scheme that its technical problem adopted is: a steel structure roof pre-assembly sliding installation device comprises rails and a hoisting frame, wherein the rails which are parallel to each other are respectively paved on the two transverse sides of a roof with a dome steel structure to be installed, and the rails are spaced from the side surface of the roof; the hoisting frame arranged on the track slides along the track.
The main part of crane boom is rectangular frame structure, and the rectangle of rectangular frame structure on 2 tracks sets up in opposite directions, and rectangular frame structure's lower extreme fixed mounting has the floorbar, and the fixed mounting in floorbar both sides has the hoist end roof beam that slides along the track.
And a hoisting block is mounted on a cross beam at the upper end of the hoisting frame.
Furthermore, a triangular support frame is arranged between the rectangular frame structure and the bottom beam.
Further, the hoisting block is a chain block.
The length of the rail is greater than the longitudinal length of the roof, and the starting position of the hoisting frame is located outside the roof.
The mounting device further comprises a hoisting device fixedly connected with the steel beam to be mounted.
One surface of a connecting plate of the hoisting device is fixedly connected with the end surface of the steel beam, the other surface of the connecting plate is fixedly connected with one side of the hoisting plate, and the connecting plate is mutually perpendicular to the hoisting plate; the hoisting plate is provided with hoisting holes.
The mounting device further comprises a fixing device for fixing the steel beam to be mounted and the hoisting frame, and the fixing device comprises a horizontal fixing piece and an inclined pulling fixing piece.
One end of each horizontal fixing piece is fixedly connected with the side face of the connecting plate, the other end of each horizontal fixing piece is fixedly connected with the vertical frame of the rectangular frame structure, and the 2 horizontal fixing pieces are symmetrically arranged on two sides of the connecting plate.
One end of each oblique-pulling fixing piece is fixedly connected with the end part of the steel beam, the other end of each oblique-pulling fixing piece is fixedly connected with the lower end of the vertical frame of the rectangular frame structure, and the 2 oblique-pulling fixing pieces are symmetrically arranged.
The utility model has the advantages of reasonable structural design, convenient construction operation, effective guarantee of the safety of the structure in the construction process and reduction of the construction cost; the occupied area is small, other work type operations cannot be hindered, the construction efficiency is effectively improved, and the construction quality is guaranteed.
Drawings
FIG. 1 is the structural schematic diagram of the steel structure roof pre-assembled sliding installation device.
Figure 2 is a schematic view of the construction of a hoisting frame according to the invention.
Fig. 3 is a schematic structural diagram (side view) of the middle fixing device of the present invention after installation.
Fig. 4 is a schematic view (front view) of a part of the structure of one end of the middle fixing device according to the present invention after installation.
Figure 5 is the utility model discloses the local structure schematic diagram of well girder steel hoist and mount piece one end.
In the figure: 1. the crane comprises a track, 2. a hoisting frame, 3. a roof, 4. a rectangular frame structure, 5. a bottom beam, 6. a crane end beam, 7. a hoisting block, 8. a triangular support frame, 9. a hoisting device, 10. a steel beam, 11. a diagonal tension fixing piece, 12. a horizontal fixing piece, 13. a fixing device, 14. a connecting plate, 15. a hoisting plate and 16. a steel beam hoisting piece.
Detailed Description
The present invention will be further explained with reference to the drawings and examples. However, it should be understood by those skilled in the art that the present invention is not limited to the specific embodiments shown, and the present invention should be included within the scope of the present invention as long as the spirit of the present invention is met.
In the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "left", "right", "horizontal", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; they may be mechanically coupled, directly coupled, indirectly coupled through an intermediary, or may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
See figure 1. The utility model relates to a steel structure roof pre-assembly sliding installation device, which comprises a track 1 and a hoisting frame 2, wherein mutually parallel tracks 1 are respectively laid on the two transverse sides of a roof 3 of a dome steel structure (steel beam) to be installed, the track 1 has a distance from the side surface of the roof 3, the distance from the track 1 to the adjacent side surface of the roof 4 is about 1 meter, and the moving requirement of the hoisting frame 2 can be met; the hoisting frame 2 arranged on the rail 1 slides along the rail 1.
See figure 2. Crane boom 2 includes main part, floorbar 5, hoist end beam 6, hoist block 7, the main part is rectangular frame structure 4, and 2 rectangle of rectangular frame structure 4 on the track 1 sets up in opposite directions, and rectangular frame structure 4's lower extreme fixed mounting has floorbar 5, and 5 both sides fixed mounting of floorbar have along the hoist end beam 6 that track 1 slided, and hoist end beam 6 slides along track 1.
A hoisting block 7 is mounted on a cross beam at the upper end of the hoisting frame 2; preferably, the hoisting block 7 is a chain block.
Further, a triangular support frame 8 is arranged between the rectangular frame structure 4 and the bottom beam 5 to improve the stability of the rectangular frame structure 4.
Further, the length of said rails 1 is greater than the longitudinal length of the roof 3, and the starting position of the hoisting frame 2 is located outside the roof 3.
See fig. 5. The installation device also comprises a hoisting device 9 fixedly connected with a steel beam 10 to be installed.
The hoisting device 9 comprises a connecting plate 14 and a hoisting plate 15. One surface of the connecting plate 14 is fixedly connected with the end surface of the steel beam 10, the other surface of the connecting plate is fixedly connected with one side of the hoisting plate 15, and the connecting plate 14 is vertical to the hoisting plate 15; preferably, the connecting plate 14 and the hoisting plate 15 are fixedly connected by welding. And hoisting holes are formed in the hoisting plate 15.
Preferably, the end surfaces of the connecting plate 14 and the steel beam 10 are provided with corresponding through holes, and the connecting plate 14 is fixedly connected with the end plate of the steel beam 10 through bolts.
See fig. 3 and 4. The mounting device also comprises fixing means 13 for fixing the steel beam 10 to be mounted to the hoisting frame 2, which facilitate the synchronous sliding of the steel beam 10 after it has been fixed to the hoisting frame 2. The fixing device 13 comprises a horizontal fixing piece 12 and a diagonal-pulling fixing piece 11; preferably, the horizontal fixing member 12 and the diagonal-pulling fixing member 11 are made of channel steel.
One end of each horizontal fixing piece 12 is fixedly connected with the side face of the connecting plate 14, the other end of each horizontal fixing piece is fixedly connected with the vertical frame of the rectangular frame structure 4, and the 2 horizontal fixing pieces 12 are symmetrically arranged on the two sides of the connecting plate 14; preferably, the 2 horizontal fixing members 12 have the same height.
One end of the oblique-pulling fixing piece 11 is fixedly connected with the end part of the steel beam 10, the other end of the oblique-pulling fixing piece is fixedly connected with the lower end of the vertical frame of the rectangular frame structure 4, and the 2 oblique-pulling fixing pieces 11 are symmetrically arranged on two sides of the steel beam 10.
Preferably, the horizontal fixing member 12 and the diagonal-pulling fixing member 11 of the fixing device 13 are fixedly connected with the connecting plate 14, the steel beam 10 and the vertical frame of the rectangular frame structure 4 by a welding process.
The mounting method of the steel structure roof pre-assembling sliding mounting device comprises the steps of assembling a steel beam 10 to be mounted, positioning a hoisting frame 2 at an initial position, and the steps are as follows:
A. installation hoisting device
Hoisting devices 9 are fixedly installed at two ends of the steel beam 10 to form a steel beam hoisting piece 16;
wherein, the connecting plate 14 of the hoisting device 9 is fixedly connected with the end plate at the end part of the steel beam 10 through bolts.
B. The steel beam hoisting part 16 is connected with the hoisting block 7
The hoisting devices 9 at the two ends of the steel beam hoisting piece 16 are arranged in the rectangular frame structure 4 of the hoisting frame 2, and the lifting hook of the hoisting block 7 is connected with the hoisting plate 15 of the hoisting device 9.
C. Hoisting piece of hoisting steel beam and mounting and fixing device
The hoisting hoist 7 hoists the steel beam hoisting piece 16 upwards to the installation height, and the installation fixing device 13 fixes the steel beam hoisting piece 16 and the hoisting frame 2 to prevent the steel beam from tilting and swinging in the sliding operation process;
wherein:
the two sides of the connecting plate 14 are fixedly provided with horizontal fixing pieces 12, and the other ends of the horizontal fixing pieces 12 are fixedly connected with the vertical frames of the rectangular frame structure 4;
the 2 diagonal tension fixing pieces 11 are symmetrically arranged. One end of the diagonal tension fixing piece 11 is fixedly connected with the end part of the steel beam 10, and the other end is fixedly connected with the lower end of the vertical frame of the rectangular frame structure 4.
Preferably, the diagonal-pulling fixing piece 11 and the horizontal fixing piece 12 are fixedly connected by adopting a welding process
D. Mounting steel beam
2 hoisting frames 2 and steel beam hoisting pieces 16 synchronously slide to designed installation positions along the track 1, the steel beam hoisting pieces 16 are in place on the roof 3, and the steel beams 10 are fixedly connected with the roof 3 after butt joint, adjustment and correction are carried out, so that the installation of one steel beam is completed;
in the process of hoisting the steel beam, the theodolite is used for correcting along with the hoisting, and the deviation is corrected at any time.
E. Hoisting frame resetting
Installing a temporary cable, detaching the fixing device 13 and the hoisting device 9 from the steel beam 10, and removing the lifting hook; hoisting frame 2 is slid along rail 1 to the starting position.
And D, repeating the steps A to E, and mounting the next steel beam until all the steel beams are mounted one by one.
The utility model adopts the function conversion technology of the sliding system combining the steel beam sliding and the supporting sliding, when the steel beam is lifted, the crane frame is used as the lifting function to vertically lift the steel beam to the design height; when the crane boom moved to the design position along the roof structure assembly direction, the crane boom was converted into the supporting platform frame of girder steel this moment for the girder steel pinpoints.
The utility model discloses a pursue the pin whole technique of sliding, hoisting frame and girder steel fixed connection, the girder steel slides and moves to design position, after the location installation is accomplished, hoisting frame and girder steel temporary connection point break away from, and the hoisting frame independently slides to initial position, carries out next pin girder steel hoist and mount, so reciprocal, pursue the pin and accomplish whole girder steel installations.
The utility model discloses steel construction room lid is assembled installation device that slides in advance has following characteristics:
1. the large-span steel structure beam can be directly positioned at the designed position, and the mounting precision is high;
2. the safety of the structure in the construction process is effectively guaranteed, the construction cost is reduced, and the construction progress is accelerated;
3. the roof structure can be fully utilized, the installation height of the structure is reduced, the construction difficulty is reduced, and the engineering safety quality is greatly improved;
4. the measure consumption of temporary support and an operation platform is reduced, and meanwhile, a large number of scaffolds and scaffold assembling and disassembling personnel are not needed, so that the equipment cost is effectively reduced, and the site treatment is saved;
5. the hoisting machinery of the steel structure component has small self-weight, low requirement on the load of the top plate and small influence on the constructed structure;
6. shorten steel construction installation time, reduce the high altitude and weigh down people's risk.
It should be noted that the above-mentioned embodiments illustrate rather than limit the invention, and that those skilled in the art will be able to design many alternative embodiments without departing from the scope of the appended claims.

Claims (6)

1. The utility model provides a steel construction roof pre-assembly installation device that slides, includes track, crane boom, characterized by:
the method comprises the following steps that mutually parallel tracks are respectively laid on the two transverse sides of a roof with a dome steel structure to be installed, and the tracks are spaced from the side face of the roof; the hoisting frame arranged on the track slides along the track;
the main body of the hoisting frame is a rectangular frame structure, the rectangles of the rectangular frame structures on the 2 rails are arranged in opposite directions, the lower end of the rectangular frame structure is fixedly provided with a bottom beam, and two sides of the bottom beam are fixedly provided with crane end beams which slide along the rails;
and a hoisting block is mounted on a cross beam at the upper end of the hoisting frame.
2. The pre-assembled sliding installation device for the steel structure roof as claimed in claim 1, which is characterized in that: a triangular support frame is arranged between the rectangular frame structure and the bottom beam.
3. The pre-assembled sliding installation device for the steel structure roof as claimed in claim 2, wherein: the hoisting block is a chain block.
4. The pre-assembling sliding installation device for steel structure roof as claimed in any one of claims 1 to 3, which is characterized in that: the length of the rail is greater than the longitudinal length of the roof, and the starting position of the hoisting frame is located outside the roof.
5. The pre-assembled sliding installation device for the steel structure roof as claimed in claim 4, wherein: the mounting device also comprises a hoisting device fixedly connected with the steel beam to be mounted;
one surface of a connecting plate of the hoisting device is fixedly connected with the end surface of the steel beam, the other surface of the connecting plate is fixedly connected with one side of the hoisting plate, and the connecting plate is mutually perpendicular to the hoisting plate; the hoisting plate is provided with hoisting holes.
6. The pre-assembled sliding installation device for the steel structure roof as claimed in claim 4, wherein: the mounting device also comprises a fixing device for fixing the steel beam to be mounted and the hoisting frame, wherein the fixing device comprises a horizontal fixing piece and a diagonal-pulling fixing piece;
one end of each horizontal fixing piece is fixedly connected with the side face of the connecting plate, the other end of each horizontal fixing piece is fixedly connected with the vertical frame of the rectangular frame structure, and the 2 horizontal fixing pieces are symmetrically arranged on the two sides of the connecting plate;
one end of each oblique-pulling fixing piece is fixedly connected with the end part of the steel beam, the other end of each oblique-pulling fixing piece is fixedly connected with the lower end of the vertical frame of the rectangular frame structure, and the 2 oblique-pulling fixing pieces are symmetrically arranged.
CN202120133256.5U 2021-01-19 2021-01-19 Steel construction roof is assembled installation device that slides in advance Active CN214615508U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120133256.5U CN214615508U (en) 2021-01-19 2021-01-19 Steel construction roof is assembled installation device that slides in advance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120133256.5U CN214615508U (en) 2021-01-19 2021-01-19 Steel construction roof is assembled installation device that slides in advance

Publications (1)

Publication Number Publication Date
CN214615508U true CN214615508U (en) 2021-11-05

Family

ID=78437338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120133256.5U Active CN214615508U (en) 2021-01-19 2021-01-19 Steel construction roof is assembled installation device that slides in advance

Country Status (1)

Country Link
CN (1) CN214615508U (en)

Similar Documents

Publication Publication Date Title
CN112663971A (en) Steel structure roof pre-assembly sliding installation device and installation method
WO2021120687A1 (en) Method for entire removal of space truss and assistive support mechanism
CN111042539A (en) Single-point support installation construction method for large-span steel structure truss
CN111749140A (en) Truss integral lifting type bridge high pier creeping formwork device and construction method
CN113756592A (en) Lifting system of truss roof when height of upper lifting point is limited and construction method thereof
CN214615508U (en) Steel construction roof is assembled installation device that slides in advance
CN109989590B (en) Auxiliary fixing device for mounting roof overlong steel beam and hoisting method of steel beam
CN208845309U (en) The support platform and wind power generating set of tower
CN216811161U (en) Modular structure of airport terminal corridor
CN212270702U (en) Truss integral lifting type bridge high pier creeping formwork device
CN210563326U (en) Overhead unit type overhead sliding splicing operation platform
CN209907886U (en) Adjustable assembled stair construction platform
CN209704036U (en) Large-span truss segmental hoisting high-altitude closes up measure device
CN108755384B (en) Cantilever assembled steel truss bridge with track and construction method thereof
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN216196726U (en) Space truss lifting structure
CN218027198U (en) Steel case roof beam tractive quick construction equipment
CN217352141U (en) Construction system of large-section steel box girder
CN219547534U (en) Prefabricated assembled corrugated steel web continuous box girder bridge
CN220564178U (en) Truss lifting device
CN212893471U (en) Lifting appliance for T-shaped beam template
CN219430545U (en) Operation platform for utilizing stiffness framework for tower column head section
CN219637717U (en) Cable-stayed bridge cable guide pipe installation device
CN221167449U (en) Movable lower hanging operation platform structure for operation of bottom surface of bridge superposed beam
CN115676559B (en) Steel construction elevator well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant