CN220666104U - Water conservancy construction cut-off equipment - Google Patents

Water conservancy construction cut-off equipment Download PDF

Info

Publication number
CN220666104U
CN220666104U CN202322215437.4U CN202322215437U CN220666104U CN 220666104 U CN220666104 U CN 220666104U CN 202322215437 U CN202322215437 U CN 202322215437U CN 220666104 U CN220666104 U CN 220666104U
Authority
CN
China
Prior art keywords
water conservancy
conservancy construction
turnover
shaft
cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322215437.4U
Other languages
Chinese (zh)
Inventor
张国栋
姚明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202322215437.4U priority Critical patent/CN220666104U/en
Application granted granted Critical
Publication of CN220666104U publication Critical patent/CN220666104U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a water conservancy construction cut-off device, which comprises a water conservancy construction cut-off frame, wherein the upper end of the water conservancy construction cut-off frame is provided with a shaft seat, a turnover shaft is arranged in the shaft seat, lifting lugs are arranged on two sides of the turnover shaft, a hanging rod is welded on the lifting lugs, the lower end of the hanging rod is welded with a cut-off plate, the outer end face of the cut-off plate is provided with a buffering convex groove, two sides of the inner end face of the cut-off plate are provided with reinforcing ribs, and the outer end of the turnover shaft is connected with a turnover arm through a fixed shaft sleeve. According to the utility model, the closure plate is in a turnover structure, the closure plate can be hung and installed on the water surface through the water conservancy construction closure frame, the hydraulic rod is used for driving the turnover arm to move downwards to enable the closure plate to be closed downwards, so that water flow is stopped, the turnover opening and closing mode is more flexible and reliable, the closing angle is determined according to the depth of water, and compared with the traditional closure mode, the closure device is easier to operate and simple in operation steps.

Description

Water conservancy construction cut-off equipment
Technical Field
The utility model relates to the field related to water conservancy construction, in particular to a water conservancy construction cut-off device.
Background
The hydraulic construction is mainly to construct hydraulic engineering, which is a general term of various engineering construction constructed for controlling, utilizing and protecting water resources and environments on the earth surface and underground, is a project constructed for eliminating water damage and developing and utilizing water resources, and is classified into flood control engineering, farmland hydraulic engineering, hydroelectric power generation engineering, navigation channel and harbor engineering, water supply and drainage engineering, environmental hydraulic engineering, marine reclamation engineering and the like according to the service objects thereof, and is a hydraulic engineering capable of simultaneously serving various targets such as flood control, water supply, irrigation, power generation and the like, and is called comprehensive utilization hydraulic engineering.
In the prior art, certain defects still exist in the use of the water conservancy construction cut-off device, the traditional cut-off mode is a filling mode, a constructor is required to stack a bag of filling material at the position where cut-off is required, the cut-off step is complex, the construction time is long, the three-dimensional consumption is realized, the cost expenditure is increased, certain potential safety hazards exist in the cut-off construction, and the personal safety cannot be guaranteed.
Disclosure of Invention
The utility model aims to provide a water conservancy construction cut-off device, which solves the problems that the traditional cut-off mode proposed in the background technology generally adopts a filling mode, a constructor is required to stack a bag of filling material at a position where cut-off is required, the cut-off step is complex, the construction time is long, the cost is consumed three-dimensionally, the cost expenditure is increased, a certain potential safety hazard exists during cut-off construction, and the personal safety cannot be guaranteed.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a water conservancy construction cut-off equipment, includes the water conservancy construction cut-off frame, the upper end of water conservancy construction cut-off frame is equipped with the axle bed, the inside of axle bed is equipped with the turnover shaft, the epaxial both sides of turnover are equipped with the lug, the welding has the jib on the lug, the lower extreme and the closure plate welded connection of jib, the outer terminal surface of closure plate is equipped with the buffering tongue, the both sides of the inner terminal surface of closure plate are equipped with the strengthening rib, the outer end of turnover shaft is connected with the upset arm through fixed axle sleeve, the lower extreme and the stroke pole of upset arm are connected, the inside at the hydraulic rod is established to the stroke pole, the hydraulic rod is established in the top of fixing base, the front end of the inside of water conservancy construction cut-off frame is equipped with the observation mouth, the position of the top of one side of water conservancy construction cut-off frame is equipped with the fixed pipe box, the inside of fixed pipe box is equipped with the screw thread telescopic link, the one end and the mounting panel are connected, the inside of mounting panel is equipped with the installation screw.
In a further embodiment, a supporting rod is arranged in the buffer convex groove, and the buffer convex groove is in a circular structure.
In a further embodiment, the threaded telescopic rod is fixedly connected with the fixed pipe sleeve through threads, and the threaded telescopic rod is rotatably connected with the mounting plate through the coordination rotating sleeve.
In a further embodiment, the lower end of the turning arm is hinged with the travel bar through an upper fixed hinge, and the turning arm is connected with the turning shaft through a buckling.
In a further embodiment, the inner side of the lifting lug is welded with the overturning shaft through a triangular reinforcing plate, and the cross section of the lifting lug is of a U-shaped structure.
In a further embodiment, the bottom of the hydraulic rod is fixedly connected with the fixing base through a connecting piece, and the bottom of the connecting piece is hinged with the fixing base through a lower fixed hinge.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the closure plate is of a turnover structure, the closure plate can be hung and installed on the water surface through the water conservancy construction closure frame, the hydraulic rod is used for driving the turnover arm to move downwards to enable the closure plate to be closed downwards, so that water flow is stopped, the turnover opening and closing mode is more flexible and reliable, the closing angle is determined according to the depth of water, compared with the traditional closure mode, the closure plate is easier to operate, the operation steps are simple, time and labor are saved, the buffer convex groove is arranged on the surface of the closure plate, the buffer convex groove can buffer water waves impacting on the surface, and the closure effect is improved.
2. The position of the mounting plate is adjusted by stretching or shortening the threaded telescopic rod, so that the mounting plate is fixedly fastened with the slope arms on two sides of the river bank, the precise adjustment can be performed according to the gap size on two sides, and the mounting firmness is improved.
Drawings
FIG. 1 is a schematic view of a hydraulic construction cut-off device according to the present utility model;
FIG. 2 is a side view of a hydraulic construction stop of the present utility model;
fig. 3 is a schematic view showing an opened structure of the shut-off plate of the present utility model;
fig. 4 is a schematic structural view of the fixing base of the present utility model.
In the figure: 1. a mounting plate; 2. a coordination rotating sleeve; 3. a threaded telescopic rod; 4. a fixed pipe sleeve; 5. a water conservancy construction interception frame; 6. lifting lugs; 7. a turnover shaft; 8. triangular reinforcing sheets; 9. a shutoff plate; 10. a fixing seat; 11. reinforcing ribs; 12. buffer the convex groove; 13. a support rod; 14. a boom; 15. fixing the shaft sleeve; 16. a flip arm; 17. a fixed hinge is arranged on the upper part; 18. a hydraulic rod; 19. installing a screw; 20. a travel bar; 21. an observation port; 22. a shaft seat; 23. a connecting piece; 24. and a lower fixed hinge.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Referring to fig. 1-4, an embodiment of the present utility model is provided: the utility model provides a water conservancy construction cut-off equipment, including water conservancy construction cut-off frame 5, the upper end of water conservancy construction cut-off frame 5 is equipped with axle bed 22, the inside of axle bed 22 is equipped with tilting shaft 7, both sides on the tilting shaft 7 are equipped with lug 6, the welding has jib 14 on the lug 6, the lower extreme and the closure plate 9 welded connection of jib 14, the outer terminal surface of closure plate 9 is equipped with buffering tongue 12, the both sides of the interior terminal surface of closure plate 9 are equipped with strengthening rib 11, the outer end of tilting shaft 7 is connected with upset arm 16 through fixed axle sleeve 15, the lower extreme and the stroke pole 20 of upset arm 16 are connected, stroke pole 20 is established in the inside of hydraulic rod 18, the hydraulic rod 18 is established in the top of fixing base 10, the front end of the inside of water conservancy construction cut-off frame 5 is equipped with viewing aperture 21, the position of the rear end of one side of water conservancy construction cut-off frame 5 is equipped with fixed pipe sleeve 4, the inside of fixed pipe sleeve 4 is equipped with screw thread telescopic link 3, the one end and mounting panel 1 are connected, the inside of mounting panel 1 is equipped with installation screw 19.
The hydraulic lifting device is characterized in that the hydraulic lifting device is used for installing the overturning shaft 7 through the shaft seat 22, overturning and adjusting the intercepting plate 9 through the overturning shaft 7, hanging and installing the intercepting plate 9 below the overturning shaft 7 through the lifting lug 6, increasing the installation firmness of the lifting lug 6 and the intercepting plate 9 through the lifting rod 14, connecting the overturning shaft 7 with the hydraulic rod 18 through the overturning arm 16, conducting up-down overturning operation on the intercepting plate 9 in an electric mode through the hydraulic rod 18, installing the threaded telescopic rod 3 through the fixed pipe sleeve 4, stretching or shortening and adjusting the installing plate 1 through the threaded telescopic rod 3, and installing and fixing the water conservancy construction intercepting frame 5 and a river bank through the installing plate 1.
Further, the support rod 13 is provided inside the buffer groove 12, and the buffer groove 12 has a circular shape.
The support bar 13 is used to increase the firmness of the buffer groove 12.
Further, the threaded telescopic rod 3 is fixedly connected with the fixed pipe sleeve 4 through threads, and the threaded telescopic rod 3 is rotatably connected with the mounting plate 1 through the coordination rotating sleeve 2.
The threaded telescopic rod 3 and the mounting plate 1 can be coordinated to operate through the coordination rotating sleeve 2.
Further, the lower end of the turning arm 16 is hinged with the travel bar 20 by an upper fixed hinge 17, and the turning arm 16 is connected with the turning shaft 7 by a snap fit.
The lower end of the invert arm 16 is coordinated with the travel bar 20 by an upper fixed hinge 17.
Further, the inner side of the lifting lug 6 is welded with the overturning shaft 7 through the triangular reinforcing plate 8, and the cross section of the lifting lug 6 is of a U-shaped structure.
The triangular reinforcing piece 8 is used for increasing the firmness of the installation of the inner side of the lifting lug 6 and the turnover shaft 7.
Further, the bottom of the hydraulic rod 18 is fixedly connected with the fixing base 10 through a connecting piece 23, and the bottom of the connecting piece 23 is hinged with the fixing base 10 through a lower fixed hinge 24.
The bottom of the hydraulic rod 18 is conveniently connected with the fixing seat 10 through a connecting piece 23.
Working principle: when the hydraulic construction intercepting frame 5 with the proper size is customized according to the width of the intercepted water area, the hydraulic construction intercepting frame 5 is hoisted on the water surface by using hoisting equipment, the two sides of the mounting plate 1 and the river bank are embedded, the mounting plate 1 is stretched or shortened and adjusted by rotating the threaded telescopic rod 3, the mounting plate 1 is tightly embedded on the river bank, the mounting plate is fixed by using bolts, the travel rod 20 is driven to shrink upwards by the hydraulic rod 18, the turning arm 16 is pushed downwards, the intercepting plate 9 is turned upwards to be closed, and therefore water flow is cut off.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a water conservancy construction cut-off equipment, includes water conservancy construction cut-off frame (5), its characterized in that: the upper end of the water conservancy construction closure frame (5) is provided with a shaft seat (22), the inside of the shaft seat (22) is provided with a turnover shaft (7), two sides on the turnover shaft (7) are provided with lifting lugs (6), lifting rods (14) are welded on the lifting lugs (6), the lower ends of the lifting rods (14) are welded with closure plates (9), the outer end surfaces of the closure plates (9) are provided with buffer convex grooves (12), two sides of the inner end surfaces of the closure plates (9) are provided with reinforcing ribs (11), the outer ends of the turnover shaft (7) are connected with turnover arms (16) through fixed shaft sleeves (15), the lower extreme and the stroke pole (20) of upset arm (16) are connected, the inside at hydraulic rod (18) is established to stroke pole (20), the top at fixing base (10) is established to hydraulic rod (18), the front end of the inside of water conservancy construction closure frame (5) is equipped with viewing aperture (21), the position of the top of the rear end of one side of water conservancy construction closure frame (5) is equipped with fixed pipe box (4), the inside of fixed pipe box (4) is equipped with screw thread telescopic link (3), the one end and the mounting panel (1) of screw thread telescopic link (3) are connected, the inside of mounting panel (1) is equipped with installation screw (19).
2. A water conservancy construction stop according to claim 1, wherein: the inside of buffering tongue (12) is equipped with bracing piece (13), and the appearance of buffering tongue (12) is set up to circular structure.
3. A water conservancy construction stop according to claim 1, wherein: the threaded telescopic rod (3) is fixedly connected with the fixed pipe sleeve (4) through threads, and the threaded telescopic rod (3) is rotationally connected with the mounting plate (1) through the coordination rotating sleeve (2).
4. A water conservancy construction stop according to claim 1, wherein: the lower end of the turnover arm (16) is hinged with the travel rod (20) through an upper fixed hinge (17), and the turnover arm (16) is connected with the turnover shaft (7) through buckling.
5. A water conservancy construction stop according to claim 1, wherein: the inner side of the lifting lug (6) is connected with the overturning shaft (7) through a triangular reinforcing plate (8) in a welded mode, and the cross section of the lifting lug (6) is of a U-shaped structure.
6. A water conservancy construction stop according to claim 1, wherein: the bottom of the hydraulic rod (18) is fixedly connected with the fixed seat (10) through a connecting piece (23), and the bottom of the connecting piece (23) is hinged with the fixed seat (10) through a lower fixed hinge (24).
CN202322215437.4U 2023-08-17 2023-08-17 Water conservancy construction cut-off equipment Active CN220666104U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322215437.4U CN220666104U (en) 2023-08-17 2023-08-17 Water conservancy construction cut-off equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322215437.4U CN220666104U (en) 2023-08-17 2023-08-17 Water conservancy construction cut-off equipment

Publications (1)

Publication Number Publication Date
CN220666104U true CN220666104U (en) 2024-03-26

Family

ID=90331324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322215437.4U Active CN220666104U (en) 2023-08-17 2023-08-17 Water conservancy construction cut-off equipment

Country Status (1)

Country Link
CN (1) CN220666104U (en)

Similar Documents

Publication Publication Date Title
CN220666104U (en) Water conservancy construction cut-off equipment
CN203625860U (en) Full-automatic bed-type flap gate
CN201050053Y (en) Waterpower hydraulic pressure interaction flap gate
CN203420260U (en) Two-way turning-over radial gate
CN202347502U (en) Trunnion lodging type gate
CN207176642U (en) Novel water conservancy gate
CN212688899U (en) River channel garbage intercepting device
CN203144977U (en) Hydraulic opening-closing long-span turning type arc-shaped steel gate
CN208980149U (en) A kind of laterally opened slag bucket
CN204875904U (en) Subway open cut construction is with end opening door sediment fill
CN102644300B (en) Four-bar linkage flat-digging grab bucket
CN205024651U (en) Hydraulic pressure dam
CN214089685U (en) Earth-rock cage bag with blocking assembly
CN209669822U (en) A kind of hydraulic lifting dam
CN209129015U (en) Water-bag-type riverway cofferdam
CN108330927B (en) High-strength and high-anticollision water conservancy gate
CN212836506U (en) Bracket convenient for concrete terrace construction
CN2751071Y (en) Multi-support-hinge type arc gate with deep hole
CN209510274U (en) Linkage on a kind of drilling rod can be realized automatic angle adjusting
CN210196511U (en) Large pneumatic blind plate valve overturning cylinder
CN207468081U (en) A kind of civil engineering is with efficiently hanging a liter machine
CN219731843U (en) Small river water guiding device for water conservancy construction
CN206128016U (en) Novel structure hydraulic flap gate
CN216689292U (en) Device convenient to steel dam replacement side stagnant water
CN221140848U (en) Well lid opener

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant