CN219731843U - Small river water guiding device for water conservancy construction - Google Patents
Small river water guiding device for water conservancy construction Download PDFInfo
- Publication number
- CN219731843U CN219731843U CN202320593174.8U CN202320593174U CN219731843U CN 219731843 U CN219731843 U CN 219731843U CN 202320593174 U CN202320593174 U CN 202320593174U CN 219731843 U CN219731843 U CN 219731843U
- Authority
- CN
- China
- Prior art keywords
- fixedly arranged
- baffle
- frames
- frame
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 31
- 238000010276 construction Methods 0.000 title claims abstract description 23
- 230000003014 reinforcing effect Effects 0.000 claims description 12
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 238000009412 basement excavation Methods 0.000 abstract 1
- 238000005457 optimization Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002262 irrigation Effects 0.000 description 1
- 238000003973 irrigation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a small-section river diversion device for water conservancy construction, which relates to the technical field of river diversion and comprises two side baffle frames and a plurality of middle baffle frames, wherein sinking blocks are respectively and fixedly arranged at the lower ends of the side baffle frames and the middle baffle frames, inserting blocks are fixedly arranged at the lower ends of the sinking blocks, a first baffle plate is movably arranged at the inner side of the side baffle frames, a first fixing seat is fixedly arranged at one side of the first baffle plate, a mounting plate is fixedly arranged at the inner side of the side baffle frames, and a first bearing seat is fixedly arranged at the lower ends of the mounting plates. Utilize plug-in type side to keep off frame and well to keep off frame assembly, hoist and mount that can be quick and impress to the riverbed bottom, and then realize a quick shutoff to the river, and the first baffle gate type setting in two side keep off frames, cooperation kuppe and drain pipe can carry out a reposition of redundant personnel to the river water body that cuts to can arrange the pipeline in original river course and extend to on the kuppe of another side to keep off frame one side, need not at the excavation splitter box, reduce hydraulic engineering's construction volume.
Description
Technical Field
The utility model relates to the technical field of river diversion, in particular to a small-section river diversion device for water conservancy construction.
Background
The hydraulic engineering is an engineering constructed for controlling and allocating surface water and groundwater in nature to achieve the purpose of removing harmful substances and is also called a water engineering, so that the hydraulic engineering can be classified into flood control engineering (embankment, reservoir, storage flood diversion area, culvert gate, drainage engineering, etc.), farmland hydraulic engineering (irrigation engineering), hydroelectric engineering, shipping and urban water supply and drainage engineering according to the service objects;
when dredging, hardening or other hydraulic engineering construction are carried out on the river with low water flow and unfavorable flow velocity, the river is cut off by adopting the interception dam, on one hand, the construction and the disassembly of the water retaining dam are time-consuming and labor-consuming, and on the other hand, after the river is cut off by directly utilizing the water retaining dam, the upward water flow is continuously injected into the river, so that additional diversion trenches are required to be excavated, the construction quantity is increased, and meanwhile, inconvenience is brought to the traveling of surrounding residents.
Disclosure of Invention
The utility model aims to provide a small river diversion device for water conservancy construction, which can effectively solve the problems in the background technology.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides a water conservancy construction is with minor segment river guiding device, includes two side check frame and a plurality of well check frame, side check frame and well check frame lower extreme respectively fixed mounting have the subsidence piece, subsidence piece lower extreme fixed mounting has the inserted block, the inboard movable mounting of side check frame has first baffle, first baffle one side fixed mounting has first fixing base, the inboard fixed mounting of side check frame has the mounting panel still, mounting panel lower extreme fixed mounting has first bearing frame, side check frame upper end fixed mounting has the second bearing frame, rotate between second bearing frame and the first bearing frame and install adjusting screw, just adjusting screw still threaded connection is in the screw in the first fixing base, is located side check frame one side fixed mounting between mounting panel and the subsidence piece has the kuppe, kuppe one side fixedly connected with drain pipe, well check frame inboard fixed mounting has the second baffle, second baffle one side fixed mounting has two reinforcing plates, two movable mounting has the support stud between the reinforcing plate, movable mounting has the adjusting post between the reinforcing plate, the adjusting post is equipped with down through the adjusting post, the adjusting post is equipped with down the end.
As a further optimization scheme of the utility model, the two sides of the side baffle frame and the middle baffle frame are respectively and fixedly provided with L-shaped plugboards, the slotting directions of the L-shaped plugboards on the two sides of the same side baffle frame or the middle baffle frame are opposite, and the two L-shaped plugboards are connected in an interpenetration way.
As a further optimization scheme of the utility model, a first connecting block is fixedly arranged at the upper end of the support stud, and the first connecting block is rotatably arranged between the two reinforcing plates by utilizing a pin shaft.
As a further optimization scheme of the utility model, the inner side of the adjusting column is provided with a screw groove, and the adjusting column is rotatably arranged at the outer side of the supporting stud through the screw groove.
As a further optimization scheme of the utility model, the lower end of the adjusting column is fixedly provided with a fixed block, the upper end of the rotating block is provided with a rotating groove, the lower end of the rotating groove is fixedly provided with a second fixed seat, and the rotating block is rotatably arranged on the fixed block through the rotating groove.
As a further optimization scheme of the utility model, a second connecting block is fixedly arranged at the center of the upper end of the base plate, a connecting groove is formed in the second connecting block, the second connecting block is installed on a second fixing seat in a penetrating manner through the connecting groove, and the second connecting block is connected with the second fixing seat through a pin shaft.
Compared with the prior art, the utility model has the following beneficial effects:
according to the small-section river water diversion device for water conservancy construction, the spliced side baffle frames and middle baffle frame combination body is utilized, the river bottom can be quickly hoisted and pressed in, so that one quick cut-off of a river is realized, the first baffle plates in the two side baffle frames are arranged in a gate mode, the diversion cover and the drain pipe are matched, one diversion can be conducted on the cut-off river water body, the pipeline can be placed in an original river channel and extends to the diversion cover on one side of the other side baffle frame, a diversion groove is not required to be excavated, and the construction amount of hydraulic engineering is reduced.
Drawings
FIG. 1 is a schematic diagram of the main structure of the present utility model;
FIG. 2 is a side dam structure exploded view of the present utility model;
FIG. 3 is a split view of a column structure according to the present utility model;
fig. 4 is an enlarged view at a in fig. 3.
In the figure: 1. a side baffle frame; 2. a middle baffle frame; 3. sinking blocks; 4. inserting blocks; 5. a first baffle; 6. a mounting plate; 7. a first bearing seat; 8. a first fixing seat; 9. a second bearing seat; 10. adjusting a screw rod; 11. a guide cover; 12. a second baffle; 13. a reinforcing plate; 14. supporting the stud; 15. an adjusting column; 16. a rotating block; 17. a backing plate; 18. a first connection block; 19. a screw groove; 20. a fixed block; 21. a rotary groove; 22. the second fixing seat; 23. a second connection block; 24. a connecting groove; 25. l-shaped plugboard.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
As shown in fig. 1-4, the small river diversion device for water conservancy construction provided by the utility model comprises two side baffle frames 1 and a plurality of middle baffle frames 2, wherein the lower ends of the side baffle frames 1 and the middle baffle frames 2 are respectively and fixedly provided with a sinking block 3, the lower end of the sinking block 3 is fixedly provided with an inserting block 4, the inner side of the side baffle frames 1 is movably provided with a first baffle plate 5, one side of the first baffle plate 5 is fixedly provided with a first fixed seat 8, the inner side of the side baffle frames 1 is fixedly provided with a mounting plate 6, the lower end of the mounting plate 6 is fixedly provided with a first bearing seat 7, the upper end of the side baffle frames 1 is fixedly provided with a second bearing seat 9, an adjusting screw rod 10 is rotatably arranged between the second bearing seat 9 and the first bearing seat 7, the adjusting screw rod 10 is also in a screw hole in the first fixed seat 8, one side of the side baffle frame 1 between the mounting plate 6 and the sinking block 3 is fixedly provided with a guide cover 11, one side of the guide cover 11 is fixedly connected with a drain pipe, the inner side of the middle baffle frame 2 is fixedly provided with a second baffle plate 12, one side of the second baffle plate 12 is fixedly provided with two reinforcing plates 13, a movable support block 14 is arranged between the two reinforcing plates 13, a movable support block 14 is movably provided with a backing plate 15, and a lower support post 15 is movably provided with a stud 15 through the lower end 15, and the stud 15 is movably arranged at the lower end 15.
The L-shaped plugboards 25 are fixedly arranged at the two sides of the side baffle frame 1 and the middle baffle frame 2 respectively, the slotting directions of the L-shaped plugboards 25 at the two sides of the same side baffle frame 1 or the middle baffle frame 2 are opposite, the two L-shaped plugboards 25 are connected in an interpenetration way, and the L-shaped plugboards 25 arranged at the two sides of the side baffle frame 1 and the middle baffle frame 2 are beneficial to the sealing plug connection between the side baffle frame 1 and the middle baffle frame 2 and between the middle baffle frame 2 and the middle baffle frame 2;
the upper end of the support stud 14 is fixedly provided with a first connecting block 18, the first connecting block 18 is rotatably arranged between the two reinforcing plates 13 by utilizing a pin shaft, the inner side of the adjusting column 15 is provided with a screw groove 19, the adjusting column 15 is rotatably arranged on the outer side of the support stud 14 by the screw groove 19, the lower end of the adjusting column 15 is fixedly provided with a fixed block 20, the upper end of the rotating block 16 is provided with a rotating groove 21, the lower end of the rotating groove 21 is fixedly provided with a second fixed seat 22, the rotating block 16 is rotatably arranged on the fixed block 20 by the rotating groove 21, the central position of the upper end of the backing plate 17 is fixedly provided with a second connecting block 23, a connecting groove 24 is arranged in the second connecting block 23, the second connecting block 23 is alternately arranged on the second fixed seat 22 by the connecting groove 24, and the adjustable adjusting column 15 is connected with the second fixed seat 22 by the pin shaft, so that the adjustable adjusting column 15 can provide additional supporting force for the backing plate 17.
It should be noted that, when the small-section river diversion device for water conservancy construction is used, firstly, two side baffle frames 1 are hung at the positions of the dikes at two sides in a river by using a hanging mechanism, the sinking blocks 3 and the inserting blocks 4 at the lower ends of the side baffle frames are pressed into soil layers at the bottom in the river bed, then, the rest middle baffle frames 2 are sequentially hung between the two side baffle frames 1, the sinking blocks 3 and the inserting blocks 4 at the bottom of the middle baffle frames 2 are pressed into the bottom of the river bed, the side baffle frames 1 and the middle baffle frames 2 or the middle baffle frames 2 and the middle baffle frames 2 are connected in an interpenetration manner by L-shaped inserting plates 25, thereby completing the interception of one side of the river, then, after the free dispersion of the river water body at one side of the combination of the side baffle frames 1 and the middle baffle frames 2 is not completed, the support studs 14 rotate between the two reinforcing plates 13 by taking the first connecting blocks 18 as axes, the adjusting column 15 is rotated downwards on the supporting stud 14 through the screw groove 19, the adjusting column 15 drives the backing plate 17 to be pressed into the bottom of the river bed through the rotating block 16 and the second connecting block 23 to provide additional supporting force for the middle baffle frame 2, then, the installation mode is installed, the other group of side baffle frames 1 and the middle baffle frame 2 are installed at the other end of the river bed construction section, the guide hoods 11 at one side of the two side baffle frames 1 are connected through the pipeline, then, the adjusting screw rod 10 can be rotated between the second bearing seat 9 and the first bearing seat 7, the adjusting screw rod 10 can be rotated in the screw hole in the first fixing seat 8, the first baffle plate 5 is lifted by the first fixing seat 8, the cut river water body is placed at the other end of the river through the guide hoods 11 and the drain pipe, and then, the diversion of the river water is completed, the hydraulic engineering construction of the construction section is not affected.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (6)
1. A water conservancy construction is with little section river water guiding device, its characterized in that: the novel water diversion device comprises two side baffle frames (1) and a plurality of middle baffle frames (2), wherein a sinking block (3) is fixedly arranged at the lower ends of the side baffle frames (1) and the middle baffle frames (2) respectively, an inserting block (4) is fixedly arranged at the lower ends of the sinking blocks (3), a first baffle plate (5) is movably arranged at the inner side of each side baffle frame (1), a first fixing seat (8) is fixedly arranged at one side of each first baffle plate (5), a mounting plate (6) is fixedly arranged at the inner side of each side baffle frame (1), a first bearing seat (7) is fixedly arranged at the lower end of each mounting plate (6), a second bearing seat (9) is fixedly arranged at the upper end of each side baffle frame (1), an adjusting screw (10) is rotatably arranged between each second bearing seat (9) and each first bearing seat (7), the adjusting screw (10) is further connected with a screw hole in the first fixing seat (8) in a threaded mode, a diversion cover (11) is fixedly arranged at one side of the side baffle frame (1) between the mounting plates (6) and the sinking blocks (3), and a drain pipe is fixedly connected to one side of the diversion cover (11).
The middle baffle frame is characterized in that a second baffle plate (12) is fixedly arranged on the inner side of the middle baffle frame (2), two reinforcing plates (13) are fixedly arranged on one side of the second baffle plate (12), support studs (14) are movably arranged between the two reinforcing plates (13), adjusting columns (15) are movably arranged on the support studs (14), base plates (17) are arranged at the lower ends of the adjusting columns (15), and the base plates (17) are movably arranged at the lower ends of the adjusting columns (15) through rotating blocks (16).
2. The small section river diversion apparatus for water conservancy construction according to claim 1, wherein: l-shaped inserting plates (25) are fixedly arranged on two sides of the side baffle frame (1) and the middle baffle frame (2) respectively, the slotting directions of the L-shaped inserting plates (25) on two sides of the same side baffle frame (1) or the middle baffle frame (2) are opposite, and the two L-shaped inserting plates (25) are connected in an interpenetration mode.
3. The small section river diversion apparatus for water conservancy construction according to claim 2, wherein: the upper end of the support stud (14) is fixedly provided with a first connecting block (18), and the first connecting block (18) is rotatably arranged between the two reinforcing plates (13) by utilizing a pin shaft.
4. A small section river diversion apparatus for water conservancy construction according to claim 3, wherein: the inner side of the adjusting column (15) is provided with a screw groove (19), and the adjusting column (15) is rotatably arranged on the outer side of the supporting stud (14) through the screw groove (19).
5. The small section river diversion apparatus for water conservancy construction according to claim 4, wherein: the adjustable fixing device is characterized in that a fixed block (20) is fixedly arranged at the lower end of the adjusting column (15), a rotary groove (21) is formed in the upper end of the rotary block (16), a second fixed seat (22) is fixedly arranged at the lower end of the rotary groove (21), and the rotary block (16) is rotatably arranged on the fixed block (20) through the rotary groove (21).
6. The small section river diversion apparatus for water conservancy construction according to claim 5, wherein: the center of the upper end of the base plate (17) is fixedly provided with a second connecting block (23), a connecting groove (24) is formed in the second connecting block (23), the second connecting block (23) is installed on a second fixing seat (22) in a penetrating mode through the connecting groove (24), and the second connecting block (23) is connected with the second fixing seat (22) through a pin shaft.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320593174.8U CN219731843U (en) | 2023-03-23 | 2023-03-23 | Small river water guiding device for water conservancy construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320593174.8U CN219731843U (en) | 2023-03-23 | 2023-03-23 | Small river water guiding device for water conservancy construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219731843U true CN219731843U (en) | 2023-09-22 |
Family
ID=88058688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320593174.8U Active CN219731843U (en) | 2023-03-23 | 2023-03-23 | Small river water guiding device for water conservancy construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219731843U (en) |
-
2023
- 2023-03-23 CN CN202320593174.8U patent/CN219731843U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204039988U (en) | Lying type flap gate | |
CN201485823U (en) | Anti-seepage structure of hydraulic asphalt concrete panel | |
CN201762694U (en) | Dam flow guiding device | |
CN202323895U (en) | Tail water channel structure for stepped hydro-junction | |
CN103031824A (en) | Hydraulic horizontal dam | |
CN219731843U (en) | Small river water guiding device for water conservancy construction | |
CN105696530B (en) | Hydraulic rotating steel dam | |
CN221320814U (en) | Water flow interception equipment for water conservancy construction | |
CN204753529U (en) | Board floodgate simply turns over | |
CN113216271A (en) | Insertion type vertical film laying method | |
CN209669822U (en) | A kind of hydraulic lifting dam | |
CN202347502U (en) | Trunnion lodging type gate | |
CN202247810U (en) | Triangle support rotating gate | |
CN216615735U (en) | Pre-buried formula of interception rubbish blocks sluice gate | |
CN202298571U (en) | Hydraulic horizontal dam | |
CN217149881U (en) | Drain pipe for bridge engineering | |
CN210737457U (en) | Retaining dam for hydraulic engineering | |
CN203603124U (en) | Landscape hydraulic flap gate | |
CN203346857U (en) | Prefabricated part for trapezoid channel lining | |
CN102677660B (en) | Quick pile-forming method and method for quickly building urban flyover by quick pile-forming method | |
CN219298148U (en) | Vertical shaft rotary trash rack | |
CN112376671B (en) | Water conservancy project construction flow guide and drainage structure and construction method thereof | |
CN210395315U (en) | Underground continuous wall structure for water-rich sand layer deep foundation pit support | |
CN221723581U (en) | Pipeline laying and fixing mechanism for water conservancy and hydropower | |
CN108930257A (en) | A kind of bank tower intake being built in steep side slope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |