CN220598407U - Pile sealing cap - Google Patents

Pile sealing cap Download PDF

Info

Publication number
CN220598407U
CN220598407U CN202322148668.8U CN202322148668U CN220598407U CN 220598407 U CN220598407 U CN 220598407U CN 202322148668 U CN202322148668 U CN 202322148668U CN 220598407 U CN220598407 U CN 220598407U
Authority
CN
China
Prior art keywords
pile
plate
sealing cap
circular plate
prestressed pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322148668.8U
Other languages
Chinese (zh)
Inventor
李丹丹
吴坤光
孟祥文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Tianyu Construction Engineering Co ltd
Original Assignee
Tianjin Tianyu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Tianyu Construction Engineering Co ltd filed Critical Tianjin Tianyu Construction Engineering Co ltd
Priority to CN202322148668.8U priority Critical patent/CN220598407U/en
Application granted granted Critical
Publication of CN220598407U publication Critical patent/CN220598407U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a pile sealing cap which solves the problems that the pile sealing cap is mainly cast in situ by concrete, the overall casting maintenance time is long, the construction period of a building can be prolonged, the casting forms that the sectional area of the pile sealing cap is slightly larger than the outer circle of a prestressed pipe pile and the settlement of the prestressed pipe pile cannot be slowed down.

Description

Pile sealing cap
Technical Field
The utility model belongs to the technical field of building construction devices, and particularly relates to a pile sealing cap.
Background
The building construction process can often meet the foundations such as silt, mucky soil, cohesive soil, silt, sandy soil and artificial filling soil, can adopt the prestressed pipe pile to this kind of foundation, and prestressed pipe pile concrete strength is high, and single pile bearing capacity is high to because prestressed pipe pile section length is different, the collocation is nimble, and the festival is long convenient, can adjust festival stake length at any time according to the change of geological conditions at the job site, and geological conditions adaptability is strong, and the saving uses the stake volume, and prestressed pipe pile top all needs to install and seals the pile cap.
However, the existing pile sealing cap is mainly formed by integrally pouring concrete on site, the overall pouring maintenance time is long, the building construction period can be prolonged, the sectional area of the pile sealing cap formed by pouring is slightly larger than the outer circle of the prestressed pipe pile, and the settlement of the prestressed pipe pile cannot be slowed down.
Disclosure of Invention
Aiming at the situation, in order to overcome the defects of the prior art, the utility model provides the pile sealing cap, which effectively solves the problems that the pile sealing cap is mainly cast in situ by concrete, the whole casting maintenance time is long, the construction period of a building can be prolonged, the section area of the cast pile sealing cap is slightly larger than the excircle of the prestressed pipe pile, and the settlement of the prestressed pipe pile cannot be slowed down.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a pile sealing cap, includes first plectane, first plectane outside is fixed with first connecting plate, and first annular plate is installed to first connecting plate one end of keeping away from first plectane, and first annular plate bottom is connected with the conical plate, and the connecting rod is installed to first plectane bottom, and connecting rod bottom fixing has the second plectane.
Preferably, the outer side of the second circular plate is connected with a prestressed pipe pile.
Preferably, the first cavity is installed to the inboard of conical plate, and the connecting rod outside is connected with the second cavity.
Preferably, the number of the first connecting plates is six, and the first connecting plates are uniformly distributed on the outer side of the first circular plate.
Preferably, the bottom of the conical plate is provided with a water through hole.
Compared with the prior art, the utility model has the beneficial effects that:
according to the utility model, concrete pouring and steel prefabrication are combined, the curing time can be reduced by partial pouring, the building construction period is shortened, the contact area between the pile sealing cap and the ground can be increased by the first annular plate, and the settlement of the prestressed pipe pile is slowed down.
The conical plate is of an inclined angle structure, the pile sealing cap is conveniently inserted into the ground, the water through holes are formed in the bottom of the conical plate, water for concrete curing can conveniently flow out of the bottom of the conical plate, and curing time can be shortened.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model. In the drawings:
FIG. 1 is a schematic diagram of the overall and prestressed pipe pile connection of the present utility model;
FIG. 2 is a schematic view of the mounting structure of the tapered plate of the present utility model;
FIG. 3 is a cross-sectional view of the utility model A-A.
In the figure: 1. a first circular plate; 2. a first connection plate; 3. a first annular plate; 4. a conical plate; 5. a connecting rod; 6. a second circular plate; 7. a first cavity; 8. a second cavity; 9. and (5) pre-stressing the tubular pile.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
As shown in fig. 1, 2 and 3, an embodiment of the utility model provides a pile sealing cap, which comprises a first circular plate 1, wherein a first connecting plate 2 is fixed on the outer side of the first circular plate 1, one end, far away from the first circular plate 1, of the first connecting plate 2 is provided with a first circular plate 3, the bottom end of the first circular plate 3 is connected with a conical plate 4, the bottom end of the first circular plate 1 is provided with a connecting rod 5, and the bottom end of the connecting rod 5 is fixed with a second circular plate 6.
Specifically, the outer side of the second circular plate 6 is connected with a prestressed pipe pile 9.
Specifically, the first cavity 7 is installed to conical plate 4 inboard, and the connecting rod 5 outside is connected with second cavity 8.
Specifically, the number of the first connecting plates 2 is six, and the six first connecting plates are uniformly distributed on the outer side of the first circular plate 1.
Specifically, the bottom of the conical plate 4 is provided with a water through hole.
First embodiment, shown by fig. 1, fig. 2 and fig. 3, first connecting plate 2 quantity is six, evenly distributed is in first plectane 1 outside, can guarantee that first plectane 1 and first ring board 3 are firm to be connected, can make the concrete follow the clearance between the first connecting plate 2 again, pour first cavity 7 and second cavity 8, first cavity 7 pour the concrete and can firmly connect pile cap and prestressing force tubular pile 9, second cavity 8 pour the concrete and also can strengthen the connection between pile cap and the prestressing force tubular pile 9, effectively avoid pile cap to drop from prestressing force tubular pile 9, conical plate 4 is the inclination structure, conveniently insert pile cap into ground, the water hole has been seted up to conical plate 4 bottom can be convenient for concrete maintenance's water to flow from conical plate 4 bottom, first plectane 1, the contact surface area that first connecting plate 2 and first ring board 3 formed is greater than prestressing force tubular pile 9 sectional area far away, can slow down prestressing force tubular pile subsides.
Working principle: when the pile sealing cap is used, the pile sealing cap is inserted into the ground, the first connecting plate 2 is contacted with the prestressed pipe pile 9, the second circular plate 6 is contacted with the inner side of the prestressed pipe pile 9, the bottom end of the conical plate 4 is contacted with the outer side of the prestressed pipe pile 9, concrete is poured into the first cavity 7 and the second cavity 8 through a gap between the first connecting plate 2, so that the first cavity 7 and the second cavity 8 are filled with concrete, watering and curing are carried out, the concrete in the first cavity 7 and the second cavity 8 can be firmly connected with the pile sealing cap and the prestressed pipe pile 9, the conical plate 4 is in an inclined angle structure, the pile sealing cap is conveniently inserted into the ground, water through holes are formed in the bottom of the conical plate 4, the water through which the concrete is cured can flow out from the bottom of the conical plate 4, the contact surface area formed by the first connecting plate 1 and the first circular plate 2 is far larger than the cross section area of the prestressed pipe pile 9, and the settlement of the prestressed pipe pile can be slowed down.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. Pile sealing cap, including first plectane (1), its characterized in that: the novel circular plate is characterized in that a first connecting plate (2) is fixed on the outer side of the first circular plate (1), a first circular plate (3) is installed at one end, far away from the first circular plate (1), of the first connecting plate (2), a conical plate (4) is connected to the bottom end of the first circular plate (3), a connecting rod (5) is installed at the bottom end of the first circular plate (1), and a second circular plate (6) is fixed at the bottom end of the connecting rod (5).
2. A pile cap according to claim 1, wherein: the outer side of the second circular plate (6) is connected with a prestressed pipe pile (9).
3. A pile cap according to claim 1, wherein: the inner side of the conical plate (4) is provided with a first cavity (7), and the outer side of the connecting rod (5) is connected with a second cavity (8).
4. A pile cap according to claim 1, wherein: the number of the first connecting plates (2) is six, and the six connecting plates are uniformly distributed on the outer side of the first circular plate (1).
5. A pile cap according to claim 1, wherein: the bottom of the conical plate (4) is provided with a water through hole.
CN202322148668.8U 2023-08-10 2023-08-10 Pile sealing cap Active CN220598407U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322148668.8U CN220598407U (en) 2023-08-10 2023-08-10 Pile sealing cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322148668.8U CN220598407U (en) 2023-08-10 2023-08-10 Pile sealing cap

Publications (1)

Publication Number Publication Date
CN220598407U true CN220598407U (en) 2024-03-15

Family

ID=90179349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322148668.8U Active CN220598407U (en) 2023-08-10 2023-08-10 Pile sealing cap

Country Status (1)

Country Link
CN (1) CN220598407U (en)

Similar Documents

Publication Publication Date Title
CN212452715U (en) Burst prefabricated construction of dark heavy open caisson
CN112502030A (en) Prefabricated assembled bridge substructure slot-in type and socket joint formula built-up connection structure
CN220598407U (en) Pile sealing cap
CN107288156B (en) Construction method of underground special-shaped water pool
CN206607583U (en) Spiral resistance to plucking foundation pile
CN210263026U (en) Anti structure that floats of hole-forming bored concrete pile steel sleeve is protected to mud dado of going out terrace
CN112726784B (en) Full-prefabricated PC sewer inspection well component assembly structure and construction method
CN2673944Y (en) Prestressed pipe pile with large end filled with sand
CN213867907U (en) Prefabricated expanded packing key type digging foundation for power transmission line
CN210151705U (en) Reinforcing pile for soft soil foundation
CN211231961U (en) Reinforced concrete pipe that leakproofness is good
CN113152446A (en) Multi-section type prestressed hollow pile and construction method thereof
CN109826229B (en) Concrete pile for constructing side wall of assembled pipe gallery
CN210177543U (en) Anti-settling well lid structure
CN217079038U (en) Integrated inspection well
CN112832287A (en) Inclined retaining wall
CN219793845U (en) Reservoir water conservancy dykes and dams reinforced structure
CN205804152U (en) A kind of sections assembled core grouted concrete bridge pier
CN216552051U (en) Column-barrel combined bearing type fan foundation
CN213867908U (en) Multisection expands dish assembled hollow excavation class basis
CN220768156U (en) Box transformer foundation of prefabricated pipe pile
CN219364580U (en) Prefabricated pile for building engineering
CN216765995U (en) Prefabricated inspection shaft construction structures of assembling of assembled components of a whole that can function independently
CN215482904U (en) Multi-section type prestressed hollow pile
CN214116587U (en) Prefabricated spiral steel pile foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant