CN220596863U - Lifting equipment for be used for concrete wind-powered electricity generation tower section of thick bamboo - Google Patents
Lifting equipment for be used for concrete wind-powered electricity generation tower section of thick bamboo Download PDFInfo
- Publication number
- CN220596863U CN220596863U CN202322158050.XU CN202322158050U CN220596863U CN 220596863 U CN220596863 U CN 220596863U CN 202322158050 U CN202322158050 U CN 202322158050U CN 220596863 U CN220596863 U CN 220596863U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- wind power
- lifting device
- power tower
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 235000017166 Bambusa arundinacea Nutrition 0.000 title claims description 6
- 235000017491 Bambusa tulda Nutrition 0.000 title claims description 6
- 241001330002 Bambuseae Species 0.000 title claims description 6
- 235000015334 Phyllostachys viridis Nutrition 0.000 title claims description 6
- 239000011425 bamboo Substances 0.000 title claims description 6
- 230000005611 electricity Effects 0.000 title claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 7
- 239000010959 steel Substances 0.000 claims abstract description 7
- 238000003466 welding Methods 0.000 abstract description 10
- 238000000034 method Methods 0.000 abstract description 8
- 230000000694 effects Effects 0.000 abstract description 7
- 230000008569 process Effects 0.000 abstract description 5
- 238000010276 construction Methods 0.000 abstract description 4
- 238000004804 winding Methods 0.000 abstract description 3
- 238000009434 installation Methods 0.000 description 7
- 238000007689 inspection Methods 0.000 description 5
- 230000001681 protective effect Effects 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000005488 sandblasting Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Escalators And Moving Walkways (AREA)
Abstract
The utility model discloses lifting equipment for a concrete wind power tower, which comprises a bottom plate, wherein two sides of the top of the bottom plate are fixedly connected with support columns, the top of one side opposite to the two support columns is fixedly connected with a top plate, the top of the top plate is fixedly connected with a driving box, and two sides of the driving box are movably connected with a winding roller through a rotating shaft. According to the wind power tower, the bottom plate, the support columns, the top plate, the driving box, the wind-up roller, the steel rope, the protection frame, the operation table, the connecting seat, the pulley block, the positioning plate, the sliding rod and the sliding rail are matched for use, so that the problem that an operator needs to climb in the tower through the escalator in the assembly welding process of the wind power tower at present is effectively solved, the lifting device is low in efficiency and inconvenient to carry a construction tool, the using effect is reduced, the lifting device can be used for rapidly conveying the constructor, meanwhile, the lifting device is convenient to be used for conveying equipment such as the tool, and the using effect is improved.
Description
Technical Field
The utility model relates to the technical field of wind power towers, in particular to lifting equipment for a concrete wind power tower.
Background
The wind power tower is a tower pole of wind power generation, mainly plays a supporting role in a wind power generator set, absorbs the vibration of the set at the same time, and generally has the following production process flow: the method comprises the steps of blanking by a numerical control cutting machine, chamfering a thick plate, spot welding, positioning, welding inner and outer longitudinal joints after plate bending by a plate bending machine is needed, carrying out roundness inspection, carrying out secondary roundness comparison if a problem exists, carrying out assembly-to-point welding on a roller frame by a hydraulic assembly after welding a single-section cylinder, carrying out tolerance inspection such as inner and outer circumferential joints, straightness and the like, carrying out nondestructive inspection and flatness inspection on a welding line after welding a flange, carrying out sand blasting and paint spraying treatment, and carrying out transportation to an installation site after finishing internal part installation and finished product inspection.
At present, when the wind power tower drum is assembled and welded, operators need to climb in the tower drum through the escalator, the up-down mode is low in efficiency and inconvenient to carry a construction tool, so that the use effect is reduced, and for this reason, the lifting equipment for the concrete wind power tower drum is provided.
Disclosure of Invention
The utility model aims to provide lifting equipment for a concrete wind power tower, which has the advantage of improving the lifting safety of constructors, and solves the problems that in the process of assembling and welding the wind power tower, operators need to climb in the tower through an escalator, the efficiency is low, and the constructors are inconvenient to carry, so that the using effect is reduced.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a lifting device for be used for concrete wind-powered electricity generation tower section of thick bamboo, includes the bottom plate, the equal fixedly connected with support column in both sides at bottom plate top, the top fixedly connected with roof of two opposite sides of support column, the top fixedly connected with driving box of roof, the both sides of driving box all are provided with the wind-up roll through pivot swing joint, the surface of wind-up roll is provided with the cable wire, the cable wire extends to the bottom on support column surface through one side of support column, the bottom fixedly connected with protection frame of cable wire, the bottom fixedly connected with operation panel of protection frame, the equal fixedly connected with connecting seat in both sides of operation panel, one side fixedly connected with assembly pulley of connecting seat, the equal fixedly connected with locating plate in both sides of bottom plate, the top fixedly connected with slide bar of locating plate, the slide rail has been seted up to one side of slide rail, one side that the connecting seat was kept away from to the inner chamber of slide rail.
Preferably, the top and the bottom of the surface of the support column are fixedly connected with limit rollers, and the surface of the limit rollers is in sliding connection with the steel cable.
Preferably, the top of support column fixedly connected with shell, the inner chamber of shell is provided with first guide roll and second guide roll respectively.
Preferably, guard rails are fixedly connected to two sides of the top of the operating platform, and a transverse plate is fixedly connected to the top of the guard rails.
Preferably, the top fixedly connected with mount pad of bottom plate, the equal fixedly connected with spring damper in both sides at mount pad top, the top fixedly connected with buffer board of spring damper.
Preferably, the top fixedly connected with mounting bracket of support column one side, the bottom and the slide bar fixed connection of mounting bracket.
Preferably, both sides at roof top all fixedly connected with installation piece, one side of installation piece passes through bearing and wind-up roll swing joint.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the wind power tower, the bottom plate, the support columns, the top plate, the driving box, the wind-up roller, the steel rope, the protection frame, the operation table, the connecting seat, the pulley block, the positioning plate, the sliding rod and the sliding rail are matched for use, so that the problem that an operator needs to climb in the tower through the escalator in the assembly welding process of the wind power tower at present is effectively solved, the lifting device is low in efficiency and inconvenient to carry a construction tool, the using effect is reduced, the lifting device can be used for rapidly conveying the constructor, meanwhile, the lifting device is convenient to be used for conveying equipment such as the tool, and the using effect is improved.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic side view of a slide bar structure of the present utility model;
FIG. 3 is a schematic top view of the structure of the console of the present utility model;
fig. 4 is a schematic cross-sectional view of the internal structure of the housing of the present utility model.
In the figure: 1. a bottom plate; 2. a support column; 3. a top plate; 4. a drive box; 5. a wind-up roll; 6. a wire rope; 7. a protective frame; 8. an operation table; 9. a connecting seat; 10. pulley block; 11. a positioning plate; 12. a slide bar; 13. a slide rail; 14. a limit roller; 15. a housing; 16. a first guide roller; 17. a second guide roller; 18. a guard rail; 19. a mounting base; 20. a spring buffer; 21. a mounting frame; 22. and (5) installing a block.
Description of the embodiments
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to FIGS. 1-4, a lifting device for a concrete wind power tower comprises a bottom plate 1, support columns 2 are fixedly connected to two sides of the top of the bottom plate 1, a top plate 3 is fixedly connected to the tops of two opposite sides of the support columns 2, a driving box 4 is fixedly connected to the top of the top plate 3, two sides of the driving box 4 are movably connected with a winding roller 5 through a rotating shaft, a steel cable 6 is arranged on the surface of the winding roller 5, the steel cable 6 extends to the bottom of the surface of the support column 2 through one side of the support column 2, a protection frame 7 is fixedly connected to the bottom of the steel cable 6, an operation table 8 is fixedly connected to two sides of the operation table 8, a connecting seat 9 is fixedly connected to one side of the connecting seat 9, a pulley block 10 is fixedly connected to two sides of the bottom plate 1, a positioning plate 11 is fixedly connected to the top of the positioning plate 11, slide rail 13 has been seted up to one side of slide bar 12, one side that connecting seat 9 was kept away from to assembly pulley 10 extends to slide rail 13's inner chamber, through bottom plate 1, support column 2, roof 3, drive box 4, wind-up roll 5, cable wire 6, protection frame 7, operation panel 8, connecting seat 9, assembly pulley 10, locating plate 11, slide bar 12 and slide rail 13's cooperation is used, can effectually solve at present carrying out at the equipment welding in-process to wind-powered electricity generation tower section of thick bamboo, operating personnel need climb in the tower section of thick bamboo through the staircase, this kind of upper and lower mode not only inefficiency, inconvenient carry construction tool, thereby reduce the problem of result of use, this lifting device can be quick carries constructor, simultaneously facilitate being used for equipment such as conveying tool, thereby the result of use has been improved.
The top and the bottom of support column 2 surface all fixedly connected with spacing roller 14, the surface of spacing roller 14 and cable wire 6 sliding connection.
Through above-mentioned technical scheme, through setting up spacing roller 14, can carry out spacingly to cable rope 6, guaranteed the stability in the cable rope 6 transportation process.
The top fixedly connected with shell 15 of support column 2, the inner chamber of shell 15 is provided with first guide roll 16 and second guide roll 17 respectively.
Through the above technical scheme, through setting up shell 15, first guide roll 16 and second guide roll 17, can conveniently carry out the change of direction with cable wire 6.
Both sides at the top of the operation table 8 are fixedly connected with protective rails 18, and the top of the protective rails 18 is fixedly connected with a transverse plate.
Through above-mentioned technical scheme, through setting up rail guard 18 and diaphragm, can protect constructor at the in-process that goes up and down to the security of using has been improved.
The top fixedly connected with mount pad 19 of bottom plate 1, the both sides at mount pad 19 top are all fixedly connected with spring damper 20, the top fixedly connected with buffer board of spring damper 20.
Through above-mentioned technical scheme, through setting up mount pad 19, spring buffer 20 and buffer board, can improve the device cushioning nature, and then guaranteed the security that equipment used.
The top fixedly connected with mounting bracket 21 of support column 2 one side, the bottom and slide bar 12 fixed connection of mounting bracket 21.
Through above-mentioned technical scheme, through setting up mounting bracket 21, can install slide bar 12, guarantee the stability of slide bar 12 installation.
Both sides at the top of the top plate 3 are fixedly connected with mounting blocks 22, and one side of each mounting block 22 is movably connected with the wind-up roll 5 through a bearing.
Through above-mentioned technical scheme, through setting up installation piece 22, can support wind-up roll 5, improve the stability of wind-up roll 5 installation.
During the use, through starting drive case 4, drive case 4 drives wind-up roll 5 and rotates, and wind-up roll 5 rolls up cable wire 6, and cable wire 6 drives protection frame 7 and removes to can reach the purpose of going up and down, sliding connection can guarantee the stability in this lifting device motion process between assembly pulley 10 and the slide rail 13, thereby improved the safety protection effect of equipment.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. Lifting equipment for be used for concrete wind-powered electricity generation tower section of thick bamboo, including bottom plate (1), its characterized in that: the utility model provides a slide rail (13) are seted up to one side of slide rail (12), slide rail (13) are seted up to one side of slide rail (12) through the bottom of support column (2) surface extension to support column (2), the bottom fixedly connected with protection frame (7) of steel cable (6), the bottom fixedly connected with operation panel (8) of protection frame (7), the equal fixedly connected with connecting seat (9) in both sides of operation panel (8), one side fixedly connected with assembly pulley (10) of connecting seat (9), the equal fixedly connected with locating plate (11) in both sides of bottom plate (1), top fixedly connected with slide bar (12) of locating plate (11), one side of slide bar (12) is kept away from one side of assembly pulley (9) and is extended to slide rail (13).
2. A lifting device for a concrete wind power tower according to claim 1, characterized in that: the top and the bottom of support column (2) surface all fixedly connected with spacing roller (14), the surface and the cable wire (6) sliding connection of spacing roller (14).
3. A lifting device for a concrete wind power tower according to claim 1, characterized in that: the top fixedly connected with shell (15) of support column (2), the inner chamber of shell (15) is provided with first guide roll (16) and second guide roll (17) respectively.
4. A lifting device for a concrete wind power tower according to claim 1, characterized in that: both sides at the top of the operating table (8) are fixedly connected with guard rails (18), and the tops of the guard rails (18) are fixedly connected with transverse plates.
5. A lifting device for a concrete wind power tower according to claim 1, characterized in that: the top fixedly connected with mount pad (19) of bottom plate (1), the both sides at mount pad (19) top are all fixedly connected with spring damper (20), the top fixedly connected with buffer board of spring damper (20).
6. A lifting device for a concrete wind power tower according to claim 1, characterized in that: the top fixedly connected with mounting bracket (21) of support column (2) one side, the bottom and slide bar (12) fixed connection of mounting bracket (21).
7. A lifting device for a concrete wind power tower according to claim 1, characterized in that: the two sides of the top plate (3) are fixedly connected with mounting blocks (22), and one side of each mounting block (22) is movably connected with the wind-up roll (5) through a bearing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322158050.XU CN220596863U (en) | 2023-08-11 | 2023-08-11 | Lifting equipment for be used for concrete wind-powered electricity generation tower section of thick bamboo |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322158050.XU CN220596863U (en) | 2023-08-11 | 2023-08-11 | Lifting equipment for be used for concrete wind-powered electricity generation tower section of thick bamboo |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220596863U true CN220596863U (en) | 2024-03-15 |
Family
ID=90171675
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322158050.XU Active CN220596863U (en) | 2023-08-11 | 2023-08-11 | Lifting equipment for be used for concrete wind-powered electricity generation tower section of thick bamboo |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220596863U (en) |
-
2023
- 2023-08-11 CN CN202322158050.XU patent/CN220596863U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103341679B (en) | The pipe end cutting device of major diameter long pipe fittings | |
CN219150492U (en) | Fan tower cylinder flange spraying tool | |
CN113084415A (en) | H-shaped steel bracket welding system | |
CN219818531U (en) | Welding workstation | |
CN208761765U (en) | A kind of metal coil tape automatic charging device | |
CN220596863U (en) | Lifting equipment for be used for concrete wind-powered electricity generation tower section of thick bamboo | |
CN116810603A (en) | Steel processing apparatus for building | |
CN214445431U (en) | Intelligent rust removing device for wind power tower cylinder | |
CN221018112U (en) | Major diameter wind tower sheet tower pitch circle degree frock | |
CN109850028B (en) | Wind power tower maintenance robot | |
CN203356810U (en) | Pipe end cutting device of long large-diameter pipe fittings | |
CN220574582U (en) | Bending device based on wind power tower processing | |
CN217965542U (en) | Wind-powered electricity generation tower is fixed knot structure for fillet weld | |
CN212421479U (en) | Cutting fluting device of rock wool board | |
CN221027545U (en) | Lifting platform for welding wind power tower drum | |
CN221474111U (en) | Auxiliary welding device for tower drum of wind driven generator | |
CN220533933U (en) | Sand blasting rust removal device for inside of wind power tower barrel | |
CN213255254U (en) | Spraying mechanism for wind power tower cylinder | |
CN220278770U (en) | Spot welding alignment and adjustment device for wind power tower | |
CN216173592U (en) | Spraying movable cover for wind power tower cylinder | |
CN219324929U (en) | Box girder H-shaped steel assembly equipment | |
CN217023486U (en) | Protection device is used in a tower section of thick bamboo transportation | |
CN217433435U (en) | Auxiliary device for external welding of pressure pipeline | |
CN206455350U (en) | Can be walked out-seam weld holder | |
CN211338703U (en) | Slotting elevator |