CN220583799U - Foam light soil engineering post-inspection and acceptance field core-pulling sampling inspection device - Google Patents
Foam light soil engineering post-inspection and acceptance field core-pulling sampling inspection device Download PDFInfo
- Publication number
- CN220583799U CN220583799U CN202320756250.2U CN202320756250U CN220583799U CN 220583799 U CN220583799 U CN 220583799U CN 202320756250 U CN202320756250 U CN 202320756250U CN 220583799 U CN220583799 U CN 220583799U
- Authority
- CN
- China
- Prior art keywords
- base
- mounting panel
- erection column
- post
- top surface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007689 inspection Methods 0.000 title claims abstract description 20
- 238000005070 sampling Methods 0.000 title claims abstract description 14
- 239000006260 foam Substances 0.000 title claims abstract description 13
- 239000002689 soil Substances 0.000 title claims abstract description 9
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims abstract description 6
- 235000017491 Bambusa tulda Nutrition 0.000 claims abstract description 6
- 241001330002 Bambuseae Species 0.000 claims abstract description 6
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims abstract description 6
- 239000011425 bamboo Substances 0.000 claims abstract description 6
- 230000003028 elevating effect Effects 0.000 claims abstract description 5
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005266 casting Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000005187 foaming Methods 0.000 description 2
- 239000004568 cement Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004088 foaming agent Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000012774 insulation material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
The utility model provides a foam light soil engineering post-inspection spot sampling inspection's equipment of loosing core, includes the base the supporting legs and gyro wheel are installed respectively to the both sides of the bottom surface of base be equipped with the working opening on the top surface of base the top of working opening is equipped with the mounting panel the both ends of mounting panel are equipped with the erection column, the bottom of erection column is articulated with the top surface of base, is equipped with stop gear on the erection column, the both ends and the erection column sliding connection of mounting panel install the motor on the top surface of mounting panel, be connected with the section of thick bamboo of boring after the pivot of motor passes the mounting panel, be equipped with elevating system on the mounting panel. The bottom of base is equipped with supporting legs and gyro wheel simultaneously, makes equipment conveniently remove, can stably place subaerial at the during operation moreover, and the control rod of convenient operation can control the position of boring a section of thick bamboo and take a sample the work, and the gag lever post is used for guaranteeing the erection column position of during operation to be motionless, guarantees that the sample work goes on smoothly.
Description
Technical Field
The utility model relates to the technical field of sampling devices, in particular to equipment for core pulling sampling inspection on a foam light soil post-inspection and acceptance site.
Background
The foaming agent is fully foamed in a mechanical way through a foaming system of a bubble machine, foam and cement paste are uniformly mixed, then cast-in-situ construction or mold forming is carried out through a pumping system of the foaming machine, and a novel light heat insulation material containing a large number of closed pores is formed through natural curing.
Disclosure of Invention
The utility model aims to solve the problems and provides equipment for core pulling sampling inspection on the basis of post-inspection acceptance site of a foam lightweight geotechnical engineering.
The utility model provides a foam light soil engineering post-inspection spot sampling inspection's equipment of loosing core, includes the base the supporting legs and gyro wheel are installed respectively to the both sides of the bottom surface of base be equipped with the working opening on the top surface of base the top of working opening is equipped with the mounting panel the both ends of mounting panel are equipped with the erection column, the bottom of erection column is articulated with the top surface of base, is equipped with stop gear on the erection column, the both ends and the erection column sliding connection of mounting panel install the motor on the top surface of mounting panel, be connected with the section of thick bamboo of boring after the pivot of motor passes the mounting panel, be equipped with elevating system on the mounting panel.
Further, the stop gear includes the gag lever post be equipped with the spacing hole on the top surface of base, the axis in spacing hole is perpendicular to the horizontal plane, the bottom and the spacing hole cooperation of gag lever post, the top and the side sliding connection of erection column of gag lever post side.
Further, a pull rod is connected to the limit rod.
Further, elevating system includes fixed plate and control rod, the one end and the installation post top of fixed plate are connected, the control rod is the threaded rod, and mounting panel and fixed plate are passed at the top of control rod, control rod and mounting panel threaded connection, and the control rod rotates with the fixed plate to be connected.
Further, a rotating handle is connected to the top of the control rod.
Further, a balancing weight is installed on one side, far away from the working opening, of the top surface of the base.
Further, a handle is mounted on the side of the base remote from the roller.
The utility model has the beneficial effects that: the bottom of base is equipped with supporting legs and gyro wheel simultaneously, makes equipment conveniently remove, can stably place subaerial at the during operation moreover, and the control rod of convenient operation can control the position of boring a section of thick bamboo and take a sample the work, and the gag lever post is used for guaranteeing the erection column position of during operation to be motionless, guarantees that the sample work goes on smoothly.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
fig. 2 is a side cross-sectional view of the present utility model.
In the example drawings: the device comprises a 1-base, 2-supporting feet, 3-rollers, 4-working ports, 5-mounting plates, 6-mounting columns, 7-motors, 8-drilling cylinders, 9-fixing plates, 10-control rods, 11-rotating handles, 12-limiting rods, 13-limiting holes, 14-pull rods, 15-balancing weights and 16-handles.
Detailed Description
For a clearer understanding of technical features, objects, and effects of the present utility model, a specific embodiment of the present utility model will be described with reference to the accompanying drawings.
Example 1
As shown in fig. 1-2, the utility model provides equipment for core pulling sampling inspection on a foam light earth works post-inspection and acceptance site, which comprises a base 1, wherein supporting legs 2 and rollers 3 are respectively arranged on two sides of the bottom surface of the base 1, a working opening 4 is arranged on the top surface of the base 1, a mounting plate 5 is arranged above the working opening 4, mounting columns 6 are arranged at two ends of the mounting plate 5, the bottom of the mounting columns 6 is hinged with the top surface of the base 1, a limiting mechanism is arranged on the mounting columns 6, two ends of the mounting plate 5 are in sliding connection with the mounting columns 6, a motor 7 is arranged on the top surface of the mounting plate 5, a rotary shaft of the motor 7 penetrates through the mounting plate 5 and is connected with a drilling cylinder 8, and a lifting mechanism is arranged on the mounting plate 5.
In this embodiment, the stop mechanism includes stop lever 12 be equipped with spacing hole 13 on the top surface of base 1, the axis of spacing hole 13 is perpendicular to the horizontal plane, the bottom and the spacing hole 13 cooperation of stop lever 12, the top and the side sliding connection of erection column 6 of stop lever 12 side. Further, a pull rod 14 is connected to the stopper rod 12. The mounting post 6 can not rotate after the limiting rod 12 is matched with the limiting hole 13, so that the motor 7 can be controlled to perform sampling work, and the pull rod 14 is arranged to facilitate the force application to the limiting rod 12.
In this embodiment, elevating system includes fixed plate 9 and control rod 10, the one end of fixed plate 9 is connected with erection column 6 top, control rod 10 is the threaded rod, and mounting panel 5 and fixed plate 9 are passed at the top of control rod 10, and control rod 10 and mounting panel 5 threaded connection, control rod 10 and fixed plate 9 rotate and are connected. Further, a stem 11 is connected to the top of the control lever 10. The mounting plate 5 can be moved along the mounting post 6 by rotating the control lever 10, and the rotating handle 11 is provided to facilitate the force application of the control lever 10 by a worker.
In this embodiment, a counterweight 15 is mounted on a side of the top surface of the base 1 away from the working opening 4. Because the motor 7 is at a high position after the mounting post 6 is rotated above the working opening 4, the gravity center of the whole device moves upwards, and the device is easy to fall down when the motor 7 is operated and forced, so that the device is damaged.
In this embodiment, a handle 16 is mounted on the side of the base 1 remote from the roller 3. The handle 16 is convenient for the force application of the staff, and is more convenient and quick when the base 1 is lifted for moving.
The working principle of the utility model is as follows: lifting one end of the base 1, moving the base 1 to a region to be detected through the roller 3, then controlling the mounting column 6 to rotate until the mounting column 6 is completely perpendicular to the top surface of the base 1, then controlling the limiting rod 12 on the mounting column 6 to be matched with the limiting hole 13 on the base 1, ensuring that the position of the mounting column 6 is fixed, starting the motor 7, driving the drill cylinder 8 to rotate through the rotating shaft, then operating the control rod 10 to rotate, enabling the mounting plate 5 to continuously move downwards along the mounting column 6 until the drill cylinder 8 penetrates through the working opening 4 to drill into the light soil casting body, then reversely rotating the control rod 10 until the drill cylinder 8 is separated from the light soil casting body, then closing the motor 7, and taking out a light soil sample for inspection.
The utility model has the beneficial effects that: the bottom of base is equipped with supporting legs and gyro wheel simultaneously, makes equipment conveniently remove, can stably place subaerial at the during operation moreover, and the control rod of convenient operation can control the position of boring a section of thick bamboo and take a sample the work, and the gag lever post is used for guaranteeing the erection column position of during operation to be motionless, guarantees that the sample work goes on smoothly.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (5)
1. The utility model provides a foam light soil engineering post-inspection spot sampling inspection's equipment of loosing core, includes base (1), its characterized in that both sides of the bottom surface of base (1) are installed supporting legs (2) and gyro wheel (3) respectively, are equipped with on the top surface of base (1) work mouth (4) the top of work mouth (4) is equipped with mounting panel (5) the both ends of mounting panel (5) are equipped with erection column (6), the bottom of erection column (6) is articulated with the top surface of base (1), is equipped with stop gear on erection column (6), the both ends and the erection column (6) sliding connection of mounting panel (5), installs motor (7) on the top surface of mounting panel (5), be connected with behind mounting panel (5) behind the pivot of motor (7) and bore a section of thick bamboo (8), be equipped with elevating system on mounting panel (5); the limiting mechanism comprises a limiting rod (12), a limiting hole (13) is formed in the top surface of the base (1), the axis of the limiting hole (13) is perpendicular to the horizontal plane, the bottom of the limiting rod (12) is matched with the limiting hole (13), and the top of the side surface of the limiting rod (12) is in sliding connection with the side surface of the mounting column (6); a balancing weight (15) is arranged on one side of the top surface of the base (1) far away from the working opening (4).
2. The foam lightweight geotechnical post-acceptance field core pulling sampling inspection device according to claim 1, wherein a pull rod (14) is connected to the limiting rod (12).
3. The equipment for core pulling sampling inspection on post-inspection and acceptance site of foam lightweight earth works according to claim 1, wherein the lifting mechanism comprises a fixed plate (9) and a control rod (10), one end of the fixed plate (9) is connected with the top of the mounting column (6), the control rod (10) is a threaded rod, the top of the control rod (10) penetrates through the mounting plate (5) and the fixed plate (9), the control rod (10) is in threaded connection with the mounting plate (5), and the control rod (10) is in rotary connection with the fixed plate (9).
4. A foam lightweight geotechnical post-acceptance field core pulling sampling test equipment according to claim 3, characterized in that a rotating handle (11) is connected to the top of the control rod (10).
5. The foam lightweight geotechnical post-acceptance field core pulling sampling test equipment according to claim 1, wherein a handle (16) is mounted on the side of the base (1) away from the roller (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320756250.2U CN220583799U (en) | 2023-04-07 | 2023-04-07 | Foam light soil engineering post-inspection and acceptance field core-pulling sampling inspection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320756250.2U CN220583799U (en) | 2023-04-07 | 2023-04-07 | Foam light soil engineering post-inspection and acceptance field core-pulling sampling inspection device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220583799U true CN220583799U (en) | 2024-03-12 |
Family
ID=90114843
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320756250.2U Active CN220583799U (en) | 2023-04-07 | 2023-04-07 | Foam light soil engineering post-inspection and acceptance field core-pulling sampling inspection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220583799U (en) |
-
2023
- 2023-04-07 CN CN202320756250.2U patent/CN220583799U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109779270B (en) | Prefabricated post installation device | |
CN116517305A (en) | Green assembly type building construction technology | |
CN220583799U (en) | Foam light soil engineering post-inspection and acceptance field core-pulling sampling inspection device | |
CN209887901U (en) | Novel concrete core drilling machine | |
CN101672731B (en) | Cement grout sampler of triaxial cement mixing pile | |
CN209958773U (en) | Formwork removing tool for floor aluminum alloy building formwork | |
CN214040673U (en) | Crack detection equipment for building engineering construction | |
CN218061465U (en) | Positioning device of metal core mold | |
CN211078316U (en) | Adjustable pipeline installation crane | |
CN217638121U (en) | CFRP restraint reinforced concrete sampling device under half-soaking effect | |
CN220525389U (en) | Cement soil slurry sampling device for cement soil pile | |
CN220150891U (en) | Novel template support | |
CN218438448U (en) | Supporting device for supporting concrete pouring template | |
CN220223389U (en) | Civil engineering construction device | |
CN221193738U (en) | Civil engineering construction class steel column connection structure | |
CN219153218U (en) | Precast concrete hollow slab pouring device | |
CN220473004U (en) | Vibrating sampling detection device | |
CN220166914U (en) | Precast pile core soil-cleaning construction device | |
CN211627002U (en) | Concrete sampling device that highway engineering quality supervise was used | |
CN215411076U (en) | Electromechanical device's installation bears uses regulation bed hedgehopping device | |
CN220063467U (en) | Cement concrete detects sampling tool | |
CN214697886U (en) | Anchor rod construction device for constructional engineering | |
CN219757766U (en) | Concrete sampling device | |
CN219973138U (en) | Cement stirring pile composite foundation bearing capacity detection device for building | |
CN217169163U (en) | Portable crowd's hole drilling equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||