CN220581865U - Clear distance control device between pipes and building components - Google Patents
Clear distance control device between pipes and building components Download PDFInfo
- Publication number
- CN220581865U CN220581865U CN202322160192.XU CN202322160192U CN220581865U CN 220581865 U CN220581865 U CN 220581865U CN 202322160192 U CN202322160192 U CN 202322160192U CN 220581865 U CN220581865 U CN 220581865U
- Authority
- CN
- China
- Prior art keywords
- building
- supporting
- pipes
- vertical plate
- baffle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 32
- 238000003079 width control Methods 0.000 claims abstract description 11
- 238000010276 construction Methods 0.000 abstract description 13
- 238000009434 installation Methods 0.000 abstract description 4
- 238000005538 encapsulation Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- 238000011179 visual inspection Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to the technical field of pipeline installation, and discloses a device for controlling the clearance between pipes and building components, which comprises the following components: the building foundation comprises a building base layer, a vertical building component arranged on one side of the top of the building base layer, and a plurality of engineering pipelines arranged on one side of the vertical building component; the construction equipment comprises a construction pipeline, a main body supporting mechanism, a first rubber pad, a sliding fixing base, a width control mechanism and a first rubber pad, wherein the main body supporting mechanism is arranged on two sides of the construction pipeline and comprises a supporting vertical plate, the mounting frame is arranged on one side, close to the construction pipeline, of the supporting vertical plate, and the first rubber pad is arranged in the center of the mounting frame. Unnecessary construction difficulties are reduced.
Description
Technical Field
The utility model relates to the technical field of pipeline installation, in particular to a device for controlling the clearance between pipes and building components.
Background
At present, the existing control pipe is mostly provided with a measuring scale or visual inspection for controlling the clearance between the pipe and the building component, the mode is only suitable for construction operation with lower installation precision of engineering pipelines, along with the existing construction operation, underground pipelines are complicated, especially old road reconstruction projects are increased, original pipelines are deeply buried underground for a long time, different degrees of damage can easily occur in the reconstruction process, the problems of excessive encapsulation or insufficient encapsulation or unsatisfied distance control and the like are easily caused by visual inspection or measurement for controlling, and potential safety hazards are brought to subsequent other working procedure construction, so the utility model is born.
Disclosure of Invention
The application provides a clear distance control device between pipes and building components to solve the problems in the background technology.
To solve the above technical problem, the present application provides a clear distance control device between pipes and building elements, including: the building foundation comprises a building base layer, a vertical building component arranged on one side of the top of the building base layer, and a plurality of engineering pipelines arranged on one side of the vertical building component; any both sides of engineering pipeline are provided with main part supporting mechanism, clear distance control mechanism including support riser, set up in support riser is close to the mounting bracket of engineering pipeline one side, and set up in the first rubber pad at mounting bracket center, the bottom of supporting the riser is provided with sliding fixed base, and support riser is kept away from one side center of engineering pipeline and is provided with width control mechanism, first rubber pad laminating is in the surface of engineering pipeline.
In some embodiments of the present application, the width control mechanism includes the interval set up in the baffle in the support riser outside sets up in the baffle with support the extension spring between the riser to and set up two bracing pieces between baffle and support riser, the both ends of extension spring are fixed connection in the surface of baffle and support riser respectively, two the center of bracing piece rotates to be connected, the both ends of two bracing pieces respectively with baffle and support riser sliding connection.
In some embodiments of the present application, the sliding fixing base includes the fixed plate, set up in the slide rail at fixed plate top, set up in gyro wheel in the slide rail, and set up in a plurality of fixed orificess at fixed plate top, be provided with the limiting plate between fixed plate and the support riser, be provided with the limiting hole on the limiting plate, the gyro wheel rotates with main part supporting mechanism to be connected, limiting hole and arbitrary fixed orifices coincidence are fixed through the pin.
In some embodiments of the present application, the first rubber pad is configured as an arc.
In some embodiments of the present application, the fixing plate is fixed to the building base layer by bolts.
In some embodiments of the present application, a second rubber pad is disposed on the outer side of the baffle.
Compared with the prior art, the utility model has the following characteristics and beneficial effects:
according to the utility model, the main body supporting mechanism is arranged to provide support for the mounting frame and the width control mechanism, the mounting frame and the first rubber pad are arranged to position the engineering pipeline, the collision damage of the engineering pipeline is prevented, the sliding fixing base is arranged to adjust the positions of the main body supporting mechanisms on two sides of the engineering pipeline so as to be suitable for engineering pipelines with different diameters, the width control mechanism is arranged to control the distance between adjacent engineering pipelines, the sliding rail and the rolling wheel are arranged to facilitate the displacement of the main body supporting mechanism, and the fixing hole and the limiting plate are arranged to facilitate the fixing of the main body supporting mechanism after the position of the main body supporting mechanism is determined.
Drawings
FIG. 1 is a schematic view of the overall structure of an embodiment of the present utility model;
fig. 2 is a schematic top view of a fixing plate according to an embodiment of the present utility model.
100, building base layer; 200. a vertical building element; 300. engineering pipelines; 400. a main body supporting mechanism; 410. supporting a vertical plate; 420. a mounting frame; 430. a first rubber pad; 500. a sliding fixed base; 510. a fixing plate; 520. a slide rail; 530. a roller; 540. a fixing hole; 550. a limiting plate; 560. a pin; 600. a width control mechanism; 610. a baffle; 620. a telescopic spring; 630. and (5) supporting the rod.
Detailed Description
The following describes in further detail the embodiments of the present utility model with reference to the drawings and examples. The following examples are illustrative of the utility model and are not intended to limit the scope of the utility model.
In the description of the present application, it should be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate orientations or positional relationships based on the orientation or positional relationships shown in the drawings, merely to facilitate description of the present application and simplify the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and therefore should not be construed as limiting the present application.
The terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature. In the description of the present application, unless otherwise indicated, the meaning of "a plurality" is two or more.
In the description of the present application, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the terms in this application will be understood by those of ordinary skill in the art in a specific context.
As shown in fig. 1 and 2, in accordance with some embodiments of the present application, a device for controlling the clearance between pipes and building elements, comprises: a building base 100, a vertical building member 200 disposed at a top side of the building base 100, and a plurality of engineering pipes 300 disposed at a side of the vertical building member 200; the main body supporting mechanisms 400 are arranged on two sides of any engineering pipeline 300, the clear distance control mechanism comprises supporting risers 410, a mounting frame 420 arranged on one side, close to the engineering pipeline 300, of the supporting risers 410, and a first rubber pad 430 arranged in the center of the mounting frame 420, a sliding fixing base 500 is arranged at the bottom of each supporting riser 410, a width control mechanism 600 is arranged in the center of one side, far away from the engineering pipeline 300, of each supporting riser 410, and the first rubber pad 430 is attached to the outer surface of the engineering pipeline 300.
According to some embodiments of the present application, the width control mechanism 600 includes a baffle 610 disposed outside the supporting riser 410 at intervals, a telescopic spring 620 disposed between the baffle 610 and the supporting riser 410, and two supporting rods 630 disposed between the baffle 610 and the supporting riser 410, two ends of the telescopic spring 620 are fixedly connected to surfaces of the baffle 610 and the supporting riser 410, centers of the two supporting rods 630 are rotatably connected, and two ends of the two supporting rods 630 are slidably connected to the baffle 610 and the supporting riser 410.
According to some embodiments of the present application, the sliding fixing base 500 includes a fixing plate 510, a sliding rail 520 disposed at the top of the fixing plate 510, a roller 530 disposed in the sliding rail 520, and a plurality of fixing holes 540 disposed at the top of the fixing plate 510, a limiting plate 550 disposed between the fixing plate 510 and the supporting riser 410, wherein the limiting plate 550 is provided with a limiting hole, the roller 530 is rotationally connected with the main body supporting mechanism 400, and the limiting hole and any fixing hole 540 are overlapped and fixed by a pin 560.
According to some embodiments of the present application, the first rubber pad 430 is provided in an arc shape.
According to some embodiments of the present application, the fixing plate 510 is fixed to the building base 100 by bolts.
According to some embodiments of the present application, the outer side of the baffle 610 is provided with a second rubber pad.
According to some embodiments of the present application, a body support mechanism 400 may also be provided on the side of the baffle 610 remote from the subject support mechanism, where the desired distance between the engineering pipes 300 permits, allowing for better protection of the engineering pipes 300.
According to some embodiments of the present application, the baffle 610 and the supporting riser 410 are provided with a limiting groove, and two ends of the supporting rod 630 may be fixed to the limiting grooves on the baffle 610 and the supporting riser 410, respectively, at any position.
In summary, the utility model relates to the technical field of pipeline installation, and discloses a device for controlling the clearance between pipes and building components, which comprises the following components: the building foundation comprises a building base layer, a vertical building component arranged on one side of the top of the building base layer, and a plurality of engineering pipelines arranged on one side of the vertical building component; the construction equipment comprises a construction pipeline, a main body supporting mechanism, a first rubber pad, a sliding fixing base, a width control mechanism and a first rubber pad, wherein the main body supporting mechanism is arranged on two sides of the construction pipeline and comprises a supporting vertical plate, the mounting frame is arranged on one side, close to the construction pipeline, of the supporting vertical plate, and the first rubber pad is arranged in the center of the mounting frame. Unnecessary construction difficulties are reduced.
The foregoing is merely a preferred embodiment of the present utility model, and it should be noted that modifications and substitutions can be made by those skilled in the art without departing from the technical principles of the present utility model, and these modifications and substitutions should also be considered as being within the scope of the present utility model.
Claims (6)
1. A device for controlling the clearance between pipes and building elements, comprising: a building base layer (100), a vertical building member (200) disposed at a top side of the building base layer (100), and a plurality of engineering pipes (300) disposed at a side of the vertical building member (200); the device is characterized in that main body supporting mechanisms (400) are arranged on two sides of any engineering pipeline (300), each main body supporting mechanism (400) comprises a supporting vertical plate (410), a mounting frame (420) arranged on one side of the supporting vertical plate (410) close to the engineering pipeline (300), and a first rubber pad (430) arranged on the center of the mounting frame (420), a sliding fixing base (500) is arranged at the bottom of the supporting vertical plate (410), a width control mechanism (600) is arranged on the center of one side, far away from the engineering pipeline (300), of the supporting vertical plate (410), and the first rubber pad (430) is attached to the outer surface of the engineering pipeline (300).
2. The device for controlling the clearance between pipes and building elements according to claim 1, wherein the width control mechanism (600) comprises a baffle (610) arranged at the outer side of the supporting vertical plate (410) at intervals, a telescopic spring (620) arranged between the baffle (610) and the supporting vertical plate (410), and two supporting rods (630) arranged between the baffle (610) and the supporting vertical plate (410), two ends of the telescopic spring (620) are fixedly connected to the surfaces of the baffle (610) and the supporting vertical plate (410) respectively, centers of the two supporting rods (630) are rotatably connected, and two ends of the two supporting rods (630) are slidably connected with the baffle (610) and the supporting vertical plate (410) respectively.
3. The device for controlling the clearance between pipes and building elements according to claim 1, wherein the sliding fixing base (500) comprises a fixing plate (510), a sliding rail (520) arranged at the top of the fixing plate (510), a roller (530) arranged in the sliding rail (520), and a plurality of fixing holes (540) arranged at the top of the fixing plate (510), a limiting plate (550) is arranged between the fixing plate (510) and the supporting vertical plate (410), a limiting hole is arranged on the limiting plate (550), the roller (530) is rotationally connected with the main body supporting mechanism (400), and the limiting hole and any fixing hole (540) are coincided and fixed through a pin (560).
4. A device for controlling the clearance between pipes and building elements according to claim 1, characterized in that said first rubber pad (430) is arranged in an arc shape.
5. A device for controlling the clearance between pipes and building elements according to claim 3, characterized in that the fixing plate (510) is fixed to the building base (100) by means of bolts.
6. A device for controlling the clearance between pipes and building elements according to claim 2, characterised in that the outside of the baffle (610) is provided with a second rubber pad.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322160192.XU CN220581865U (en) | 2023-08-11 | 2023-08-11 | Clear distance control device between pipes and building components |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322160192.XU CN220581865U (en) | 2023-08-11 | 2023-08-11 | Clear distance control device between pipes and building components |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220581865U true CN220581865U (en) | 2024-03-12 |
Family
ID=90117961
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322160192.XU Active CN220581865U (en) | 2023-08-11 | 2023-08-11 | Clear distance control device between pipes and building components |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220581865U (en) |
-
2023
- 2023-08-11 CN CN202322160192.XU patent/CN220581865U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101200878A (en) | Continuous girder frusta top segment precisely locating apparatus and precisely locating construction technique thereof | |
CN108613658A (en) | A kind of novel cast-in-place box beam bracket Monitoring method of the subsidence and equipment | |
CN108151784B (en) | Supporting device of engineering measurement equipment | |
CN108613666A (en) | Rectangular top pipe attitude measurement method | |
CN220581865U (en) | Clear distance control device between pipes and building components | |
CN105648923A (en) | Stay cable saddle positioning device and positioning method thereof | |
CN110735367B (en) | Track mounting system and stacker-reclaimer | |
CN211504139U (en) | Pipe culvert prefabricated component installation state measuring device | |
CN104776780A (en) | Device for measuring and detecting gear shift cable of automobile | |
CN117128928A (en) | Building foundation subsides deformation monitoring devices | |
CN115451914A (en) | Fixed inclinometer adapting to large deformation of soil body | |
CN114561925A (en) | Electric power foundation pit safety monitoring system based on thing networking | |
CN213274210U (en) | Height difference monitor for swivel beam construction | |
CN215177766U (en) | Adjustable subway evacuation platform limit detection device | |
CN113585729A (en) | High formwork supporting mechanism | |
CN207597175U (en) | A kind of ballastless track boards dynamic displacement monitoring device | |
CN108827253B (en) | Method for installing, positioning and measuring pipeline bracket of snowmobile ski track | |
CN201133817Y (en) | Super high-rise steel structure steel column measurement correction base | |
CN219936187U (en) | Biprism device | |
JP2022029745A (en) | Construction gage confirmation jig | |
CN112284460A (en) | Subway evacuation platform limit detection device and using method thereof | |
CN221549673U (en) | Verticality and axis deviation measurement and control platform | |
CN212444965U (en) | Positioning device for butt joint of water supply pipes | |
CN215926477U (en) | Support column for prefabricated building | |
CN216240645U (en) | TBM belt bracket mounting and positioning system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |