CN220581862U - A pipeline gallows for steel construction building - Google Patents

A pipeline gallows for steel construction building Download PDF

Info

Publication number
CN220581862U
CN220581862U CN202322128934.0U CN202322128934U CN220581862U CN 220581862 U CN220581862 U CN 220581862U CN 202322128934 U CN202322128934 U CN 202322128934U CN 220581862 U CN220581862 U CN 220581862U
Authority
CN
China
Prior art keywords
piece
connecting section
steel structure
section
structure building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322128934.0U
Other languages
Chinese (zh)
Inventor
徐灿
翟婷婷
胡凌
李颖
龚锐
杜险峰
王媚
王志威
张叶
何帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central and Southern China Municipal Engineering Design and Research Institute Co Ltd filed Critical Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Priority to CN202322128934.0U priority Critical patent/CN220581862U/en
Application granted granted Critical
Publication of CN220581862U publication Critical patent/CN220581862U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a pipeline support and hanger for a steel structure building, which comprises a connecting piece, a transition piece, a clamping piece and a locking piece; the transition piece comprises a transition section, a first connecting section and a second connecting section which are positioned at two sides of the transition section, and the connecting piece is used for fixing the first connecting section on an H-shaped steel upright post of the steel structure building; the two ends of the clamping piece are connected to the second connecting section through the locking piece, and a clamping space for clamping the pipeline is formed by enclosing between the clamping piece and the second connecting section.

Description

A pipeline gallows for steel construction building
Technical Field
The utility model relates to the technical field of brackets, in particular to a pipeline support and hanger for steel structure building.
Background
When the support and hanger of the pipeline are installed in the steel structure building, the pipeline needs to be fixedly installed by means of the indoor steel structure member. In general, the steel structure building upright is an H-shaped steel upright, and when the support of the pipeline is installed on the H-shaped steel upright, in order to ensure the strength of the upright and maintain the mechanical properties of the upright, the operation of welding, drilling and other damage to the surface of the H-shaped steel upright is generally required. In the prior art, on the premise of not influencing the strength of the steel structure, the installation of the steel structure building pipeline is realized, a large amount of labor investment is needed, the construction difficulty is high, and the safety risk is very high.
Disclosure of Invention
Based on the above description, the utility model provides a pipeline support and hanger for a steel structure building, so as to solve the technical problems.
The technical scheme for solving the technical problems is as follows:
a pipeline support and hanger for a steel structure building comprises a connecting piece, a transition piece, a clamping piece and a locking piece;
the transition piece comprises a transition section, a first connecting section and a second connecting section which are positioned at two sides of the transition section, and the connecting piece is used for fixing the first connecting section on an H-shaped steel upright post of the steel structure building;
the two ends of the clamping piece are connected to the second connecting section through the locking piece, and a clamping space for clamping the pipeline is formed by enclosing the clamping piece with the second connecting section.
Compared with the prior art, the technical scheme of the application has the following beneficial technical effects:
the pipeline support hanger provided by the utility model has the advantages that the structure is simple, the manufacture is easy, the problem that the fixed point of the electromechanical installation pipeline of the building on the H-shaped steel upright post of the existing steel structure building is insufficient to meet the standard requirement is solved, the problem that the installation of the electromechanical pipeline is required to be welded or drilled on a large area of the main body of the steel structure building is solved, the influence of the pipeline installation on the performance of the main body of the steel structure is reduced, the service life and the safety of the steel structure building are indirectly improved, and the pipeline support hanger provided by the application has good applicability and can be popularized and used and recycled.
On the basis of the technical scheme, the utility model can be improved as follows.
Furthermore, the connecting piece is a tiger mouth clamp correspondingly clamped at two ends of a single side plate of the H-shaped steel upright post.
Further, the transition piece is a C-shaped steel beam, two sides of the C-shaped steel beam correspond to the first connecting section and the second connecting section respectively, two ends of the first connecting section are correspondingly inserted into bayonets of two tiger mouth clamps respectively, and bolts of the tiger mouth clamps are used for propping and fixing the first connecting section and the H-shaped steel upright post.
Further, the clamping piece is of a U-shaped structure, and two ends of the clamping piece are arranged at intervals on the second connecting section.
Further, the locking member includes a nut and a bolt welded to an end portion of the clip member in a length direction, and the nut passes through the second connection section and is connected with the nut.
Drawings
Fig. 1 is an isometric schematic view of a pipe support and hanger for a steel structure building according to an embodiment of the present application;
FIG. 2 is a schematic top view of FIG. 1 of the present application;
FIG. 3 is a schematic side elevational view of FIG. 1 of the present application;
fig. 4 is an enlarged partial schematic view of the connection part of the present application.
Detailed Description
In order to facilitate an understanding of the present application, a more complete description of the present application will now be provided with reference to the relevant figures. Examples of the present application are given in the accompanying drawings. This application may, however, be embodied in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. The terminology used herein in the description of the application is for the purpose of describing particular embodiments only and is not intended to be limiting of the application.
It will be appreciated that spatially relative terms such as "under … …," "under … …," "below," "under … …," "over … …," "above," and the like may be used herein to describe one element or feature's relationship to another element or feature as illustrated in the figures. It will be understood that the spatially relative terms are intended to encompass different orientations of the device in use and operation in addition to the orientation depicted in the figures. For example, if the device in the figures is turned over, elements or features described as "under" or "beneath" other elements would then be oriented "on" the other elements or features. Thus, the exemplary terms "under … …" and "under … …" may include both an upper and a lower orientation. Furthermore, the device may also include an additional orientation (e.g., rotated 90 degrees or other orientations) and the spatial descriptors used herein interpreted accordingly.
It will be understood that when an element is referred to as being "connected" to another element, it can be directly connected to the other element or be connected to the other element through intervening elements. In the following embodiments, "connected" is understood to mean "electrically connected", "communicatively connected", and the like, if the connected circuits, modules, units, and the like have electrical or data transferred therebetween.
As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms "comprises" and/or "comprising," and/or the like, specify the presence of stated features, integers, steps, operations, elements, components, or groups thereof, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, or groups thereof.
As shown in fig. 1 to 4, the embodiment of the present application provides a pipe hanger for a steel structure building, which includes a connection member 10, a transition member 20, a clip member 30, and a locking member 40.
The transition piece 20 comprises a transition section 21, a first connecting section 22 and a second connecting section 23 which are positioned on two sides of the transition section 21, and the connecting piece 10 is used for fixing the first connecting section 22 on the H-shaped steel upright post 200 of the steel structure building.
The two ends of the clamping piece 30 are connected to the second connecting section 23 through the locking piece 40, and a clamping space a for clamping the pipeline 100 is formed by enclosing the clamping piece 30 and the second connecting section 23.
Wherein, separate through the changeover portion between changeover portion first linkage segment 22 and the second linkage segment 23, connect through first linkage segment 22 and H shaped steel stand 200, adopt second linkage segment 23 and fastener 30 to connect and constitute chucking space, can set aside the installation space for fastener 30 connects, and not directly be connected with H shaped steel stand 200, effectively protect H shaped steel stand 200's structural integrity.
In the embodiment of the present application, the connecting piece 10 is a tiger mouth clip correspondingly clamped at two ends of a single side plate of the H-shaped steel upright 200, and the tiger mouth clip generally includes a tiger mouth single piece 11 with a bayonet and a fastening bolt 12 extending from one side of the bayonet, which is a fastening part with stable structure and reliable locking.
The transition piece 20 is a C-shaped steel beam, two sides of the C-shaped steel beam correspond to the first connecting section 22 and the second connecting section 23 respectively, two ends of the first connecting section 22 are inserted into two bayonets of the tiger's mouth clamp correspondingly respectively, and bolts of the tiger's mouth clamp are used for tightly propping and fixing the first connecting section 22 and the H-shaped steel upright 200.
In this embodiment, the clip 30 has a U-shaped structure, and two ends of the clip 30 are disposed at intervals on the second connection section.
Specifically, the locking member 40 includes a nut 41 and a bolt 42, the bolt 42 is welded to the end of the clip 30 in the length direction, and the nut 41 passes through the second connection section 23 and is connected to the nut 41.
The pipeline support hanger provided by the utility model has the advantages that the structure is simple, the manufacture is easy, the problem that the fixed point of the electromechanical installation pipeline of the building on the H-shaped steel upright post of the existing steel structure building is insufficient to meet the standard requirement is solved, the problem that the installation of the electromechanical pipeline is required to be welded or drilled on a large area of the main body of the steel structure building is solved, the influence of the pipeline installation on the performance of the main body of the steel structure is reduced, the service life and the safety of the steel structure building are indirectly improved, and the pipeline support hanger provided by the application has good applicability and can be popularized and used and recycled.
The foregoing description of the preferred embodiments of the utility model is not intended to limit the utility model to the precise form disclosed, and any such modifications, equivalents, and alternatives falling within the spirit and scope of the utility model are intended to be included within the scope of the utility model.

Claims (5)

1. The pipeline support and hanger for the steel structure building is characterized by comprising a connecting piece, a transition piece, a clamping piece and a locking piece;
the transition piece comprises a transition section, a first connecting section and a second connecting section which are positioned at two sides of the transition section, and the connecting piece is used for fixing the first connecting section on an H-shaped steel upright post of the steel structure building;
the two ends of the clamping piece are connected to the second connecting section through the locking piece, and a clamping space for clamping the pipeline is formed by enclosing the clamping piece with the second connecting section.
2. The pipe hanger for steel structure building according to claim 1, wherein the connecting piece is a jaw clip correspondingly clamped at two ends of a single side plate of the H-steel upright.
3. The pipeline support and hanger for steel structure building according to claim 2, wherein the transition piece is a C-shaped steel beam, two sides of the C-shaped steel beam correspond to the first connecting section and the second connecting section respectively, two ends of the first connecting section are inserted into bayonets of two tiger mouth cards respectively, and bolts of the tiger mouth cards are used for tightly propping and fixing the first connecting section and the H-shaped steel upright.
4. A pipe hanger for a steel structure building according to claim 3, wherein the clip is of a U-shaped configuration, and two ends of the clip are disposed at intervals on the second connecting section.
5. The pipe hanger for steel structure building according to claim 1, wherein the locking member comprises a nut and a bolt welded to an end of the clip in a length direction, the nut passing through the second connection section and being connected with the nut.
CN202322128934.0U 2023-08-09 2023-08-09 A pipeline gallows for steel construction building Active CN220581862U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322128934.0U CN220581862U (en) 2023-08-09 2023-08-09 A pipeline gallows for steel construction building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322128934.0U CN220581862U (en) 2023-08-09 2023-08-09 A pipeline gallows for steel construction building

Publications (1)

Publication Number Publication Date
CN220581862U true CN220581862U (en) 2024-03-12

Family

ID=90121480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322128934.0U Active CN220581862U (en) 2023-08-09 2023-08-09 A pipeline gallows for steel construction building

Country Status (1)

Country Link
CN (1) CN220581862U (en)

Similar Documents

Publication Publication Date Title
CN220581862U (en) A pipeline gallows for steel construction building
CN213742629U (en) Double-cross-arm mounting bracket on electric pole
CN214410544U (en) Utilize fixed license plate mounting fixture of cat ladder foot nail
CN214947992U (en) Novel installation staple bolt
CN210561725U (en) Device for quickly connecting bridge deck and distribution beam
CN211852407U (en) Clamp type angle steel connecting device suitable for unmanned aerial vehicle charging platform
CN212404782U (en) Hanging bracket device on trestle girder steel
CN214176809U (en) Core-through type leaky-cable fixing clamp
CN216276798U (en) I-steel scaffold steel pipe connecting piece
CN215716046U (en) Adjustable buckle for fixing cantilever frame upright rod
CN214249050U (en) Special lossless clamp
CN213937371U (en) Durable wire clamp device for electric power engineering
CN205720324U (en) Circuit filth test insulator fixing device
CN219866647U (en) Support rod for pipeline installation
CN213448898U (en) Connecting piece for upright post and gutter of multi-span greenhouse
CN219013072U (en) Installation staple bolt on steel construction
CN218668586U (en) Temporary fixing device for hoisting precast beam
CN219710110U (en) Concrete bridge structure reinforcing apparatus
CN216050725U (en) Vehicle-mounted camera system mounting structure of collision test vehicle
CN109786993B (en) Shunt device suitable for crimping pipe and jumper wire
CN216866040U (en) Electrolytic steel plate mounting buckle
CN217559210U (en) Groove type clamping type anti-seismic connecting support combined structure
CN214332202U (en) Holding pole mounting device on square tower column
CN219471512U (en) Wall connecting device for scaffold
CN215172784U (en) Position-adjustable pipe clamp assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant