CN220580315U - Assembled furred ceiling conversion layer pinning structure - Google Patents

Assembled furred ceiling conversion layer pinning structure Download PDF

Info

Publication number
CN220580315U
CN220580315U CN202322146409.1U CN202322146409U CN220580315U CN 220580315 U CN220580315 U CN 220580315U CN 202322146409 U CN202322146409 U CN 202322146409U CN 220580315 U CN220580315 U CN 220580315U
Authority
CN
China
Prior art keywords
rows
conversion layer
shaped steel
galvanized angle
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322146409.1U
Other languages
Chinese (zh)
Inventor
林细桃
王维
莫凡
黄贵
程海林
高宗立
李常青
覃庆满
蒙思宇
李政友
林崇玺
申浣琪
汪婷婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202322146409.1U priority Critical patent/CN220580315U/en
Application granted granted Critical
Publication of CN220580315U publication Critical patent/CN220580315U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to an assembled suspended ceiling conversion layer bolting structure, which belongs to the technical field of decoration and fitment, in particular to an assembled suspended ceiling conversion layer bolting structure, comprising a wall body, wherein two rows of T-shaped steel plates are arranged on the lower side of the wall body, and galvanized angle steel pull rods are arranged on one sides of the two rows of T-shaped steel plates; the utility model has high construction efficiency, adopts the uniform T-shaped steel plate and the galvanized angle steel pull rod bolt for bolting and fixing, has strong operability, high speed and simple supporting operation, simultaneously has convenient processing of the T-shaped steel plate in factories, saves time for construction period, is energy-saving and environment-friendly, has low construction noise, does not disturb people, adopts bolts for fixing the whole device, does not need welding, avoids potential safety hazards caused by less traditional welding contact surfaces, and improves safety performance and construction quality; the problems that the existing welding contact surface is few and only in linear contact, potential safety hazards exist, the welding connection process is complicated, the welding amount is large, the construction period is long, and the efficiency is low are solved.

Description

Assembled furred ceiling conversion layer pinning structure
Technical Field
The utility model relates to the technical field of decoration and fitment, in particular to an assembled suspended ceiling conversion layer bolting structure.
Background
The modern building suspended ceiling has a changeable decorative style form, and the suspended ceiling is taken as a modern decorative artistic expression form and is visible everywhere in modern buildings.
But current common furred ceiling conversion layer is welding atress structure, and the pull rod of furred ceiling conversion layer all passes through welded connection with upper fossil fragments, upper fossil fragments and lower floor fossil fragments, and the technology is loaded down with trivial details, and the welding volume is big, and the time limit for a project is long, and inefficiency, and the welding contact surface is few, only is the line type contact, exists the risk hidden danger, and an assembled furred ceiling conversion layer bolting structure is urgently needed.
Disclosure of Invention
In order to solve the technical problems, the utility model provides an assembled suspended ceiling conversion layer bolting structure which is simple to operate, the whole device is fixed by bolts, the problems of few welding surfaces and poor safety performance caused by traditional welding are avoided, the traditional welding surfaces are large, the welding time is long, the construction noise is high, and the problems are effectively solved by fixing the bolts.
The technical solution for realizing the purpose of the utility model is as follows: the utility model provides an assembled furred ceiling conversion layer bolting structure, includes the wall body, two rows of T steel sheet are installed to the downside of wall body, two rows T steel sheet one side all is provided with galvanized angle steel pull rod, two rows one side of galvanized angle steel pull rod all is fixed with galvanized angle steel upper keel through expansion bolts, two the downside of galvanized angle steel upper keel is equidistant to be fixed with a plurality of C shape steel through a plurality of connecting bolts, and is a plurality of the lower extreme of connecting bolt all has the screw-thread jib through the screw-thread spiro union.
In some embodiments, a plurality of long threaded holes are formed in the inner sides of the two rows of the T-shaped steel plates.
In some embodiments, a plurality of the threaded elongated holes are each elliptical.
In some embodiments, the two rows of the galvanized angle ties, the two galvanized angle upper keels, and the plurality of C-shaped steel dimensions are each 50 x 5 millimeters.
Compared with the prior art, the utility model, its apparent advantage is:
the utility model has high construction efficiency, adopts the uniform T-shaped steel plate and the galvanized angle steel pull rod bolt for bolting and fixing, has strong operability, high speed and simple supporting operation, simultaneously has convenient processing of the T-shaped steel plate in factories, saves time for construction period, is energy-saving and environment-friendly, has low construction noise, does not disturb people, adopts bolts for fixing the whole device, does not need welding, avoids potential safety hazards caused by less traditional welding contact surfaces, and improves safety performance and construction quality;
the problems that the existing welding contact surface is few and only in linear contact, potential safety hazards exist, the welding connection process is complicated, the welding amount is large, the construction period is long, and the efficiency is low are solved.
Drawings
The utility model is further explained below with reference to the drawings and examples:
FIG. 1 is a schematic diagram of an assembled state structure provided in one embodiment of the present utility model;
FIG. 2 is a schematic plan view of a ceiling conversion layer according to an embodiment of the present utility model;
FIG. 3 is a schematic diagram of a partial top view node structure provided in one embodiment of the utility model;
FIG. 4 is a schematic view of the planar structure of one of the T-shaped steels provided in one embodiment of the present utility model;
FIG. 5 is an enlarged schematic view of the structure of FIG. 1A provided in one embodiment of the present utility model;
reference numerals illustrate:
1. a wall body; 2. t-shaped steel plates; 3. a threaded long hole; 4. galvanized angle steel pull rod; 5. c-shaped steel; 6. galvanized angle steel upper keel; 7. a connecting bolt; 8. a threaded boom.
Detailed Description
The following detailed description of the present utility model clearly and fully describes the technical solutions of the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The utility model provides an assembled suspended ceiling conversion layer bolting structure through improvement, which comprises the following technical scheme:
as shown in fig. 1-5, an assembled furred ceiling conversion layer bolting structure, including wall body 1, wall body 1's downside is provided with two rows of T-shaped steel plates 2, optimize into two rows of T-shaped steel plates 2 with traditional buried plate, fix between two rows of T-shaped steel plates 2 and the wall body 1 through a plurality of expansion bolts, ensure the steadiness, two rows of T-shaped steel plates 2 one side all is provided with galvanized angle steel pull rod 4, two rows of galvanized angle steel pull rod 4 all pass through bolt and two rows of T-shaped steel plates 2 fixed connection, thereby optimize traditional welding process into the bolt, the operability is strong, it is fast, certain assurance to the quality simultaneously, one side of every row of galvanized angle steel pull rod 4 all is fixed with galvanized angle steel upper keel 6 through expansion bolts fixed connection, the downside of two galvanized angle steel upper keel 6 is equidistant to be fixed with a plurality of C-shaped steel 5 through a plurality of connecting bolts 7, the lower extreme of a plurality of connecting bolts 7 all has screw thread 8 through the screw thread spiro union, wholly adopt the spiro union to fix, the potential safety hazard that the welding contact face is few has been avoided.
As shown in fig. 4, in an embodiment, the inner sides of the two rows of T-shaped steel plates 2 are provided with a plurality of long threaded holes 3, and by providing a plurality of long threaded holes 3, each T-shaped steel plate 2 is ensured to be fixed by a plurality of expansion bolts, so that the stability in fixing is improved.
As shown in fig. 4, in an embodiment, in order to solve the conventional elevation control problem, the plurality of screw thread long holes 3 are elliptical, so that the civil engineering errors can be adjusted left and right and up and down, and the installation and the fixation are convenient.
As shown in FIG. 2, in an embodiment, the sizes of the two rows of galvanized angle steel pull rods 4, the galvanized angle steel upper keels 6 and the plurality of C-shaped steel 5 are all 50 multiplied by 5 millimeters, so that the method is quick and efficient in prefabrication and convenient in factory processing.
The specific working method is as follows: the two rows of T-shaped steel plates 2 are respectively fixed with the wall body 1 through expansion bolts, a plurality of threaded long holes 3 are formed in the inner sides of the two rows of T-shaped steel plates 2, the plurality of threaded long holes 3 are oval, civil errors can be adjusted left and right and up and down, the expansion bolts are convenient to install and fix, the two rows of galvanized angle steel pull rods 4 are respectively fixed with the two rows of T-shaped steel plates 2 through bolts, the two galvanized angle steel upper keels 6 are respectively fixed with the two rows of galvanized angle steel pull rods 4 through the plurality of expansion bolts, the plurality of C-shaped steel 5 are respectively fixed with the galvanized angle steel upper keels 6 through the plurality of connecting bolts 7, and finally the plurality of threaded suspenders 8 are in threaded connection with the plurality of connecting bolts 7, so that integral assembly construction is realized, construction is simple, the whole device is fixed through threaded connection, the problems of small welding surface caused by traditional welding are avoided, safety performance is poor, the traditional welding surface is large, welding time consumption is long, construction noise is high, and the bolts are fixed.
The technical means disclosed by the scheme of the utility model is not limited to the technical means disclosed by the technical means, and also comprises the technical scheme consisting of the technical characteristics and the equivalent substitution. The present utility model is not limited to the prior art.

Claims (4)

1. An assembled furred ceiling conversion layer bolting structure, its characterized in that: including wall body (1), two rows of T steel sheet (2) are installed to the downside of wall body (1), two rows T steel sheet (2) one side all is provided with galvanized angle steel pull rod (4), two rows one side of galvanized angle steel pull rod (4) all is through expansion bolts fixedly connected with galvanized angle steel upper keel (6), two the downside of galvanized angle steel upper keel (6) is equidistant to be fixed with a plurality of C steel (5) through a plurality of connecting bolt (7), a plurality of the lower extreme of connecting bolt (7) all has screw-thread suspender (8) through screw-thread spiro union.
2. The fabricated ceiling conversion layer bolting configuration of claim 1, wherein: a plurality of threaded long holes (3) are formed in the inner sides of the two rows of T-shaped steel plates (2).
3. The fabricated ceiling conversion layer bolting configuration of claim 2, wherein: the plurality of threaded long holes (3) are all elliptical.
4. The fabricated ceiling conversion layer bolting configuration of claim 1, wherein: the sizes of the two rows of galvanized angle steel pull rods (4), the two galvanized angle steel upper keels (6) and the plurality of C-shaped steel (5) are 50 multiplied by 5 mm.
CN202322146409.1U 2023-08-10 2023-08-10 Assembled furred ceiling conversion layer pinning structure Active CN220580315U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322146409.1U CN220580315U (en) 2023-08-10 2023-08-10 Assembled furred ceiling conversion layer pinning structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322146409.1U CN220580315U (en) 2023-08-10 2023-08-10 Assembled furred ceiling conversion layer pinning structure

Publications (1)

Publication Number Publication Date
CN220580315U true CN220580315U (en) 2024-03-12

Family

ID=90120413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322146409.1U Active CN220580315U (en) 2023-08-10 2023-08-10 Assembled furred ceiling conversion layer pinning structure

Country Status (1)

Country Link
CN (1) CN220580315U (en)

Similar Documents

Publication Publication Date Title
CN207079724U (en) A kind of steel construction primary and secondary beam connecting node
CN220580315U (en) Assembled furred ceiling conversion layer pinning structure
CN205259361U (en) Connected node of reinforced concrete column and light -duty girder steel
CN111809729A (en) Dry-type connected node of assembled concrete beam column
CN204960073U (en) There is not horizontal fossil fragments curtain
CN201460022U (en) Cold bending thin-wall welded steel truss purline
CN219863548U (en) Truss switching structure of metal and stone curtain wall
CN211646807U (en) Light gauge steel sound insulation construction
CN211080762U (en) Bending-resistant arc-shaped steel beam
CN216156931U (en) Green decoration and fitment combination fossil fragments furred ceiling structure
CN212129464U (en) Special-shaped steel beam
CN104533023A (en) Connecting structure of purline, roof panel and steel beam
CN204531330U (en) A kind of stainless steel clad plate support
CN219011668U (en) Large-span space grid suspended ceiling structure
CN211312871U (en) Net rack roof primary and secondary purline connecting joint
CN215802504U (en) A connection structure for glass curtain wall
CN212715382U (en) Connection node of perforated light steel keel composite wall and I-beam
CN215670079U (en) Assembled special-shaped column-beam full-bolt connection node
CN214739190U (en) Light gauge steel furred ceiling structure convenient to overhaul
CN220644828U (en) Assembled metal furred ceiling
CN218406211U (en) Assembled kitchen wall connecting piece of making level
CN212109037U (en) Firm balcony wall hanging solar collector support
CN214456269U (en) Heavy work system crane beam system connection structure
CN219261853U (en) Cantilever type floor carrier plate supporting structure
CN203667813U (en) Bailey frame bottom chord downwards-hanging I-steel pin-type clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant