CN219863548U - Truss switching structure of metal and stone curtain wall - Google Patents

Truss switching structure of metal and stone curtain wall Download PDF

Info

Publication number
CN219863548U
CN219863548U CN202321295102.1U CN202321295102U CN219863548U CN 219863548 U CN219863548 U CN 219863548U CN 202321295102 U CN202321295102 U CN 202321295102U CN 219863548 U CN219863548 U CN 219863548U
Authority
CN
China
Prior art keywords
steel
truss
vertical
channel steel
switching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321295102.1U
Other languages
Chinese (zh)
Inventor
祁宏伟
邬嘉
金星宇
刘珊珊
陈珏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Curtain Wall Co Ltd
Original Assignee
Zhejiang Yasha Curtain Wall Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Curtain Wall Co Ltd filed Critical Zhejiang Yasha Curtain Wall Co Ltd
Priority to CN202321295102.1U priority Critical patent/CN219863548U/en
Application granted granted Critical
Publication of CN219863548U publication Critical patent/CN219863548U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a metal and stone curtain wall truss switching structure which comprises a truss, vertical steel keels, first steel switching pieces, second steel switching pieces and third steel switching pieces, wherein the truss comprises an upper chord member, a lower chord member and vertical web members, the upper chord member and the lower chord member are connected through the plurality of vertical web members, the first steel switching pieces are respectively arranged on the vertical web members at the two ends of the truss, the vertical steel keels are positioned at one side of the truss, and the vertical steel keels are arranged on the truss through the second steel switching pieces and the third steel switching pieces. The adaptor on the main structure embedded part is connected with the truss firstly, and then the vertical keels of the metal and stone curtain wall are connected and fixed with the truss through the adaptor, and because the truss span is large, a steel truss can be simultaneously connected with a plurality of vertical keels, so that the number of connection points of the curtain wall adaptor structure and the main structure is effectively reduced, and the purposes of reducing energy transmission and building energy consumption are achieved.

Description

Truss switching structure of metal and stone curtain wall
Technical Field
The utility model belongs to the technical field of curtain wall construction, and particularly relates to a truss switching structure of a metal and stone curtain wall.
Background
The curtain wall is used as a light wall body with a decorative effect commonly used in modern large-scale and high-rise buildings, mainly comprises a panel and a supporting structure system, and is used as a suspension type wall body, a certain stability is required to be achieved through the supporting structure system, and a large number of connecting structures are often adopted for connection support in order to ensure the stability.
The advent of low energy consumption and passive construction has also provided requirements for the number of points of connection between curtain wall transit systems and the main structure. Because the metal and stone curtain wall at present mostly is to set up the adaptor that is connected with the main structure on every vertical fossil fragments of facade to realize the connection of main structure, this can cause there is a large amount of energy consumption to pass through the transmission of main structure-adaptor-curtain fossil fragments-outer facade, leads to the increase of building energy consumption.
Disclosure of Invention
In view of the above, the present utility model aims to provide a truss switching structure for a metal and stone curtain wall.
The specific technical scheme is as follows:
the utility model provides a metal and stone material curtain truss switching structure, includes truss, vertical steel joist, first steel adaptor and second steel adaptor, the truss includes chord member, lower chord member and erects the web member, realizes connecting through many erects the web member between chord member and the lower chord member, is equipped with first steel adaptor on the perpendicular web member at truss both ends respectively, and vertical steel joist is located one side of truss, and installs on the truss through the second steel adaptor.
Further, one end of the first steel adapter is installed on the vertical web member, and the other end of the first steel adapter is installed on the wall body through the embedded part.
Further, the first steel adaptor comprises a first channel steel and a second channel steel, the opening directions of the first channel steel and the second channel steel are opposite, and the bolts sequentially penetrate through the first channel steel, the vertical web members and the second channel steel to realize the fixed connection of the first steel adaptor on the truss.
Further, one end of the second steel adapter is fixed on the vertical steel keel, and the other end of the second steel adapter is welded on the upper chord member.
Further, the second steel adaptor comprises a third channel steel and a fourth channel steel, the opening directions of the third channel steel and the fourth channel steel are opposite, and bolts sequentially penetrate through the third channel steel, the vertical steel keels and the fourth channel steel to realize the fixed connection of the second steel adaptor on the vertical steel keels.
Further, the steel cable tie further comprises a third steel adapter, one end of the third steel adapter is fixed on the vertical steel keel, and the other end of the third steel adapter is welded on the lower chord member.
Further, the third steel adaptor comprises a fifth channel steel and a sixth channel steel, the opening directions of the fifth channel steel and the sixth channel steel are opposite, and bolts sequentially penetrate through the fifth channel steel, the vertical steel keels and the sixth channel steel to realize the fixed connection of the third steel adaptor on the vertical steel keels.
Further, an inclined web member is further arranged between the vertical web members, the upper chord member and the lower chord member are parallel, and the vertical web members are perpendicular to the upper chord member and the lower chord member respectively.
The utility model has the beneficial effects that: the adaptor on the main structure embedded part is connected with the truss firstly, and then the vertical keels of the metal and stone curtain wall are connected and fixed with the truss through the adaptor, and because the truss span is large, a steel truss can be simultaneously connected with a plurality of vertical keels, so that the number of connection points of the curtain wall adaptor structure and the main structure is effectively reduced, and the purposes of reducing energy transmission and building energy consumption are achieved.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic cross-sectional view of a mounting structure of the present utility model;
fig. 3 is an enlarged detail view at a.
In the figure: 1. truss; 11. an upper chord; 12. a lower chord; 13. vertical web members; 14. a diagonal web member; 2. vertical steel keels; 3. a first steel adaptor; 31. a first channel steel; 32. a second channel steel; 4. a second steel adaptor; 41. a third channel steel; 42. a fourth channel steel; 5. a bolt; 6. a third steel adaptor; 61. a fifth channel steel; 62. and a sixth channel steel.
Detailed Description
The utility model will be further described with reference to the drawings, but the scope of the utility model is not limited thereto.
As shown in fig. 1 to 3, the truss switching structure of the metal and stone curtain wall comprises a truss 1, a vertical steel keel 2, a first steel switching piece 3, a second steel switching piece 4 and a third steel switching piece 6, wherein the truss 1 comprises an upper chord member 11, a lower chord member 12, a vertical web member 13 and a diagonal web member 14, the upper chord member 11 and the lower chord member 12 are parallel, a plurality of vertical web members 13 are vertically and uniformly arranged between the upper chord member 11 and the lower chord member 12, a plurality of diagonal web members 14 are respectively arranged between the vertical web members 13 and the vertical web members 13, the vertical web members 13 at two ends of the truss 1 are respectively fixedly connected with a first steel switching piece 3, the first steel switching piece 3 comprises a first channel steel 31 and a second channel steel 32, the opening directions of the first channel steel 31 and the second channel steel 32 are opposite, a bolt 5 sequentially passes through the first channel steel 31, the vertical web members 13 and the second channel steel 32 to realize the fixed connection of one end of the first steel switching piece 3 on the truss 1, the other end part of the first steel adaptor 3 is mounted on a wall body through an embedded part, one end parts of the second steel adaptor 4 and the third steel adaptor 6 are fixedly mounted on the vertical steel keel 2, the other end part of the second steel adaptor 4 is fixed on the upper chord 11, the other end part of the third steel adaptor 6 is fixed on the lower chord 12, the second steel adaptor 4 comprises a third channel steel 41 and a fourth channel steel 42, the opening directions of the third channel steel 41 and the fourth channel steel 42 are opposite, a bolt 5 sequentially penetrates through the third channel steel 41, the vertical steel keel 2 and the fourth channel steel 42 to realize the fixed connection of the second steel adaptor 4 on the vertical steel keel 2, the third steel adaptor 6 comprises a fifth channel steel 61 and a sixth channel steel 62, the opening directions of the fifth channel steel 61 and the sixth channel steel 62 are opposite, and the bolt 5 sequentially penetrates through the fifth channel steel 61, the vertical steel keel 2 and the sixth channel steel 62 are used for realizing the fixed connection of the third steel adapter 6 on the vertical steel keel 2.
The installation mode is as follows: the first steel adapter 3 and the embedded part are welded and fixed, the first steel adapter 3 and the embedded part are connected with two ends of the truss 1 through bolts 5, one ends of the second steel adapter 4 and the third steel adapter 6 are welded on the upper chord 11 and the lower chord 12 respectively, and the other ends of the second steel adapter 4 and the third steel adapter 6 are connected with the vertical steel keels 2 through bolts 5.

Claims (8)

1. The utility model provides a metal and stone material curtain truss switching structure, its characterized in that includes truss (1), vertical steel joist (2), first steel adaptor (3) and second steel adaptor (4), truss (1) are including last chord member (11), lower chord member (12) and perpendicular web member (13), are connected through many perpendicular web members (13) between last chord member (11) and lower chord member (12), are equipped with first steel adaptor (3) on perpendicular web member (13) at truss (1) both ends respectively, and vertical steel joist (2) are located one side of truss (1), and install on truss (1) through second steel adaptor (4).
2. A metal and stone curtain wall truss switching structure according to claim 1, characterized in that one end of the first steel switching piece (3) is mounted on the vertical web member (13), and the other end is mounted on the wall body through the embedded piece.
3. The metal and stone curtain wall truss switching structure according to claim 2, wherein the first steel switching piece (3) comprises a first channel steel (31) and a second channel steel (32), the opening directions of the first channel steel (31) and the second channel steel (32) are opposite, and the bolts (5) sequentially penetrate through the first channel steel (31), the vertical web members (13) and the second channel steel (32) so as to realize the fixed connection of the first steel switching piece (3) on the truss (1).
4. A metal and stone curtain wall truss switching structure according to claim 1, characterized in that one end of the second steel switching element (4) is fixed on the vertical steel keel (2) and the other end is welded on the upper chord (11).
5. The metal and stone curtain wall truss switching structure according to claim 4, wherein the second steel switching piece (4) comprises a third channel steel (41) and a fourth channel steel (42), the opening directions of the third channel steel (41) and the fourth channel steel (42) are opposite, and the bolts (5) sequentially penetrate through the third channel steel (41), the vertical steel keels (2) and the fourth channel steel (42) so as to realize the fixed connection of the second steel switching piece (4) on the vertical steel keels (2).
6. A metal and stone curtain wall truss switching structure as claimed in claim 1, further comprising a third steel switching member (6), wherein one end of the third steel switching member (6) is fixed to the vertical steel joist (2), and the other end is welded to the lower chord member (12).
7. The metal and stone curtain wall truss switching structure according to claim 6, wherein the third steel switching piece (6) comprises a fifth channel steel (61) and a sixth channel steel (62), openings of the fifth channel steel (61) and the sixth channel steel (62) are opposite, and the bolts (5) sequentially penetrate through the fifth channel steel (61), the vertical steel keels (2) and the sixth channel steel (62) so as to realize the fixed connection of the third steel switching piece (6) on the vertical steel keels (2).
8. The metal and stone curtain wall truss switching structure according to claim 1, wherein a diagonal web member (14) is further arranged between the vertical web members (13), the upper chord member (11) and the lower chord member (12) are parallel, and the vertical web members (13) are perpendicular to the upper chord member (11) and the lower chord member (12), respectively.
CN202321295102.1U 2023-05-26 2023-05-26 Truss switching structure of metal and stone curtain wall Active CN219863548U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321295102.1U CN219863548U (en) 2023-05-26 2023-05-26 Truss switching structure of metal and stone curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321295102.1U CN219863548U (en) 2023-05-26 2023-05-26 Truss switching structure of metal and stone curtain wall

Publications (1)

Publication Number Publication Date
CN219863548U true CN219863548U (en) 2023-10-20

Family

ID=88332678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321295102.1U Active CN219863548U (en) 2023-05-26 2023-05-26 Truss switching structure of metal and stone curtain wall

Country Status (1)

Country Link
CN (1) CN219863548U (en)

Similar Documents

Publication Publication Date Title
CN219863548U (en) Truss switching structure of metal and stone curtain wall
CN212224202U (en) Prefabricated wallboard that steel sheet is connected
CN211646807U (en) Light gauge steel sound insulation construction
CN220580315U (en) Assembled furred ceiling conversion layer pinning structure
CN212129464U (en) Special-shaped steel beam
CN105680784A (en) Double-glass solar photovoltaic plate reinforcing structure and method
CN219100426U (en) Photovoltaic curtain wall structure
CN210342341U (en) Glass fiber reinforced plastic combined supporting clamp point type glass curtain wall
CN220889139U (en) Indoor suspended ceiling construction system of building
CN215594542U (en) Install in canopy structure of curtain system
CN209941915U (en) Steel structure fixing device of supporting beam
CN219825790U (en) Suspended ceiling hook and assembled steel structure building suspended ceiling structure using same
CN220504269U (en) Inhaul cable component type glass curtain wall
CN219825749U (en) Fireproof metal composite curtain wall plate
CN217783304U (en) Light steel structure building window frame
CN213926713U (en) Steel structure supporting beam
CN220210310U (en) Steel construction roof photovoltaic board connecting device
CN220848010U (en) Be used for house skeleton to build with heavy light steel connection structure
CN216616473U (en) Assembled steel construction floor bearing structure
CN214006171U (en) Curtain wall structure
CN215333770U (en) Curtain wall luminous character steel structure connecting adapter
CN216196520U (en) I-steel positioning and clamping device
CN212656419U (en) Novel peripheral revetment structure of assembled
CN213174146U (en) Node suitable for steel construction vestibule tip
CN219107346U (en) Waterproof photovoltaic bracket system for trapezoid roof boards

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant