CN220565611U - Double-deck fossil fragments timber apron structure in basketball court - Google Patents

Double-deck fossil fragments timber apron structure in basketball court Download PDF

Info

Publication number
CN220565611U
CN220565611U CN202321866493.8U CN202321866493U CN220565611U CN 220565611 U CN220565611 U CN 220565611U CN 202321866493 U CN202321866493 U CN 202321866493U CN 220565611 U CN220565611 U CN 220565611U
Authority
CN
China
Prior art keywords
keel
connecting plate
double
basketball court
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321866493.8U
Other languages
Chinese (zh)
Inventor
李剑刚
王卫忠
杨柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Jinling Gongchuang Sports Equipment Co ltd
Original Assignee
Suzhou Jinling Gongchuang Sports Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Jinling Gongchuang Sports Equipment Co ltd filed Critical Suzhou Jinling Gongchuang Sports Equipment Co ltd
Priority to CN202321866493.8U priority Critical patent/CN220565611U/en
Application granted granted Critical
Publication of CN220565611U publication Critical patent/CN220565611U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to the technical field of keel wood floor structures, in particular to a double-layer keel wood floor structure of a basketball court, which comprises a lower keel, wherein a chute is formed in the lower keel, an upper keel is connected to the inner side wall of the chute in a sliding manner, a rectangular groove is formed in the front end face of the upper keel, a connecting frame is inserted into the rectangular groove, a clamping groove is formed in the top of the bottom end of the connecting frame, a clamping block is clamped in the clamping groove, a moisture-proof isolation pad is arranged at the top of the upper keel, and the clamping block is connected with the inside of the moisture-proof isolation pad in a sliding manner. According to the basketball court, the connecting frames, the clamping grooves and the clamping blocks are arranged, so that the convenience in mounting and dismounting of the first connecting plate, the second connecting plate and the third connecting plate is enhanced, the lower dampproof isolation pad is convenient to remove and replace, the sliding grooves are arranged, the convenience in mounting of the upper keel is further improved, and the shock pad is utilized for enhancing the trampling comfort of the basketball court.

Description

Double-deck fossil fragments timber apron structure in basketball court
Technical Field
The utility model relates to the technical field of keel wood floor structures, in particular to a double-layer keel wood floor structure of a basketball court.
Background
With the continuous improvement of the life quality of people, floor decorative materials such as floors, carpets and the like are increasingly widely applied to the field of decoration. With the advent of various floors, the installation requirements for the floors are also relatively raised, especially with respect to special places such as gymnasiums. Not only meets the movement requirement, but also has a certain protection function for the floor system.
The existing basketball court adopts double-deck fossil fragments timber apron mechanism more, and the inside of double-deck fossil fragments timber apron is installed dampproofing isolation pad usually, but dampproofing isolation pad need be changed after long-term use, but current double-deck fossil fragments timber apron mechanism passes through the fix with screw, consumes more time when leading to dismantling, and then influences dismantling efficiency, consequently needs a double-deck fossil fragments timber apron structure in basketball court.
Disclosure of Invention
The utility model aims to solve the defects in the prior art and provides a double-layer keel wood floor structure of a basketball court.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a double-deck fossil fragments timber apron structure in basketball court, includes the lower floor fossil fragments, the spout has been seted up to the inside of lower floor fossil fragments, the inside wall sliding connection of spout has the upper keel, rectangular channel has been seted up to the preceding terminal surface of upper keel, the inside grafting of rectangular channel has the link, the draw-in groove has been seted up at the bottom top of link, the inside joint of draw-in groove has the fixture block, dampproofing isolation pad is installed at the top of upper keel, and the inside sliding connection of fixture block and dampproofing isolation pad.
Further: the top of upper keel has seted up the second spacing groove, first spacing groove has been seted up to dampproofing isolation pad's inside, and first spacing groove is corresponding with the position in second spacing groove.
Further: the bottom of fixture block passes first spacing groove and second spacing groove, and with the inside wall swing joint of draw-in groove.
Further: the top fixedly connected with first connecting plate of fixture block, the side surface sliding connection of first connecting plate has the second connecting plate, the bottom of second connecting plate is laminated mutually with dampproofing top of separating the pad.
Further: the number of the second connecting plates is multiple, and the second connecting plates are all connected through the third connecting plate.
Further: the bottom fixedly connected with shock pad of lower floor's fossil fragments, and the shape of shock pad and lower floor's fossil fragments is corresponding.
The utility model has the following beneficial effects:
1. compared with the prior art, through setting up link, draw-in groove and fixture block, when dismantling dampproofing isolation pad, utilize first connecting plate to drive the fixture block and separate with link bottom end top draw-in groove to this step gradually pulls down second connecting plate and third connecting plate, and same step also can install it, is favorable to reinforcing first connecting plate, second connecting plate and third connecting plate installation and the convenience of dismantling to be convenient for demolish the dampproofing isolation pad of below and change.
2. Compared with the prior art, through setting up spout and shock pad, utilize the spout to be convenient for upper fossil fragments at the inside slip of lower floor fossil fragments to be convenient for upper fossil fragments install fast, and then promote the convenience of upper fossil fragments installation, also be convenient for carry out fast adjustment to the distance between the upper fossil fragments, and utilize the shock pad to be used for reinforcing the travelling comfort that the basketball court tramples.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of the internal structure of the present utility model;
fig. 3 is an enlarged view of fig. 2 a in accordance with the present utility model.
Legend description:
1. a lower keel; 2. a chute; 3. an upper keel; 4. rectangular grooves; 5. a connecting frame; 6. a clamping groove; 7. a clamping block; 8. a first connection plate; 9. a first limit groove; 10. the second limit groove; 11. a second connecting plate; 12. a shock pad; 13. a third connecting plate; 14. a moisture-proof isolation pad.
Detailed Description
Referring to fig. 1-3, the present utility model provides a double-deck keel wood floor structure for basketball courts: including lower floor's fossil fragments 1, spout 2 has been seted up to the inside of lower floor's fossil fragments 1, and the inside wall sliding connection of spout 2 has upper keel 3, and rectangular channel 4 has been seted up to the preceding terminal surface of upper keel 3, and rectangular channel 4's inside grafting has link 5, and draw-in groove 6 has been seted up at link 5's bottom top, and draw-in groove 6's inside joint has fixture block 7, and dampproofing isolation pad 14 is installed at upper keel 3's top, and the inside sliding connection of fixture block 7 and dampproofing isolation pad 14. When the dampproof isolation pad 14 needs to be disassembled, the first connecting plate 8 is utilized to drive the clamping block 7 to be separated from the clamping groove 6 at the top end of the bottom end of the connecting frame 5, the second connecting plate 11 and the third connecting plate 13 are gradually disassembled in the step, the same step can be also used for installing the dampproof isolation pad, and convenience in installing and disassembling the first connecting plate 8, the second connecting plate 11 and the third connecting plate 13 is enhanced, so that the lower dampproof isolation pad 14 is convenient to be disassembled for replacement.
The second limiting groove 10 is formed in the top of the upper keel 3, the first limiting groove 9 is formed in the dampproof isolation pad 14, and the first limiting groove 9 corresponds to the second limiting groove 10 in position. The clamping block 7 can be clamped into the clamping block through the first limiting groove 9 and the second limiting groove 10.
The bottom end of the clamping block 7 passes through the first limit groove 9 and the second limit groove 10 and is movably connected with the inner side wall of the clamping groove 6.
The top fixedly connected with first connecting plate 8 of fixture block 7, the side surface sliding connection of first connecting plate 8 has second connecting plate 11, and the bottom of second connecting plate 11 is laminated with dampproofing top of separating pad 14 mutually. The first connection plate 8 and the second connection plate 11 are matched, so that the pavement is performed.
The number of the second connecting plates 11 is plural, and the plural second connecting plates 11 are all connected through the third connecting plate 13. The first connecting plate 8, the second connecting plate 11 and the third connecting plate 13 are clamped, so that the stability of connection is improved.
The bottom of the lower keel 1 is fixedly connected with a shock pad 12, and the shock pad 12 corresponds to the shape of the lower keel 1. The shock pad 12 is used to facilitate increased comfort in the pedalling of the basketball court.
Working principle: when the dampproofing isolation pad 14 of needs is dismantled, utilize first connecting plate 8 to drive fixture block 7 and link 5 bottom top draw-in groove 6 and separate, with this step progressively with second connecting plate 11 and third connecting plate 13 pull down, the same step also can be installed it, be favorable to reinforcing first connecting plate 8, second connecting plate 11 and third connecting plate 13 installation and the convenience of dismantling, thereby be convenient for dismantle dampproofing isolation pad 14 in below and change, utilize spout 2 to be convenient for upper fossil fragments 3 at the inside slip of lower floor fossil fragments 1, thereby be convenient for upper fossil fragments 3 install fast, and then promote the convenience of upper fossil fragments 3 installation, also be convenient for carry out the fast adjustment to the distance between the upper fossil fragments 3, and then be convenient for install between the connecting plate.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (6)

1. The utility model provides a double-deck fossil fragments timber apron structure in basketball court, includes lower floor's fossil fragments (1), its characterized in that: spout (2) have been seted up to the inside of lower floor's fossil fragments (1), the inside wall sliding connection of spout (2) has upper keel (3), rectangular channel (4) have been seted up to the preceding terminal surface of upper keel (3), peg graft in the inside of rectangular channel (4) has link (5), draw-in groove (6) have been seted up at the bottom top of link (5), the inside joint of draw-in groove (6) has fixture block (7), dampproofing isolation pad (14) are installed at the top of upper keel (3), and the inside sliding connection of fixture block (7) and dampproofing isolation pad (14).
2. A double-deck keel wood flooring structure of a basketball court according to claim 1, wherein: the top of upper keel (3) has seted up second spacing groove (10), first spacing groove (9) have been seted up to the inside of dampproofing isolation pad (14), and the position of first spacing groove (9) and second spacing groove (10) is corresponding.
3. A double-deck keel wood flooring structure of a basketball court according to claim 2, wherein: the bottom end of the clamping block (7) penetrates through the first limiting groove (9) and the second limiting groove (10) and is movably connected with the inner side wall of the clamping groove (6).
4. A double-deck keel wood flooring structure of a basketball court according to claim 1, wherein: the top fixedly connected with first connecting plate (8) of fixture block (7), the side surface sliding connection of first connecting plate (8) has second connecting plate (11), the bottom of second connecting plate (11) is laminated mutually with the top of dampproofing isolation pad (14).
5. A double-deck keel wood flooring structure for a basketball court according to claim 4, wherein: the number of the second connecting plates (11) is multiple, and the second connecting plates (11) are connected through the third connecting plates (13).
6. A double-deck keel wood flooring structure of a basketball court according to claim 1, wherein: the bottom of the lower keel (1) is fixedly connected with a shock pad (12), and the shock pad (12) corresponds to the shape of the lower keel (1).
CN202321866493.8U 2023-07-17 2023-07-17 Double-deck fossil fragments timber apron structure in basketball court Active CN220565611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321866493.8U CN220565611U (en) 2023-07-17 2023-07-17 Double-deck fossil fragments timber apron structure in basketball court

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321866493.8U CN220565611U (en) 2023-07-17 2023-07-17 Double-deck fossil fragments timber apron structure in basketball court

Publications (1)

Publication Number Publication Date
CN220565611U true CN220565611U (en) 2024-03-08

Family

ID=90103684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321866493.8U Active CN220565611U (en) 2023-07-17 2023-07-17 Double-deck fossil fragments timber apron structure in basketball court

Country Status (1)

Country Link
CN (1) CN220565611U (en)

Similar Documents

Publication Publication Date Title
CN220565611U (en) Double-deck fossil fragments timber apron structure in basketball court
CN209958575U (en) Interlocking type curtain wall plate and curtain wall
CN210947535U (en) Indoor wallboard supporting structure
CN210002640U (en) curtain wall mounting structure
CN208408101U (en) A kind of sheet metal component bending mechanism that stairstepping fixed block is easy for assemble or unload
CN208563679U (en) A kind of fixed system of the aluminum facade bump of bumps moulding
CN202055687U (en) Seepage-proof windowsill board and windowsill structure using same
CN219315629U (en) Water stop plate for traffic transportation engineering construction
CN217268533U (en) Novel punching aluminum veneer
CN217429486U (en) Dampproofing detachable artificial quartz stone plate
CN219863833U (en) Novel large-scale public building expansion joint decoration cover plate
CN220790251U (en) Curtain wall structure convenient to installation operation
CN218406142U (en) Full-covered glass railing
CN217871947U (en) Wood column and column foundation reinforcing structure for repairing wooden ancient architecture
CN214531727U (en) Novel elevator well
CN208122039U (en) A kind of novel aluminum partition installation fitting
CN210033091U (en) Frame section bar for mounting double-layer glass
CN218116945U (en) Combined gypsum board
CN218815953U (en) Bridge cut-off aluminum alloy door and window
CN213234755U (en) Whole window of toughened glass
CN220954099U (en) Assembled aluminium veneer curtain connection structure
CN218714575U (en) Fireproof plate for interior decoration
CN220849382U (en) Aluminum alloy door and window
CN216840520U (en) High-stability attachment support for building construction climbing frame
CN218211401U (en) Building material's detection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant