CN216840520U - High-stability attachment support for building construction climbing frame - Google Patents

High-stability attachment support for building construction climbing frame Download PDF

Info

Publication number
CN216840520U
CN216840520U CN202221322716.XU CN202221322716U CN216840520U CN 216840520 U CN216840520 U CN 216840520U CN 202221322716 U CN202221322716 U CN 202221322716U CN 216840520 U CN216840520 U CN 216840520U
Authority
CN
China
Prior art keywords
frame
support
plate
climbing
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221322716.XU
Other languages
Chinese (zh)
Inventor
张蒙
刘晓勇
杨晓笨
贾莎莎
孙孝忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway Urban Construction Group Co Ltd filed Critical First Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Priority to CN202221322716.XU priority Critical patent/CN216840520U/en
Application granted granted Critical
Publication of CN216840520U publication Critical patent/CN216840520U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses an attached support with high stability for a building construction climbing frame, which belongs to the technical field of the building construction climbing frame, and comprises a support and a climbing frame, wherein two first fixing plates are respectively arranged on the front side surface and the rear side surface of the support, a first bolt is arranged on the first fixing plate through threads, a first groove is arranged on the right side surface of the support, the climbing frame is arranged in the first groove, and supporting plates are respectively arranged on the front side surface and the rear side surface of the climbing frame; this attachment support that steadiness is high that frame was used is climbed in construction, during the use, through setting up bolt one and extension board, utilize a pair of bolt one of fixed plate to fix, combine bolt one can fix the support on the suitable face, effect through recess one, hold spacingly to climbing the frame, the effect that combines extension board and fixed subassembly is strengthened supporting to both sides around the backup pad, and then will climb the frame and fix in recess one, fix both sides around climbing the frame, make the support firm fix climbing the frame, and then improve the stability of climbing the frame.

Description

High-stability attachment support for building construction climbing frame
Technical Field
The utility model relates to a frame technical field is climbed in the construction, especially relates to the high attached support of steadiness that frame was used is climbed in the construction.
Background
The climbing frame is also called a lifting frame, can be divided into hydraulic type, electrodynamic type, manual pull type and other main types according to the power source, is a novel scaffold system developed in recent years, is mainly applied to high-rise shear wall type floors, can ascend or descend upwards along buildings, and makes the scaffold technology completely changed by the system: firstly, the frame does not need to be turned over; and secondly, the dismounting and mounting process of the scaffold is eliminated, the scaffold is not limited by the height of a building, the manpower and the materials are greatly saved, the traditional scaffold is greatly improved in the safety angle, and the scaffold has development advantages in high-rise buildings.
The support mainly comprises two curb plates and mount, when needs use and climb the frame, needs fix the position of climbing the frame through the support, avoids climbing the position of frame off tracking to appear, but current support can not be fine support climbing the frame, can only block fixedly climbing the frame, leads to climbing the support of frame unstable, brings very big inconvenience for the user.
SUMMERY OF THE UTILITY MODEL
The utility model provides an attached support that the steadiness is high that the frame was used is climbed in construction has solved the problem that current support is not enough to climb a support stability.
In order to achieve the above purpose, the utility model adopts the following technical scheme: high attached support of steadiness that the frame was used is climbed in construction, include the support and climb the frame, two fixed plate one are all installed to the front and back both sides face of support, bolt one is installed to the screw thread on the fixed plate one, the right flank of support is seted up flutedly one, it sets up in flutedly one to climb the frame, the backup pad is all installed to the front and back both sides face of climbing the frame, the mounting panel is all installed to the front and back both sides face of support, the mounting panel is located between two fixed plate one of homonymy, install the curb plate on the mounting panel, the side of curb plate articulates there is the cover frame, be provided with the extension board in the cover frame, the top of extension board is provided with fixed subassembly, the backup pad is all installed to the front and back both sides face of climbing the frame, the extension board can dismantle with the backup pad through fixed subassembly and be connected.
Adopt above-mentioned scheme, through setting up bolt one and extension board, utilize a pair of bolt one of fixed plate to fix, combine bolt one to fix the support on the suitable face, through the effect of recess one, hold spacingly climbing the frame, the effect that combines extension board and fixed subassembly strengthens the support to the front and back both sides of backup pad, and then will climb the frame and fix in recess one, fix both sides around climbing the frame for the support is firm fixes climbing the frame, and then improves the stability of climbing the frame.
As a preferred embodiment, the fixing assembly includes a second fixing plate mounted on the upper surface of the extension plate, the second fixing plate is obliquely arranged, a second bolt is connected to the second fixing plate through a screw thread, and a threaded hole matched with the second bolt is formed in the support plate.
Adopt above-mentioned scheme, through setting up fixed plate two and bolt two, utilize fixed plate two to lay for the slope the effect, when the convenient state to the extension board changes, the side of fixed plate two is laminated with the side of backup pad mutually, through the effect of bolt two with the screw hole, makes things convenient for the later stage to strengthen fixedly climbing the frame.
As a preferred embodiment, the support device further comprises a support assembly arranged on the sleeve frame, the support assembly comprises a spring, two grooves II are formed in the front side surface and the rear side surface of the support, the spring is arranged on one side surface of the inner wall of each groove II, the other end of the spring is connected with the sleeve frame, the spring is obliquely arranged, a telescopic rod is arranged in the spring, the telescopic rod is hinged to the inner wall surface of each groove II, and a telescopic shaft of the telescopic rod is hinged to the sleeve frame.
Adopt above-mentioned scheme, through setting up the spring, when utilizing two pairs of springs of recess to hold, the elasticity that combines the spring has certain holding power to the cover frame, and then is in vertical state when not using the cover frame, when preventing not using the cover frame, gliding phenomenon around the cover frame appears, utilizes the telescopic link to fill in the spring, improves the inside satiation of spring, the phenomenon that appears warping when avoiding the spring to receive the extrusion of extension board or tensile.
As a preferred embodiment, the left and right sides of the inner wall of the sleeve frame are both provided with a first clamping groove, the left and right sides of the extension plate are both provided with a clamping plate, and one end of the clamping plate is slidably mounted in the first clamping groove.
Adopt above-mentioned scheme, through setting up the cardboard, utilize the one end of cardboard to carry out spacing support in draw-in groove one gliding effect to the position of extension board, avoid when improving extension board stability extension board to break away from the cover frame.
In a preferred embodiment, the lower surface of the side plate is provided with an L-shaped plate, and the transverse part of the L-shaped plate is fixedly connected with the side surface of the bracket.
Adopt above-mentioned scheme, through setting up the L shaped plate, utilize the L shaped plate shape to strengthen the support for the curb plate for the effect of L shape, avoid the curb plate to receive the effect of cover frame unstable phenomenon appears, improve the stability of curb plate.
As a preferred embodiment, the front side surface and the rear side surface of the inner wall of the first groove are respectively provided with a second clamping groove, a clamping block is arranged in the second clamping groove, and one end of the clamping block is fixedly connected with the climbing frame.
Adopt above-mentioned scheme, through setting up the fixture block, utilize the effect of fixture block in draw-in groove two for when climbing the frame and removing recess one, through fixture block and draw-in groove two-phase fit's effect, will climb the preliminary card of frame in recess one, and then the convenience is fixed the position of climbing the frame, and convenient later stage is strengthened fixedly climbing the frame.
The utility model discloses relative to prior art have following technological effect at least:
1. the high-stability attachment support for the building construction climbing frame is characterized in that a first bolt and an extension plate are arranged, a first bolt is fixed by a fixing plate, the support can be fixed on a suitable surface by combining the first bolt, the climbing frame is accommodated and limited by the action of a first groove, the front side and the rear side of a support plate are reinforced and supported by combining the action of the extension plate and a fixing assembly, the climbing frame is fixed in the first groove, the front side and the rear side of the climbing frame are fixed, the support can firmly fix the climbing frame, and the stability of the climbing frame is improved;
2. this attachment support that steadiness that frame was used is climbed in construction is high, through setting up cardboard and bolt two, the one end that utilizes the cardboard carries out spacing support in the position of draw-in groove gliding effect to the extension board, avoid the extension board to break away from a cover frame when improving extension board stability, combine the effect of bolt two, fix fixed plate two in the backup pad, and then fix in the backup pad the one end of extension board, utilize the L shaped plate to strengthen the stability of curb plate, further strengthen the fastness of support, the stability of frame is climbed in the improvement.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of the sectional structure of the bracket according to the present invention.
Fig. 3 is an enlarged view of a portion a in fig. 2.
In the figure: 1. a support; 2. climbing a frame; 3. mounting a plate; 4. a side plate; 5. a first fixing plate; 6. a first bolt; 7. sleeving a frame; 8. an extension plate; 9. clamping a plate; 10. a spring; 11. a telescopic rod; 12. an L-shaped plate; 13. a second fixing plate; 14. a second bolt; 15. a first groove; 16. a second groove; 17. a support plate; 18. and (6) clamping blocks.
Detailed Description
The utility model discloses in, the position definition of upper and lower, left and right, preceding and back all is the visual angle of figure 1, and wherein preceding indicates that the paper is outwards, and the back indicates that the paper is inwards.
Referring to fig. 1-3, the utility model provides a high attached support of steadiness that the frame was used is climbed in construction, including support 1 and climb frame 2, two fixed plates 5 are all installed to the front and back both sides face of support 1, bolt 6 is installed to screw thread on the fixed plate 5, support 1's right flank is seted up fluted 15, it sets up in recess 15 to climb frame 2, it all installs backup pad 17 to climb frame 2's front and back both sides face, mounting panel 3 is all installed to support 1's front and back both sides face, mounting panel 3 is located between two fixed plates 5 of homonymy, install curb plate 4 on mounting panel 3, the side of curb plate 4 articulates there is cover frame 7, be provided with extension board 8 in the cover frame 7, extension board 8's top is provided with fixed subassembly, extension board 8 can dismantle with backup pad 17 through fixed subassembly and be connected.
Fixed subassembly is including installing two 13 fixed plates at 8 upper surfaces of extension board, two 13 fixed plates are laid for the slope, threaded connection has two 14 bolts on two 13 fixed plates, utilize two 14 bolts to strengthen fixedly climbing frame 2, set up the screw hole with two 14 bolt matched with in the backup pad 17, be provided with supporting component on the cover frame 7, through setting up two 13 fixed plates and two 14 bolts, utilize two 13 effects of laying for the slope of fixed plate, when the convenient state to extension board 8 changes, the side of two 13 fixed plates is laminated with the side of backup pad 17 mutually, effect through two 14 bolts and screw hole, it is fixed to strengthen climbing frame 2 in convenient later stage.
The supporting component comprises a spring 10, two grooves 16 are formed in the front side surface and the rear side surface of the support 1, the spring 10 is arranged on one side surface of the inner wall of the two grooves 16, the sleeve frame 7 is supported by the spring 10, the other end of the spring 10 is connected with the sleeve frame 7, the spring 10 is obliquely arranged, an expansion rod 11 is arranged in the spring 10, the expansion rod 11 is used for limiting and supporting the spring 10, the expansion rod 11 is hinged to the inner wall surface of the two grooves 16, an expansion shaft of the expansion rod 11 is hinged to the sleeve frame 7, the spring 10 is arranged, the two grooves 16 are used for accommodating the spring 10, a certain supporting force is provided for the sleeve frame 7 by combining the elasticity of the spring 10, the sleeve frame 7 is in a vertical state when not used, the phenomenon that the sleeve frame 7 slides forwards and backwards when the sleeve frame 7 is not used is prevented, the expansion rod 11 is used for filling the spring 10, and the fullness inside of the spring 10 is improved, the spring 10 is prevented from being deformed when being pressed or stretched by the extension plate 8.
Draw-in groove one has all been seted up to the left and right sides face of cover frame 7 inner wall, and cardboard 9 is all installed to the left and right sides face of extension board 8, utilizes cardboard 9 to carry out spacing support to extension board 8, and the one end slidable mounting of cardboard 9 is in draw-in groove one, through setting up cardboard 9, utilizes the one end of cardboard 9 to carry out spacing support in draw-in groove one gliding effect to the position of extension board 8, avoids extension board 8 to break away from the cover frame when improving extension board 8 stability.
The lower surface mounting of curb plate 4 has L shaped plate 12, utilizes L shaped plate 12 to strengthen the support to the bottom of curb plate 4, improves the stability of curb plate 4, and the horizontal part of L shaped plate 12 and the side fixed connection of support 1 through setting up L shaped plate 12, utilize the effect that L shaped plate 12 shape is L shape, strengthen the support to curb plate 4, avoid curb plate 4 to receive the effect of cover frame 7 unstable phenomenon to appear, improve the stability of curb plate 4.
Two draw-in grooves have all been seted up to the front and back both sides face of the 15 inner walls of recess, utilize two pairs of fixture blocks 18 of draw-in groove to hold, make the stable card of fixture block 18 in draw-in groove two, be provided with fixture block 18 in the draw-in groove two, fixture block 18's one end with climb 2 fixed connection of frame, through setting up fixture block 18, utilize the effect of fixture block 18 in draw-in groove two, when making to climb frame 2 and remove recess 15 in, through fixture block 18 and the effect of draw-in groove two-phase fit, will climb 2 preliminary cards of frame in recess one, and then conveniently fix the position of climbing frame 2, make things convenient for the later stage to strengthen fixedly to climbing frame 2.
The working principle is as follows: the side surface of the bracket 1 is close to the concrete wall, then the first bolt 6 is rotated, one end of the first bolt 6 is screwed into the concrete wall, the bracket 1 is fixed, then the climbing frame 2 is placed in the first groove 15, when the climbing frame 2 moves into the first groove 15, the clamping block 18 is driven to move into the second clamping groove, then the extension board 8 is moved upwards, the extension board 8 drives the clamping board 9 to slide in the first clamping groove when moving upwards, when the top end of the extension plate 8 moves to the lower part of the support plate 17, the sleeve frame 7 is rotated to drive the extension plate 8 to rotate, the extension plate 8 approaches to the climbing frame 2, the extension plate 8 drives the sleeve frame 7 to incline gradually, the extension plate 8 extrudes the spring 10 and the telescopic rod 11 when approaching to the climbing frame 2 gradually, when the second fixing plate 13 is attached to the support plate 17, the second bolt 14 is rotated, and one end of the second bolt 14 is rotated into the threaded hole to fix the climbing frame 2, so that the operation can be performed.

Claims (4)

1. The high-stability attachment support for the building construction climbing frame is characterized by comprising a support (1) and a climbing frame (2), wherein two first fixing plates (5) are respectively arranged on the front side surface and the rear side surface of the support (1), a first groove (15) is formed in the right side surface of the support (1), and the climbing frame (2) is arranged in the first groove (15);
the mounting plate (3) is mounted on the front side face and the rear side face of the support (1), the mounting plate (3) is located between the two fixing plates I (5) on the same side, a side plate (4) is mounted on the mounting plate (3), a sleeve frame (7) is hinged to the side face of the side plate (4), an extension plate (8) is arranged in the sleeve frame (7), and a fixing assembly is arranged at the top end of the extension plate (8);
supporting plates (17) are arranged on the front side surface and the rear side surface of the climbing frame (2), and the extension plate (8) is detachably connected with the supporting plates (17) through a fixing component;
the fixing assembly comprises a second fixing plate (13) arranged on the upper surface of the extension plate (8), the second fixing plate (13) is obliquely arranged, a second bolt (14) is connected to the second fixing plate (13) in a threaded mode, and a threaded hole matched with the second bolt (14) is formed in the supporting plate (17);
still including setting up supporting component on cover frame (7), supporting component includes spring (10), two recess two (16) are all seted up to the front and back both sides face of support (1), two recess two (16) are about recess one (15) symmetry, spring (10) set up the side at recess two (16) inner wall, the other end of spring (10) is connected with cover frame (7), spring (10) slope is laid, be provided with telescopic link (11) in spring (10), telescopic link (11) articulate on the internal face of recess two (16), the telescopic shaft and the articulated connection of cover frame (7) of telescopic link (11).
2. The attachment support with high stability for the building construction climbing frame according to claim 1, wherein a first clamping groove is formed in each of the left side surface and the right side surface of the inner wall of the sleeve frame (7), clamping plates (9) are mounted on each of the left side surface and the right side surface of the extension plate (8), and one end of each clamping plate (9) is slidably mounted in the corresponding first clamping groove.
3. The attachment bracket for the construction creeper according to claim 1, wherein the lower surface of the side plate (4) is provided with an L-shaped plate (12), and the transverse portion of the L-shaped plate (12) is fixedly connected with the side surface of the bracket (1).
4. The attachment support with high stability for the building construction climbing frame according to claim 1, wherein the front side surface and the rear side surface of the inner wall of the first groove (15) are respectively provided with a second clamping groove, a clamping block (18) is arranged in each second clamping groove, and one end of each clamping block (18) is fixedly connected with the climbing frame (2).
CN202221322716.XU 2022-05-30 2022-05-30 High-stability attachment support for building construction climbing frame Active CN216840520U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221322716.XU CN216840520U (en) 2022-05-30 2022-05-30 High-stability attachment support for building construction climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221322716.XU CN216840520U (en) 2022-05-30 2022-05-30 High-stability attachment support for building construction climbing frame

Publications (1)

Publication Number Publication Date
CN216840520U true CN216840520U (en) 2022-06-28

Family

ID=82097573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221322716.XU Active CN216840520U (en) 2022-05-30 2022-05-30 High-stability attachment support for building construction climbing frame

Country Status (1)

Country Link
CN (1) CN216840520U (en)

Similar Documents

Publication Publication Date Title
CN111734014B (en) Installation and construction process of grc light partition board
CN216840520U (en) High-stability attachment support for building construction climbing frame
CN207110940U (en) A kind of outdoor substation insulating ladder with shoe
CN210289062U (en) Adjustable cushion block for climbing frame
CN219420177U (en) Cable support for electric power design
CN219316491U (en) Traditional building structure mortise and tenon joint reinforcing apparatus
CN210239225U (en) Interim steel construction stair that building engineering used
CN210421963U (en) Fine adjustment device for PC building wallboard
CN112962839B (en) Slope glass curtain wall
CN212533772U (en) Bridge is with pile foundation reinforcing apparatus convenient to installation
CN207920014U (en) A kind of flat grey device of ceramic tile
CN217439591U (en) Building curtain wall mounting structure
CN221030839U (en) Light steel joist for mounting building curtain wall
CN220645124U (en) Building engineering building climbing frame
CN218234468U (en) Vertical building prefab consolidates adjustment facility
CN220401354U (en) Tunnel wall cable installing support
CN216195820U (en) Curtain wall pillar connecting structure convenient to dock fast and fix
CN212897707U (en) Reinforcing apparatus of self-organizing wall for assembly type building
CN220100805U (en) Building construction strutting arrangement
CN220451471U (en) Support for assembly wall
CN218375512U (en) Steel structure reinforcing device
CN221196821U (en) Movable electromechanical installation supporting equipment for electromechanical engineering
CN114086707B (en) Outdoor intelligent building solar curtain wall
CN219931823U (en) Outdoor railing with adjustable
CN217151384U (en) A consolidate bearing structure for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant