CN220560034U - Construction engineering dust keeper - Google Patents

Construction engineering dust keeper Download PDF

Info

Publication number
CN220560034U
CN220560034U CN202321873719.7U CN202321873719U CN220560034U CN 220560034 U CN220560034 U CN 220560034U CN 202321873719 U CN202321873719 U CN 202321873719U CN 220560034 U CN220560034 U CN 220560034U
Authority
CN
China
Prior art keywords
construction engineering
movably sleeved
rod
fixed plate
engineering dust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321873719.7U
Other languages
Chinese (zh)
Inventor
张琨
苗擘
崔殿瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321873719.7U priority Critical patent/CN220560034U/en
Application granted granted Critical
Publication of CN220560034U publication Critical patent/CN220560034U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a construction engineering dustproof device, which relates to the technical field of construction engineering, and comprises: fixed plate, foundation pile, fixed mounting is in the downside of fixed plate still includes: the stand is fixedly arranged on the upper side of the fixed plate, the threaded rod is arranged on the inner wall of the stand through a bearing, the lifting block is sleeved on the outer surface of the threaded rod, the mounting cylinder is movably sleeved on the outer surface of the lifting block, the plug pin is movably sleeved in the mounting cylinder, one side of the plug pin is fixedly provided with the elastic piece, and the other end of the elastic piece is fixedly arranged on the outer surface of the mounting cylinder.

Description

Construction engineering dust keeper
Technical Field
The utility model relates to the technical field of construction engineering, in particular to a construction engineering dust-proof device.
Background
The construction engineering refers to the collective name of various buildings and engineering facilities which provide material technology foundation for human life and production, the construction engineering is an organized, purposeful and large-scale economic activity of human beings, the construction engineering can be divided into three types of construction engineering, civil engineering and electromechanical engineering according to natural attributes, the construction engineering is a fixed asset, the engineering project of combining production capacity or exerting engineering benefit is formed in the production process, and the construction engineering refers to the construction of new or original fixed asset.
In the prior art, for example, the Chinese patent number is: the utility model discloses a CN216324074U, which belongs to the technical field of building construction, and particularly relates to a construction engineering dustproof device, comprising a bottom plate, wherein a counter bore is formed in the inner side surface of the bottom plate, a ground pile is inserted into the inner side surface of the counter bore, a support frame is arranged on the upper end surface of the ground pile in a threaded manner, a pulley frame is welded on the upper end surface of the support frame, a supporting rope is slidably arranged on the outer surface of the pulley frame, and a dustproof component is sleeved on the outer surface of the supporting rope and comprises a curtain net, a cross beam and a sleeve. According to the utility model, the ground piles can be driven into the soil, compared with the existing dustproof device which only adopts the diagonal brace as a support, the arrangement of the ground piles ensures that the dustproof device is firmer after being installed, the sleeve and the cross beam are arranged, so that after the dustproof assembly is sleeved on the support cable, the edges of all curtain nets do not drop, the wind resistance of the whole dustproof assembly can be reduced, the cross beam prevents the middle part of the curtain net from sagging and bending, and is not easy to swing due to wind blowing, and the dustproof device is more stable.
However, the prior art has the following disadvantages when in use: the stability of equipment installation is strengthened through the ground stake to above-mentioned technique, and the sleeve pipe makes dustproof subassembly cover behind the supporting rope, and cooperation crossbeam adjustment curtain net edge and intermediate zone do not have to fall for above-mentioned technique has better stability, but the structure of above-mentioned technique is loaded down with trivial details, and has certain occupation of land space, leads to the space utilization of construction site usable area to reduce, and the while structure loaded down with trivial details is bulky, inconvenient transportation.
Disclosure of Invention
The utility model aims to solve the problems that in the prior art, although the stability of equipment installation is enhanced through a ground pile, and after a dustproof assembly is sleeved on a supporting rope through a sleeve, the edge and the middle area of a curtain net are adjusted by matching with a beam, so that the technology has better stability, but the technology has a complicated structure and certain occupied space, so that the space utilization rate of the usable area of a construction site is reduced, and meanwhile, the structure is complicated, the size is large, and the transportation is inconvenient.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: a construction engineering dust-proof device, comprising: fixed plate, foundation pile, fixed mounting is in the downside of fixed plate still includes:
the upright post is fixedly arranged on the upper side of the fixed plate, and a threaded rod is arranged on the inner wall of the upright post through a bearing;
the lifting block is sleeved on the outer surface of the threaded rod in a threaded manner, and an installation cylinder is movably sleeved on the outer surface of the lifting block;
the bolt is movably sleeved in the mounting cylinder, one side of the bolt is fixedly provided with an elastic piece, and the other end of the elastic piece is fixedly arranged on the outer surface of the mounting cylinder;
the motor is fixedly arranged on one side of the fixed plate, and the output end of the motor is fixedly arranged at one end of the threaded rod;
the connecting rod is movably sleeved in the mounting cylinder, and the outer surface of one end of the connecting rod is movably sleeved outside one end of the bolt.
Preferably, a connecting cylinder is fixedly arranged at the other end of the connecting rod, and a spring is fixedly arranged on the outer surface of the connecting cylinder.
Preferably, a limiting frame is fixedly arranged at the other end of the spring, and a splicing rod is movably sleeved in the connecting cylinder.
Preferably, both ends of the splicing rod are provided with limiting holes.
Preferably, the outer surface of the splicing rod is movably sleeved with a placing plate.
Preferably, one side of the placing plate is movably connected with dustproof sun-shading cloth.
Preferably, a plurality of connecting ropes are fixedly arranged on the outer surface of the dustproof sun-shading cloth.
Compared with the prior art, the utility model has the advantages and positive effects that,
1. when the foundation pile is used, foundation piles are buried after the ground is perforated in advance, the fixing plates are exposed out of the ground, after the foundation piles are distributed in a rectangular shape and are installed, the foundation piles are distributed at four corners of the rectangular shape, the fixing plates, the foundation piles and the stand columns are integrated, the occupied area is small, the structure is simplified, and the field utilization rate of construction engineering is improved.
2. In the utility model, when the dustproof sun-shading cloth is used, the motor is convenient to stop working after the dustproof sun-shading cloth is lifted to a certain height, the aim of lifting dustproof dust is fulfilled, a sun-shading area can be provided for workers, direct sun-shading is avoided, and meanwhile, the connecting rod, the placing plate, the splicing rod and the dustproof sun-shading cloth are independent individuals, so that the dustproof sun-shading cloth is small in volume, convenient to transport, convenient to install and detach, and beneficial to improving the working efficiency.
Drawings
Fig. 1 is a schematic perspective view of a construction engineering dust-proof device provided by the utility model;
fig. 2 is a schematic perspective view of a construction engineering dust-proof device provided by the utility model;
FIG. 3 is an enlarged view of the construction engineering dust-proof device at A in FIG. 2;
fig. 4 is an enlarged view of a position B of fig. 1 of the construction engineering dust-proof device provided by the utility model.
Legend description: 1. a fixing plate; 101. a motor; 2. a foundation pile; 3. a column; 301. a threaded rod; 302. a lifting block; 303. a mounting cylinder; 304. a plug pin; 305. an elastic member; 4. dustproof sun-shading cloth; 401. a connecting rope; 5. a connecting rod; 501. a connecting cylinder; 502. a limiting frame; 503. a spring; 6. placing a plate; 7. splicing the connecting rods; 701. and a limiting hole.
Detailed Description
In order that the above objects, features and advantages of the utility model will be more clearly understood, a further description of the utility model will be rendered by reference to the appended drawings and examples. It should be noted that, in the case of no conflict, the embodiments of the present application and the features in the embodiments may be combined with each other.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, however, the present utility model may be practiced otherwise than as described herein, and therefore the present utility model is not limited to the specific embodiments of the disclosure that follow.
Embodiment 1 as shown in fig. 1 to 4, the present utility model provides a construction engineering dust-proof device, comprising: fixed plate 1, foundation pile 2, fixed mounting still includes at the downside of fixed plate 1:
the upright post 3 is fixedly arranged on the upper side of the fixed plate 1, and a threaded rod 301 is arranged on the inner wall of the upright post 3 through a bearing;
the lifting block 302 is sleeved on the outer surface of the threaded rod 301 in a threaded manner, and an installation cylinder 303 is movably sleeved on the outer surface of the lifting block 302;
the bolt 304 is movably sleeved in the mounting cylinder 303, one side of the bolt 304 is fixedly provided with an elastic piece 305, and the other end of the elastic piece 305 is fixedly arranged on the outer surface of the mounting cylinder 303;
the motor 101 is fixedly arranged on one side of the fixed plate 1, and the output end of the motor 101 is fixedly arranged at one end of the threaded rod 301;
the connecting rod 5 is movably sleeved in the mounting cylinder 303, and the outer surface of one end of the connecting rod 5 is movably sleeved outside one end of the bolt 304.
In this embodiment, when in use, after ground is perforated in advance and is accomplished, pile foundation 2 is buried, fixed plate 1 exposes the ground, after a plurality of pile foundation 2 are in rectangular distribution and accomplish the installation, pile foundation 2 distributes and sets up in rectangular four corners department, fixed plate 1, pile foundation 2, stand 3 are as a whole, area is little and the structure is simplified, be favorable to improving the land utilization of construction engineering, lifting block 302 is in threaded rod 301 bottom, firstly pulling the bolt 304 on the installation section of thick bamboo 303 inserts connecting rod 5 in lifting block 302, then loosen the hand, under the effect of elastic component 305 bolt 304 resumes the normal position, carry out spacing to connecting rod 5, reinforcing installation's stability, there is connecting cylinder 501 at the pulling connecting rod 5 other end, after pulling spacing frame 502 on connecting cylinder 501, insert connecting rod 5 and do not have the one end of connecting cylinder 501, can install a plurality of connecting rods 5 in proper order according to the distance needs.
In embodiment 2, as shown in fig. 1-4, a connecting cylinder 501 is fixedly mounted at the other end of a connecting rod 5, a spring 503 is fixedly mounted on the outer surface of the connecting cylinder 501, a limiting frame 502 is fixedly mounted at the other end of the spring 503, a splicing rod 7 is movably sleeved in the connecting cylinder 501, limiting holes 701 are formed at both ends of the splicing rod 7, a placing plate 6 is movably sleeved on the outer surface of the splicing rod 7, a dustproof sun-shading cloth 4 is movably connected to one side of the placing plate 6, and a plurality of connecting ropes 401 are fixedly mounted on the outer surface of the dustproof sun-shading cloth 4.
In this embodiment, when using, when connecting rod 5 installation is accomplished, pulling spacer 502, install reinstallation splice rod 7 between two connecting cylinders 501, the one end of spacer 502 is moved to spacing hole 701 inside to spring 503 behind the loose hand, accomplish the installation of splice rod 7, place board 6 on the movable sleeve on parallel connecting rod 5 and splice rod 7 afterwards, the staff lays dustproof sun-shading cloth 4 on connecting rod 5, splice rod 7, place board 6 again, tie the connecting rope 401 of dustproof sun-shading cloth 4 on connecting rod 5, reinforcing dustproof sun-shading cloth 4's installation stability, all install and prepare the work to accomplish this moment, the staff is through controlling motor 101 simultaneous equidirectional work, drive the threaded rod 301 rotation of bearing installation in stand 3, be convenient for with dustproof sun-shading cloth 4 rise to the back of a take off the work of motor 101, be favorable to reach dustproof dust ascending purpose, can provide the sun-shading region for the staff simultaneously, avoid being directly shone by sunshine, simultaneously connecting rod 5, place board 6, splice rod 7, sun-shading cloth 4 all are independent individual, the volume is less convenient transportation, and convenient for dismantlement, work efficiency is favorable to improve.
Working principle: when in use, foundation piles 2 are buried after the ground is perforated in advance, fixing plate 1 is exposed out of the ground, after a plurality of foundation piles 2 are distributed in a rectangle, and after limit frames 502 on the connecting cylinders 501 are pulled, one ends of connecting rods 5 are not connected with the connecting cylinders 501, a plurality of connecting rods 5 can be sequentially installed according to the distance requirement, when in use, after the limit frames 502 are pulled, the connecting rods 7 are installed between the two connecting cylinders 501, a lifting block 302 is positioned at the bottom of a threaded rod 301, firstly, a plug 304 on a pull mounting cylinder 303 inserts the connecting rods 5 into the lifting block 302, then the plug 304 is loosened, the connecting rods 5 are restored to the original position under the action of an elastic piece 305, limit is carried out, the stability of installation is enhanced, the connecting rods 5 are inserted at one ends of the connecting rods 5, the connecting rods 5 are not connected with the connecting cylinders 501, the connecting rods 5 can be sequentially installed according to the distance requirement, when in use, after the connecting rods 5 are installed, the limit frames 502 are pulled, the connecting rods 7 are installed between the two connecting cylinders 501, one ends of the limit frames 502 are moved to the inside the limit holes 701 by a loose hand, the springs 503, the connecting rods 7 are installed, the connecting rods are installed in parallel with the connecting rods 7, the connecting rods are installed in the parallel with the connecting rods 6, the connecting rods are installed in the connecting rods 4, the direction of the connecting rods are matched shafts 4 are installed in the connecting rods, and the dustproof protection device is provided, and the dustproof protection device is prepared, and the dustproof protection is provided, and the dustproof protection is realized. Avoid being directly sunned by sunshine, connecting rod 5, place board 6, splice bar 7, dustproof sun-shading cloth 4 are all independent individual simultaneously, and the volume is less convenient transportation, and easy to assemble dismantles, is favorable to improving work efficiency.
The present utility model is not limited to the above-mentioned embodiments, and any equivalent embodiments which can be changed or modified by the technical content disclosed above can be applied to other fields, but any simple modification, equivalent changes and modification made to the above-mentioned embodiments according to the technical substance of the present utility model without departing from the technical content of the present utility model still belong to the protection scope of the technical solution of the present utility model.

Claims (7)

1. The utility model provides a construction engineering dust keeper, includes fixed plate (1), foundation pile (2) fixed mounting is in the downside of fixed plate (1), its characterized in that still includes:
the upright post (3) is fixedly arranged on the upper side of the fixed plate (1), and a threaded rod (301) is arranged on the inner wall of the upright post (3) through a bearing;
the lifting block (302) is sleeved on the outer surface of the threaded rod (301), and an installation cylinder (303) is movably sleeved on the outer surface of the lifting block (302);
the bolt (304) is movably sleeved in the mounting cylinder (303), one side of the bolt (304) is fixedly provided with an elastic piece (305), and the other end of the elastic piece (305) is fixedly arranged on the outer surface of the mounting cylinder (303);
the motor (101) is fixedly arranged on one side of the fixed plate (1), and the output end of the motor (101) is fixedly arranged at one end of the threaded rod (301);
the connecting rod (5) is movably sleeved in the mounting cylinder (303), and the outer surface of one end of the connecting rod (5) is movably sleeved outside one end of the bolt (304).
2. A construction engineering dust-proof device according to claim 1, wherein: the other end of the connecting rod (5) is fixedly provided with a connecting cylinder (501), and the outer surface of the connecting cylinder (501) is fixedly provided with a spring (503).
3. A construction engineering dust-proof device according to claim 2, characterized in that: the other end of the spring (503) is fixedly provided with a limiting frame (502), and the inside of the connecting cylinder (501) is movably sleeved with a splicing rod (7).
4. A construction engineering dust-proof device according to claim 3, wherein: limiting holes (701) are formed at two ends of the splicing rod (7).
5. The construction engineering dust-proof device according to claim 4, wherein: the outer surface of the splicing rod (7) is movably sleeved with a placement plate (6).
6. The construction engineering dust-proof device according to claim 5, wherein: one side of the placing plate (6) is movably connected with a dustproof sun-shading cloth (4).
7. The construction engineering dust-proof device according to claim 6, wherein: the outer surface of the dustproof sun-shading cloth (4) is fixedly provided with a plurality of connecting ropes (401).
CN202321873719.7U 2023-07-17 2023-07-17 Construction engineering dust keeper Active CN220560034U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321873719.7U CN220560034U (en) 2023-07-17 2023-07-17 Construction engineering dust keeper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321873719.7U CN220560034U (en) 2023-07-17 2023-07-17 Construction engineering dust keeper

Publications (1)

Publication Number Publication Date
CN220560034U true CN220560034U (en) 2024-03-08

Family

ID=90086892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321873719.7U Active CN220560034U (en) 2023-07-17 2023-07-17 Construction engineering dust keeper

Country Status (1)

Country Link
CN (1) CN220560034U (en)

Similar Documents

Publication Publication Date Title
CN220560034U (en) Construction engineering dust keeper
CN216553951U (en) Combined variable-size U-shaped steel frame for supporting roadway
CN2816171Y (en) Built-in section steel bar concrete composite concealed supprting shear wall
CN214336268U (en) Be suitable for building site with prefabricated pin-connected panel individual character combination advertisement device
CN208310404U (en) Unit type suspended moso bamboo ecological enclosing wall
CN213268314U (en) Truss structure and building structure
CN210561586U (en) Landscape plank road
CN211523222U (en) Thermal power plant confined space deep basal pit pond construction safety enclosure device
CN203393628U (en) Ground basket device
CN113175196A (en) Cable net construction platform
CN203225074U (en) Advertising board of net rack structure
CN203034914U (en) Demountable rail structure
CN205063021U (en) Simple and easy space of modular
CN221193353U (en) Foundation pit supporting device
CN218027513U (en) Hydraulic engineering is flood prevention stake supporting device for bank protection
CN114837060B (en) Safety temporary trestle structure for bridge construction engineering
CN203271193U (en) Large overhang stand with space structure
CN220621218U (en) Assembled building inter-column support
CN217759295U (en) Repeatedly-used alternate board room structure
CN219352557U (en) Simple net wall device for isolating diaphorina citri and supporting upright post thereof
CN211228550U (en) Ecological slope protection device
CN210636445U (en) Building supporting structure
CN210086244U (en) Stabilising arrangement for hydraulic engineering pile driver
CN214170161U (en) Fence for construction convenient to dismantle
CN219315744U (en) Supporting and reinforcing device for deep foundation pit construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant