CN220519764U - Cable pay-off for construction - Google Patents

Cable pay-off for construction Download PDF

Info

Publication number
CN220519764U
CN220519764U CN202322022314.9U CN202322022314U CN220519764U CN 220519764 U CN220519764 U CN 220519764U CN 202322022314 U CN202322022314 U CN 202322022314U CN 220519764 U CN220519764 U CN 220519764U
Authority
CN
China
Prior art keywords
fixedly connected
shell
motor
movable block
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322022314.9U
Other languages
Chinese (zh)
Inventor
卢世民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Xiangyuan Information Technology Co ltd
Original Assignee
Shanghai Xiangyuan Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Xiangyuan Information Technology Co ltd filed Critical Shanghai Xiangyuan Information Technology Co ltd
Priority to CN202322022314.9U priority Critical patent/CN220519764U/en
Application granted granted Critical
Publication of CN220519764U publication Critical patent/CN220519764U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

The utility model relates to the technical field of cable arrangement and discloses a cable paying-off device for building construction, which comprises a base, wherein the top of the base is fixedly connected with a shell, the inside of the shell is fixedly connected with a motor II, the output end of the motor II is fixedly connected with a screw rod, the periphery of the screw rod is in threaded connection with a movable block I, the outer side of the movable block I is fixedly connected with a shell, the right side of the shell is fixedly connected with a motor I, the output end of the motor I is fixedly connected with a bidirectional threaded rod, both ends of the bidirectional threaded rod are in threaded connection with a movable block II, the top of the movable block II is fixedly connected with a connecting rod, and one end of the connecting rod is fixedly connected with a push plate. According to the utility model, through the mutual matching of the structures such as the motor II and the screw rod, the structures such as the movable block I and the shell are driven to work, the up-and-down movement of the equipment is realized, the height of the equipment can be adjusted according to the installation position, and the installation of the equipment is more convenient.

Description

Cable pay-off for construction
Technical Field
The utility model relates to the technical field of cable arrangement, in particular to a cable paying-off device for building construction.
Background
The cable is a generic term of articles such as optical cables, cables and the like, has a plurality of uses, is mainly used for controlling multiple functions such as installation, connection equipment, power transmission and the like, is a common and indispensable article in daily life, and in building construction, the cable paying-off device is a tool for installing and arranging wires, cables or other similar cables.
The existing cable paying-off device is mainly of a fixed-in-place structure, a cable is required to be pulled to an installation position by manpower during paying-off, and the cable paying-off device for building construction is provided for solving the problem because the cable is excessively heavy and consumes large force in the pulling process.
Disclosure of Invention
In order to make up the defects, the utility model provides a cable paying-off device for building construction, and aims to solve the problem that a cable is required to be pulled manually in the prior art.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a cable pay-off for construction, includes the base, the top fixedly connected with casing of base, the inside fixedly connected with motor two of casing, the output fixedly connected with lead screw of motor two, the periphery threaded connection of lead screw has movable block one, the outside fixedly connected with shell of movable block one.
As a further description of the above technical solution:
the right side fixedly connected with motor one of shell, the output fixedly connected with two-way threaded rod of motor one, the equal threaded connection in both ends of two-way threaded rod has movable block two, the top fixedly connected with connecting rod of movable block two, the one end fixedly connected with push pedal of connecting rod.
As a further description of the above technical solution:
the bottom of base is provided with the universal wheel.
As a further description of the above technical solution:
the top of base fixedly connected with handle.
As a further description of the above technical solution:
the inside fixedly connected with bull stick of shell, the both ends of bull stick all rotate and are connected with the pulley.
As a further description of the above technical solution:
the top both sides of shell all sliding connection has the limiting plate, the outside fixedly connected with handle of limiting plate.
As a further description of the above technical solution:
the top sliding connection of shell has the pull rod, the bottom fixedly connected with fixture block of pull rod, the periphery cover of pull rod is equipped with the spring, the top fixed connection of fixture block is in the bottom of spring.
The utility model has the following beneficial effects:
1. according to the utility model, through the mutual matching of the structures such as the motor II and the screw rod, the structures such as the movable block I and the shell are driven to work, the up-and-down movement of the equipment is realized, the height of the equipment can be adjusted according to the installation position, and the installation of the equipment is more convenient.
2. According to the utility model, under the mutual coordination of the structures of the motor I, the bidirectional threaded rod and the like, the movable block II, the connecting rod and the push plate can be moved, so that the problem that a cable is easy to fall off from the lead groove in the traction process is solved.
Drawings
Fig. 1 is a schematic perspective view of a cable pay-off device for building construction according to the present utility model;
fig. 2 is a schematic structural view of a housing of a cable pay-off device for building construction according to the present utility model;
fig. 3 is a schematic structural diagram of a housing of a cable pay-off device for building construction according to the present utility model;
FIG. 4 is a schematic cross-sectional view of a housing of a cable pay-off device for construction according to the present utility model;
FIG. 5 is an enlarged view of FIG. 4 at A;
fig. 6 is a schematic structural view of a bidirectional threaded rod of a cable pay-off device for building construction.
Legend description:
1. a base; 2. a housing; 3. a housing; 4. a universal wheel; 5. a handle; 6. a limiting plate; 7. a handle; 8. a pulley; 9. a push plate; 10. a first motor; 11. a second motor; 12. a movable block I; 13. a screw rod; 14. a rotating rod; 15. a clamping block; 16. a spring; 17. a pull rod; 18. a connecting rod; 19. a two-way threaded rod; 20. and a second movable block.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-6, one embodiment provided by the present utility model is: the utility model provides a cable pay-off for construction, including base 1, the top fixedly connected with casing 2 of base 1, the inside fixedly connected with motor two 11 of casing 2, the output fixedly connected with lead screw 13 of motor two 11, the periphery threaded connection of lead screw 13 has movable block one 12, the outside fixedly connected with shell 3 of movable block one 12, motor two 11 drive lead screw 13 rotate, the movable block one 12 of lead screw 13 drive its periphery carries out the reciprocates, movable block one 12 drives and also carries out the reciprocates rather than fixed connection's shell 3, thereby realize the lift of equipment, when cable mounted position is higher, can start the lift and install the cable.
The right side fixedly connected with motor one 10 of shell 3, the output fixedly connected with two-way threaded rod 19 of motor one 10, the equal threaded connection in both ends of two-way threaded rod 19 has movable block two 20, the top fixedly connected with connecting rod 18 of movable block two 20, the one end fixedly connected with push pedal 9 of connecting rod 18, motor one 10 drives and rotates rather than the two-way threaded rod 19 of output fixedly connected with, two movable blocks two 20 are respectively at the both ends of two-way threaded rod 19, when two-way threaded rod 19 rotates, two movable blocks two 20 move to the centre of two-way threaded rod 19, the connecting rod 18 and the push pedal 9 that are connected with movable block two 20 also follow and move together, can block the cable in the wire groove, let the cable can not drop in the mounting process.
The bottom of base 1 is provided with universal wheel 4, and when needs long-range haulage cable, universal wheel 4 can make the more convenient removal of equipment to the mounted position.
The top fixedly connected with handle 5 of base 1, when needs universal wheel 4 remove equipment, handle 5 is fine impetus, can cooperate universal wheel 4 with the better removal of equipment.
The inside fixedly connected with bull stick 14 of shell 3, the both ends of bull stick 14 all rotate and are connected with pulley 8, and pulley 8 on the bull stick 14 reducible cable can make the haulage cable laborsaving more in the frictional force of lead wire inslot.
The top both sides of shell 3 all sliding connection has limiting plate 6, and limiting plate 6's outside fixedly connected with handle 7, and when equipment was in the cable middle section and the cable can not break away from equipment, accessible handle 7 pulled out limiting plate 6 from the top both sides of shell 3 to solve the problem that special circumstances cable can not break away from equipment.
The top sliding connection of shell 3 has pull rod 17, and the bottom fixedly connected with fixture block 15 of pull rod 17, and the periphery cover of pull rod 17 is equipped with spring 16, and the top fixed connection of fixture block 15 is in the bottom of spring 16, and when equipment is in the cable middle section and the cable can not break away from equipment, can pull rod 17 will block the fixture block 15 in limiting plate 6 and pull handle 7 will limiting plate 6 take out, can take out the cable from the lead wire inslot this moment.
Working principle: when the cable is laid on site, the cable is put into the wire guiding groove at the top of the shell 3 (two wire guiding grooves are arranged at the top of the shell 3, two wires can be simultaneously pulled), when the cable enters the wire guiding groove at the top, the motor I10 can be started, the motor I10 drives the bidirectional threaded rod 19 to rotate, at the moment, the movable block II 20 at the two ends of the bidirectional threaded rod can be pushed inwards by the connecting rod 18 and the push plate 9 connected with the top of the bidirectional threaded rod, the cable in the wire guiding groove is clamped so as to facilitate the pulling of the cable, the device is pulled to a position where the cable needs to be installed through the universal wheel 4 at the bottom of the base 1 and the handle 5 at the top of the base 1, when the height of the device is different from the installation position, the motor II 11 is started, the screw 13 can be driven to rotate by the motor II 11, and the movable block I12 fixedly connected with the shell 3 can be driven to move upwards, and the cable is installed after the movable block II moves to the installation position. When the equipment is in the middle section of the cable and the cable cannot be separated from the equipment, the clamping block 15 clamped in the limiting plate 6 can be pulled out by pulling the pull rod 17, the limiting plate 6 is taken out by pulling the pull handle 7, and the cable can be taken out from the lead groove.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (7)

1. The utility model provides a cable pay-off for construction, includes base (1), its characterized in that: the novel portable electric power tool is characterized in that the top of the base (1) is fixedly connected with the shell (2), the inside of the shell (2) is fixedly connected with the motor II (11), the output end of the motor II (11) is fixedly connected with the screw rod (13), the periphery of the screw rod (13) is in threaded connection with the movable block I (12), and the outer side of the movable block I (12) is fixedly connected with the shell (3).
2. The cable pay-off for building construction according to claim 1, wherein: the right side fixedly connected with motor one (10) of shell (3), the output fixedly connected with two-way threaded rod (19) of motor one (10), the equal threaded connection in both ends of two-way threaded rod (19) has movable block two (20), the top fixedly connected with connecting rod (18) of movable block two (20), the one end fixedly connected with push pedal (9) of connecting rod (18).
3. The cable pay-off for building construction according to claim 1, wherein: the bottom of the base (1) is provided with universal wheels (4).
4. The cable pay-off for building construction according to claim 1, wherein: the top of the base (1) is fixedly connected with a handle (5).
5. The cable pay-off for building construction according to claim 1, wherein: the inside fixedly connected with bull stick (14) of shell (3), the both ends of bull stick (14) all rotate and are connected with pulley (8).
6. The cable pay-off for building construction according to claim 1, wherein: both sides of the top of the shell (3) are slidably connected with limiting plates (6), and the outer sides of the limiting plates (6) are fixedly connected with handles (7).
7. The cable pay-off for building construction according to claim 1, wherein: the top sliding connection of shell (3) has pull rod (17), the bottom fixedly connected with fixture block (15) of pull rod (17), the periphery cover of pull rod (17) is equipped with spring (16), the top fixed connection of fixture block (15) is in the bottom of spring (16).
CN202322022314.9U 2023-07-31 2023-07-31 Cable pay-off for construction Active CN220519764U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322022314.9U CN220519764U (en) 2023-07-31 2023-07-31 Cable pay-off for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322022314.9U CN220519764U (en) 2023-07-31 2023-07-31 Cable pay-off for construction

Publications (1)

Publication Number Publication Date
CN220519764U true CN220519764U (en) 2024-02-23

Family

ID=89939476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322022314.9U Active CN220519764U (en) 2023-07-31 2023-07-31 Cable pay-off for construction

Country Status (1)

Country Link
CN (1) CN220519764U (en)

Similar Documents

Publication Publication Date Title
CN210763739U (en) Cable rack for construction of electric automation engineering
CN220519764U (en) Cable pay-off for construction
CN219173921U (en) Cable laying device with cable protect function for highway construction
CN2512986Y (en) Road lamp capable of conveniently changing lamp tube
CN2638303Y (en) Mine cable towing device
CN208367283U (en) A kind of electric power communication optical cable fixed clamping device
CN217126506U (en) A novel cabling machine for wire and cable processing
CN214270007U (en) Power transmission and transformation line construction hoisting device
CN111049057B (en) Equipment for fixing roof cable
CN211812507U (en) Detachable unwinding device for coating machine
CN210084633U (en) Cable cuts dish line integrated device
CN210393166U (en) Paying-off device
CN219351116U (en) High-speed construction auxiliary device is striden to wire overhead
CN219918208U (en) Cable traction device
CN211126813U (en) Wire drawing device for power cable
CN103264924B (en) Cable discharging rack
CN213568943U (en) Portable pay-off reel for electric power construction
CN219018305U (en) Cable erection vehicle
CN218371447U (en) Intelligent control single-point crane
CN216360365U (en) Automatic rope arranging device for coal mine winch
CN211958575U (en) Traction device for electric power construction
CN218341984U (en) Auxiliary device for industrial robot installation
CN215934318U (en) Threading construction device for building electrical engineering
CN213864722U (en) Stringing construction device for installing intelligent power equipment
CN213753794U (en) Laborsaving cable pulls auxiliary device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant