CN220486729U - Fast-assembling formula building steel construction - Google Patents
Fast-assembling formula building steel construction Download PDFInfo
- Publication number
- CN220486729U CN220486729U CN202321946459.1U CN202321946459U CN220486729U CN 220486729 U CN220486729 U CN 220486729U CN 202321946459 U CN202321946459 U CN 202321946459U CN 220486729 U CN220486729 U CN 220486729U
- Authority
- CN
- China
- Prior art keywords
- groups
- fixing
- wall
- fixed
- shaped steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 73
- 239000010959 steel Substances 0.000 title claims abstract description 73
- 238000010276 construction Methods 0.000 title claims description 12
- 230000000694 effects Effects 0.000 description 6
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to the technical field of building steel, in particular to a quick-assembly type building steel structure, which comprises a fixing body, wherein a first supporting plate is arranged at the lower end of the fixing body, a fixing opening is formed in the inner wall of the fixing body, a first H-shaped steel body is connected to the inner wall of the fixing opening through first bolts in a threaded manner.
Description
Technical Field
The utility model relates to the technical field, in particular to a quick-assembled building steel structure.
Background
The steel structure is mainly composed of steel materials, is one of main building structure types, is mainly composed of steel beams, steel columns, steel separation frames and other components made of section steel, steel plates and the like, is too complex, and is time-consuming and labor-consuming, so that working efficiency is affected, inconvenience is brought to workers, and therefore the quick-assembly building steel structure is needed to improve the problems.
Disclosure of Invention
The utility model aims to provide a quick-assembled building steel structure so as to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a fast-assembling formula building steel construction, includes the fixed body, first backup pad is installed to the lower extreme of fixed body, the fixed mouth has been seted up on the inner wall of fixed body, the plug is connected with first worker shaped steel body on the inner wall of fixed mouth, first fixed orifices has been seted up on one side of first worker shaped steel body and the inner wall that is located the fixed mouth, threaded connection has first bolt on the inner wall of first fixed orifices, the second bolt is installed to the one end of first worker shaped steel body, threaded connection has concave type fixed plate and first mount in proper order on the outer wall of second bolt, the second backup pad is installed to the lower extreme of first mount, install single face fixed plate on the outer wall of first mount, through third bolt threaded connection on the inner wall of concave type fixed plate, the fourth screw thread is installed to the one end of second worker shaped steel body, L type fixed plate and second mount have in proper order threaded connection, the third backup pad is installed to the lower extreme of second mount.
As a preferable scheme of the utility model, the first I-shaped steel body is connected with the upper threads on the outer wall of the first bolt, a plurality of groups of first bolts are arranged and are respectively connected with the first I-shaped steel body in a threaded mode, and a plurality of groups of first fixing holes are respectively formed in the inner wall of the fixing opening.
As a preferable scheme of the utility model, the second bolts are provided with a plurality of groups and are respectively positioned at one end of the first I-shaped steel body, and the fourth bolts are provided with a plurality of groups and are respectively connected with the L-shaped fixing plate and the second fixing frame in a threaded manner.
As a preferable scheme of the utility model, the second supporting plate is provided with two groups which are respectively positioned at the lower end of the first fixing frame, the third bolts are provided with a plurality of groups which are respectively connected with the second I-shaped steel body in a threaded manner, and the fixing openings are provided with a plurality of groups which are respectively arranged on the inner wall of the fixing body.
As a preferable scheme of the utility model, the first I-shaped steel body is provided with a plurality of groups and is connected with the fixed port in a plug-in mode, and the second I-shaped steel body is provided with a plurality of groups and is connected with the third bolt in a threaded mode.
As a preferable scheme of the utility model, the L-shaped fixing plate is provided with two groups and is in threaded connection with the fourth bolt respectively, and the concave fixing plate is provided with a plurality of groups and is in threaded connection with the second bolt respectively.
As a preferable scheme of the utility model, the first fixing frame is provided with two groups of fixing plates which are respectively connected with the concave fixing plates in a threaded manner, and the single-sided fixing plates are provided with a plurality of groups and are respectively positioned on the outer wall of the first fixing frame.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, through the concave fixing plate, the L-shaped fixing plate, the fixing body, the first fixing frame and the second fixing frame in the quick-assembly building steel structure, and by utilizing the concave fixing plate, the L-shaped fixing plate and the fixing body, a worker firstly fixes the fixing body, then inserts the first I-shaped steel body into the fixing opening, then fixes by utilizing the first bolt, then sequentially fixes the concave fixing plate and the first fixing frame by utilizing the second bolt, then fixes the second I-shaped steel body and the concave fixing plate by utilizing the third bolt, and then fixes the L-shaped fixing plate and the second fixing frame by utilizing the fourth bolt, thereby being beneficial to solving the problems that the existing building steel structure is too complicated, a large amount of labor and time are consumed in the assembly process by the worker, the time and the labor are consumed, the working efficiency is affected, and inconvenience is brought to the worker.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of a partial structure of the present utility model;
FIG. 3 is a schematic view of the structure of the fixing block of the present utility model.
In the figure: 1. a fixed body; 2. a first support plate; 3. a fixed port; 4. a first I-shaped steel body; 5. a first fixing hole; 6. a first bolt; 7. a second bolt; 8. a concave fixing plate; 9. a first fixing frame; 10. a second support plate; 11. a single-sided fixing plate; 12. a third bolt; 13. a second I-shaped steel body; 14. a fourth bolt; 15. an L-shaped fixing plate; 16. the second fixing frame; 17. and a third support plate.
Description of the embodiments
The technical solutions of the embodiments of the present utility model will be clearly and completely described below in conjunction with the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, but not all embodiments, and all other embodiments obtained by those skilled in the art without making any inventive effort based on the embodiments of the present utility model are within the scope of protection of the present utility model.
In order that the utility model may be readily understood, several embodiments of the utility model will be described more fully hereinafter with reference to the accompanying drawings, in which, however, the utility model may be embodied in many different forms and is not limited to the embodiments described herein, but instead is provided for the purpose of providing a more thorough and complete disclosure of the utility model.
It will be understood that when an element is referred to as being "mounted" on another element, it can be directly on the other element or intervening elements may also be present, and when an element is referred to as being "connected" to the other element, it may be directly connected to the other element or intervening elements may also be present, the terms "vertical", "horizontal", "left", "right" and the like are used herein for the purpose of illustration only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this utility model belongs, and the terms used herein in this description of the utility model are for the purpose of describing particular embodiments only and are not intended to be limiting of the utility model, with the term "and/or" as used herein including any and all combinations of one or more of the associated listed items.
Referring to fig. 1-3, the present utility model provides a technical solution:
the utility model provides a fast-assembling formula building steel construction, including fixed body 1, first backup pad 2 is installed to the lower extreme of fixed body 1, fixed port 3 has been seted up on the inner wall of fixed body 1, the plug is connected with first worker's shaped steel body 4 on the inner wall of fixed port 3, first fixed orifices 5 have been seted up on one side of first worker's shaped steel body 4 and the inner wall that is located fixed port 3, threaded connection has first bolt 6 on the inner wall of first fixed orifices 5, second bolt 7 is installed to the one end of first worker's shaped steel body 4, threaded connection has concave fixed plate 8 and first mount 9 in proper order on the outer wall of second bolt 7, second backup pad 10 is installed to the lower extreme of first mount 9, install single face fixed plate 11 on the outer wall of first mount 9, through third bolt 12 line connection second worker's shaped steel body 13 on the inner wall of concave fixed plate 8, fourth screw thread 14 is installed to the one end of second worker's shaped steel body 13, L type fixed plate 15 and second mount 16 are installed to the one end of fourth screw thread connection in proper order, third backup pad 17 is installed to the lower extreme of second mount 16.
Further, the first I-shaped steel body 4 is connected on the outer wall of the first bolt screw 6 in a threaded manner, the first bolt 6 is provided with a plurality of groups and is respectively connected with the first I-shaped steel body 4, the first fixing hole 5 is provided with a plurality of groups and is respectively arranged on the inner wall of the fixing opening 3, the second bolt 7 is provided with a plurality of groups and is respectively positioned at one end of the first I-shaped steel body 4, the fourth bolt 14 is provided with a plurality of groups and is respectively connected with the L-shaped fixing plate 15 and the second fixing frame 16 in a threaded manner, the second supporting plate 10 is provided with two groups and is respectively positioned at the lower end of the first fixing frame 9, the third bolt 12 is provided with a plurality of groups and is respectively connected with the second I-shaped steel body 13 in a threaded manner, the fixing opening 3 is provided with a plurality of groups and is respectively arranged on the inner wall of the fixing body 1, the first I-shaped steel body 4 is provided with a plurality of groups and is connected with the connection mode of the fixed port 3 in a plugging manner, the second I-shaped steel body 13 is provided with a plurality of groups and is connected with the connection mode of the third bolt 12 in a threaded manner, the L-shaped fixed plate 15 is provided with two groups and is connected with the fourth bolt in a threaded manner, the fixing effect is achieved, the concave fixed plate 8 is provided with a plurality of groups and is connected with the second bolt 7 in a threaded manner, the fixing effect is achieved, the first fixed frame 9 is provided with two groups and is connected with the concave fixed plate 8 in a threaded manner, and the single-sided fixed plate 11 is provided with a plurality of groups and is positioned on the outer wall of the first fixed frame 9 respectively, and the assembling and fixing effects are achieved.
The working flow of the utility model is as follows: through the fast-assembling building steel construction during operation who uses this scheme design, fix the fixed body 1 earlier at the staff, connect gradually first worker's shaped steel body 4 through the plug on the inner wall of fixed orifices 3, one side of first worker's shaped steel body 4 and be located and offer first fixed orifices 5 on the inner wall of fixed orifices 3, threaded connection has first bolt 6 on the inner wall of first fixed orifices 5, the line is connected with under the effect of first worker's shaped steel body 4 on the outer wall of first bolt spiral shell 6, the staff again with first worker's shaped steel body 4 intubate fixed orifices 3 departments, reuse first bolt 6 fixes, install second bolt 7 through the one end of first worker's shaped steel body 4, threaded connection has concave type fixed plate 8 and first mount 9 in proper order on the outer wall of second bolt 7 under the effect of second worker's shaped steel body 8 and first mount 9, through the effect of third bolt 12 line connection second worker's shaped steel body 13 on the inner wall of concave type fixed plate 8, the staff reuse third worker carries out second worker's shaped steel body 12 and second worker's shaped plate and second worker's fixed plate 16, thereby the fixed effort is consumed in order at the fixed effort of the fixed plate of second worker's L15, the fixed effort is realized through the first bolt 15, the fixed effort is realized to the fixed plate is realized through the first worker's L-shaped steel body 15, the fixed effort is realized through the second worker's L15, the fixed effort is realized through the second bolt 15, the fixed plate is realized through the second bolt 15, the work line is realized through the work line is convenient, and the work is convenient and is convenient to be used.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a fast-assembling formula building steel construction, includes the fixed body (1), its characterized in that: the utility model discloses a fixing device for a steel cable, including fixed body (1) and fixed support plate (1), first backup pad (2) are installed to the lower extreme of fixed body (1), fixed port (3) have been seted up on the inner wall of fixed body (1), plug is connected with first worker shaped steel body (4) on the inner wall of fixed port (3), first fixed orifices (5) have been seted up on one side of first worker shaped steel body (4) and are located the inner wall of fixed port (3), threaded connection has first bolt (6) on the inner wall of first fixed orifices (5), second bolt (7) are installed to the one end of first worker shaped steel body (4), threaded connection has concave fixed plate (8) and first mount (9) in proper order on the outer wall of second bolt (7), second backup pad (10) are installed to the lower extreme of first mount (9), install single face fixed plate (11) on the outer wall of first mount (9), through third bolt (12) threaded connection has second worker shaped steel body (13) on the inner wall of concave fixed plate (8), second worker shaped steel body (16) have first end (16) threaded connection of second mount (16).
2. A ready-to-assemble construction steel structure according to claim 1, characterized in that: the outer wall of the first bolt (6) is in threaded connection with a first I-shaped steel body (4), the first bolt (6) is provided with a plurality of groups and is in threaded connection with the first I-shaped steel body (4) respectively, and the first fixing hole (5) is provided with a plurality of groups and is respectively arranged on the inner wall of the fixing opening (3).
3. A ready-to-assemble construction steel structure according to claim 1, characterized in that: the second bolts (7) are provided with a plurality of groups and are respectively positioned at one end of the first I-shaped steel body (4), and the fourth bolts (14) are provided with a plurality of groups and are respectively in threaded connection with the L-shaped fixing plate (15) and the second fixing frame (16).
4. A ready-to-assemble construction steel structure according to claim 1, characterized in that: the second support plate (10) is provided with two groups and is respectively located at the lower end of the first fixing frame (9), the third bolts (12) are provided with a plurality of groups and are respectively connected with the second I-shaped steel body (13) in a threaded mode, and the fixing ports (3) are provided with a plurality of groups and are respectively arranged on the inner wall of the fixing body (1).
5. A ready-to-assemble construction steel structure according to claim 1, characterized in that: the first I-shaped steel body (4) is provided with a plurality of groups and is connected with the fixed port (3) in a plug-in mode, and the second I-shaped steel body (13) is provided with a plurality of groups and is connected with the third bolt (12) in a threaded mode.
6. A ready-to-assemble construction steel structure according to claim 1, characterized in that: the L-shaped fixing plates (15) are provided with two groups and are in threaded connection with the fourth bolts respectively, and the concave fixing plates (8) are provided with a plurality of groups and are in threaded connection with the second bolts (7) respectively.
7. A ready-to-assemble construction steel structure according to claim 1, characterized in that: the first fixing frames (9) are provided with two groups and are respectively in threaded connection with the concave fixing plates (8), and the single-sided fixing plates (11) are provided with a plurality of groups and are respectively positioned on the outer walls of the first fixing frames (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321946459.1U CN220486729U (en) | 2023-07-24 | 2023-07-24 | Fast-assembling formula building steel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321946459.1U CN220486729U (en) | 2023-07-24 | 2023-07-24 | Fast-assembling formula building steel construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220486729U true CN220486729U (en) | 2024-02-13 |
Family
ID=89842071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321946459.1U Active CN220486729U (en) | 2023-07-24 | 2023-07-24 | Fast-assembling formula building steel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220486729U (en) |
-
2023
- 2023-07-24 CN CN202321946459.1U patent/CN220486729U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220486729U (en) | Fast-assembling formula building steel construction | |
CN111794167B (en) | Based on construction is with spraying dust fall heat sink | |
CN211622189U (en) | Assemble anti-drop's outer wall curtain structure | |
CN203271096U (en) | Operating platform | |
CN214246247U (en) | Stone curtain wall system without cross beam | |
CN209704006U (en) | A kind of wall reinforcement device | |
CN213952650U (en) | High strength assembled curtain wall construction | |
CN214659210U (en) | Prefabricated assembled assembly type water pool | |
CN209874657U (en) | Keep off with keeping apart to construction | |
CN206726674U (en) | A kind of LED display fixed frame for being easy to assembling | |
CN221095532U (en) | Splicing structure of aluminum plate curtain wall | |
CN207609099U (en) | A kind of bolt sphere connection envelope eaves supportive structure system | |
CN213508956U (en) | Steel house assembling connecting part | |
CN220848900U (en) | Building engineering safety protection net | |
CN215670079U (en) | Assembled special-shaped column-beam full-bolt connection node | |
CN212176597U (en) | Dismantle convenient cloth machine construction platform for concrete placement | |
CN206625227U (en) | A kind of hydraulic engineering construction formwork | |
CN216930482U (en) | Wire drawing-free threading blind plate for cabinet | |
CN218178627U (en) | Water pipe monitoring device based on building automation | |
CN211448768U (en) | Gas outage appearance convenient to installation | |
CN219526313U (en) | Building site effluent water circulating device | |
CN220825261U (en) | Online cleaning device for oxidation pipe network | |
CN219604881U (en) | Combined civil engineering construction template | |
CN208977141U (en) | A kind of modularization welded steel structure | |
CN220953823U (en) | Building energy-saving component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |