CN220486460U - Novel concrete pouring device - Google Patents

Novel concrete pouring device Download PDF

Info

Publication number
CN220486460U
CN220486460U CN202321712917.5U CN202321712917U CN220486460U CN 220486460 U CN220486460 U CN 220486460U CN 202321712917 U CN202321712917 U CN 202321712917U CN 220486460 U CN220486460 U CN 220486460U
Authority
CN
China
Prior art keywords
hopper
connecting rod
plate
supporting legs
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321712917.5U
Other languages
Chinese (zh)
Inventor
刘新雨
周成贤
赵敏
赵鹏
罗帅
李尚义
包泽龙
刘银霞
段雪胶
甘炎波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN202321712917.5U priority Critical patent/CN220486460U/en
Application granted granted Critical
Publication of CN220486460U publication Critical patent/CN220486460U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a novel concrete pouring device which comprises a leakage hopper, a connecting rod, a hanging ring, a hanging frame and a clamping box, wherein the connecting rod is fixedly arranged on the side surface of the leakage hopper, the hanging ring is arranged at the upper end of the connecting rod, the hanging frame is fixedly connected with the lower end of the connecting rod, the clamping box is fixedly arranged on the inner side surface of the hanging frame, the mounting seat is fixedly arranged on the lower surface of the hanging frame, a sliding sealing plate is arranged on the inner side surface of a discharge hole, a sealing rod is fixedly connected with the outer side surface of the sealing plate, and a limiting plate is fixedly arranged on the outer surface of one end of the sealing rod. This novel concreting device, it is hung through the hoist with leaking the hopper when pouring, utilizes in leaking the hopper concrete to pour into perpendicularly downwards in the steel reinforcement cage and cooperates the mode that the workman supported the gallows, reduces the lateral impact of concrete transfer tube to the steel reinforcement cage in the traditional concrete pouring method, reduces the possibility of pile foundation skew.

Description

Novel concrete pouring device
Technical Field
The utility model relates to the technical field of building construction, in particular to a novel concrete pouring device.
Background
The solar photovoltaic power generation technology is the renewable energy power generation technology with the most sustainable development ideal characteristics, whether an independent power generation system or a grid-connected power generation system is adopted, the main component of the renewable energy power generation technology is infrastructure construction, the foundation construction of a photovoltaic support is one of the keys of photovoltaic power generation, the quality of the foundation stability plays a vital role in the whole system, the working face of the photovoltaic support construction is often located in mountain areas, the working difficulty is high, the holes of a filling pile foundation are designed to be deep, the photovoltaic power generation general filling pile foundation is the greatest, the perpendicularity of the filling pile foundation is the most important, the foundation position of a pile foundation is very important for the stability of the whole pile foundation and support installation, but the traditional manual operation pouring can cause the influence of slow construction progress and the like due to the instability of pouring, the pile foundation pouring foundation is very easy to cause the deviation of the pile foundation pouring in the later operation process, the phenomenon that the installation is not in place in the support installation operation is caused, the manual re-pouring is required, the reworking is caused, and the construction progress is greatly influenced.
Disclosure of Invention
The utility model aims to provide a novel concrete pouring device for solving the problem of pile foundation deviation caused by unstable pouring mode in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a novel concrete placement device, includes hourglass hopper, connecting rod, rings, gallows and joint box, the side fixed surface of hourglass hopper is provided with the connecting rod, rings are installed to the upper end of connecting rod, and the lower extreme fixedly connected with gallows of connecting rod, the inboard fixed surface of gallows is provided with the joint box, the lower fixed surface of gallows is provided with the mount pad, and the inboard surface mounting of mount pad has pivoted slide bar to the one end of slide bar is connected with gliding supporting legs, the fixed discharge gate that is provided with of lower extreme of hourglass hopper, and the surface mounting of discharge gate has gliding go-between, go-between's last fixed surface is provided with the connecting plate, and go-between's lower fixed surface is connected with spacing seat, the inboard surface mounting of discharge gate has gliding closure plate, and the outside fixed surface of closure plate is connected with the closure bar, the one end fixed surface of closure bar is provided with the limiting plate.
Preferably, the lower surface of the clamping box is provided with a groove, and the shape of the groove on the lower surface of the clamping box is the same as the shape of one end of the supporting leg, which faces the hopper.
By adopting the technical scheme, the supporting legs can stably support the hanging frame and the leakage hopper through the clamping of the grooves on the lower surface of the clamping box.
Preferably, a spring is connected between one end of the sliding rod positioned inside the supporting leg and the supporting leg, one end of the supporting leg facing the hopper is of a right trapezoid design, and an inclined plane of one end of the right trapezoid of the supporting leg is attached to one end of the connecting plate.
By adopting the technical scheme, the supporting legs can push the connecting plate and the discharging ring to slide downwards in a way of extruding the connecting plate through the inclined plane.
Preferably, the connecting plates are uniformly distributed on the upper surface of the discharging ring, the connecting plates and the supporting legs are arranged in one-to-one correspondence, and springs are connected between the connecting plates and the hopper.
By adopting the technical scheme, the connecting plate can drive the discharge ring to slide upwards and reset when no stress is applied.
Preferably, the upper surface of the limiting seat is provided with a groove, the width of the groove on the upper surface of the limiting seat is larger than the diameter of the closing rod, and the width of the groove on the upper surface of the limiting seat is smaller than the diameter of the limiting plate.
By adopting the technical scheme, the limiting seat can block the movement of the limiting plate through the clamping groove and the clamping of the sealing rod.
Preferably, a spring is connected between the sealing plate and the discharge hole, the lower surface of one end of the sealing plate, facing the middle of the discharge hole, is designed as an inclined plane, and the side surfaces of the adjacent sealing plates are mutually attached.
By adopting the technical scheme, the sealing plates can be mutually attached to realize sealing of the discharge port.
Compared with the prior art, the utility model has the beneficial effects that: this novel concrete placement device:
1. during pouring, the leakage hopper is lifted by a crane, and concrete in the leakage hopper is vertically and downwards poured into the steel reinforcement cage to be matched with a worker to support the hanging bracket, so that the lateral impact of a concrete conveying pipe on the steel reinforcement cage in the traditional concrete pouring method is reduced, and the possibility of foundation deviation of a pile foundation is reduced;
2. in the pouring process, the supporting legs slide outwards and rotate, so that one end of the right trapezoid of the supporting legs can be opposite to the clamping box, the inclined supporting legs slide upwards to be clamped with the grooves of the clamping box to form supporting protection for the hanging frame, the hanging chain is prevented from being broken suddenly when the hopper is hoisted, and the hopper can be stably supported on the ground when falling down, so that a person injury event is avoided;
3. through must slide and rotate the mode that the supporting legs made the supporting legs to reset when pouring the completion reinforced, utilize the supporting legs to extrude the mode of connecting plate at the in-process that resets to the closure board unblock for the closure board can slide under the support of spring and seal the discharge gate, avoids the workman to forget to seal the discharge gate and leads to leaking the problem emergence of material when leading to the reinforced to leaking the hopper again.
Drawings
FIG. 1 is a schematic view of the overall three-dimensional structure of the present utility model;
FIG. 2 is a schematic diagram of a connection three-dimensional structure of a discharge hole and a discharge ring of the utility model;
FIG. 3 is a schematic view of a cut-away perspective structure of a connection between a discharge port and a closing plate according to the present utility model;
FIG. 4 is an enlarged schematic view of the structure of FIG. 2A according to the present utility model;
FIG. 5 is a perspective view of the overall operation state of the present utility model;
fig. 6 is a schematic view of a connection structure between a clamping box and a supporting leg according to the present utility model.
In the figure: 1. a hopper; 2. a connecting rod; 3. a hanging ring; 4. a hanging bracket; 5. a clamping box; 6. a mounting base; 7. a slide bar; 8. supporting feet; 9. a discharge port; 10. a discharge ring; 11. a connecting plate; 12. a limit seat; 13. a closing plate; 14. a closing rod; 15. and a limiting plate.
Description of the embodiments
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-6, the present utility model provides a technical solution: the novel concrete pouring device comprises a leakage hopper 1, a connecting rod 2, a lifting ring 3, a hanging bracket 4, a clamping box 5, a mounting seat 6, a sliding rod 7, supporting feet 8, a discharge hole 9, a discharge ring 10, a connecting plate 11, a limiting seat 12, a sealing plate 13, a sealing rod 14 and a limiting plate 15, wherein the side surface of the leakage hopper 1 is fixedly provided with the connecting rod 2, the lifting ring 3 is installed at the upper end of the connecting rod 2, the lower end of the connecting rod 2 is fixedly connected with the hanging bracket 4, the inner side surface of the hanging bracket 4 is fixedly provided with the clamping box 5, the lower surface of the hanging bracket 4 is fixedly provided with the mounting seat 6, the inner side surface of the mounting seat 6 is provided with a rotating sliding rod 7, one end of the sliding rod 7 is connected with a sliding supporting foot 8, the lower surface of the clamping box 5 is provided with a groove, the shape of the groove of the lower surface of the clamping box 5 is the same as the shape of one end of the supporting feet 8 facing the leakage hopper 1, the slide bar 7 is connected with a spring between one end of the inside of the support leg 8 and the support leg 8, one end of the support leg 8 facing the leakage hopper 1 is of a right trapezoid design, the inclined plane of one end of the right trapezoid of the support leg 8 is attached to one end of the connecting plate 11, before concrete is poured into the leakage hopper 1, the leakage hopper 1 is stably placed on the ground through the support leg 8, along with the completion of concrete, a connecting chain passes through the hanging ring 3 to be connected with lifting equipment, the lifting equipment lifts the leakage hopper 1 and the side surface of the leakage hopper 1 through the hanging frame 4 connected with the connecting rod 2 by the connecting chain and the hanging ring 3, a worker keeps the stability of the leakage hopper 1 through the auxiliary hanging frame 4, then the support leg 8 transversely slides and rotates after sliding relative to the mounting seat 6 by the slide bar 7, one end of the right trapezoid of the support leg 8 is inserted into the groove of the clamping box 5, so as to prevent the hopper 1 from falling and falling down during the lifting process.
The lower end of the hopper 1 is fixedly provided with a discharge hole 9, the outer surface of the discharge hole 9 is provided with a sliding discharge ring 10, the upper surface of the discharge ring 10 is fixedly provided with a connecting plate 11, the lower surface of the discharge ring 10 is fixedly connected with a limit seat 12, the inner side surface of the discharge hole 9 is provided with a sliding closing plate 13, the outer side surface of the closing plate 13 is fixedly connected with a closing rod 14, one end outer surface of the closing rod 14 is fixedly provided with a limit plate 15, the connecting plate 11 is uniformly distributed on the upper surface of the discharge ring 10, the connecting plate 11 and the supporting legs 8 are arranged in a one-to-one correspondence manner, a spring is connected between the connecting plate 11 and the hopper 1, the upper surface of the limit seat 12 is provided with a groove, the width of the groove on the upper surface of the limit seat 12 is larger than the diameter of the closing rod 14, the width of the groove on the upper surface of the limit seat 12 is smaller than the diameter of the limit plate 15, a spring is connected between the closing plate 13 and the discharge hole 9, and the lower surface of one end of the closing plate 13 facing the middle of the discharge hole 9 is designed as an inclined plane, and the side surfaces of the adjacent closing plates 13 are mutually attached, when in pouring, the discharge ring 10 is slid down at this time, the limit seat 12 is driven by the discharge ring 10 to slide downwards to release the limit of the limit plate 15, then the limit plate 15 is slid so that the closing rod 14 drives the closing plate 13 to slide outwards to the discharge hole 9, the concrete leaks downwards from the inner opening of the discharge hole 9 to pour, then the discharge ring 10 is released, the discharge ring 10 slides upwards under the pulling of the spring between the connecting plate 11 and the hopper 1, at this time, the limit seat 12 is blocked by the closing rod 14 through the groove on the upper surface, the limit plate 15 cannot move during pouring, the closing plate 13 can always keep an open state, when the concrete is required to be supplemented after pouring, the downward sliding supporting feet 8 are separated from the clamping boxes 5, the supporting legs 8 slide relative mount pad 6 under the promotion of spring between with slide bar 7, the both ends of supporting legs 8 rotate through slide bar 7 relative mount pad 6 under the action of gravity at this moment and resume the level, and the inclined plane extrusion connecting plate 11 of the trapezoidal one end of supporting legs 8 right angle, connecting plate 11 drives ejection of compact ring 10 and slides downwards, spacing to limiting plate 15 is released to spacing seat 12 this moment for closing plate 13 can slide under the drive of spring and reset and seal the discharge gate 9 lower extreme, forget the concrete leakage that closes closing plate 13 and lead to when filling the completion and carry out the replenishment of concrete in order to prevent the staff.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Novel concreting device, including hourglass hopper (1), connecting rod (2), rings (3), gallows (4) and joint box (5), its characterized in that: the side fixed surface of hopper (1) is provided with connecting rod (2), rings (3) are installed to the upper end of connecting rod (2), and the lower extreme fixedly connected with gallows (4) of connecting rod (2), the inboard fixed surface of gallows (4) is provided with joint box (5), the lower fixed surface of gallows (4) is provided with mount pad (6), and the inboard fixed surface of mount pad (6) has pivoted slide bar (7), and the one end of slide bar (7) is connected with gliding supporting legs (8), the lower extreme of hopper (1) is fixedly provided with discharge gate (9), and the surface mounting of discharge gate (9) has gliding go out go-between (10), the upper surface fixedly connected with connecting plate (11) of go out go-between (10), the inboard fixed surface of discharge gate (9) is provided with gliding closure plate (13), and the outside fixed surface of closure plate (13) is connected with closure bar (14), the fixed surface of closure bar (14) is provided with spacing board (15).
2. A novel casting device according to claim 1, characterized in that: the lower surface of the clamping box (5) is provided with a groove, and the shape of the groove on the lower surface of the clamping box (5) is the same as the shape of one end of the supporting leg (8) facing the leakage hopper (1).
3. A novel casting device according to claim 1, characterized in that: the slide bar (7) is located and is connected with the spring between the inside one end of supporting legs (8) and supporting legs (8), and the one end of supporting legs (8) towards hourglass hopper (1) is right trapezoid design to the inclined plane of right trapezoid one end of supporting legs (8) is laminated with the one end of connecting plate (11) mutually.
4. A novel casting device according to claim 1, characterized in that: the connecting plates (11) are uniformly distributed on the upper surface of the discharging ring (10), the connecting plates (11) and the supporting legs (8) are arranged in one-to-one correspondence, and springs are connected between the connecting plates (11) and the hopper (1).
5. A novel casting device according to claim 1, characterized in that: the upper surface of the limiting seat (12) is provided with a groove, the width of the groove on the upper surface of the limiting seat (12) is larger than the diameter of the sealing rod (14), and the width of the groove on the upper surface of the limiting seat (12) is smaller than the diameter of the limiting plate (15).
6. A novel casting device according to claim 1, characterized in that: the sealing plate (13) and the discharging hole (9) are connected with springs, the lower surface of one end of the sealing plate (13) facing the middle of the discharging hole (9) is designed to be an inclined surface, and the side surfaces of the adjacent sealing plates (13) are mutually attached.
CN202321712917.5U 2023-07-03 2023-07-03 Novel concrete pouring device Active CN220486460U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321712917.5U CN220486460U (en) 2023-07-03 2023-07-03 Novel concrete pouring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321712917.5U CN220486460U (en) 2023-07-03 2023-07-03 Novel concrete pouring device

Publications (1)

Publication Number Publication Date
CN220486460U true CN220486460U (en) 2024-02-13

Family

ID=89824295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321712917.5U Active CN220486460U (en) 2023-07-03 2023-07-03 Novel concrete pouring device

Country Status (1)

Country Link
CN (1) CN220486460U (en)

Similar Documents

Publication Publication Date Title
CN206110656U (en) Scalable foldable integrally lift up tube formwork of elevartor shaft
CN206680962U (en) Hydraulic self-lifting truss-like cantilever heavy type arch dam template system
CN211286622U (en) Hoop type lead screw creeping formwork system for cylindrical pier construction
CN116335162A (en) Assembled inclined-throwing supporting mechanism and construction method thereof
CN220486460U (en) Novel concrete pouring device
CN217631264U (en) Floor hangs mould construction structures
CN217027119U (en) Seepage-proofing underground supporting structure for foundation pit
CN206090567U (en) Cantilever type reservoir dam template
CN207392758U (en) Concrete casting device
CN206607554U (en) Mould mold closing mechanism is moved back for the cantilever form that climbs certainly
CN109778806B (en) Construction method for integrally sliding and lifting pier wall with connecting beam
CN206053965U (en) A kind of tunnel ditch cable trough construction trolley
CN113235465B (en) Positioning and moving device for reconstruction construction of river channel water-blocking bridge
CN219043964U (en) Caisson mandrel device
CN211414127U (en) Auxiliary welding device for reinforcing plate of steel-concrete wind power generation tower
CN207525776U (en) A kind of cycle bottom-sitting type concrete side walls pour device
CN207620793U (en) A kind of porous vertical shaft slide model synchronizes sliding constructing device
CN106812121A (en) Mould mold closing mechanism is moved back for the cantilever form that climbs certainly
CN109322483B (en) Reinforcing and supporting structure of shear wall external formwork
CN208328850U (en) A kind of seamless spliced prefab-form of inclination
CN220845146U (en) Sewage pump support in deep foundation pit rich in underground water
CN111101485A (en) Hydropower station gate slot first-stage installation method
CN213837780U (en) Chute device for shear wall concrete pouring
CN219993149U (en) Self-compacting concrete pouring bucket
CN217920996U (en) Bottom die hoisting equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant