CN220485795U - Hot galvanizing mounting device - Google Patents

Hot galvanizing mounting device Download PDF

Info

Publication number
CN220485795U
CN220485795U CN202321740442.0U CN202321740442U CN220485795U CN 220485795 U CN220485795 U CN 220485795U CN 202321740442 U CN202321740442 U CN 202321740442U CN 220485795 U CN220485795 U CN 220485795U
Authority
CN
China
Prior art keywords
steel pipes
fixedly arranged
fixing plate
mounting device
galvanizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321740442.0U
Other languages
Chinese (zh)
Inventor
田华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Qinsheng Metal Products Co ltd
Original Assignee
Tianjin Qinsheng Metal Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Qinsheng Metal Products Co ltd filed Critical Tianjin Qinsheng Metal Products Co ltd
Priority to CN202321740442.0U priority Critical patent/CN220485795U/en
Application granted granted Critical
Publication of CN220485795U publication Critical patent/CN220485795U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coating With Molten Metal (AREA)

Abstract

The utility model discloses a mounting device for hot galvanizing, which relates to the technical field of workpiece galvanizing processing and comprises a top fixing plate, wherein a vertical rod is fixedly arranged in the middle of the side surface of the top fixing plate, and an extension block is fixedly arranged on the side surface of the bottom of the vertical rod. The utility model is provided with the top fixing plate and the bottom fixing plate, the bottom fixing plate and the top fixing plate are matched to fix the end faces of a plurality of steel pipes, compared with the traditional method that when workers place the steel pipes in a galvanizing tank, most of the steel pipes are clamped by using clamps, then the steel pipes are suspended in the galvanizing tank, the galvanizing operation of the steel pipes is completed, the outer walls of the steel pipes are not shielded, the outer walls of the steel pipes can be galvanized at one time, the upper surface of the bottom fixing plate is equidistantly provided with the auxiliary frame, the auxiliary frame can facilitate the quick placement of the plurality of steel pipes in fixed positions, the bottom of the auxiliary frame is provided with the ejection assembly, and when the plurality of steel pipes are galvanized, the ejection assembly ejects the outer walls of the tail ends of the auxiliary frame out of the steel pipes, so that the galvanized dead angles of the steel pipes are avoided.

Description

Hot galvanizing mounting device
Technical Field
The utility model relates to the technical field of workpiece galvanization processing, in particular to a mounting device for hot galvanizing.
Background
Hot dip galvanizing is also called hot dip galvanizing and hot dip galvanizing, in which zinc ingots are melted at high temperature, auxiliary materials are put into the zinc bath, and then metal structural parts such as steel pipes are immersed into the zinc bath, so that the steel pipes are attached with a zinc layer, thereby achieving the aim of corrosion prevention.
Conventionally, when a worker places a steel pipe in a galvanizing bath, a clamp is mostly used for clamping the outer wall of one end of the steel pipe, then the steel pipe is suspended in the galvanizing bath, the galvanizing work of the steel pipe is completed, but the contact position of the clamp and the steel pipe is shielded, and the galvanizing cannot be completed at the contact position of the clamp and the steel pipe.
Disclosure of Invention
The utility model aims to solve the problems that in the prior art, when a worker places a steel pipe in a galvanizing tank traditionally, a clamp is used for clamping the outer wall of one end of the steel pipe, then the steel pipe is suspended in the galvanizing tank to finish the galvanizing work of the steel pipe, but the contact position of the clamp and the steel pipe is blocked, and the galvanizing cannot be finished at the contact position of the clamp and the steel pipe.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a hot-galvanize's mounting device, includes the solid board in top, the solid board side intermediate position in top is fixed to be provided with vertical pole, vertical pole bottom side is fixed to be provided with the extension piece, vertical pole is along vertical direction activity inserting the butt joint piece top, the solid board in bottom is fixed to be provided with to the butt joint piece side, solid board top equidistance in bottom is provided with the auxiliary frame, be provided with ejecting subassembly in the auxiliary frame.
Optionally, the top surface of the extension block is fixedly connected with one end of a connecting spring, and the other end of the connecting spring is fixedly arranged at the bottom of the butt joint block.
Optionally, the movable cover of connecting spring outer wall is equipped with the second bellows, second bellows top is fixed to be set up in extension piece bottom, the fixed setting in butt joint piece bottom in second bellows top.
Optionally, the ejecting subassembly includes public board, vertical post, ejector plate, public board intermediate position rotation is connected with the ejector screw, ejector screw head screw in to public board top.
Optionally, the public board top equidistance is provided with vertical post, vertical post top is fixed to be provided with the liftout plate, the liftout plate slides and sets up at auxiliary frame inner chamber.
Optionally, the outer wall of the ejector screw is sleeved with a first corrugated pipe, the bottom of the first corrugated pipe is fixedly arranged at the bottom of the public plate, and the top of the first corrugated pipe is fixedly arranged at the middle position of the bottom surface of the bottom fixing plate.
Compared with the prior art, the utility model has the following advantages:
1. the utility model is provided with the top fixing plate and the bottom fixing plate, the bottom fixing plate and the top fixing plate are matched to fix the end faces of a plurality of steel pipes, and compared with the traditional method that when workers place the steel pipes in a galvanizing tank, most of the steel pipes are clamped by using clamps, then the steel pipes are suspended in the galvanizing tank, the galvanizing operation of the steel pipes is completed, the outer walls of the steel pipes are not shielded, and the outer walls of the steel pipes can be galvanized at one time.
2. According to the utility model, the auxiliary frames are equidistantly arranged on the upper surface of the bottom fixing plate, the auxiliary frames can be convenient for a plurality of steel pipes to be quickly placed in fixing positions, the ejector components are arranged at the bottoms of the auxiliary frames, and when the plurality of steel pipes are galvanized, the ejector components eject the steel pipes out of the outer walls of the tail ends of the auxiliary frames to be exposed, so that the steel pipes are prevented from generating galvanization dead angles.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model.
Fig. 2 is a schematic view of another view structure of fig. 1.
Fig. 3 is a schematic view of a partial structure of fig. 2 with the second bellows removed.
Fig. 4 is a schematic top view of fig. 1.
In the figure: 1. lifting lugs; 2. a top fixing plate; 3. a vertical rod; 4. a bottom fixing plate; 41. an auxiliary frame; 5. a common plate; 51. a vertical column; 52. an ejector plate; 6. a first bellows; 7. an ejector screw; 8. a second bellows; 9. an extension block; 10. a connecting spring; 11. and (5) butt joint blocks.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
In the description of the present utility model, it should be understood that the terms "upper," "lower," "front," "rear," "left," "right," "top," "bottom," "inner," "outer," and the like indicate or are based on the orientation or positional relationship shown in the drawings, merely to facilitate description of the present utility model and to simplify the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model.
Referring to fig. 1-4, a hot galvanizing mounting device comprises a top fixing plate 2, wherein a lifting lug 1 is fixedly arranged at the top of the top fixing plate 2, a vertical rod 3 is fixedly arranged in the middle of the side surface of the top fixing plate 2, an extension block 9 is fixedly arranged on the side surface of the bottom of the vertical rod 3, the top surface of the extension block 9 is fixedly connected with one end of a connecting spring 10, the other end of the connecting spring 10 is fixedly arranged at the bottom of a butt joint block 11, a second corrugated pipe 8 is movably sleeved on the outer wall of the connecting spring 10, the top of the second corrugated pipe 8 is fixedly arranged at the bottom of the extension block 9, the top of the second corrugated pipe 8 is fixedly arranged at the bottom of the butt joint block 11, and the second corrugated pipe 8 protects the connecting spring 10 when the connecting spring 10 deforms, so that the connecting spring 10 is prevented from being damaged by high-temperature zinc liquid.
The vertical rod 3 is movably inserted into the top of the butt joint block 11 along the vertical direction, the bottom fixing plate 4 is fixedly arranged on the side face of the butt joint block 11, the auxiliary frames 41 are arranged at the top of the bottom fixing plate 4 at equal intervals, the auxiliary frames 41 are internally provided with ejection assemblies, the ejection assemblies comprise a public plate 5, vertical columns 51 and ejection plates 52, the middle position of the public plate 5 is rotationally connected with an ejection screw rod 7, the tail end of the ejection screw rod 7 is provided with a corrugated head, and the ejection screw rod 7 is convenient to manually rotate.
The top of the public board 5 is screwed in by the threads of the head of the ejection screw 7, vertical columns 51 are equidistantly arranged at the top of the public board 5, ejection plates 52 are fixedly arranged at the tops of the vertical columns 51, the ejection plates 52 are slidably arranged in the inner cavity of the auxiliary frame 41, a first corrugated pipe 6 is sleeved on the outer wall of the ejection screw 7, the bottom of the first corrugated pipe 6 is fixedly arranged at the bottom of the public board 5, the top of the first corrugated pipe 6 is fixedly arranged at the middle position of the bottom surface of the bottom fixing plate 4, and the first corrugated pipe 6 can protect the ejection screw 7.
The specific implementation steps and principles of the utility model are as follows: the workman uses cable wire and lifting ear 1 to hang whole mounting device on the hoist, ejector plate 52 is in auxiliary frame 41 bottom under the initial condition, the workman overcomes connecting spring 10 elasticity at first, keep away from top solid board 2 with bottom solid board 4, insert a plurality of steel pipes one end in auxiliary frame 41, loosen bottom solid board 4, bottom solid board 4 is close to top solid board 2 again under connecting spring 10 resets, bottom solid board 4 is fixed the steel pipe both ends with top solid board 2, rotatory ejector screw 7, ejector screw 7 drives the multiunit ejector plate 52 at public board 5 top and upwards moves the steel pipe end and follow in auxiliary frame 41, finally the workman uses the hoist to shift a plurality of steel pipes and place to galvanize the inslot and accomplish galvanization work.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (6)

1. The utility model provides a hot-galvanize's mounting device, includes top solid board (2), its characterized in that, top solid board (2) side intermediate position is fixed to be provided with vertical pole (3), vertical pole (3) bottom side is fixed to be provided with extension piece (9), vertical pole (3) are inserted butt joint piece (11) top along vertical direction activity, butt joint piece (11) side is fixed to be provided with bottom solid board (4), bottom solid board (4) top equidistance is provided with auxiliary frame (41), be provided with ejecting subassembly in auxiliary frame (41).
2. The hot galvanizing mounting device according to claim 1, wherein the top surface of the extension block (9) is fixedly connected with one end of a connecting spring (10), and the other end of the connecting spring (10) is fixedly arranged at the bottom of the butt joint block (11).
3. The hot galvanizing mounting device according to claim 2, wherein a second corrugated pipe (8) is movably sleeved on the outer wall of the connecting spring (10), the top of the second corrugated pipe (8) is fixedly arranged at the bottom of the extension block (9), and the top of the second corrugated pipe (8) is fixedly arranged at the bottom of the butt joint block (11).
4. The hot galvanizing mounting device according to claim 1, wherein the ejection assembly comprises a common plate (5), a vertical column (51) and an ejection plate (52), an ejection screw (7) is rotatably connected to the middle position of the common plate (5), and the head of the ejection screw (7) is screwed into the top of the common plate (5).
5. The hot galvanizing mounting device according to claim 4, wherein vertical columns (51) are equidistantly arranged at the top of the common plate (5), ejector plates (52) are fixedly arranged at the tops of the vertical columns (51), and the ejector plates (52) are slidably arranged in the inner cavity of the auxiliary frame (41).
6. The hot galvanizing mounting device according to claim 4, wherein the outer wall of the ejector screw (7) is sleeved with a first corrugated pipe (6), the bottom of the first corrugated pipe (6) is fixedly arranged at the bottom of the public plate (5), and the top of the first corrugated pipe (6) is fixedly arranged at the middle position of the bottom surface of the bottom fixing plate (4).
CN202321740442.0U 2023-07-05 2023-07-05 Hot galvanizing mounting device Active CN220485795U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321740442.0U CN220485795U (en) 2023-07-05 2023-07-05 Hot galvanizing mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321740442.0U CN220485795U (en) 2023-07-05 2023-07-05 Hot galvanizing mounting device

Publications (1)

Publication Number Publication Date
CN220485795U true CN220485795U (en) 2024-02-13

Family

ID=89829824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321740442.0U Active CN220485795U (en) 2023-07-05 2023-07-05 Hot galvanizing mounting device

Country Status (1)

Country Link
CN (1) CN220485795U (en)

Similar Documents

Publication Publication Date Title
CN110026793B (en) General type curved surface anchor clamps
CN220485795U (en) Hot galvanizing mounting device
CN111069573B (en) Cast welding device for storage battery
CN211330650U (en) Ultrapure water cleaning system for hollow glass
CN211471590U (en) Anodic oxidation hanger for aluminum alloy workpiece
CN205587790U (en) Tooth discharge apparatus for equipment is attacked to handle handle
CN214921613U (en) Car seat skeleton pipe welding equipment convenient to use
CN210230453U (en) Novel hinder and plate frock
CN211339719U (en) Fixing clamp for electroplating processing
CN210945833U (en) Dumbbell rod electroplating support
CN108620573B (en) Infrared positioning device for mounting iron shell of immersed water inlet and working method
CN209798103U (en) Special fixture for workpiece surface rust prevention treatment
CN211197871U (en) Feeding mechanism of steel pipe galvanizing device
CN110951959A (en) Heat-proof treatment deformation tool for large-scale shell thin-wall product
CN212576696U (en) Decoration strip plating resistance tool
CN220449555U (en) Large-sized workpiece galvanization lifting appliance
CN216656432U (en) Piano iron plate processingequipment
CN216397625U (en) Bending machine for machining furnace cover plate
CN217372011U (en) A quick clamping frock for processing thin wall work piece
CN216879975U (en) Quick-release type jig for workpiece paint spraying
CN215634948U (en) High accuracy pottery tap sealing member apparatus for producing
CN215251260U (en) Environment-friendly micro-arc oxidation production line
CN217255588U (en) Angle-fixing fixture for spray head of small part sand blasting assembly line
CN212217834U (en) Numerical control machine tool fixture tool
CN108889890A (en) A kind of automatic rivet pulling machine and working method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant