CN220414316U - Temporary cable channel - Google Patents
Temporary cable channel Download PDFInfo
- Publication number
- CN220414316U CN220414316U CN202321747804.9U CN202321747804U CN220414316U CN 220414316 U CN220414316 U CN 220414316U CN 202321747804 U CN202321747804 U CN 202321747804U CN 220414316 U CN220414316 U CN 220414316U
- Authority
- CN
- China
- Prior art keywords
- side wall
- trench
- cable
- channel
- temporary cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 claims abstract description 30
- 239000002184 metal Substances 0.000 claims abstract description 22
- 230000005684 electric field Effects 0.000 claims abstract description 5
- 230000000149 penetrating effect Effects 0.000 claims abstract description 5
- 239000004570 mortar (masonry) Substances 0.000 claims description 6
- 230000001681 protective effect Effects 0.000 claims description 6
- 239000011449 brick Substances 0.000 claims description 3
- 239000011505 plaster Substances 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 6
- 238000000034 method Methods 0.000 abstract description 6
- 239000002699 waste material Substances 0.000 description 4
- 239000002023 wood Substances 0.000 description 4
- 230000007613 environmental effect Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002994 raw material Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model provides a temporary cable channel, which comprises a channel arranged between a main distribution box and a construction electric field station and used for placing cables, wherein the channel comprises a left side wall and a right side wall which are vertically arranged on a ground cushion layer; a supporting structure for supporting the cable is arranged between the middle parts of the left side wall and the right side wall, the supporting structure comprises a plurality of metal supporting rods, the plurality of metal supporting rods are arranged at intervals along the length direction of the channel, and the left end and the right end of each metal supporting rod are fixedly connected with the middle parts of the left side wall and the right side wall respectively; the bottoms of the left side wall and/or the right side wall are/is provided with a drainage structure in a penetrating manner along the thickness direction of the side wall; a cover plate structure for covering the cavity inside the channel is arranged between the top of the left side wall and the top of the right side wall. The utility model has the advantages of simple structure, convenient construction and good drainage effect, reduces the workload of cable laying on the construction site, and improves the safety of the cable in the construction process.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to a temporary cable channel.
Background
The construction site cable is generally laid by ditching or overhead, when the cable is buried underground, a trench needs to be excavated, the field excavation workload is large, the cable can be soaked in water in the rainy period, and once the cable is damaged, safety accidents such as electric shock and the like are easily caused, so that a large safety risk exists; when the cable is laid in the air, a cable support frame is required to be erected on a construction site, the cable is fixed on the top of the cable support frame, the field work load is larger, meanwhile, as more aerial penetrating work exists on the construction site, when a constructor operates equipment or facilities in the air, the equipment or facilities are easy to collide with the cable laid in the air, and therefore, the cable laid in the air also has larger safety risk.
Disclosure of Invention
Aiming at the defects of large construction workload and high safety risk of the cable in the use process of the conventional construction site cable laying, the utility model provides the temporary cable channel which is simple in structure, convenient and fast to construct and good in drainage effect, so that the workload of the construction site cable laying is reduced, and the safety of the cable in the construction process is improved.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows: the temporary cable channel is structurally characterized by comprising a channel which is arranged between a main distribution box and an electric field station for construction and is used for placing cables, wherein the channel comprises a left side wall and a right side wall which are vertically arranged on a ground cushion layer, and a channel internal cavity is formed between the inner side surfaces of the left side wall and the right side wall;
a supporting structure for supporting the cable is arranged between the middle parts of the left side wall and the right side wall, the supporting structure comprises a plurality of metal supporting rods, the plurality of metal supporting rods are arranged at intervals along the length direction of the channel, and the left end and the right end of each metal supporting rod are fixedly connected with the middle parts of the left side wall and the right side wall respectively;
the bottoms of the left side wall and/or the right side wall are/is provided with a drainage structure in a penetrating manner along the thickness direction of the side wall; and a cover plate structure for covering the cavity in the channel is arranged between the top parts of the left side wall and the right side wall.
Furthermore, the bottom surface of the ditch is provided with a plurality of catch basins downwards, and the left side wall or the right side wall of the ditch at the position of the catch basin is provided with the drainage structure.
Further, an opening is formed in the upper portion of the left side wall and/or the upper portion of the right side wall, and a branch cable in the channel is connected with the secondary distribution box through the opening.
Further, a protective cover for covering the exposed part of the branch cable is arranged between the channel and the secondary distribution box.
Further, the metal support rod is a support steel bar, and a PVC sleeve is sleeved on the outer surface of the support section of the metal support rod.
Further, the distance between two adjacent metal support rods is 50 cm-100 cm.
Further, a first L-shaped notch is formed in the right side end of the top surface of the left side wall downwards, a second L-shaped notch is formed in the left side end of the top surface of the right side wall downwards, and a cover plate structure is arranged between the first L-shaped notch and the second L-shaped notch.
Further, the cover plate structure comprises a plurality of cover plates which are assembled and connected, and a plurality of pull rings are fixedly arranged on the top end face of the cover plates.
Further, the left side wall and the right side wall are built by bricks and mortar, and the outer side face, the inner side face and the top face of the left side wall and the right side wall are all provided with plastering layers.
Further, the drainage structure is a drain pipe.
Compared with the prior art, the utility model has the beneficial effects that:
(1) The temporary cable channel has the advantages of simple structure, small construction workload and good drainage effect, can reduce the workload of cable laying on a construction site, and simultaneously improves the safety of the cable in the construction process.
(2) The temporary cable trench is simple and convenient to construct, and the main materials are raw materials or wastes of a construction site, so that the temporary cable trench has the advantages of economy and environmental protection.
(3) According to the temporary cable trench, the cable is laid on the supporting structure inside the trench, the cable is not buried, the side wall of the trench is provided with the drainage structure, the drainage effect of the trench is good, the cover plate at the top of the trench can be movably opened, and the cable can be conveniently overhauled.
Drawings
FIG. 1 is a schematic plan view of a temporary cable channel according to the present utility model;
FIG. 2 is a cross-sectional view taken at A-A of FIG. 1;
fig. 3 is a longitudinal cross-sectional view of the shield.
In the figure:
1. a main distribution box; 2. an electric field station for construction; 3. a cable; 4. a channel; 41. a ground cushion layer; 42. a left side wall; 43. a right side wall; 44. a channel internal cavity; 45. a support structure; 46. a catch basin; 47. a drainage structure; 48. a cover plate structure; 481. a cover plate; 482. a pull ring; 5. a secondary distribution box; 6. a protective cover; 7. temporary roads.
Detailed Description
The utility model will be described in detail below with reference to the drawings in connection with embodiments. It should be noted that, without conflict, the embodiments of the present utility model and features of the embodiments may be combined with each other. For convenience of description, the words "upper", "lower", "left" and "right" are used hereinafter to denote only the directions corresponding to the upper, lower, left, and right directions of the drawings, and do not limit the structure.
As shown in fig. 1 to 3, a temporary cable channel of the present embodiment includes a channel 4 for placing a cable 3 provided between a main distribution box 1 and a construction electric field station 2. The cable 3 comprises a main cable and a branch cable.
The trench 4 includes a left sidewall 42 and a right sidewall 43 vertically disposed on the floor mat 41. In this embodiment, the ground cushion 41 is formed by casting concrete or mortar, and the concrete or mortar may be the remainder of the construction site. The left side wall 42 and the right side wall 43 are built by bricks and mortar, and the outer side face, the inner side face and the top face of the left side wall 42 and the right side wall 43 are respectively provided with a plastering layer.
A temporary road 7 is provided on one side of the channel 4.
A channel interior cavity 44 is formed between the inner side surfaces of the left side wall 42 and the right side wall 43.
A supporting structure 45 for supporting the cable 3 is arranged between the left side wall 42 and the middle part of the right side wall 43, the supporting structure 45 comprises a plurality of metal supporting rods, the plurality of metal supporting rods are arranged at intervals along the length direction of the channel 4, and the left end and the right end of each metal supporting rod are respectively and fixedly connected with the left side wall 42 and the middle part of the right side wall 43. In this embodiment, the metal support bar is a support bar, and a PVC sleeve is sleeved on the outer surface of the support section of the metal support bar. The distance between two adjacent metal support rods is 50 cm-100 cm.
The bottom of the left side wall 42 and/or the right side wall 43 is provided with a drain structure 47 penetrating in the thickness direction of the side wall. The drain structure 47 is a drain pipe.
A cover structure 48 is provided between the top of the left side wall 42 and the right side wall 43 for covering the trench interior cavity 44.
As shown in fig. 1, in this embodiment, two catch basins 46 are provided on the bottom surface of the channel 4, and the drain structure 47 is provided on the left sidewall 42 of the catch basin 46.
As shown in fig. 1 and 3, an opening is formed in the upper portion of the left side wall 42, and the branch cable in the channel 4 is connected to the secondary distribution box 5 through the opening. A protective cover 6 for covering the exposed part of the branch cable is arranged between the channel 4 and the secondary distribution box 5. The protective cover is made of wood templates, and the wood templates can be waste templates in construction sites.
As shown in fig. 2, in this embodiment, a first L-shaped slot is formed downward at the right side end of the top surface of the left side wall 42, a second L-shaped slot is formed downward at the left side end of the top surface of the right side wall 43, and the cover plate structure 48 is installed between the first L-shaped slot and the second L-shaped slot.
The cover plate structure 48 comprises a plurality of cover plates 481 which are assembled and connected, wherein the cover plates 481 are wood cover plates, and the wood cover plates can adopt waste templates of construction sites. A plurality of pull rings 482 are fixedly arranged on the top end surface of the cover plate 481. The tab 482 comprises a circular ring section and a threaded connection section, the bottom of the threaded section being anchored to the top of the cover plate 481. Therefore, the cover plate structure can be conveniently movably opened, and the cable can be conveniently overhauled.
The construction process of the temporary cable channel in the embodiment comprises the following steps:
step 1: a measurement scribe of the trench 4 is performed.
Step 2: the rainwater well 46 is excavated, and the construction ground is leveled.
Step 3: construction of the floor mat 41 is performed.
Step 4: construction of the left side wall 42, the right side wall 43 and the supporting structure 5 is carried out, the supporting structure 5 is installed when the left side wall 42 and the right side wall 43 are constructed to the middle position, and two ends of each metal supporting rod of the supporting structure 5 are fixedly connected with middle mortar layers of the left side wall 42 and the right side wall 43 respectively.
Step 5: the main cable and the branch cable are installed.
Step 6: a cover structure 48 is mounted on top of the trench 4, while a protective cover 6 for covering the exposed portion of the drop cable is mounted between the trench 4 and the secondary distribution box 5.
The temporary cable trench has the advantages of simple structure, small construction workload and good drainage effect, can reduce the workload of cable laying on a construction site, and improves the safety of the cable in the construction process. The temporary cable trench is simple and convenient to construct, and the main materials are raw materials or wastes of a construction site, so that the temporary cable trench has the advantages of economy and environmental protection. According to the temporary cable trench, the cable is laid on the supporting structure inside the trench, the cable is not buried, the side wall of the trench is provided with the drainage structure, the drainage effect of the trench is good, the cover plate at the top of the trench can be movably opened, and the cable can be conveniently overhauled.
The foregoing examples are set forth in order to provide a more thorough description of the present utility model, and are not intended to limit the scope of the utility model, since modifications of the present utility model, in which equivalents thereof will occur to persons skilled in the art upon reading the present utility model, are intended to fall within the scope of the utility model as defined by the appended claims.
Claims (10)
1. The temporary cable trench is characterized by comprising a trench (4) which is arranged between a main distribution box (1) and an electric field station (2) for construction and is used for placing a cable (3), wherein the trench (4) comprises a left side wall (42) and a right side wall (43) which are vertically arranged on a ground cushion layer (41), and a trench inner cavity (44) is formed between the inner side surfaces of the left side wall (42) and the right side wall (43);
a supporting structure (45) for supporting the cable (3) is arranged between the middle parts of the left side wall (42) and the right side wall (43), the supporting structure (45) comprises a plurality of metal supporting rods, the plurality of metal supporting rods are arranged at intervals along the length direction of the channel (4), and the left end and the right end of each metal supporting rod are fixedly connected with the middle parts of the left side wall (42) and the right side wall (43) respectively;
a drainage structure (47) is arranged at the bottom of the left side wall (42) and/or the right side wall (43) in a penetrating manner along the thickness direction of the side wall; a cover plate structure (48) for covering the channel internal cavity (44) is arranged between the tops of the left side wall (42) and the right side wall (43).
2. A temporary cable trench according to claim 1, characterized in that the trench bottom surface of the trench (4) is provided with a plurality of catch basins (46) downwards, and the trench (4) is provided with the drainage structure (47) on the left side wall (42) or the right side wall (43) at the position of the catch basin (46).
3. A temporary cable trench according to claim 1, characterized in that the upper part of the left side wall (42) and/or the right side wall (43) is provided with openings, through which branch cables in the trench (4) are connected to a secondary distribution box (5).
4. A temporary cable trench according to claim 3, characterized in that a protective cover (6) is provided between the trench (4) and the secondary distribution box (5) for covering the exposed part of the branch cable.
5. The temporary cable trench of claim 1, wherein the metal support bar is a support bar, and the outer surface of the support section of the metal support bar is sleeved with a PVC sleeve.
6. A temporary cable trench according to claim 1 wherein the distance between two adjacent metal support bars is 50cm to 100cm.
7. A temporary cable trench according to claim 1, wherein the right side end of the top surface of the left side wall (42) is provided with a first L-shaped slot downwards, the left side end of the top surface of the right side wall (43) is provided with a second L-shaped slot downwards, and the cover plate structure (48) is installed between the first L-shaped slot and the second L-shaped slot.
8. A temporary cable trench according to claim 7, characterized in that the cover structure (48) comprises a plurality of cover plates (481) assembled and connected, and a plurality of pull rings (482) are fixedly arranged on the top end surface of the cover plates (481).
9. A temporary cable trench according to claim 1, characterized in that the left side wall (42) and the right side wall (43) are built by brick and mortar, and the outer side, inner side and top surfaces of the left side wall (42) and the right side wall (43) are provided with a plaster layer.
10. A temporary cable trench according to any one of claims 1-9, wherein the drainage structure (47) is a drain pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321747804.9U CN220414316U (en) | 2023-07-05 | 2023-07-05 | Temporary cable channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321747804.9U CN220414316U (en) | 2023-07-05 | 2023-07-05 | Temporary cable channel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220414316U true CN220414316U (en) | 2024-01-30 |
Family
ID=89654721
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321747804.9U Active CN220414316U (en) | 2023-07-05 | 2023-07-05 | Temporary cable channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220414316U (en) |
-
2023
- 2023-07-05 CN CN202321747804.9U patent/CN220414316U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109235499B (en) | Open-cut underground building structure assembly type construction method | |
CN101509263A (en) | Digging method foundation pit structure of steel cover and plate cover, and construction method | |
US7467910B2 (en) | Prefabricated structure made of reinforced concrete with an integrated removable handling system | |
CN104466869A (en) | Reinforced concrete assembly type cable duct and manufacturing method | |
CN109026064A (en) | A kind of construction method that large span multiple-arch tunnel is hazy | |
CN210529750U (en) | Cable type utility tunnel system | |
CN108798059A (en) | A kind of old masonry seismic reinforcing structure and construction method | |
CN109372018A (en) | Soft base Self-sinking type underground space structure construction and construction technology | |
CN109695247B (en) | Deep foundation pit temporary pipeline comprehensive arrangement system and construction method | |
WO2013012175A2 (en) | Prefabricated trench type cable trough and construction method thereof | |
AU2019202413B2 (en) | Improved concrete road pavement with more sustainability benefits | |
CN108708727B (en) | Half-excavation rear-jacking shield cutter head manhole assembly type construction method | |
CN220414316U (en) | Temporary cable channel | |
KR102252905B1 (en) | Frp collector well | |
CN207646753U (en) | Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery | |
CN213653515U (en) | Assembled multifunctional comprehensive miniature pipe gallery | |
CN215105472U (en) | Backfill soft foundation temporary construction foundation construction device | |
CN219910090U (en) | Basement roof tower crane opening water interception device | |
CN110486074B (en) | Pipe arrangement design method and construction method for ventilation in long and large tunnel construction | |
CN207743669U (en) | Cable duct structure for large equipment base side | |
CN106759493A (en) | A kind of underground space existing ground iron winds booth underpinning structure and nested configuration | |
CN219690584U (en) | Comprehensive pipe trench on underground continuous wall crown beam | |
CN219621938U (en) | Medical science keeps apart interim building structure of observing | |
CN218723994U (en) | Double-layer intelligent survey station for automatically monitoring dam displacement | |
CN209760296U (en) | rail transit does not have post station system of building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |