CN220395226U - Steel bar bearing device for fixing reinforcing mesh - Google Patents
Steel bar bearing device for fixing reinforcing mesh Download PDFInfo
- Publication number
- CN220395226U CN220395226U CN202320567481.9U CN202320567481U CN220395226U CN 220395226 U CN220395226 U CN 220395226U CN 202320567481 U CN202320567481 U CN 202320567481U CN 220395226 U CN220395226 U CN 220395226U
- Authority
- CN
- China
- Prior art keywords
- bearing
- frame
- steel bar
- fixing
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 64
- 239000010959 steel Substances 0.000 title claims abstract description 64
- 230000003014 reinforcing effect Effects 0.000 title abstract description 15
- 230000008878 coupling Effects 0.000 claims description 2
- 238000010168 coupling process Methods 0.000 claims description 2
- 238000005859 coupling reaction Methods 0.000 claims description 2
- 240000004282 Grewia occidentalis Species 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract 1
- 239000004567 concrete Substances 0.000 description 11
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 239000011150 reinforced concrete Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000000969 carrier Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
Abstract
The utility model relates to a steel bar bearing device for reinforcing mesh fixation, which comprises a plurality of bearing frames arranged on a base frame, wherein each bearing frame is arranged in parallel on the base frame, two ends of each bearing frame are arranged at the top ends of two sides of the base frame, each bearing frame is provided with a plurality of bearing bars arranged in parallel, each bearing bar is arranged perpendicular to the length direction of the bearing frame, two ends of each bearing bar are connected with two sides of the bearing frame, a plurality of steel bars arranged vertically are inserted on each bearing bar, and the plurality of steel bars are distributed at equal intervals along the length direction of the bearing bar. The utility model has the effects of reducing the labor intensity in the process of fixing the reinforcing mesh and improving the installation efficiency of the steel bars.
Description
Technical Field
The utility model relates to the field of reinforced concrete pouring, in particular to a steel bar bearing device for fixing a steel bar net.
Background
Reinforced concrete refers to a composite material formed by adding a reinforcing mesh to concrete to achieve reinforcement of the mechanical properties of the concrete through the internal reinforcement cage. Before concrete pouring, the steel bar net is required to be vertically placed and inserted into a concrete mold, then the steel bars are inserted into buckles of the steel bar net to internally fix the steel bar net, and after pouring, the steel bars are removed from the concrete after the steel bars are fixed and pulled out to form the concrete. The prior common fixing mode of the steel bar net in concrete fluid is to manually insert steel bars singly or in a row into buckles of the steel bar net. With respect to the related art, the inventor considers that the existing method has low fixing efficiency and high labor cost.
Disclosure of Invention
In order to reduce the labor intensity in the reinforcing mesh fixing process and improve the installation efficiency of steel bars, the utility model provides a steel bar bearing device for reinforcing mesh fixing.
The steel bar bearing device for fixing the steel bar mesh adopts the following technical scheme:
the utility model provides a fixed drill steel bears device with reinforcing bar net, including setting up a plurality of carrier bars on the bed frame, every carrier bar parallel arrangement on the bed frame, the carrier bar both ends set up on bed frame both sides top, all are provided with many parallel arrangement's carrier bar on every carrier bar, carrier bar perpendicular to carrier bar length direction sets up, every carrier bar both ends are connected with the carrier bar both sides, all peg graft on every carrier bar have many drill steel of vertical setting, many drill steel are along the equidistant distribution of the length direction of carrier bar.
Through adopting above-mentioned technical scheme, the drill steel is pegged graft in rows on the carrier bar, and the staff carries many carrier bars on the carrier, decides the quantity of the carrier bar that the carrier carried according to actual conditions, realizes the whole removal of multirow drill steel to the whole handling of carrier through the gallows.
Optionally, the four corners bottom of bearing frame is provided with the gyro wheel, and the bed frame both sides rigid coupling has the slide rail of horizontal setting, gyro wheel and slide rail sliding connection.
By adopting the technical scheme, the roller wheels are arranged to realize the mobility of the bearing frames on the base frame, so that the position of the bearing frames can be conveniently adjusted by staff, and before each bearing frame is lifted by the lifting frame, the bearing frames are pushed to the position right below the lifting frame by the staff; the hanger is put back to the carrier on the bed frame after the concrete shaping, and the staff breaks away from the hanger with the carrier of placing and pushes away to the open place on the bed frame, prevents to hinder the settling of follow-up carrier.
Optionally, the four corners top threaded connection of bearing frame has first fixing bolt, and first fixing bolt sets up directly over the slide rail, and first fixing bolt is used for fixed bearing frame.
Through adopting above-mentioned technical scheme, owing to lean on the gyro wheel unable realization to bear the fixed of frame on the bed frame, when preventing the carrier bar on toward bearing the frame, the unset of frame position of bearing brings trouble for staff's installation, and first fixing bolt's setting makes the staff screw up first fixing bolt, makes its tip support tightly slide rail surface, realizes bearing the convenient fixed of frame.
Optionally, the two ends of each bearing rod are fixedly connected with sliding blocks corresponding to the two sides of the bearing frame, and the sliding blocks are connected with the two sides of the bearing frame in a sliding manner.
Through adopting above-mentioned technical scheme, realized the slip of carrier bar and carrier frame, the staff of being convenient for adjusts the position of carrier bar on the carrier frame, realizes the variety of drill rod distribution.
Optionally, each carrier bar both ends equal threaded connection has the second fixing bolt, and the second fixing bolt transversely sets up, and the second fixing bolt is used for fixed carrier bar.
By adopting the technical scheme, a worker screws up the second fixing bolt, and the second fixing bolt abuts against the side surface of the second sliding rail, so that the bearing rod is fixed on the bearing frame; when the staff inserts the steel rod, the second fixing bolt is screwed down first to fix the bearing rod, so that the movable bearing rod is prevented from affecting the insertion of the steel rod.
Optionally, a plurality of clamping holes are formed in each bearing rod at equal intervals along the length direction.
Through adopting above-mentioned technical scheme, insert the adjustment of drill rod position on the carrier bar with the drill rod in the joint hole of difference, the staff is according to the interval between the actual reinforcing bar net, nimble adjustment carrier bar interval between.
Optionally, the clamping holes are arranged corresponding to clamping blocks on the steel drills, and clamping grooves are formed in the bearing rods.
By adopting the technical scheme, the steel drill is fixed in the clamping hole, and after the lower part of the steel drill is inserted into the clamping hole by a worker, the clamping block at the upper part of the steel drill is aligned with the shape of the clamping hole for insertion, so that the steel drill is fixed; in addition, when the joint piece is pegged graft and is passed through the carrier bar inside rotatory drill rod, realize that the drill rod can't break away from in the joint hole of carrier bar top.
Optionally, rubber blocks are fixedly connected to four corners of the bearing frame.
Through adopting above-mentioned technical scheme, when the staff promotes the carriage on the bed frame, because the carriage is close to each other and sets up, collision easily each other between the carriage, then the wearing and tearing or the noise that produce collide with, the carriage has been protected in the setting of rubber piece, has avoided the production of noise.
Drawings
Fig. 1 is a schematic overall structure of an embodiment of the present application.
Fig. 2 is a schematic view of the structure of the carrier.
Fig. 3 is a cross-sectional view for highlighting the snap-in block.
Reference numerals illustrate: 1. a base frame; 11. a slide rail; 2. a carrier; 21. a roller; 22. a first fixing bolt; 23. a rubber block; 3. a carrier bar; 31. a sliding block; 32. a second fixing bolt; 33. a clamping hole; 34. a clamping groove; 4. steel drill rod; 41. and a clamping block.
Detailed Description
The utility model is described in further detail below with reference to fig. 1-3.
The embodiment of the utility model discloses a steel bar 4 bearing device for reinforcing mesh fixation. Referring to fig. 1 and 2, the steel bar carrying device for fixing the reinforcing mesh comprises a plurality of carrying frames 2 arranged on a base frame 1, wherein the carrying frames 2 are transversely arranged, idler wheels 21 are arranged at the parts, close to four corners, of the side surfaces of the carrying frames 2, sliding rails 11 are fixedly connected to the two sides of the base frame 1, and the idler wheels 21 are connected to the sliding rails 11 in a sliding manner; the four corners top of bearing frame 2 all threaded connection has the first fixing bolt 22 of vertical setting, and first fixing bolt 22 is close to gyro wheel 21 setting. The bearing frame 2 is carried on the base frame 1, after the hanging frame drops the bearing frame 2 to be placed on the base frame 1, a worker pushes the bearing frame 2 to other positions of the base frame 1, so that the hanging frame is prevented from being prevented from placing other bearing frames 2; the staff tightens first fixing bolt 22, and first fixing bolt 22 tip supports tightly slide rail 11 bottom, realizes the fixed of bearing frame 2.
The end parts of the bearing frame 2 near the four corners are fixedly connected with rubber blocks 23. The rubber blocks 23 at the four corners of the carrier 2 are placed to be worn out between the carriers 2 due to collision with each other, while avoiding the generation of noise.
The bearing frame 2 is connected with a plurality of bearing rods 3 in a sliding manner, the plurality of bearing rods 3 are transversely arranged, the plurality of bearing rods 3 are arranged in parallel at equal intervals along the length direction of the bearing frame 2, two ends of each bearing rod 3 are fixedly connected with sliding blocks 31 corresponding to two sides of the bearing frame 2 respectively, and two sides of the bearing frame 2 are connected with the sliding blocks 31 in a sliding manner; the end parts of the two ends of the bearing rod 3 are respectively connected with a second fixing bolt 32 in a threaded manner, and the second fixing bolts 32 are respectively arranged transversely. After the worker slides the bearing rod 3 to a proper position, the second fixing bolt 32 is screwed, and the second fixing bolt 32 abuts against the side face of the bearing frame 2, so that the position of the bearing rod 3 is fixed.
Referring to fig. 3, a plurality of vertically-opened clamping holes 33 are correspondingly formed on the upper surface and the lower surface of the bearing rod 3, the plurality of clamping holes 33 are distributed in one row at equal intervals along the length direction of the bearing rod 3, three rows of clamping holes 33 are parallelly formed, and each row of clamping holes 33 is parallelly distributed along the length direction perpendicular to the bearing rod 3; the steel rod 4 is inserted into the clamping hole 33, the clamping block 41 is fixedly connected to the middle part of the steel rod 4, and the shape of the clamping hole 33 on the upper surface of the bearing rod 3 is consistent with the shape of the clamping block 41; the bearing rod 3 is internally provided with a clamping groove 34, and the clamping hole 33 is communicated with the clamping groove 34.
The implementation principle of the steel bar 4 bearing device for reinforcing mesh fixation in the embodiment of the utility model is as follows: the staff tightens first fixing bolt 22 and second fixing bolt 32, will bear frame 2 and carrier bar 3 fixed, then according to actual need decides quantity and the distribution condition that drill rod 4 pegged graft.
After the first fixing bolt 22 and the second fixing bolt 32 are tightly abutted, the worker inserts the steel rod 4 into a part of the clamping holes 33, the shape of the clamping block 41 is aligned with the shape of the clamping holes 33 on the upper surface of the bearing rod 3, the steel rod 4 is continuously inserted into the inner bottom wall of the clamping block 41 abutting clamping groove 34, the steel rod 4 cannot continuously fall, and the insertion is completed. The staff inserts the drill steel 4 onto a plurality of bearing rods 3 according to actual needs, the fixation of the second fixing bolts 32 is canceled, the bearing rods 3 are slipped to different positions of the bearing frame 2 according to the distribution of the predetermined drill steel 4, and the second fixing bolts 32 are screwed to fix the bearing rods 3.
After the distribution of the bearing rods 3 and the steel bars 4 is completed, the fixation of the first fixing bolts 22 is canceled, the bearing frame 2 is slipped to the lower part of the hanging frame, the hanging frame hangs the bearing frame 2, and the worker continuously installs the bearing rods 3 and the steel bars 4 on the next bearing frame 2, so that the process is repeated. Thereby realizing the improvement of the installation efficiency of the steel drill 4 in the concrete pouring process, and greatly reducing the labor intensity of the installation of the steel drill 4.
The hanger falls down after being transported to the upper part of the concrete reinforcing mesh, a worker installs the buckle of the reinforcing mesh on the steel bar 4, and then the steel bar 4 descends to enable the reinforcing mesh to be buried in the concrete.
The above embodiments are not intended to limit the scope of the present utility model, so: all equivalent changes in structure, shape and principle of the utility model should be covered in the scope of protection of the utility model.
Claims (6)
1. The utility model provides a steel bar net is fixed with drill rod bearing device which characterized in that: the device comprises a plurality of bearing frames (2) arranged on a base frame (1), wherein each bearing frame (2) is arranged on the base frame (1) in parallel, and two ends of each bearing frame (2) are arranged at the top ends of two sides of the base frame (1);
a plurality of parallel bearing rods (3) are arranged on each bearing frame (2), the bearing rods (3) are perpendicular to the length direction of the bearing frames (2), two ends of each bearing rod (3) are connected with two sides of each bearing frame (2), a plurality of vertically arranged steel bars (4) are inserted on each bearing rod (3), and the steel bars (4) are distributed at equal intervals along the length direction of the bearing rods (3);
each bearing rod (3) is provided with a plurality of clamping holes (33) at equal intervals along the length direction, the clamping holes (33) are arranged corresponding to clamping blocks (41) on the steel drills (4), and clamping grooves (34) are formed in the bearing rods (3).
2. The steel bar carrying device for fixing a steel bar mesh according to claim 1, wherein: the four corners bottom of bearing frame (2) is provided with gyro wheel (21), and bed frame (1) both sides rigid coupling has slide rail (11) of horizontal setting, gyro wheel (21) and slide rail (11) sliding connection.
3. The steel bar carrying device for fixing a steel bar mesh according to claim 2, wherein: the four-corner top threaded connection of bearing frame (2) has first fixing bolt (22), and first fixing bolt (22) set up directly over slide rail (11), and first fixing bolt (22) are used for fixed bearing frame (2).
4. The steel bar carrying device for fixing a steel bar mesh according to claim 1, wherein: and the sliding blocks (31) are fixedly connected to the two ends of each bearing rod (3) corresponding to the two sides of the bearing frame (2), and the sliding blocks (31) are connected with the two sides of the bearing frame (2) in a sliding manner.
5. The steel bar carrying device for fixing a steel bar mesh according to claim 4, wherein: and two ends of each bearing rod (3) are connected with second fixing bolts (32) in a threaded manner, the second fixing bolts (32) are transversely arranged, and the second fixing bolts (32) are used for fixing the bearing rods (3).
6. The steel bar carrying device for fixing a steel bar mesh according to claim 1, wherein: rubber blocks (23) are fixedly connected to four corners of the bearing frame (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320567481.9U CN220395226U (en) | 2023-03-21 | 2023-03-21 | Steel bar bearing device for fixing reinforcing mesh |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320567481.9U CN220395226U (en) | 2023-03-21 | 2023-03-21 | Steel bar bearing device for fixing reinforcing mesh |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220395226U true CN220395226U (en) | 2024-01-26 |
Family
ID=89607941
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320567481.9U Active CN220395226U (en) | 2023-03-21 | 2023-03-21 | Steel bar bearing device for fixing reinforcing mesh |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220395226U (en) |
-
2023
- 2023-03-21 CN CN202320567481.9U patent/CN220395226U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111734147B (en) | Three-dimensional reinforcing bar rack preparation auxiliary device | |
CN220395226U (en) | Steel bar bearing device for fixing reinforcing mesh | |
CN204982663U (en) | External steel anchor case system of suspension bridge cat way device | |
CN106476124A (en) | A kind of dual-direction pre-tensioning system prestressed concrete track slab mould | |
CN211894877U (en) | Belt feeder bearing roller changes device | |
CN101326330A (en) | Method for pouring sleepers and formwork used therefore | |
CN110315634A (en) | A kind of prefabricated components curing kilns and its application method | |
CN104326369A (en) | Stepping heating furnace support beam replacement apparatus and method thereof | |
CN207088114U (en) | A kind of dual-direction pre-tensioning system prestressed concrete track slab model | |
CN211869438U (en) | A conveyer for tunnel reinforcing bar | |
CN209117293U (en) | A kind of calibration fixture of suspension and support anti-seismic performance detection device | |
CN102442521A (en) | Concrete pipe pile die opening and closing chain conveyor | |
CN215665547U (en) | Pipeline conveyor in tunnel | |
CN111168618A (en) | Belt carrier roller quick replacement tool and replacement method | |
CN219822043U (en) | Combined jig frame structure | |
CN218090556U (en) | Device is used in severe cold district pier construction | |
CN204384472U (en) | Fixing device in a kind of setting machine folder base system | |
CN104890929A (en) | Packer for finished brick | |
CN216944936U (en) | Support device for replacing horizontal carrier roller of conveyor | |
CN109502138A (en) | Adjustable transport support and working method | |
CN211564430U (en) | Core setting device | |
CN211541050U (en) | Belt carrier roller quick replacement instrument | |
CN109056539B (en) | Assembled reinforcing bar mounting structure | |
CN204545913U (en) | The left side iron cover assemble mechanism of automobile condenser iron cover assembly machine | |
CN220078401U (en) | Movable lifting frame device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |