CN110315634A - A kind of prefabricated components curing kilns and its application method - Google Patents
A kind of prefabricated components curing kilns and its application method Download PDFInfo
- Publication number
- CN110315634A CN110315634A CN201910692359.2A CN201910692359A CN110315634A CN 110315634 A CN110315634 A CN 110315634A CN 201910692359 A CN201910692359 A CN 201910692359A CN 110315634 A CN110315634 A CN 110315634A
- Authority
- CN
- China
- Prior art keywords
- prefabricated components
- pedestal
- maintenance
- curing kilns
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 9
- 238000012423 maintenance Methods 0.000 claims abstract description 56
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 31
- 238000009434 installation Methods 0.000 claims description 11
- 230000007246 mechanism Effects 0.000 claims description 9
- 230000009471 action Effects 0.000 claims description 6
- 238000005096 rolling process Methods 0.000 claims description 6
- 210000000056 organ Anatomy 0.000 claims description 5
- 230000008676 import Effects 0.000 claims description 3
- 230000008859 change Effects 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 230000000712 assembly Effects 0.000 description 3
- 238000000429 assembly Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/24—Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
- B28B11/245—Curing concrete articles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The invention discloses a kind of prefabricated components curing kilns and its application methods, it includes the kiln body with pedestal, it is used to place the maintenance space of the die station equipped with prefabricated components in kiln body at least one, the maintenance space includes the two sidewalls being disposed in parallel on the pedestal, support conducting subassembly is symmetrically arranged on two sidewalls, it is characterized in that, the support conducting subassembly includes along the spaced apart multiple support conduction units in sidewall width direction, each support conduction unit includes idler wheel and the wheel shaft for connecting idler wheel, the idler wheel of each support conduction unit forms idler wheel assembly line, and the wheel shaft of each support conduction unit is detachably connected on the side wall in the maintenance space.The present invention had both been able to satisfy the set requirement of curing kilns, but also adapted to the maintenance needs of different size prefabricated components, and breaking down in support conduction unit influences in use, being also convenient to carry out dismounting and change, later maintenance is easy to maintenance easy.
Description
Technical field
The present invention relates to prefabricated components curing kilns and its application methods.
Background technique
Currently, in the production process of prefabricated components, being by being found to domestic main prefabricated components manufacturing enterprise investigation
Guarantee that prefabricated components can be formed securely, requires the maintenance place that prefabricated components are specially set, these places have using vacant lot
, have using warehouse, also has using curing kilns.Vacant lot maintenance land occupation area is big, and temperature humidity environment is uncontrollable;Storehouse
Library conserves scheduling transportation difficulty, and temperature humidity environment is also difficult to control;Curing kilns maintenance is more satisfactory maintenance place, but such as
Shown in Chinese patent application CN108312320A, each component connection in curing kilns all uses non-removable structure at present, thus
The maintenance of certain specification prefabricated component can only be adapted to, and is difficult to carry out dismounting and change when the parts damages of curing kilns.In addition at present
Curing kilns adjust entire kiln body levelness operation difficulty when installing is big, and as local height deformation occurs in later period use process
It can not adjust accordingly.
Summary of the invention
The technical problem to be solved by the present invention is to overcoming the deficiencies of the prior art and provide one kind, to adapt to different size pre-
Component conservation processed, and later maintenance easy prefabricated components curing kilns easy to maintenance.
In order to solve the above technical problems, the invention adopts the following technical scheme: a kind of prefabricated components curing kilns, including have
The kiln body of pedestal, the interior maintenance space for being used to place the die station equipped with prefabricated components at least one of kiln body, the maintenance are empty
Between include the two sidewalls that are disposed in parallel on the pedestal, support conducting subassembly, the support biography are symmetrically arranged on two sidewalls
Guide assembly include along the spaced apart multiple support conduction units in sidewall width direction, it is each support conduction unit include idler wheel and
For connecting the wheel shaft of idler wheel, each idler wheel for supporting conduction unit forms idler wheel assembly line, and the wheel shaft of each support conduction unit
It is detachably connected on the side wall in the maintenance space.
The present invention is by the way that each support conduction unit to be detachably connected on the side wall in the maintenance space, so that support passes
Leading unit can need to be adjusted according to Level-adjusting, and remove part support conduction unit, prefabricated to adapt to different size
The maintenance of component needs, and breaking down in support conduction unit influences in use, being also convenient to carry out dismounting and change.
Further, the side wall includes an organ timbering body, and adjacent two rows cylinder forms the maintenance space, and the wheel shaft
It wears the cylinder and is fixed on the cylinder by fastener, make to support the easy for installation, reliable, adjustable of conduction unit.
Further, the pedestal is bolted with the side wall through installation, and the connection of the pedestal and the side wall
Place's setting height adjustment mechanism, facilitates the levelness that entire kiln body is adjusted when installation, and as part occurs in later period use process
Deformation can also be adjusted by height adjustment mechanism.
Further, the height adjustment mechanism include the wedge block being arranged between the pedestal and side wall and with it is described
Pedestal is threadedly coupled and supports the adjusting bolt in the sidewall bottom.In this way, sidewall bottom makees backing plate using wedge block, and
The distance between side wall and pedestal are adjusted with bolt is adjusted, is made in curing kilns installation and later maintenance, the adjusting of kiln body levelness
More convenient, adjustment cost is substantially reduced.
Further, the support conduction unit on the two sidewalls in the maintenance space is symmetrical arranged two-by-two, so as to prefabricated
The support of component is more steady.
Further, along conducting subassembly is supported described in short transverse setting multilayer on the two sidewalls in the maintenance space, often
Layer support conducting subassembly forms a maintenance position, to increase the primary maintenance quantity of kiln body.
Further, the kiln body further includes top cover, and the pedestal and the top cover are detachably connected the maintenance space
Side wall, and the top cover and the pedestal are respectively frame structure, and the side wall includes an organ timbering body, so that maintenance is empty
Between ventilated performance it is more preferable.
Further, first pull rod of the installation for laterally reinforcing on the side wall.
Further, the back side installation of the kiln body is for positive the second pull rod reinforced.
Based on the same inventive concept, the present invention provides the application methods of the prefabricated components curing kilns comprising:
The die station equipped with prefabricated components is conveyed to kiln body;
The die station equipped with prefabricated components is sent to the import of corresponding maintenance position, by the branch of the maintenance position by descending operation
Die station equipped with prefabricated components is pushed to corresponding maintenance position and conserved by the idler wheel rolling action for supportting conduction unit;
After the completion of conserving, the mould of prefabricated components will be housed by the idler wheel rolling action of the support conduction unit of maintenance position
Platform sends out maintenance position.
The present invention had both been able to satisfy the set requirement of curing kilns, and can also be according to the Level-adjusting need of prefabricated components
Part support conduction unit is removed, moreover it is possible to adapt to different rule by removably supporting conduction unit to carry out Level-adjusting
The maintenance of lattice prefabricated components needs, in support conduction unit failure influence in use, being also convenient to carry out dismounting and change,
Thus curing kilns integral device is easy installation and reliable, and later maintenance is easy to maintenance easy, can reach save the cost, improves production effect
Rate, various improvement effects such as optimization properties of product.
Detailed description of the invention
Fig. 1 is the three-dimensional structure diagram of one embodiment of prefabricated components curing kilns of the present invention.
Fig. 2 is the structure and connection relationship diagram of the first roll wheel assembly of the invention.
Fig. 3 is the structure and connection relationship diagram of the second roll wheel assembly of the invention.
Fig. 4 is the structure and connection relationship diagram of height adjustment mechanism of the present invention.
In figure: 1 pedestal, 2 top covers, 3 cylinders, 4 first roll wheel assemblies, 5 second roll wheel assemblies, 6 first pull rods, 7 second draw
Bar, 8 height adjustment mechanisms, 9 installation bolts, 401 first idler wheels, 402 first wheel shafts, 403 first nuts, 501 second idler wheels,
502 second wheel shafts, 503 second nuts, 801 wedge blocks adjust bolt 802, and A conserves space, B side wall.
Specific embodiment
Below in conjunction with specific preferred embodiment, the invention will be further described, but not thereby limiting the invention
Protection scope.
For ease of description, the description of the relative positional relationship (such as: upper and lower, left and right) of each component is according to explanation
Restriction effect is not played to the structure of this patent come what is be described in the Butut direction of book attached drawing.
Embodiment 1:
As shown in Figure 1, one embodiment of prefabricated components curing kilns of the present invention includes kiln body, pedestal 1, top is arranged in the bottom of kiln body
Top cover 2 is arranged in portion, and pedestal 1 is fixed on the ground by expansion bolt, and multiple side wall B, pedestal are arranged between pedestal 1 and top cover 3
1, top cover 2 and side wall B, which enclose, sets to form at least one for placing the maintenance space A that the die station of prefabricated components is housed.It is each to support
Shield space A includes the two sidewalls B being disposed in parallel on pedestal 1, and Multi-layer supporting conducting subassembly is symmetrical arranged on the B of two sidewalls, and one supports
The one layer of support conducting subassembly protected in the A of space forms a maintenance position.One support conducting subassembly includes along sidewall width direction interval
Arrangement and linear distributing multiple support conduction units.
Side wall B includes the organ timbering body 3 being intervally arranged along sidewall width direction, and it is empty that adjacent two rows cylinder 3 forms a maintenance
Between A.First pull rod 6 is mounted on the cylinder 3 of the side wall B of kiln body side, for reinforcing the lateral stability of kiln body.Second
Pull rod 7 is mounted on the cylinder 3 at the kiln body back side, for reinforcing the stability of kiln body forward direction.
Cylinder 3 is linked into an integrated entity with pedestal 1, top cover 3 by installing bolt 9.The lower surface of each cylinder 3 is upper with pedestal 1
Height adjustment mechanism 8 for adjusting kiln body integral level degree is set between surface.
Support conduction unit includes the first roll wheel assembly 4 being arranged on kiln body outside side wall and is arranged in kiln
The second roll wheel assembly 5 in body middle part of sliding channel.As shown in Fig. 2, the first roll wheel assembly 4 includes: the first idler wheel 401, the first wheel shaft
402, the first nut 403, the first idler wheel 401 roll the one end for being mounted on the first wheel shaft 402, and the other end of the first wheel shaft 402 is set
Set screw thread, and be placed through kiln body outside side wall cylinder 3 mounting hole after be fixed on cylinder 3 with the first nut 403.Such as figure
Shown in 3, the second roll wheel assembly 5 includes: two the second idler wheels 501, the second wheel shaft 501, the second nut 503, two the second idler wheels
501 roll the both ends for being mounted on the second wheel shaft 501 respectively, and the middle part of the second wheel shaft 501 is fixed on by the second nut 503 to be located at
In the mounting hole of the cylinder 3 of kiln body middle part of sliding channel.Setting height is different multiple on a cylinder 3 of kiln body outside side wall
First roll wheel assembly 4, different multiple second roll wheel assemblies 5 of setting height on a cylinder 3 of kiln body middle part of sliding channel, respectively
The first roll wheel assembly 4 and the second roll wheel assembly 5 or the second roll wheel assembly 5 and the second roll wheel assembly 5 in maintenance space is right two-by-two
Claim arrangement, it is same maintenance space A in same side wall B cylinder 3 on mutually level first roll wheel assembly 4 or identical height
The first roll wheel assembly 5 be respectively formed idler wheel assembly line, when for accessing prefabricated components die station carry out die station support and importing
Or export.
As shown in figure 4, height adjustment mechanism 8 includes 4 wedge blocks, 801,4 adjustings bolts 802, and when height adjustment, tune
The bottom-up threaded hole on pedestal 1 of bolt 802 is saved to control under each cylinder 3 by adjusting the adjusting of bolt 802
Gap between 1 upper surface of surface and pedestal;Wedge block 801 is placed on the lower surface and 1 upper surface junction of pedestal of cylinder 3
The effect of robust structure is played in gap;Cylinder 3 and pedestal 1 are connected and fixed finally by installation bolt 9.
Workflow of the present invention are as follows:
The die station equipped with prefabricated components is conveyed to kiln body;
The die station equipped with prefabricated components is sent to the import of corresponding maintenance position, by the branch of the maintenance position by descending operation
Die station equipped with prefabricated components is pushed to corresponding maintenance position and conserved by the idler wheel rolling action for supportting conduction unit;
After the completion of conserving, the mould of prefabricated components will be housed by the idler wheel rolling action of the support conduction unit of maintenance position
Platform sends out maintenance position.
The above is only the preferred embodiment of the application, not does any type of limitation to the application, although this Shen
Please disclosed as above with preferred embodiment, however not to limit the application, any person skilled in the art is not taking off
In the range of technical scheme, a little variation or modification are made using the technology contents of the disclosure above and is equal to
Case study on implementation is imitated, is belonged in technical proposal scope.
Claims (10)
1. a kind of prefabricated components curing kilns, the kiln body including having pedestal, kiln body is interior to have at least one for placing equipped in advance
The maintenance space of the die station of component processed, the maintenance space include the two sidewalls being disposed in parallel on the pedestal, on two sidewalls
It is symmetrically arranged with support conducting subassembly, which is characterized in that the support conducting subassembly includes along sidewall width direction arranged for interval
Multiple support conduction units, each to support conduction unit include idler wheel and the wheel shaft for connecting idler wheel, and each support conduction is single
The idler wheel of member forms idler wheel assembly line, and the wheel shaft of each support conduction unit is detachably connected on the side wall in the maintenance space
On.
2. a kind of prefabricated components curing kilns according to claim 1, which is characterized in that the side wall includes an organ timbering body,
Adjacent two rows cylinder forms the maintenance space, and the wheel shaft wears the cylinder and is fixed on the cylinder by fastener
On.
3. a kind of prefabricated components curing kilns according to claim 1, which is characterized in that the pedestal is with the side wall through pacifying
Dress is bolted, and height adjustment mechanism is arranged in the junction of the pedestal and the side wall.
4. a kind of prefabricated components curing kilns according to claim 3, which is characterized in that the height adjustment mechanism includes setting
It sets the wedge block between the pedestal and side wall and is threadedly coupled with the pedestal and supports the tune in the sidewall bottom
Save bolt.
5. a kind of prefabricated components curing kilns according to claim 1, which is characterized in that on the two sidewalls in the maintenance space
Support conduction unit be symmetrical arranged two-by-two.
6. a kind of prefabricated components curing kilns according to claim 1, which is characterized in that on the two sidewalls in the maintenance space
Along conducting subassembly is supported described in short transverse setting multilayer, every layer of support conducting subassembly forms a maintenance position.
7. a kind of prefabricated components curing kilns according to claim 1, which is characterized in that the kiln body further includes top cover, institute
It states pedestal and the top cover is detachably connected the side wall in the maintenance space, and the top cover and the pedestal are respectively frame knot
Structure, the side wall include an organ timbering body.
8. a kind of prefabricated components curing kilns according to claim 7, which is characterized in that installation is for lateral on the side wall
The first pull rod reinforced.
9. a kind of prefabricated components curing kilns according to claim 7, which is characterized in that the back side installation of the kiln body is used for
The second pull rod that forward direction is reinforced.
10. a kind of application method of prefabricated components curing kilns of any of claims 1-9, characterized by comprising:
The die station equipped with prefabricated components is conveyed to kiln body;
The die station equipped with prefabricated components is sent to the import of corresponding maintenance position by descending operation, is passed by the support of the maintenance position
Die station equipped with prefabricated components is pushed to corresponding maintenance position and conserved by the idler wheel rolling action for leading unit;
After the completion of conserving, the die station equipped with prefabricated components is sent by the idler wheel rolling action of the support conduction unit of maintenance position
Position is conserved out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910692359.2A CN110315634A (en) | 2019-07-29 | 2019-07-29 | A kind of prefabricated components curing kilns and its application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910692359.2A CN110315634A (en) | 2019-07-29 | 2019-07-29 | A kind of prefabricated components curing kilns and its application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110315634A true CN110315634A (en) | 2019-10-11 |
Family
ID=68124772
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910692359.2A Pending CN110315634A (en) | 2019-07-29 | 2019-07-29 | A kind of prefabricated components curing kilns and its application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110315634A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111186006A (en) * | 2020-01-07 | 2020-05-22 | 苏州嘉盛万城建筑工业有限公司 | Steam and electric auxiliary heating dual-purpose pre-curing kiln for PC (polycarbonate) production line |
CN117484660A (en) * | 2023-11-20 | 2024-02-02 | 苏州嘉盛宝成建筑科技有限公司 | Curing kiln and curing process for PC component production |
CN117656229A (en) * | 2023-12-13 | 2024-03-08 | 苏州嘉盛宝成建筑科技有限公司 | Surrounding and blocking device for PC component curing kiln and preparation method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202519014U (en) * | 2012-04-05 | 2012-11-07 | 山东滨州博莱威生物技术有限公司 | Bottle conveying device of penicillin bottle filling machine |
KR20140087306A (en) * | 2012-12-28 | 2014-07-09 | 서보산업 주식회사 | Pillar heat truss |
CN204076475U (en) * | 2014-08-07 | 2015-01-07 | 深圳市纳瑞科技有限公司 | The three-dimensional curing kilns body of heavy cement pre-fabricated panel |
CN205272283U (en) * | 2016-01-11 | 2016-06-01 | 河北榆构建材有限公司 | A three -dimensional curing kilns for maintenance of precast concrete component steam |
CN210758367U (en) * | 2019-07-29 | 2020-06-16 | 长沙远大住宅工业集团股份有限公司 | Prefabricated component curing kiln |
-
2019
- 2019-07-29 CN CN201910692359.2A patent/CN110315634A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202519014U (en) * | 2012-04-05 | 2012-11-07 | 山东滨州博莱威生物技术有限公司 | Bottle conveying device of penicillin bottle filling machine |
KR20140087306A (en) * | 2012-12-28 | 2014-07-09 | 서보산업 주식회사 | Pillar heat truss |
CN204076475U (en) * | 2014-08-07 | 2015-01-07 | 深圳市纳瑞科技有限公司 | The three-dimensional curing kilns body of heavy cement pre-fabricated panel |
CN205272283U (en) * | 2016-01-11 | 2016-06-01 | 河北榆构建材有限公司 | A three -dimensional curing kilns for maintenance of precast concrete component steam |
CN210758367U (en) * | 2019-07-29 | 2020-06-16 | 长沙远大住宅工业集团股份有限公司 | Prefabricated component curing kiln |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111186006A (en) * | 2020-01-07 | 2020-05-22 | 苏州嘉盛万城建筑工业有限公司 | Steam and electric auxiliary heating dual-purpose pre-curing kiln for PC (polycarbonate) production line |
CN111186006B (en) * | 2020-01-07 | 2021-04-13 | 苏州嘉盛万城建筑工业有限公司 | Steam and electric auxiliary heating dual-purpose pre-curing kiln for PC (polycarbonate) production line |
CN117484660A (en) * | 2023-11-20 | 2024-02-02 | 苏州嘉盛宝成建筑科技有限公司 | Curing kiln and curing process for PC component production |
CN117484660B (en) * | 2023-11-20 | 2024-05-24 | 苏州嘉盛宝成建筑科技有限公司 | Curing kiln and curing process for PC component production |
CN117656229A (en) * | 2023-12-13 | 2024-03-08 | 苏州嘉盛宝成建筑科技有限公司 | Surrounding and blocking device for PC component curing kiln and preparation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110315634A (en) | A kind of prefabricated components curing kilns and its application method | |
CN103922077B (en) | A kind of ampulla connecting gear | |
CN204173467U (en) | A kind of belt roller regulates support | |
CN203638637U (en) | Suspension type H-shaped conveying frame | |
CN208345151U (en) | A kind of H profile steel delivery track | |
CN203568087U (en) | Adjustable and recyclable packing device | |
CN206880410U (en) | A kind of Multifunctional rack | |
CN214731798U (en) | Coal mining machine electric automation conveyer | |
CN210758367U (en) | Prefabricated component curing kiln | |
CN201742508U (en) | Guide rail for communication frame and communication frame | |
CN204508718U (en) | A kind of guide piece of stacker loading platforms | |
CN210791441U (en) | PC component curing kiln | |
CN209139678U (en) | A kind of Adjustable horizontal plate stock shelf | |
CN209241576U (en) | Adjustable transport support | |
CN202540675U (en) | Regulating device of injection molding machine | |
CN206552714U (en) | A kind of delivery track | |
CN204953527U (en) | Water heater colored steel roller for shell | |
CN207226795U (en) | A kind of clamping device of staircase or pavement chain | |
CN206580192U (en) | A kind of oscillation feed tray of pin rod | |
CN206580193U (en) | A kind of oscillation feed tray suitable for pin rod | |
CN212260892U (en) | A freely adjust high western medicine cupboard for depositing western medicine | |
CN216611784U (en) | Feeding device for electric bed packing | |
CN219219827U (en) | Bottom support frame structure for electric pole framework concrete distribution | |
CN218706421U (en) | Variable-distance track | |
CN210260226U (en) | Continuous composite material pusher |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |