CN220395152U - Novel scaffold wall connecting piece - Google Patents

Novel scaffold wall connecting piece Download PDF

Info

Publication number
CN220395152U
CN220395152U CN202322034521.6U CN202322034521U CN220395152U CN 220395152 U CN220395152 U CN 220395152U CN 202322034521 U CN202322034521 U CN 202322034521U CN 220395152 U CN220395152 U CN 220395152U
Authority
CN
China
Prior art keywords
steel tube
scaffold
steel pipe
screw rod
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322034521.6U
Other languages
Chinese (zh)
Inventor
刘路
陆树航
吉登松
邓志峰
余烈俊
王辉
卢志钊
张晨
潘德发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN202322034521.6U priority Critical patent/CN220395152U/en
Application granted granted Critical
Publication of CN220395152U publication Critical patent/CN220395152U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a novel scaffold wall connecting piece, which comprises a screw hole and a scaffold left on a wall body after an aluminum mould is used, and further comprises a screw, wherein the screw penetrates through the screw hole, one end of the screw, which faces the scaffold, is sleeved with a telescopic steel pipe, one end of the telescopic steel pipe, which faces the scaffold, is provided with a disc fastener which is fixedly connected with the scaffold, and one end of the screw, which is far away from the telescopic steel pipe, extends out of the wall body and is connected with a nut. The utility model adopts a sleeving connection mode, does not need welding tools, has higher safety and faster installation efficiency, does not need pre-burying steel pipes or pre-burying holes in advance, and reduces construction steps.

Description

Novel scaffold wall connecting piece
Technical Field
The utility model relates to the technical field of scaffold wall connecting pieces, in particular to a novel scaffold wall connecting piece.
Background
The scaffold is an indispensable structure for building construction, and the scaffold needs to be connected with a building for fixing through a wall connecting piece when the scaffold is built. In the past, when installing even wall spare, need pre-buried steel pipe or reserve the pre-buried hole of fixed steel pipe on the building, this kind of mode not only need the building to pour before reserving the cavity, and it is comparatively troublesome when demolising even wall spare, follow-up needs to fill the cavity, has certain influence to the intensity of building in more places in the cavity, and because pre-buried steel pipe demolishs the back, the entrance to a cave is great, has great filling trace after filling, with building integration inadequately, influences the outward appearance. In addition, the traditional wall connecting piece is generally installed in a welding mode, so that the installation efficiency is low, and the risk of fire is present. Therefore, a novel scaffold wall connecting piece which does not need to be embedded with steel pipes, is more attractive and does not need to be welded by fire is needed.
Disclosure of Invention
The utility model provides a novel scaffold wall connecting piece, which aims to solve the problems in the background technology.
In order to solve the problems, the utility model adopts the following technical scheme:
the utility model provides a novel scaffold frame even wall spare, remains screw rod hole and scaffold frame on the wall body after the aluminium mould uses, still includes the screw rod, the screw rod passes the screw rod hole, the screw rod cup joints towards the one end of scaffold frame and a flexible steel pipe, the one end of flexible steel pipe towards scaffold frame is equipped with a set fastener and scaffold frame fixed connection, the one end that flexible steel pipe was kept away from to the screw rod stretches out the wall body and is connected with a nut outward. The screw hole is fully utilized, the steps of embedding the steel pipe during construction are reduced, and the screw hole is smaller, so that the repair is convenient.
Preferably, the telescopic steel tube comprises a first steel tube and a second steel tube, the outer diameter of the first steel tube is smaller than the inner diameter of the second steel tube, the first steel tube is sleeved in the second steel tube, a plurality of first perforations are respectively arranged at two ends of the first steel tube, a third perforation is arranged at one end, facing the first steel tube, of the screw rod, one end, which is provided with the third perforation, of the screw rod stretches into the first steel tube and is fixedly connected with the first perforation through a bolt, and a disc fastener is arranged at one end, facing the scaffold, of the second steel tube. The first steel pipe, the second steel pipe and the screw are connected in a sleeving manner, welding connection is not needed, the welding device can be installed only by carrying a torque wrench during installation, a welding tool is not needed, the installation speed is higher, and the safety is high. The second steel pipe is fixedly connected with the scaffold through a disc fastener.
Preferably, one end of the screw rod facing the first steel pipe is a square block, the three through holes are positioned on the square block, and one end of the first steel pipe facing the screw rod is provided with a square cavity which is matched and sleeved with the square block. The square block and the square cavity are used for positioning and fixing the first steel pipe and the end of the screw rod, so that the installation efficiency is improved, the accuracy in installation is improved, and the experience requirement of workers in manual installation is reduced.
Preferably, the second steel pipe is a hollow circular pipe, a plurality of through holes are formed in the second steel pipe, and the first steel pipe and the second steel pipe are connected through adjusting bolts driven into the through holes. The lengths of the first steel pipe and the second steel pipe after being connected are adjusted by adjusting different connections between the first perforation and the second perforation, so that the scaffold is suitable for different distances between the scaffold and the wall body.
Preferably, a steel pad is sleeved on the screw rod between the nut and the wall body. The internal diameter of the steel pad is smaller than the external diameter of the nut, the external diameter of the steel pad is larger than the external diameter of the nut, and rubber pads can be added on two side surfaces of the steel pad for preventing the nut from directly contacting with a wall body to damage the wall body, or the nut is rotated due to external force such as vibration in the use process.
Compared with the prior art, the utility model has the following beneficial effects:
the screw hole is integrally connected in a sleeving manner by adopting the bolts, a welding tool is not required, the safety is higher during installation, the installation efficiency is higher, the screw hole is fully utilized for installation, a steel pipe or a pre-embedded hole is not required to be pre-embedded in advance, the construction steps are reduced, the diameter of the screw hole is smaller than that of the pre-embedded hole which is required to be preset in the past, the construction is more convenient in the subsequent repair work, and the repair trace after repair is small;
the first steel pipe, the second steel pipe and the screw are all installed through sleeving, the installation is convenient, the installation speed is high, and when needed, the positions corresponding to the first perforation and the second perforation are corresponding to the first perforation through the adjusting bolts, so that the length of the first steel pipe and the second steel pipe after being connected is adjusted, and the installation between different distances between the scaffold and the wall body is adapted.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic illustration of an unconnected structure of the present utility model;
FIG. 3 is a schematic view of the attachment of the disc fastener to a scaffold of the present utility model;
1 screw rod, 11 square block, 2 flexible steel pipe, 21 steel pipe one, 22 steel pipe two, 23 square cavity, 4 nut, 5 dish fastener, 61 perforation one, 62 perforation two, 63 perforation three, 7 scaffold.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, a novel scaffold wall connecting piece comprises a screw hole left on a wall body after an aluminum mould is used, a scaffold 7 and a screw 1, wherein the screw 1 penetrates through the screw hole, one end of the screw 1, facing the scaffold 7, is sleeved with a telescopic steel tube 2, one end, facing the scaffold 7, of the telescopic steel tube 2 is provided with a disc fastener 5 and fixedly connected with the scaffold 7, and one end, far away from the telescopic steel tube 2, of the screw 1 extends out of the wall body and is connected with a nut 4. The screw hole is fully utilized, the steps of embedding the steel pipe during construction are reduced, and the screw hole is smaller, so that the repair is convenient. The screw 1 is provided with threads on the surface, so that the friction force with the inner wall of the screw hole can be improved when the screw is in the hole, and the movement can be prevented when the screw is used. The screw 1 is sized to match the screw hole so that the screw 1 can pass through the screw hole.
The telescopic steel tube 2 comprises a first steel tube 21 and a second steel tube 22, the outer diameter of the first steel tube 21 is smaller than the inner diameter of the second steel tube 22, the first steel tube 21 is sleeved into the second steel tube 22, a plurality of first through holes 61 are respectively formed in two ends of the first steel tube 21, a third through hole 63 is formed in one end, facing the first steel tube 21, of the screw 1, one end, provided with the third through hole 63, of the screw 1 stretches into the first steel tube 21 to be fixedly connected with the first through holes 61 through bolts, and a disc fastener 5 is arranged at one end, facing the scaffold 7, of the second steel tube 22. The first steel pipe 21, the second steel pipe 22 and the screw 1 are connected in a sleeving manner, welding connection is not needed, the welding device can be installed only by carrying a torque wrench during installation, a welding tool is not needed, the installation speed is higher, and the safety is high. The second steel pipe 22 is fixedly connected with the scaffold 7 through the disc fastener 5.
The one end of screw rod 1 towards steel pipe one 21 is square piece 11, perforation three 63 is located square piece 11, steel pipe one 21 towards screw rod 1 one end be equipped with square cavity 23 that the cooperation of square piece 11 cup jointed. The first steel pipe 21 and the end part of the screw rod 1 are positioned and fixed through the square block 11 and the square cavity 23, so that the installation efficiency is accelerated, the accuracy in installation is improved, and the experience requirement of workers in manual installation is reduced.
The second steel pipe 22 is a hollow round pipe, a plurality of second perforations 62 are formed in the second steel pipe 22, and the first steel pipe 21 and the second steel pipe 22 are connected through adjusting bolts driven into the first perforations 61 and the second perforations 62. The lengths of the first steel pipe 21 and the second steel pipe 22 after being connected are adjusted by adjusting different connections between the first perforation 61 and the second perforation 62, so that the scaffold is suitable for different distances between the scaffold 7 and the wall body.
A steel pad is sleeved on the screw rod 1 between the nut 4 and the wall body. The internal diameter of steel pad is less than the external diameter of nut 4, and the external diameter of steel pad is greater than the external diameter of nut 4, and the rubber pad can be added to steel pad both sides face for prevent nut 4 direct and wall body contact damage wall body, perhaps cause nut 4 rotation because of external force reasons such as vibrations in the use.
When the utility model is used, the steel pipe I21, the steel pipe II 22 and the screw 1 are sleeved and mounted, the other end of the screw 1 penetrates through the screw hole and then is sequentially connected with the steel gasket and the nut 4, and then the steel pipe I21 and the nut 4 are matched and fixed on the wall body. According to the requirements of different positions, the positions of the first through holes 61 and the second through holes 62 are adjusted, the lengths of the first steel pipe 21 and the second steel pipe 22 are fixed after the nuts 4 are screwed in, the distances between the scaffolds 7 and the walls at different positions are matched, and finally the scaffolds 7 are fixedly installed through the disc fasteners 5.
The utility model adopts a sleeving connection mode, does not need welding tools, has higher safety and faster installation efficiency, does not need pre-burying steel pipes or pre-burying holes in advance, and reduces construction steps.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (5)

1. Novel scaffold links wall spare, leave over screw rod hole and scaffold (7) on the wall body after the aluminium mould uses, its characterized in that: still include screw rod (1), screw rod (1) pass the screw rod hole, the one end of screw rod (1) orientation scaffold frame (7) cup joints with a flexible steel pipe (2), the one end of flexible steel pipe (2) orientation scaffold frame (7) is equipped with dish fastener (5) and scaffold frame (7) fixed connection, the one end that the flexible steel pipe (2) was kept away from to screw rod (1) stretches out the wall body and is connected with a nut (4) outward.
2. The novel scaffold wall coupling according to claim 1, wherein: the telescopic steel tube (2) comprises a first steel tube (21) and a second steel tube (22), the outer diameter of the first steel tube (21) is smaller than the inner diameter of the second steel tube (22) and the first steel tube (21) is sleeved in the second steel tube (22), a plurality of first through holes (61) are respectively formed in two ends of the first steel tube (21), a third through hole (63) is formed in one end, facing the first steel tube (21), of the screw (1), one end, provided with the third through hole (63), of the screw (1) stretches into the first steel tube (21) and is fixedly connected with the first through holes (61) through bolts, and a disc fastener (5) is arranged at one end, facing the scaffold (7), of the second steel tube (22).
3. The novel scaffold wall coupling according to claim 2, wherein: one end of the screw rod (1) facing the first steel pipe (21) is provided with a square block (11), the third perforated hole (63) is positioned on the square block (11), and one end of the first steel pipe (21) facing the screw rod (1) is provided with a square cavity (23) which is matched and sleeved with the square block (11).
4. A novel scaffold wall coupling according to claim 3, wherein: the steel tube II (22) is a hollow round tube, a plurality of through holes II (62) are formed in the steel tube II (22), and the steel tube I (21) and the steel tube II (22) are connected through adjusting bolts driven into the through holes I (61) and the through holes II (62).
5. The novel scaffold wall coupling according to claim 1, wherein: a steel pad is sleeved on the screw rod (1) between the nut (4) and the wall body.
CN202322034521.6U 2023-07-31 2023-07-31 Novel scaffold wall connecting piece Active CN220395152U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322034521.6U CN220395152U (en) 2023-07-31 2023-07-31 Novel scaffold wall connecting piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322034521.6U CN220395152U (en) 2023-07-31 2023-07-31 Novel scaffold wall connecting piece

Publications (1)

Publication Number Publication Date
CN220395152U true CN220395152U (en) 2024-01-26

Family

ID=89605923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322034521.6U Active CN220395152U (en) 2023-07-31 2023-07-31 Novel scaffold wall connecting piece

Country Status (1)

Country Link
CN (1) CN220395152U (en)

Similar Documents

Publication Publication Date Title
CN220395152U (en) Novel scaffold wall connecting piece
CN108747966B (en) Installation tool for sheath of warm air water pipe
CN205033132U (en) A T type long arm sleeve for fastening lead screw
CN207027326U (en) Stud screws in spanner
CN211548091U (en) Extension prosthetic devices of buried bolt in advance
CN113733003B (en) Hydraulic torque wrench reaction force arm fulcrum positioning support
CN213452233U (en) Flange head for building engineering convenient to change
JP3147904U (en) Wire clamp clamping jig
CN205996866U (en) A kind of interior Hexagonal jacket joint of tiltable angle
CN210307634U (en) Chain drive nodular cast iron pipe socket joint connecting device
CN220807178U (en) Telescopic quick mounting tool for top plate expansion bolts
CN212055417U (en) Expansion screw for car-repairing gecko
CN110644625A (en) Extension prosthetic devices of buried bolt in advance
CN209923703U (en) Novel torque wrench
CN210307633U (en) Double-screw rod driven socket joint connecting device for nodular cast iron pipe
CN212384995U (en) Automatic oil pipe bolt tightening equipment
CN2474855Y (en) Pipeline connector
CN210939066U (en) Rubber tube joint kludge
CN216239829U (en) Simple hanger rod mounting tool
CN219426701U (en) Novel urea electronic sensor assembly fixture
CN211220496U (en) Wind power generation bolt torque tightening tool
CN212497481U (en) Special tool for assembling and disassembling tower crane
CN216299133U (en) Wire-pulling locking structure without operating gap
CN209011753U (en) A kind of top plate percussive drilling equipment
CN213539681U (en) Building frame connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant