CN220389910U - High-precision bridge construction drilling device - Google Patents
High-precision bridge construction drilling device Download PDFInfo
- Publication number
- CN220389910U CN220389910U CN202321908594.7U CN202321908594U CN220389910U CN 220389910 U CN220389910 U CN 220389910U CN 202321908594 U CN202321908594 U CN 202321908594U CN 220389910 U CN220389910 U CN 220389910U
- Authority
- CN
- China
- Prior art keywords
- base
- fixed mounting
- fixedly arranged
- bridge construction
- dust collection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 29
- 238000010276 construction Methods 0.000 title claims abstract description 21
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 60
- 239000000428 dust Substances 0.000 claims abstract description 50
- 239000007921 spray Substances 0.000 claims abstract description 22
- 238000009434 installation Methods 0.000 claims abstract description 15
- 230000000149 penetrating effect Effects 0.000 claims abstract description 8
- 230000001681 protective effect Effects 0.000 claims description 4
- 238000010521 absorption reaction Methods 0.000 abstract description 5
- 238000001816 cooling Methods 0.000 abstract description 4
- 238000005507 spraying Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 7
- 230000008569 process Effects 0.000 description 7
- 230000008901 benefit Effects 0.000 description 6
- 230000009471 action Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model relates to the technical field of construction drilling devices and discloses a high-precision bridge construction drilling device which comprises a base, wherein electric telescopic legs are fixedly arranged on the periphery of the bottom end of the base, pulleys are fixedly arranged at the bottom end of the electric telescopic legs, a water tank is arranged at the top end of the base, upright posts are symmetrically and fixedly arranged at the top end of the base, a top plate is fixedly arranged at the top end of the upright posts, a cylinder is fixedly arranged at the top end of the top plate, a fixed block is fixedly arranged at the bottom end of the cylinder, an installation block is detachably arranged at the bottom end of the fixed block, a motor is fixedly arranged at the bottom end of the installation block, a drill rod is fixedly arranged at the output shaft of the motor, a through hole is formed in the top end of the base in a penetrating manner, and a water spraying ring is fixedly arranged on the inner wall of the through hole. This bridge construction drilling equipment of high accuracy is through setting up dust absorption head, dust absorption pipe and dust catcher, is convenient for absorb the dust that the device body produced in the course of the work, and through setting up water tank and spray ring, is convenient for carry out water spray cooling to the drilling rod after the work and handle.
Description
Technical Field
The utility model relates to the technical field of construction drilling devices, in particular to a high-precision bridge construction drilling device.
Background
The drilling machine refers to a machine or equipment for forming a cylindrical hole or hole in a target object by rotary cutting or rotary extrusion by using a tool which is harder and sharper than the target object, and is also called a drilling machine, a perforating machine, a punching machine, a perforating machine and the like, and the desired effect is achieved by drilling a precision part.
According to the search discovery, chinese patent document, grant bulletin number CN215256058U discloses a bridge engineering construction drilling equipment, the device is through being provided with dust cover, the water tank, the cooperation of outlet pipe and shower nozzle is used, thereby can effectually prevent that the dust from flying in disorder, cause pollution and reduce the dust and be absorbed by constructor, ensure constructor's healthy, but the shower nozzle is direct installs in the drill bit side in the device, though can restrain the dust of drill bit working process, but the rubble of splashing at will, probably splash on the shower nozzle, cause certain damage to the shower nozzle, and the drill bit is after drilling, the high temperature is too high, if high temperature time lasts longer, can influence the life of drill bit, the suitability of the device body has been reduced, so need improve current device, in order to satisfy actual demand.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides a high-precision bridge construction drilling device which has the advantages of good dust settling effect, cooling of a drill rod and the like, and solves the technical problems.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a bridge construction drilling equipment of high accuracy, includes the base, fixed mounting has electric telescopic leg all around in the base bottom, electric telescopic leg bottom fixed mounting has the pulley, the water tank has been placed on the base top, base top symmetry fixed mounting has the stand, stand top fixed mounting has the roof, roof top fixed mounting has the cylinder, cylinder bottom fixed mounting has the fixed block, fixed block bottom demountable installation has the installation piece, installation piece bottom fixed mounting has the motor, motor output shaft fixed mounting has the drilling rod, the through-hole has been seted up in the base top penetration, through-hole inner wall fixed mounting has the spray ring, the dust catcher is installed to the base side, through-hole side fixed mounting has the dust absorption pipe, dust absorption pipe bottom array link up and installs the dust absorption head.
Preferably, a push rod is fixedly arranged at the side end of the base.
Through above-mentioned technical scheme, push rod cooperation pulley is convenient for remove the device body to arbitrary position.
Preferably, the water tank is limited at the top end of the base through the corner connector, and the top end of the water tank is provided with a water inlet.
Through above-mentioned technical scheme, carry the water to the water tank through the water inlet in, the water tank is inside to be provided with miniature water pump simultaneously.
Preferably, the mounting block is mounted at the bottom end of the fixed block through a mounting bolt.
Through above-mentioned technical scheme, the installation piece passes through the mounting bolt to be installed in the fixed block bottom, is convenient for carry out the dismouting with the installation piece, has improved the suitability of the device body.
Preferably, the inner wall array of the spray ring is provided with water outlets in a penetrating way, and the spray ring is connected with the water tank in a penetrating way through a hose.
Through above-mentioned technical scheme, in carrying the spray ring with the water in the water tank through the hose, the spray ring goes out water through the delivery port to spray water to the drilling rod and cool down the processing.
Preferably, the dust collection pipe is in through connection with the dust collector through a connecting pipe, and a protective baffle is fixedly arranged at the bottom end of the dust collection head.
Through the technical scheme, the protection baffle can prevent broken stone of the drill rod in the working process from splashing randomly, so that the dust collection head or the dust collection pipe is damaged.
Compared with the prior art, the utility model provides a high-precision bridge construction drilling device, which has the following beneficial effects:
1. according to the utility model, the device body is moved to a proper position under the action of the pulleys by pushing the push rod, the electric telescopic legs are started to adjust the height of the base, the mounting block is mounted at the bottom end of the fixed block through the mounting bolt, the air cylinder is started, the air cylinder drives the drill rod to move downwards, and after the drill rod is moved to a proper position, the motor is synchronously started, and the motor drives the drill rod to rotate, so that the ground is drilled, and in the process of working the drill rod, the dust collector is started, and the dust collector drives the dust collection head to absorb dust in the working process.
2. According to the utility model, the water spray ring is arranged, after the drill rod is finished, the miniature water pump in the water tank is started, the hose is used for conveying water in the water tank to the water spray ring, and then the water is sprayed to the drill rod through the water outlet on the inner wall of the water spray ring, so that the drill rod can be cooled, soil and dust attached to the outer wall of the drill rod can be cleaned, and the applicability of the device body is improved.
Drawings
FIG. 1 is a schematic diagram of a structural bridge construction drilling apparatus of the present utility model;
FIG. 2 is a schematic diagram of a structural bridge construction drilling apparatus of the present utility model in a lower view;
fig. 3 is a schematic view of a front cut-away view of the structural bridge construction drilling apparatus of the present utility model.
Wherein: 1. a base; 2. an electric telescopic leg; 3. a pulley; 4. a water tank; 5. a column; 6. a top plate; 7. a cylinder; 8. a fixed block; 9. a mounting block; 10. a motor; 11. a drill rod; 12. a through hole; 13. a spray ring; 14. a dust collector; 15. a dust collection pipe; 16. a dust collection head.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, a high-precision bridge construction drilling device comprises a base 1, electric telescopic legs 2 are fixedly installed around the bottom end of the base 1, pulleys 3 are fixedly installed at the bottom ends of the electric telescopic legs 2, a water tank 4 is placed at the top end of the base 1, upright posts 5 are symmetrically and fixedly installed at the top ends of the base 1, a top plate 6 is fixedly installed at the top end of the upright posts 5, an air cylinder 7 is fixedly installed at the top end of the top plate 6, a fixed block 8 is fixedly installed at the bottom end of the air cylinder 7, an installation block 9 is detachably installed at the bottom end of the fixed block 8, a motor 10 is fixedly installed at the bottom end of the installation block 9, a drill rod 11 is fixedly installed at the output shaft of the motor 10, a through hole 12 is formed in the top end of the base 1 in a penetrating mode, a water spraying ring 13 is fixedly installed on the inner wall of the through hole 12, a dust collector 14 is installed at the side end of the base 1, a dust collecting pipe 15 is fixedly installed at the side end of the through hole 12, and a dust collecting head 16 is installed in a penetrating mode at the bottom end array of the dust collecting pipe 15.
Specifically, the fixed mounting of base 1 side has the push rod, and advantage is, push rod cooperation pulley 3 is convenient for remove the device body to arbitrary position.
Specifically, water tank 4 is spacing in base 1 top through the angle sign indicating number, and the water inlet has been seted up on water tank 4 top, and the advantage is, carries water tank 4 through the water inlet in, and water tank 4 inside is provided with miniature water pump simultaneously.
Specifically, the installation piece 9 passes through the mounting bolt to be installed in fixed block 8 bottom, and the advantage is, and the installation piece 9 passes through the mounting bolt to be installed in fixed block 8 bottom, is convenient for carry out the dismouting with the installation piece 9, has improved the suitability of the device body.
Specifically, the inner wall array of the spray ring 13 is communicated with a water outlet, the spray ring 13 is communicated with the water tank 4 through a hose, and the advantage is that water in the water tank 4 is conveyed into the spray ring 13 through the hose, and the spray ring 13 discharges water through the water outlet, so that cooling treatment is performed on water sprayed by the drill rod 11.
Specifically, the dust collection pipe 15 is connected with the dust collector 14 in a penetrating way through the connecting pipe, and the bottom end of the dust collection head 16 is fixedly provided with a protective baffle, so that the protective baffle has the advantage of preventing broken stones of the drill rod 11 in the working process from splashing at will, thereby damaging the dust collection head 16 or the dust collection pipe 15.
When the device is used, the device body is moved to a proper position by pushing the push rod under the action of the pulley 3, the electric telescopic leg 2 is started to adjust the height of the base 1, the mounting block 9 is mounted at the bottom end of the fixed block 8 through the mounting bolt, the air cylinder 7 is started, the air cylinder 7 drives the drill rod 11 to move downwards, the motor 10 is synchronously started after the drill rod 11 is moved to a proper position, the motor 10 drives the drill rod 11 to rotate, so that holes are drilled on the ground, the dust collector 14 is started in the working process of the drill rod 11, the dust collector 14 drives the dust collector head 16 to absorb dust in the working process, the water spray ring 13 is arranged, the miniature water pump inside the water tank 4 is started after the working of the drill rod 11 is finished, the hose conveys water in the water tank 4 to the water spray ring 13, then the water outlet on the inner wall of the water spray ring 13 is used for spraying the drill rod 11, not only cooling treatment can be carried out on the drill rod 11, but also the cleaning of soil dust attached to the outer wall of the drill rod 11 is carried out, and the applicability of the device body is improved.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a bridge construction drilling equipment of high accuracy, includes base (1), its characterized in that: the utility model discloses a dust collection device, including base (1), motor, dust collection pipe (15) bottom array, dust collection head (16) are installed in fixed mounting all around in base (1) bottom, motor telescopic leg (2) are fixed mounting all around, motor telescopic leg (2) bottom fixed mounting has pulley (3), water tank (4) have been placed on base (1) top, base (1) top symmetry fixed mounting has stand (5), stand (5) top fixed mounting has roof (6), roof (6) top fixed mounting has cylinder (7), cylinder (7) bottom fixed mounting has fixed block (8), fixed block (8) bottom demountable installation has installation piece (9), installation piece (9) bottom fixed mounting has motor (10), motor (10) output shaft fixed mounting has drilling rod (11), through-hole (12) have been seted up on base (1) top, through-hole (12) inner wall fixed mounting has spray ring (13), dust collector (14) are installed to base (1) side, through-hole (12) side fixed mounting has dust collection pipe (15), dust collection pipe (15) bottom array link up and install dust collection head (16).
2. The high-precision bridge construction drilling device according to claim 1, wherein: the push rod is fixedly arranged at the side end of the base (1).
3. The high-precision bridge construction drilling device according to claim 1, wherein: the water tank (4) is limited at the top end of the base (1) through an angle code, and the top end of the water tank (4) is provided with a water inlet.
4. The high-precision bridge construction drilling device according to claim 1, wherein: the mounting block (9) is mounted at the bottom end of the fixed block (8) through a mounting bolt.
5. The high-precision bridge construction drilling device according to claim 1, wherein: the inner wall array of the spray ring (13) is provided with water outlets in a penetrating way, and the spray ring (13) is connected with the water tank (4) in a penetrating way through a hose.
6. The high-precision bridge construction drilling device according to claim 1, wherein: the dust collection pipe (15) is in through connection with the dust collector (14) through a connecting pipe, and a protective baffle is fixedly arranged at the bottom end of the dust collection head (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321908594.7U CN220389910U (en) | 2023-07-19 | 2023-07-19 | High-precision bridge construction drilling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321908594.7U CN220389910U (en) | 2023-07-19 | 2023-07-19 | High-precision bridge construction drilling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220389910U true CN220389910U (en) | 2024-01-26 |
Family
ID=89601696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321908594.7U Active CN220389910U (en) | 2023-07-19 | 2023-07-19 | High-precision bridge construction drilling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220389910U (en) |
-
2023
- 2023-07-19 CN CN202321908594.7U patent/CN220389910U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202185381U (en) | Four-column type environment-friendly pneumatic dust collecting atomizer | |
CN109676173A (en) | A kind of new type auto puncher | |
CN220389910U (en) | High-precision bridge construction drilling device | |
CN213729532U (en) | Green foundry goods drilling equipment | |
CN212262726U (en) | Dust absorbing device for machining | |
CN210848502U (en) | Milling machine is used in brake arm production | |
CN211802616U (en) | Drill bit fixing device for petroleum drilling | |
CN212492097U (en) | Building waste dust removal spraying system | |
CN210684417U (en) | Cutting device with dust fall function for cement road surface restoration | |
CN211490732U (en) | Building material cutting device for building site | |
CN215374604U (en) | Drilling slag collector of concrete core drilling machine | |
CN213137324U (en) | Vertical glass drilling machine | |
CN212945601U (en) | Energy-saving multi-station drilling machine | |
CN220736871U (en) | Building site dust collector | |
CN220901156U (en) | Plate self-cleaning feeding device suitable for laser cutting machine | |
CN218911078U (en) | Highway construction road surface cutting crushing equipment | |
CN220812240U (en) | Wet concrete spraying trolley | |
CN220533663U (en) | Hole machine suitable for deep hole machining | |
CN220451954U (en) | Underground coal mining dust treatment device | |
CN210993186U (en) | Machine parts washs sewage collection device | |
CN219862601U (en) | Municipal administration dust device | |
CN213049938U (en) | Electric power construction building site dust collector | |
CN214869608U (en) | Adjustable polishing lathe | |
CN213510425U (en) | Road surface drilling equipment is used in road construction | |
CN216800813U (en) | Cleaning device for thread rolling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |