CN220382645U - Telescopic cable support of card solid installation - Google Patents
Telescopic cable support of card solid installation Download PDFInfo
- Publication number
- CN220382645U CN220382645U CN202321389633.7U CN202321389633U CN220382645U CN 220382645 U CN220382645 U CN 220382645U CN 202321389633 U CN202321389633 U CN 202321389633U CN 220382645 U CN220382645 U CN 220382645U
- Authority
- CN
- China
- Prior art keywords
- rod
- clamping
- cable
- main rod
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title description 7
- 239000007787 solid Substances 0.000 title description 2
- 230000006978 adaptation Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 14
- 238000004080 punching Methods 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model relates to a telescopic cable bracket fixedly mounted by clamping, which comprises a main rod, a left clamping rod, a right clamping rod and a telescopic rod, wherein a stop block is arranged on the left end face of the main rod, a thread section is arranged on the right end section, a locking nut is connected to the thread section in a threaded manner, sleeve seats matched with the main rod are arranged at one ends of the two clamping rods, the left sleeve seat can rotate on the main rod, the right sleeve seat can rotate and slide on the main rod, clamping plates are arranged at the opposite faces of the other ends of the two clamping rods, the left clamping rod is sleeved on the main rod and is close to the stop block, the right clamping rod is sleeved on the thread section, and a groove capable of realizing stepless adjustment and clamping is formed by the clamping rods and the main rod so as to fix the bracket on a building main body; the length of the telescopic rod is connected to the right end of the main rod, a cable groove is formed in the telescopic rod, and the position of the cable groove can be adjusted by adjusting the telescopic rod; the cable trough comprises a frame body and the rotating wheel, wherein the frame body is provided with two vertical shafts and one horizontal shaft, the three shafts form a U-shaped structure, the rotating wheel rotates on the shaft, and when a cable slides, the rotating wheel also rotates, so that the cable is prevented from being damaged by friction.
Description
Technical Field
The utility model relates to the technical field of cable brackets, in particular to a telescopic cable bracket fixedly mounted by clamping.
Background
The construction site environment is complex, the number of construction personnel is large, the number of special vehicles is large, the number of construction materials is large, the road condition is poor, and the temporary electricity safety of the construction site is important. The cable support is usually buried by a sleeve or fixed on a building main body when the field illumination cable of the building site is paved, and then the cable is erected on the support.
Disclosure of Invention
In view of the above, the utility model aims to provide a telescopic cable bracket which is fixedly mounted, and effectively solves the problems that the prior cable bracket needs to be perforated on a building main body when being fixed, a construction finished product is damaged, and the prior cable bracket is more troublesome to dismount after the construction is finished.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows: a snap-in mounted retractable cable mount comprising:
the left end face of the main rod is provided with a stop block, the right end section is provided with a threaded section, and the threaded section is connected with a locking bolt in a threaded manner;
the clamping device comprises a left clamping rod and a right clamping rod, wherein one end of the left clamping rod is provided with a left sleeve seat matched with the main rod, one end of the right clamping rod is provided with a right sleeve seat matched with the main rod, the left sleeve seat can rotate on the main rod, and the right sleeve seat can rotate and slide on the main rod; the opposite surfaces of the other ends of the two clamping rods are provided with clamping plates, the left sleeve seat is sleeved on the main rod and is close to the stop block, and the right sleeve seat is sleeved on the threaded section;
the telescopic rod is connected to the right end of the main rod and comprises a fixed rod and a sliding rod, an adjusting hole is formed in the sliding rod, a fixed hole corresponding to the adjusting hole is formed in the fixed rod, the fixed rod is connected to the telescopic rod, the sliding rod is sleeved in the fixed rod, and the fixed rod and the sliding rod penetrate through the fixed hole and are connected with the adjusting hole through a fixed bolt; the telescopic rod is provided with a cable groove, the cable groove comprises a frame body and a rotating wheel, the frame body is provided with two vertical shafts and a horizontal shaft, the three shafts form a U-shaped structure, and the rotating wheel rotates on the shaft.
Further, friction surfaces are arranged between the stop block and the left clamping rod, and between the lock nut and the right clamping rod.
Further, the middle section of the main rod, which is positioned between the left clamping rod and the right clamping rod, is provided with an abutting structure, and the abutting structure is a plate welded on the main rod, or is a section of square tube positioned between the left clamping rod and the right clamping rod.
Further, the sleeve pipe with telescopic link adaptation is installed to the cable groove lower part, is provided with the mounting hole that corresponds with the fixed orifices on the sleeve pipe, and cable groove and telescopic link pass fixed orifices and mounting hole fixed connection through the bolt.
Further, a rubber pad is arranged on one side of the clamping plate, which is in contact with the wall surface.
The beneficial effects of the technical scheme are as follows:
according to the novel cable bracket disclosed by the utility model, the stop block is arranged on the left end face of the main rod, the screw thread section is arranged on the right end section, the locking nut is connected to the screw thread section, the left clamping rod is sleeved on the main rod and is close to the stop block, the right clamping rod is sleeved on the screw thread section, the opposite faces of the two clamping rods are connected with the clamping plates, the distance between the two clamping rods can be adjusted by rotating the locking nut, so that the cable bracket body is clamped on the building main body through the clamping plates, the rubber pad is further arranged on one face of the clamping plates, which is in contact with the building main body, and the friction force between the clamping plates and the building main body can be increased, and the clamping stability of the cable bracket is improved. In addition, the sleeve seat matched and sleeved with the main rod is arranged at one end of each of the two clamping rods, so that the clamping rods can rotate relatively around the main rod, friction surfaces are arranged between the left sleeve seat and the stop block and between the right sleeve seat and the locking nut, and therefore the rotation angle of the clamping rods can be adjusted according to different installation environments, and the cable can be hung upwards through the opening of the cable groove. The cable support is fixed on the building main body through the clamping of the clamping rod and the main rod, so that the damage to the building main body caused by punching construction on a building finished product is avoided, and the cable support is convenient to dismantle after construction is finished.
The cable trough has two vertical shafts and a horizontal shaft on the support body, and three shafts constitute U-shaped structure, and the runner rotates on the axle, and the runner can rotate and the surface of runner is comparatively smooth along with the slip of cable when the cable slides, can not damage the cable because of the friction, improves the life of cable, ensures the safety in utilization. The sleeve pipe of cable duct lower extreme setting and telescopic link adaptation is fixed the cable duct on the telescopic link through the fixed orifices on the sleeve pipe, and the length of telescopic link is adjustable, can adjust the position of cable duct according to the scene condition on the one hand, on the other hand can increase the quantity of cable duct according to the user demand of difference.
The middle section of the main rod, which is positioned on the left clamping rod or the right clamping rod, is provided with an abutting structure, the abutting structure is used for abutting on a building surface, and the phenomenon that the cable slides in the groove due to external force or self gravity of the cable, and the main rod rotates relative to the clamping rod when the friction force between the left sleeve seat and the stop block and between the right sleeve seat and the lock nut is too small is prevented, so that the opening of the cable groove is not upward any more, and the cable falls off.
Drawings
FIG. 1 is a schematic view of a snap-in mounted retractable cable mount according to the present utility model;
FIG. 2 is a side view of a snap-fit retractable cable mount of the present utility model;
fig. 3 is a schematic view of the installation of a telescopic cable support of the present utility model.
Reference numerals: the device comprises a main rod 1, a left clamping rod 2, a right clamping rod 3, a left sleeve seat 4, a right sleeve seat 5, a 6-clamping plate, a 7-rubber pad 8, a stop block 9, a locking nut 10, a friction surface 11, a threaded section 12, a telescopic rod 13, a fixed rod 14, a sliding rod 15, a sleeve 16, a rotating wheel 17, a vertical shaft 18, a cable groove 19, an abutting structure 20, a beam 21, and a horizontal shaft 22.
Detailed Description
The utility model is described in further detail below with reference to the attached drawings and detailed description:
embodiment 1 aims at providing a telescopic cable support of clamping installation, and is mainly used for installing the cable support on a building main body, then hanging a cable on the cable support to realize temporary construction electricity consumption, and aiming at the problems that in the prior art, the fixed cable support needs to be perforated and installed on the building main body to damage a building finished product and is not easy to dismantle after construction is finished, the embodiment provides a telescopic cable support of clamping installation on a beam or a column.
As shown in fig. 1, 2, a snap-fit telescopic cable support comprises a main rod 1, a left clamping rod 2, a right clamping rod 3 and a telescopic rod 12. The left end face of the main rod 1 is provided with a stop block 8, the right end section is provided with a thread section 11, the thread section 11 is connected with a locking nut 9 in a threaded manner, the telescopic rod 12 is connected to the right end of the main rod 1, and a cable groove 18 is arranged on the telescopic rod 12. One end of the left clamping rod 2 is provided with a left sleeve seat 4 matched with the main rod, one end of the right clamping rod 3 is provided with a right sleeve seat 5 matched with the main rod 1, the opposite surfaces of the other ends of the two clamping rods are provided with clamping plates 6, the left sleeve seat 4 is sleeved on the main rod 1 and is close to a stop block 8, the right sleeve seat 5 is sleeved on a thread section 11, the left sleeve seat 4 can rotate on the main rod 1, and the right sleeve seat 5 can rotate and slide on the main rod 1. The rotary sleeve seat enables the main rod 1 and the clamping rods to rotate relatively, the openings of the cable grooves 18 are adjusted to be in an upward state according to different building construction environments, the locking nuts 9 are rotated to adjust the distance between the two clamping rods, the cable support body is clamped on the beam 20 through the clamping plates 6, the rubber pads 7 are further arranged on the contact surface of the clamping plates 6 and the beam 20, friction force between the clamping plates 6 and the beam 20 can be increased, and the clamping stability of the cable support is improved. The structure adjusts the distance between the two clamping rods by adjusting the position of the locking nut 9, so that the clamping rods and the main rod 1 form a groove to clamp the cable support on the beam 20, the construction of punching on a building finished product is prevented from damaging a building main body, and the construction is convenient to dismantle after the construction is finished.
The telescopic rod 12 comprises a fixed rod 13 and a sliding rod 14, an adjusting hole is formed in the sliding rod 14, a fixed hole corresponding to the adjusting hole is formed in the fixed rod 13, the fixed rod 13 is connected to the main rod 1, the sliding rod 14 is sleeved in the fixed rod 13 and can slide relative to the fixed rod 13, and the sliding rod 14 is fixed through bolts passing through the fixed hole and the adjusting hole. The cable trough 18 comprises a frame body and a rotating wheel 16, wherein the frame body is provided with two vertical shafts 17 and a horizontal shaft 23, the three shafts form a U-shaped structure, the rotating wheel 16 rotates on the shaft, the rotating wheel 16 is made of wood material, the surface of the rotating wheel 16 is smooth, insulation is nonconductive, and when a cable slides in the cable trough 18, the rotating wheel 16 can roll to a certain extent, so that the cable is protected from being damaged by friction. The sleeve 15 matched with the telescopic rod 12 is arranged at the lower part of the cable groove 18, a mounting hole corresponding to the fixing hole is arranged on the sleeve 15, and the cable groove 18 is fixed on the telescopic rod 12 through the fixing hole and the mounting hole by bolts. The structure can adjust the length of the telescopic rod 12 according to the field condition so as to adjust the position of the cable grooves 18, and on the other hand, a plurality of cable grooves can be fixed on the telescopic rod according to different use requirements.
Embodiment 2 is basically the same as embodiment 1, except that the structure is further described in the case where the friction force between the left socket and the stopper and between the right socket and the lock nut is insufficient to prevent the main rod from rotating relative to the clamping rod when the cable slides in the cable slot.
As shown in fig. 3, in this embodiment, an abutment structure 19 is provided on the main rod 1 at a section between the left clamping rod 2 and the right clamping rod 3, and the basic concept of the abutment structure 19 is to prevent the main rod 1 from rotating relative to the clamping rod by the abutment structure 19 provided on the main rod 1 and abutted against the mounting surface, thereby preventing the cable slot opening from causing the cable to drop from the slot upwards. The abutting structure 19 may be a plate welded between the main rod 1 and the mounting surface, or may be a section of square tube located between the left clamping rod 2 and the right clamping rod 3.
The above-mentioned embodiments of the present utility model do not limit the scope of the present utility model, and the basic concept of the present utility model is to clamp and fix the cable support on the building main body through the adjustable clamping groove formed by the two clamping bars and the main bar, so as to avoid punching and installation on the building main body and facilitate dismantling after construction is finished, one end of the main bar is connected with the telescopic bar provided with the cable groove, the lower part of the cable groove is provided with the sleeve pipe adapted to the telescopic bar, so that the position and number of the cable groove can be adjusted according to the construction site condition. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present utility model should be included in the scope of the present utility model as set forth in the appended claims.
Claims (5)
1. A clip-mounted telescopic cable bracket, comprising:
the left end face of the main rod is provided with a stop block, the right end section is provided with a threaded section, and the threaded section is connected with a locking bolt in a threaded manner;
the clamping device comprises a left clamping rod and a right clamping rod, wherein one end of the left clamping rod is provided with a left sleeve seat matched with the main rod, one end of the right clamping rod is provided with a right sleeve seat matched with the main rod, the left sleeve seat can rotate on the main rod, and the right sleeve seat can rotate and slide on the main rod; the opposite surfaces of the other ends of the two clamping rods are provided with clamping plates, the left sleeve seat is sleeved on the main rod and is close to the stop block, and the right sleeve seat is sleeved on the threaded section;
the telescopic rod is connected to the right end of the main rod and comprises a fixed rod and a sliding rod, an adjusting hole is formed in the sliding rod, a fixed hole corresponding to the adjusting hole is formed in the fixed rod, the fixed rod is connected to the telescopic rod, the sliding rod is sleeved in the fixed rod, and the fixed rod and the sliding rod penetrate through the fixed hole and are connected with the adjusting hole through a fixed bolt; the telescopic rod is provided with a cable groove, the cable groove comprises a frame body and a rotating wheel, the frame body is provided with two vertical shafts and a horizontal shaft, the three shafts form a U-shaped structure, and the rotating wheel rotates on the shaft.
2. A snap-on, retractable cable holder as in claim 1, wherein: friction surfaces are arranged between the stop block and the left clamping rod, and between the locking nut and the right clamping rod.
3. A snap-on, retractable cable holder as in claim 1, wherein: the middle section of the main rod, which is positioned between the left clamping rod and the right clamping rod, is provided with an abutting structure, and the abutting structure is a plate welded on the main rod, or is a section of square tube positioned between the left clamping rod and the right clamping rod.
4. A snap-on, retractable cable holder as in claim 1, wherein: the cable duct lower part install with the sleeve pipe of telescopic link adaptation, be provided with the mounting hole that corresponds with the fixed orifices on the sleeve pipe, cable duct and telescopic link pass fixed orifices and mounting hole fixed connection through the bolt.
5. A snap-fit retractable cable holder according to any one of claims 1-4, wherein: one side of the clamping plate, which is contacted with the wall surface, is provided with a rubber pad.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321389633.7U CN220382645U (en) | 2023-06-02 | 2023-06-02 | Telescopic cable support of card solid installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321389633.7U CN220382645U (en) | 2023-06-02 | 2023-06-02 | Telescopic cable support of card solid installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220382645U true CN220382645U (en) | 2024-01-23 |
Family
ID=89566066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321389633.7U Active CN220382645U (en) | 2023-06-02 | 2023-06-02 | Telescopic cable support of card solid installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220382645U (en) |
-
2023
- 2023-06-02 CN CN202321389633.7U patent/CN220382645U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220382645U (en) | Telescopic cable support of card solid installation | |
CN204917055U (en) | Slope bearing roller erection support and cell type bearing roller subassembly and belt conveyor | |
CN103151752B (en) | Universal surge arrester support | |
CN219322050U (en) | Cable trench cross arm assembly | |
CN213872611U (en) | Ceiling lamp mounting structure | |
CN201616299U (en) | Eccentricity control device for cable plastic extrusion | |
CN211288316U (en) | Special mounting bracket for hydraulic cylinder | |
CN212201526U (en) | Positioning device for electric power engineering | |
CN221002229U (en) | Concatenation formula construction encloses fender | |
CN215415295U (en) | Detection apparatus for be used for low concentration benzene in air | |
CN217205578U (en) | Single top for building | |
CN203624141U (en) | Roller support structure | |
CN217842562U (en) | Lead screw fixing seat with position adjusting function | |
CN210062720U (en) | Adjustable rotating base | |
CN111584221A (en) | Transformer yoke pipe installation strutting arrangement | |
CN112031254A (en) | Adjustable top hanging structure of bearing steel pipe and mounting method | |
CN111864541A (en) | Electric power iron tower lightning rod installation device | |
CN221053128U (en) | Scaffold frame | |
CN215759853U (en) | Constructional engineering steel construction curtain bearing structure | |
CN210290992U (en) | Interval adjustment formula pipeline installation is with hanging support | |
CN218771214U (en) | Rotary adjustable high-voltage cable support | |
CN117926956A (en) | Curtain wall hooking system | |
CN216939760U (en) | Alarm photoelectric barrier mounting assembly for machine tool protection | |
CN219413783U (en) | U-shaped support and hanger convenient to install and adjust | |
CN220022276U (en) | Fastener for tangent tower convenient to dismouting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |