CN219322050U - Cable trench cross arm assembly - Google Patents
Cable trench cross arm assembly Download PDFInfo
- Publication number
- CN219322050U CN219322050U CN202320863321.9U CN202320863321U CN219322050U CN 219322050 U CN219322050 U CN 219322050U CN 202320863321 U CN202320863321 U CN 202320863321U CN 219322050 U CN219322050 U CN 219322050U
- Authority
- CN
- China
- Prior art keywords
- cable
- connecting block
- arm
- cross arm
- arm assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 210000000078 claw Anatomy 0.000 claims description 4
- 238000009434 installation Methods 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses a cable trench cross arm assembly, which comprises a fixed seat, wherein one side of the fixed seat is provided with a plurality of supporting arms, and a boss is provided with a plurality of line clamps; the support arm one end is equipped with the connecting block, and the support arm passes through the hinge rotationally with the connecting block upper end and is connected, connecting block lower part fixedly connected with bottom plate, threaded connection has fixing bolt on the bottom plate, and the support arm lower part is equipped with and fixes bolt matched with screw hole. When the cable is fixed on the cross arm assembly, the fixing bolt of the upper supporting arm is loosened, the supporting arm is folded upwards around the connecting block, then the fixing bolt is screwed, the top of the fixing bolt is used for supporting one end of the supporting arm, the supporting arm is in a folded state, after the cable on the lower cross arm assembly is fixed, the upper cross arm assembly is put down one by one and fixed by the fixing bolt, and then the cable on the layer is fixed, so that inconvenience of the cross arm assembly to operators during cable laying in a cable pit is avoided.
Description
Technical Field
The utility model belongs to the field of cable pit accessories, and particularly relates to a cable pit cross arm assembly.
Background
The cable trench has the advantages of simple structure of the building, few additional supporting facilities such as technical protection, low engineering investment, higher economical efficiency and the like. A plurality of groups of cross arm assemblies are fixedly arranged on the side wall of the cable, and the cable is placed on a line card of the cross arm and fixed when the underground cable is laid. However, because the cable duct space size is different, to the cable duct that the space is narrow and small, when the cable is fixed to the operating personnel, especially when fixing the cable that is close to cable duct lateral wall one end, because the length of cross arm is longer, the operating personnel needs the operation of bowing, but the cross arm subassembly of upper portion can hinder the operating personnel operation again, causes cable laying inconvenience.
Disclosure of Invention
The utility model aims to overcome the defects in the prior art and provides a cable pit cross arm assembly so as to solve the problem of inconvenient operation when the cable pit cross arm assembly is used for fixing a cable.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
the cable pit cross arm assembly comprises a fixed seat, wherein the fixed seat is fixedly arranged on the side wall of a cable pit, a plurality of supporting arms are arranged on one side of the fixed seat, a boss is fixedly connected to the supporting arms, a plurality of line clamps are arranged on the boss, each line clamp comprises a lower clamping seat and an upper clamping seat, the lower clamping seat and the upper clamping seat are connected through bolts, and the corresponding surfaces of the lower clamping seat and the upper clamping seat are arc-shaped surfaces; the support arm one end is equipped with the connecting block, and the support arm passes through the hinge rotationally with the connecting block upper end and is connected, connecting block lower part fixedly connected with bottom plate, threaded connection has fixing bolt on the bottom plate, and the support arm lower part is equipped with and fixes bolt matched with screw hole.
As the further preference of this technical scheme, the support arm is hollow square tubular structure, is equipped with flexible arm with sliding in the support arm inside, be equipped with the adjustment tank on the support arm lateral wall, flexible arm one end fixedly connected with double-screw bolt, the double-screw bolt is installed in the adjustment tank and threaded connection has fastening nut with the clearance, is equipped with a plurality of ply-yarn drill on the flexible arm, has enlarged the cable quantity that the cross arm subassembly supported.
As the further preference of this technical scheme, lower holder both sides fixedly connected with L type deflector, deflector clearance ground is installed on boss or flexible arm, deflector one side threaded connection has adjusting bolt, and adjusting bolt's end offsets with boss or flexible arm, is convenient for adjust the position of ply-yarn drill on boss or flexible arm to adjust the interval of cable installation on the cross arm subassembly.
As the further preference of this technical scheme, boss and flexible arm both sides all are equipped with the draw-in groove, deflector lower extreme fixedly connected with buckle, and the buckle is installed inside the draw-in groove with clearance, buckle and draw-in groove cooperate, have restricted the movement of ply-yarn drill in boss or flexible arm upper and lower direction to avoided the ply-yarn drill to drop from boss or flexible arm.
As a further preferable mode of the technical scheme, the two sides of the upper part of the lower clamping seat are symmetrically provided with side plates, and the upper clamping seat is arranged in the side plates in a clearance mode, so that the upper clamping seat and the lower clamping seat can be accurately and quickly aligned and installed when cables are fixed.
As a further preference of the technical scheme, rubber pads are arranged in the arc-shaped grooves of the upper clamping seat and the lower clamping seat, so that the cable is prevented from being damaged by the wire clamp.
As a further preference of the technical scheme, one side of the fixed seat is provided with a chute, the connecting block is slidably arranged in the chute, one side of the connecting block is provided with an ear plate, one side of the ear plate is rotationally connected with an eccentric wheel, the eccentric distance of the eccentric wheel is larger than the gap between the eccentric wheel and the outer wall of the chute, and a handle is fixedly connected on the eccentric wheel; the position of the supporting arm is convenient to adjust through the chute, the eccentric wheel is rotated after the position of the supporting arm is adjusted, and the eccentric wheel is utilized to prop against the outer wall of the chute, so that the connecting block and the chute are fast fixed.
As the further preference of this technical scheme, one side that the otic placode was kept away from to the connecting block is equipped with the curb plate, be equipped with a plurality of archs on the curb plate, be equipped with a plurality of and protruding matched with spacing groove on the curb plate outer wall, when the connecting block is fixed, protruding card has further guaranteed the fixed stability of connecting block in the spacing inslot.
As a further preference of the technical scheme, the fastening nut adopts a butterfly nut, the fixing bolt adopts a knob bolt, and the adjusting bolt adopts a claw head bolt, so that the cable assembly is quickly adjusted without tools.
The beneficial effects of the utility model are as follows:
1) When the cable is fixed on the cross arm assembly, the fixing bolt of the upper supporting arm is loosened, the supporting arm is folded upwards around the connecting block, then the fixing bolt is screwed, the top of the fixing bolt is used for supporting one end of the supporting arm, the supporting arm is in a folded state, after the cable on the lower cross arm assembly is fixed, the upper cross arm assembly is put down one by one and fixed by the fixing bolt, and then the cable on the layer is fixed, so that inconvenience of the cross arm assembly to operators during cable laying in a cable pit is avoided.
2) The support arm is hollow square tubular structure, is equipped with flexible arm with sliding in the support arm inside, is equipped with the adjustment tank on the support arm lateral wall, flexible arm one end fixedly connected with double-screw bolt, and the double-screw bolt is installed in the adjustment tank and threaded connection has fastening nut with the clearance, is equipped with a plurality of ply-yarn drill on the flexible arm, has enlarged the cable quantity that the cross arm subassembly supported.
3) The lower holder both sides fixedly connected with L type deflector, deflector clearance ground installs on boss or flexible arm, and deflector one side threaded connection has adjusting bolt, and adjusting bolt's end offsets with boss or flexible arm, is convenient for adjust the position of ply-yarn drill on boss or flexible arm to adjust the interval of cable installation on the cross arm subassembly.
4) The boss and the telescopic boom both sides all are equipped with the draw-in groove, deflector lower extreme fixedly connected with buckle, and the buckle is installed inside the draw-in groove with clearance, and buckle and draw-in groove cooperate, have restricted the movement of ply-yarn drill in boss or telescopic boom upper and lower direction to avoided the ply-yarn drill to drop from boss or telescopic boom.
5) The side plates are symmetrically arranged on two sides of the lower clamping seat, and the upper clamping seat is arranged in the side plates in a clearance way, so that the upper clamping seat and the lower clamping seat can be accurately and quickly aligned and installed when the cable is fixed.
6) Rubber pads are arranged in the arc grooves of the upper clamping seat and the lower clamping seat, so that the cable is prevented from being damaged by the cable clamp.
7) A chute is arranged on one side of the fixing seat, a connecting block is slidably arranged in the chute, an ear plate is arranged on one side of the connecting block, an eccentric wheel is rotationally connected on one side of the ear plate, and a handle is fixedly connected on the eccentric wheel; the position of the supporting arm is convenient to adjust through the chute, the eccentric wheel is rotated after the position of the supporting arm is adjusted, and the eccentric wheel is utilized to prop against the outer wall of the chute, so that the connecting block and the chute are fast fixed.
8) One side of otic placode is kept away from to the connecting block is equipped with the curb plate, is equipped with a plurality of archs on the curb plate, is equipped with a plurality of and protruding matched with spacing groove on the curb plate outer wall, and when the connecting block was fixed, protruding card had further guaranteed the fixed stability of connecting block in the spacing inslot.
9) The fastening nut adopts butterfly nut, and fixing bolt adopts knob bolt, and adjusting bolt adopts claw head bolt, has realized the quick adjustment of cable subassembly instrument exempting from.
Drawings
FIG. 1 is a schematic view of a cable trough cross arm assembly according to the present utility model.
Fig. 2 is a schematic structural view of a fixing base in a cable trench cross arm assembly according to the present utility model.
FIG. 3 is a schematic view of the assembly of the support arm and telescoping arm of the cable pit cross arm assembly of the present utility model.
Fig. 4 is an enlarged view of a portion of the cable trough cross arm assembly of the present utility model at a in fig. 3.
FIG. 5 is a schematic view of the structure of a connecting block in a cable trough cross arm assembly according to the present utility model.
FIG. 6 is an exploded view of a line card of a cable pit cross arm assembly of the present utility model.
FIG. 7 is a schematic view of a lifted condition of a support arm of a cable duct cross arm assembly according to the present utility model.
In the figure: 1. a fixing seat; 2. a chute; 3. a limit groove; 4. a connecting block; 5. a side plate; 6. a protrusion; 7. ear plates; 8. an eccentric wheel; 9. a handle; 10. a bottom plate; 11. a fixing bolt; 12. a hinge; 13. a support arm; 14. a telescoping arm; 15. an adjustment tank; 16. a stud; 17. a fastening nut; 18. a boss; 19. a clamping groove; 20. a line clip; 201. a lower clamping seat; 202. a side plate; 203. an upper clamping seat; 204. a guide plate; 205. a buckle plate; 206. and (5) adjusting a bolt.
Detailed Description
The following description of the embodiments of the present utility model will be made more fully hereinafter with reference to the accompanying drawings, in which it is shown, however, in an illustrative embodiment of the utility model, in which some, but not all embodiments of the utility model are shown. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be understood that the terms "longitudinal," "transverse," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate or are based on the orientation or positional relationship shown in the drawings, merely to facilitate description of the present utility model, and do not indicate or imply that the devices or elements referred to must have a particular orientation, a particular orientation configuration and operation, and thus should not be construed as limiting the present utility model.
1-2 and 7, a cable pit cross arm assembly comprises a fixing seat 1, wherein the fixing seat 1 is fixedly arranged on the side wall of a cable pit, one side of the fixing seat 1 is provided with a plurality of supporting arms 13, a boss 18 is fixedly connected to the supporting arms 13, a plurality of line cards 20 are arranged on the boss 18, each line card 20 comprises a lower clamping seat 201 and an upper clamping seat 203, the lower clamping seat 201 and the upper clamping seat 203 are connected through bolts, and corresponding surfaces of the lower clamping seat 201 and the upper clamping seat 203 are arc-shaped surfaces; one end of the supporting arm 13 is provided with a connecting block 4, the supporting arm 13 is rotatably connected with the upper end of the connecting block 4 through a hinge 12, the lower part of the connecting block 4 is fixedly connected with a bottom plate 10, the bottom plate 10 is connected with a fixing bolt 11 in a threaded manner, and the lower part of the supporting arm 13 is provided with a threaded hole matched with the fixing bolt 11; when the cable is fixed on the cross arm assembly, the fixing bolt 11 of the upper supporting arm 13 is loosened, the supporting arm 13 is folded upwards around the connecting block 4, then the fixing bolt 11 is screwed down again, as shown in fig. 7, one end of the supporting arm 13 is propped against by the top of the fixing bolt 11, the supporting arm 13 is in a folded state, after the cable on the lower cross arm assembly is fixed, the upper cross arm assembly is put down one by one and fixed by the fixing bolt 11, and then the cable on the layer is fixed, so that inconvenience to operators caused by the cross arm assembly when the cable is laid in a cable pit is avoided.
As shown in fig. 3, in this embodiment, the supporting arm 13 is of a hollow square tubular structure, a telescopic arm 14 is slidably disposed inside the supporting arm 13, an adjusting groove 15 is disposed on a side wall of the supporting arm 13, one end of the telescopic arm 14 is fixedly connected with a stud 16, the stud 16 is installed in the adjusting groove 15 in a clearance manner and is in threaded connection with a fastening nut 17, and a plurality of line cards 20 are disposed on the telescopic arm 14, so that the number of cables supported by the cross arm assembly is increased.
As shown in fig. 6, in this embodiment, two sides of the lower clamping seat 201 are fixedly connected with L-shaped guide plates 204, the guide plates 204 are mounted on the boss 18 or the telescopic arm 14 with a gap, one side of the guide plates 204 is connected with an adjusting bolt 206 in a threaded manner, and the tail end of the adjusting bolt 206 abuts against the boss 18 or the telescopic arm 14, so that the position of the line card 20 on the boss 18 or the telescopic arm 14 can be conveniently adjusted, and the mounting interval of the cable on the cross arm assembly can be adjusted.
As shown in fig. 3 and 6, in this embodiment, the two sides of the boss 18 and the telescopic arm 14 are respectively provided with a clamping groove 19, the lower end of the guide plate 204 is fixedly connected with a buckle 205, the buckle 205 is installed in the clamping groove 19 in a clearance manner, and the buckle 205 is matched with the clamping groove 19, so that the movement of the line card 20 in the up-down direction of the boss 18 or the telescopic arm 14 is limited, and the line card 20 is prevented from falling off from the boss 18 or the telescopic arm 14.
As shown in fig. 6, in this embodiment, two sides of the upper portion of the lower holder 201 are symmetrically provided with side plates 202, and the upper holder 203 is disposed in the side plates 202 with a gap therebetween, so that the upper holder 203 and the lower holder 201 can be accurately and rapidly aligned and mounted when the cable is fixed.
In this embodiment, rubber pads are disposed in the arc grooves of the upper holder 203 and the lower holder 201, so that damage to the cable caused by the wire clip is avoided.
As shown in fig. 2 and 5, in this embodiment, a chute 2 is provided on one side of the fixing seat 1, the connection block 4 is slidably mounted in the chute 2, an ear plate 7 is provided on one side of the connection block 4, an eccentric wheel 8 is rotatably connected to one side of the ear plate 7, the eccentricity of the eccentric wheel 8 is larger than the gap between the eccentric wheel 8 and the outer wall of the chute 2, and a handle 9 is fixedly connected to the eccentric wheel 8; the chute 2 is convenient for adjusting the position of the supporting arm 13, and after the position of the supporting arm 13 is adjusted, the eccentric wheel 8 is rotated, and the eccentric wheel 8 is utilized to prop against the outer wall of the chute 2, so that the connecting block 4 and the chute 2 are quickly fixed.
As shown in fig. 2 and fig. 4-5, in this embodiment, a side plate 5 is disposed on one side of the connection block 4 away from the ear plate 7, a plurality of protrusions 6 are disposed on the side plate 5, a plurality of limiting grooves 3 matched with the protrusions 6 are disposed on the outer wall of the side plate 5, and when the connection block 4 is fixed, the protrusions 6 are clamped in the limiting grooves 3, so that the stability of fixing the connection block 4 is further ensured.
In this embodiment, as shown in fig. 3 and fig. 5-6, the fastening nut 17 is a butterfly nut, the fixing bolt 11 is a knob bolt, and the adjusting bolt 206 is a claw bolt, so that the cable assembly is quickly adjusted without tools.
The foregoing is merely illustrative and explanatory of the utility model, as it is well within the scope of the utility model as claimed, as it relates to various modifications, additions and substitutions for those skilled in the art, without departing from the inventive concept and without departing from the scope of the utility model as defined in the accompanying claims.
Claims (9)
1. The cable pit cross arm assembly comprises a fixed seat, wherein the fixed seat is fixedly arranged on the side wall of a cable pit, a plurality of supporting arms are arranged on one side of the fixed seat, a boss is fixedly connected to the supporting arms, a plurality of line clamps are arranged on the boss, each line clamp comprises a lower clamping seat and an upper clamping seat, the lower clamping seat and the upper clamping seat are connected through bolts, and the corresponding surfaces of the lower clamping seat and the upper clamping seat are arc-shaped surfaces; the support arm is characterized in that a connecting block is arranged at one end of the support arm, the support arm is rotatably connected with the upper end of the connecting block through a hinge, a bottom plate is fixedly connected to the lower portion of the connecting block, a fixing bolt is connected to the bottom plate through threads, and a threaded hole matched with the fixing bolt is formed in the lower portion of the support arm.
2. The cable pit cross arm assembly according to claim 1, wherein the supporting arm is of a hollow square tubular structure, a telescopic arm is slidably arranged in the supporting arm, an adjusting groove is formed in the side wall of the supporting arm, one end of the telescopic arm is fixedly connected with a stud, the stud is installed in the adjusting groove in a clearance mode and is in threaded connection with a fastening nut, and a plurality of line clamps are arranged on the telescopic arm.
3. The cable pit cross arm assembly according to claim 2, wherein two sides of the lower clamping seat are fixedly connected with L-shaped guide plates, the guide plates are installed on the boss or the telescopic arm in a clearance mode, one side of each guide plate is connected with an adjusting bolt in a threaded mode, and the tail ends of the adjusting bolts are abutted against the boss or the telescopic arm.
4. The cable pit cross arm assembly according to claim 3, wherein clamping grooves are formed in two sides of the boss and the telescopic arms, the lower end of the guide plate is fixedly connected with a buckle plate, and the buckle plate is installed in the clamping grooves in a clearance mode.
5. The crossarm assembly of claim 1, wherein the lower holder is provided with side plates symmetrically on both sides of the upper portion, and the upper holder is disposed in the side plates with a gap therebetween.
6. The cable pit cross arm assembly of claim 1, wherein rubber pads are disposed in the arcuate slots of the upper and lower clamp holders.
7. The cable pit cross arm assembly of any one of claims 1-6, wherein a chute is formed in one side of the fixed seat, the connecting block is slidably mounted in the chute, an ear plate is formed in one side of the connecting block, an eccentric wheel is rotatably connected to one side of the ear plate, the eccentricity of the eccentric wheel is larger than the gap between the eccentric wheel and the outer wall of the chute, and a handle is fixedly connected to the eccentric wheel.
8. The cable pit cross arm assembly according to claim 7, wherein a side of the connecting block away from the lug plate is provided with a side plate, a plurality of protrusions are arranged on the side plate, a plurality of limit grooves matched with the protrusions are arranged on the outer wall of the side plate, and the protrusions are clamped in the limit grooves when the connecting block is fixed.
9. A cable pit cross arm assembly according to claim 3, wherein the fastening nut is a wing nut, the fixing bolt is a knob bolt, and the adjusting bolt is a claw head bolt.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320863321.9U CN219322050U (en) | 2023-04-13 | 2023-04-13 | Cable trench cross arm assembly |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320863321.9U CN219322050U (en) | 2023-04-13 | 2023-04-13 | Cable trench cross arm assembly |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219322050U true CN219322050U (en) | 2023-07-07 |
Family
ID=87004660
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320863321.9U Active CN219322050U (en) | 2023-04-13 | 2023-04-13 | Cable trench cross arm assembly |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219322050U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117458386A (en) * | 2023-12-01 | 2024-01-26 | 中铁四局集团有限公司 | A comprehensive cross arm connection device for large transverse spans in subway public areas |
-
2023
- 2023-04-13 CN CN202320863321.9U patent/CN219322050U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117458386A (en) * | 2023-12-01 | 2024-01-26 | 中铁四局集团有限公司 | A comprehensive cross arm connection device for large transverse spans in subway public areas |
| CN117458386B (en) * | 2023-12-01 | 2024-05-03 | 中铁四局集团有限公司 | Transverse large-span comprehensive cross arm connecting device for subway public area |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN118554357B (en) | Telescopic wiring rack | |
| CN221767460U (en) | Cable erection device | |
| CN219937866U (en) | Cable bridge support for realizing safe installation of cable bridge | |
| CN213242088U (en) | Post insulator convenient to install | |
| CN222301386U (en) | Wire harness fixing device for 10kV overhead line | |
| CN223035867U (en) | A highly adaptable channel steel bracket | |
| CN223261203U (en) | Cable support structure for power design | |
| CN218472735U (en) | Fixing clamp convenient to install and used for electric power design | |
| CN210462207U (en) | Shunt fixing support | |
| CN115588910A (en) | Equipment mounting support | |
| CN223306447U (en) | Adjustable mounting bracket for weak current system engineering | |
| CN217824166U (en) | Mineral cable mounting bracket | |
| CN217769309U (en) | Support frame with adjustable power cable | |
| CN220107451U (en) | Wiring frame for communication cable | |
| CN219801808U (en) | Universal pay-off rack | |
| CN221408270U (en) | Street sign indicating number with adjustable | |
| CN219960066U (en) | Temporary auxiliary fixing device for cable | |
| CN218565032U (en) | Portable installing support of supervisory equipment | |
| CN220629238U (en) | Portable solar panel installs auxiliary mechanism fast | |
| CN217882304U (en) | Power distribution frame for electronic information engineering | |
| CN218727467U (en) | Oscilloscope probe grounding clamp | |
| CN222602508U (en) | Wireless AP mounting structure and wireless AP device | |
| CN217835411U (en) | Adjustable cantilever support device for railway tunnel | |
| CN222638130U (en) | Angle adjustment type communication support | |
| CN224097555U (en) | An overheat protection device for electric motors |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |