CN220365610U - Temporary support device for coal mining and tunneling of coal mine - Google Patents

Temporary support device for coal mining and tunneling of coal mine Download PDF

Info

Publication number
CN220365610U
CN220365610U CN202322078227.5U CN202322078227U CN220365610U CN 220365610 U CN220365610 U CN 220365610U CN 202322078227 U CN202322078227 U CN 202322078227U CN 220365610 U CN220365610 U CN 220365610U
Authority
CN
China
Prior art keywords
plate
rod
tunnel
temporary support
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202322078227.5U
Other languages
Chinese (zh)
Inventor
吴长青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202322078227.5U priority Critical patent/CN220365610U/en
Application granted granted Critical
Publication of CN220365610U publication Critical patent/CN220365610U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

本实用新型公开了一种煤矿采煤掘进用临时支护装置,属于临时支护装置领域,包括顶板,顶板的两侧下方分别设有支护机构,设置的顶板和支护机构之间的配合使用,根据采煤巷道的宽度,通过底板底面的万向轮向两侧方向推动侧板,使侧板从调节板侧壁中移出,直至侧板置于巷道两侧部位上,然后,根据采煤巷道的高度同时旋动位于底板前端的手轮,手轮将通过第一转动杆带动螺纹孔使连接块作出相对移动操作,并让连接杆发生倾斜变化的过程中来通过顶升杆向上顶升侧板,直至让顶板顶在采煤巷道的顶部,从而通过顶板及其两侧的支护机构可根据采煤巷道的宽度和高度快速在巷道内调节搭建形成一个临时支护的结构,并能够对巷道起到有效的支撑防护的作用。

The utility model discloses a temporary support device for coal mine excavation, which belongs to the field of temporary support devices. It includes a roof. Support mechanisms are respectively provided below both sides of the roof. The cooperation between the roof and the support mechanism is provided. In use, according to the width of the coal mining tunnel, push the side plates in both directions through the universal wheels on the bottom surface of the bottom plate to move the side plates out of the side walls of the adjusting plate until the side plates are placed on both sides of the tunnel, and then, according to the mining At the same time, the handwheel located at the front end of the bottom plate is rotated to increase the height of the coal tunnel. The handwheel will drive the threaded hole through the first rotating rod to make the connecting block move relatively, and allow the connecting rod to change its inclination to push upward through the jacking rod. Raise the side plates until the roof plate is on the top of the coal mining tunnel, so that the roof plate and the support mechanisms on both sides can be quickly adjusted and built in the tunnel according to the width and height of the coal mining tunnel to form a temporary support structure, and It can effectively support and protect the tunnel.

Description

一种煤矿采煤掘进用临时支护装置A temporary support device for coal mine excavation

技术领域Technical field

本实用新型涉及临时支护装置领域,特别涉及一种煤矿采煤掘进用临时支护装置。The utility model relates to the field of temporary support devices, in particular to a temporary support device for coal mining and excavation.

背景技术Background technique

在采煤领域内,由于煤矿采煤掘进的限制与必要性,需要在煤层中掘出人工作业的巷道,而由于煤层的岩质大多较为脆弱,所以巷道需要利用专门的支护装置支撑起煤层,防止煤层掉落而发生安全危害。In the field of coal mining, due to the restrictions and necessity of coal mine excavation, manual tunnels need to be dug in the coal seams. Since the rock quality of the coal seams is mostly fragile, the tunnels need to be supported by special support devices. coal seam to prevent safety hazards caused by coal seam falling.

在现有技术中,采煤掘进巷道临时支护的主要工序一般为开设锚杆孔、架设锚网、向锚杆孔内打入树脂药包和锚杆,在巷道狭小区段需人力手举锚网,在使用风锤打入药包及锚杆,但是通过上述方式在采煤巷道中搭建临时支护装置时不仅操作比较繁琐,且费时费力,并降低了工作效率和煤矿开采的进度,同时,由于临时支护装置不能够调节,导致无法根据巷道宽度和高度快速在巷道内搭建临时支护装置。In the existing technology, the main processes for temporary support of coal mining tunnels are generally opening anchor holes, erecting anchor nets, and driving resin bags and anchor rods into the anchor holes. In narrow sections of the tunnel, manual lifting is required. Anchor nets use pneumatic hammers to drive explosive bags and anchor rods. However, when building temporary support devices in coal mining tunnels through the above method, it is not only cumbersome to operate, but also time-consuming and labor-intensive, and also reduces work efficiency and the progress of coal mining. At the same time, because the temporary support device cannot be adjusted, it is impossible to quickly build a temporary support device in the tunnel according to the width and height of the tunnel.

实用新型内容Utility model content

本实用新型的主要目的在于提供一种煤矿采煤掘进用临时支护装置,可以有效解决背景技术中的问题。The main purpose of this utility model is to provide a temporary support device for coal mine excavation, which can effectively solve the problems in the background technology.

为实现上述目的,本实用新型采取的技术方案为:In order to achieve the above purpose, the technical solution adopted by this utility model is:

一种煤矿采煤掘进用临时支护装置,包括顶板,所述顶板的两侧下方分别设有支护机构,且支护机构包括凹型架、双向调节螺杆、连接块、凹型块、连接杆、侧板、调节板和斜撑杆,所述双向调节螺杆通过两端的第一转动杆活动连接在凹型架的凹口内底面中,且两个连接块分别通过前端壁上的螺纹孔与双向调节螺杆活动连接,所述侧板通过底面两侧的顶升杆活动连接在底板的顶端,且顶升杆的顶端和连接块的顶面均固定连接有凹型块,所述连接杆通过两端两侧的第二转动杆分别与顶升杆和连接块上的凹型块活动连接,所述调节板固定连接在侧板的顶端并活动连接在顶板的侧壁内,且侧板和调节板之间还固定连接有对称的斜撑杆。A temporary support device for coal mine excavation, including a roof, with support mechanisms respectively provided on both sides of the roof, and the support mechanism includes a concave frame, a two-way adjusting screw, a connecting block, a concave block, a connecting rod, Side plates, adjustment plates and diagonal braces. The two-way adjustment screws are movably connected to the inner bottom surface of the concave frame through the first rotating rods at both ends, and the two connecting blocks pass through the threaded holes on the front wall and the two-way adjustment screws respectively. Movably connected, the side plates are movably connected to the top of the bottom plate through jacking rods on both sides of the bottom surface, and the top of the jacking rod and the top surface of the connecting block are fixedly connected to concave blocks, and the connecting rods are connected through both ends of the The second rotating rod is movably connected to the lifting rod and the concave block on the connecting block respectively. The adjusting plate is fixedly connected to the top of the side plate and movably connected to the side wall of the top plate, and there is also a gap between the side plate and the adjusting plate. Fixed connection with symmetrical diagonal braces.

优选地,所述顶板的左右两侧壁上分别开设有内腔,且顶板的底面左右两侧分别开设有一组对称的与内腔连通的活动口。Preferably, the left and right side walls of the top plate are respectively provided with inner cavities, and the left and right sides of the bottom surface of the top plate are respectively provided with a set of symmetrical movable openings connected to the inner cavities.

优选地,所述凹型架固定安装在底板的顶面上,且底板的底面固定安装有一组前后对称的万向轮,所述凹型架的凹口内底面开设有活动槽,且活动槽的槽内壁左右两侧分别开设有滑动口,所述活动槽的槽内前后两端分别开设有第一转动孔,所述凹型架的凹口内左右两侧壁上还分别开设有侧槽。Preferably, the concave frame is fixedly installed on the top surface of the base plate, and the bottom surface of the base plate is fixedly installed with a set of front-to-back symmetrical universal wheels. The inner bottom surface of the concave frame is provided with a movable groove, and the inner wall of the movable groove is provided with a movable groove. Sliding openings are provided on the left and right sides respectively, first rotation holes are provided at the front and rear ends of the movable groove, and side grooves are provided on the left and right side walls of the recess of the concave frame.

优选地,所述双向调节螺杆的前后两端分别固定安装有第一转动杆,且第一转动杆活动安装在第一转动孔内,前端所述第一转动杆的端壁上还固定安装有手轮,两个所述连接块的前端壁上分别开设有螺纹孔并通过螺纹孔与双向调节螺杆螺纹连接,且连接块的左右两侧壁上还分别固定安装有滑动块并活动安装在滑动口内。Preferably, the first rotating rod is fixedly installed at the front and rear ends of the two-way adjusting screw, and the first rotating rod is movably installed in the first rotating hole. The end wall of the first rotating rod at the front end is also fixedly installed. Handwheels, the front walls of the two connecting blocks are respectively provided with threaded holes and are threadedly connected to the two-way adjusting screws through the threaded holes, and the left and right side walls of the connecting block are also fixedly installed with sliding blocks and movable installed on the sliding block. Intraoral.

优选地,所述侧板的底面固定安装有一组对称的顶升杆并插入安装在侧槽内,且顶升杆的底端和连接块的顶面分别固定安装有凹型块,所述凹型块的凹口内壁两侧分别开设有第二转动孔,所述连接杆的前后端两侧分别固定安装有第二转动杆,且第二转动杆活动安装在第二转动孔内。Preferably, a set of symmetrical lifting rods are fixedly installed on the bottom surface of the side plate and inserted into the side groove, and the bottom end of the lifting rod and the top surface of the connecting block are respectively fixedly installed with concave blocks, and the concave blocks are fixedly installed. Second rotation holes are respectively provided on both sides of the inner wall of the recess, and second rotation rods are fixedly installed on both sides of the front and rear ends of the connecting rod, and the second rotation rod is movably installed in the second rotation hole.

优选地,所述调节板固定安装在侧板的顶面,且调节板活动安装在内腔内,所述调节板的底面和侧板的内侧壁之间还固定安装有一组对称的斜撑杆,且斜撑杆穿过活动口。Preferably, the adjustment plate is fixedly installed on the top surface of the side plate, and the adjustment plate is movably installed in the inner cavity. A set of symmetrical diagonal struts are also fixedly installed between the bottom surface of the adjustment plate and the inner side wall of the side plate. , and the diagonal support rod passes through the movable opening.

与现有技术相比,本实用新型具有如下有益效果:Compared with the existing technology, the utility model has the following beneficial effects:

本实用新型中,设置的顶板和支护机构之间的配合使用,根据采煤巷道的宽度,通过底板底面的万向轮向两侧方向推动侧板,使侧板从调节板侧壁中移出,直至侧板置于巷道两侧部位上,然后,根据采煤巷道的高度同时旋动位于底板前端的手轮,手轮将通过第一转动杆带动螺纹孔使连接块作出相对移动操作,并让连接杆发生倾斜变化的过程中来通过顶升杆向上顶升侧板,直至让顶板顶在采煤巷道的顶部,从而通过顶板及其两侧的支护机构可根据采煤巷道的宽度和高度快速在巷道内调节搭建形成一个临时支护的结构,并对巷道起到有效的支撑防护的作用,搭建操作简单方便且省时省力,进而可提高工作效率和煤矿开采的进度。In this utility model, the roof plate and the supporting mechanism are used in conjunction with each other. According to the width of the coal mining tunnel, the universal wheels on the bottom surface of the bottom plate push the side plates in both directions to move the side plates out of the side walls of the adjusting plate. , until the side plates are placed on both sides of the tunnel, and then simultaneously rotate the handwheel located at the front end of the bottom plate according to the height of the coal mining tunnel. The handwheel will drive the threaded hole through the first rotating rod to make the connecting block move relative to each other, and During the tilt change of the connecting rod, the side plate is lifted upward through the jacking rod until the top plate is placed on the top of the coal mining tunnel, so that the roof plate and the support mechanisms on both sides can be used according to the width and width of the coal mining tunnel. The height is quickly adjusted in the tunnel to form a temporary support structure, which effectively supports and protects the tunnel. The construction operation is simple and convenient and saves time and effort, thereby improving work efficiency and the progress of coal mining.

附图说明Description of the drawings

图1为本实用新型的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the utility model;

图2为本实用新型的顶板的整体结构示意图;Figure 2 is a schematic diagram of the overall structure of the roof of the present utility model;

图3为本实用新型的凹型架的整体结构示意图;Figure 3 is a schematic diagram of the overall structure of the concave frame of the present utility model;

图4为本实用新型的支护机构的结构拆分示意图。Figure 4 is an exploded schematic diagram of the structure of the support mechanism of the present invention.

图中:1、顶板;2、支护机构;3、内腔;4、活动口;5、底板;6、万向轮;7、凹型架;8、活动槽;9、滑动口;10、第一转动孔;11、侧槽;12、双向调节螺杆;13、第一转动杆;14、手轮;15、连接块;16、螺纹孔;17、滑动块;18、凹型块;19、第二转动孔;20、连接杆;21、第二转动杆;22、侧板;23、顶升杆;24、调节板;25、斜撑杆。In the picture: 1. Top plate; 2. Supporting mechanism; 3. Inner cavity; 4. Movable port; 5. Bottom plate; 6. Universal wheel; 7. Concave frame; 8. Movable slot; 9. Sliding port; 10. First rotating hole; 11. Side groove; 12. Two-way adjusting screw; 13. First rotating rod; 14. Hand wheel; 15. Connecting block; 16. Threaded hole; 17. Sliding block; 18. Concave block; 19. Second rotating hole; 20, connecting rod; 21, second rotating rod; 22, side plate; 23, jacking rod; 24, adjusting plate; 25, diagonal support rod.

具体实施方式Detailed ways

为使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施方式,进一步阐述本实用新型。In order to make it easy to understand the technical means, creative features, objectives and effects of the present utility model, the present utility model will be further elaborated below in conjunction with specific implementation modes.

如图1-图4所示,在本实施例中,为了通过顶板1和两侧的支护机构2的使用来在采煤巷道中快速搭建临时支护装置,以对巷道进行支护,顶板1和两侧支护机构2的具体使用原理如下:As shown in Figures 1 to 4, in this embodiment, in order to quickly build a temporary support device in the coal mining tunnel through the use of the roof 1 and the support mechanisms 2 on both sides to support the tunnel, the roof The specific usage principles of 1 and both sides of the support mechanism 2 are as follows:

通过底板5底面安装的万向轮6将整个装置移动至采煤巷道中,接着,根据巷道的宽度向相反方向推动侧板22,侧板22将通过底板5底面的万向轮6移动,此时,侧板22将通过斜撑杆25带动调节板24从顶板1两侧所开设的内腔3中向外部移动,且斜撑杆25将在顶板1底面所开设的活动口4中移动,直至侧板22向两侧移动至巷道两侧部位上,随后,对万向轮6进行锁止防止装置移动,万向轮6是具有锁止功能的万向轮6,紧接着,同时旋动位于底板5顶面安装的凹型架7前端下方的手轮14,手轮14将带动双向调节螺杆12前后端安装的第一转动杆13在底板5的凹口内底面活动槽8的槽内前后端壁上所开设的第一转动孔10内转动,且第一转动杆13将带动双向调节螺杆12在活动槽8内旋转,当双向调节螺杆12在旋转的过程中,对称的连接块15将通过前端壁上所开设的螺纹孔16顺着双向调节螺杆12在活动槽8的槽内作出相反移动操作,且连接块15两侧安装的滑动块17将在活动槽8的槽内壁左右两侧所开设的滑动口9内滑动,这时,因为连接杆20前后端两侧安装的第二转动杆21分别活动安装在顶升杆23底端和连接块15顶面安装的凹型块18的两侧壁上所开设的第二转动孔19内,所以连接块15移动时将迫使连接杆20发生倾斜变化,且第二转动杆21在第二转动孔19内转动,连接杆20与凹型架7的凹口内底面之间所形成的夹角度数将逐渐变大,并在发生变化的过程中来向上推动顶升杆23,使得顶升杆23在凹型架7的凹口内左右两侧壁上所开设的侧槽11内向上移动,与此同时,侧板22以及侧板22顶端安装的调节板24和调节板24外部的顶板1将同时向上移动,直至顶板1抵紧在巷道内顶面使得手轮14无法在旋动,以此来通过顶板1和两侧延伸出的调节板24对巷道内上方进行支护,且斜撑杆25可提高对巷道上方的支护强度和稳定性,而侧板22可对巷道两侧进行支护,从而可根据采煤巷道的宽度和高度快速在巷道内调节搭建形成一个临时支护的结构,并能够对巷道起到有效地支撑防护的作用,搭建操作简单方便且省时省力,进而可提高工作效率和煤矿开采的进度。The entire device is moved into the coal mining tunnel through the universal wheel 6 installed on the bottom surface of the bottom plate 5. Then, the side plate 22 is pushed in the opposite direction according to the width of the tunnel, and the side plate 22 will move through the universal wheel 6 on the bottom surface of the bottom plate 5. This At this time, the side plate 22 will drive the adjustment plate 24 to move outward from the inner cavity 3 opened on both sides of the top plate 1 through the inclined support rod 25, and the inclined support rod 25 will move in the movable opening 4 opened on the bottom surface of the top plate 1 until The side plates 22 move to both sides of the tunnel, and then the universal wheel 6 is locked to prevent the device from moving. The universal wheel 6 is a universal wheel 6 with a locking function. Then, the universal wheel 6 is rotated simultaneously. There is a handwheel 14 under the front end of the concave frame 7 installed on the top surface of the base plate 5. The handwheel 14 will drive the first rotating rod 13 installed at the front and rear ends of the two-way adjustment screw 12 in the notch of the base plate 5 and in the groove of the bottom movable groove 8 on the front and rear end walls. Rotate in the first rotation hole 10 opened on the top, and the first rotation rod 13 will drive the two-way adjustment screw 12 to rotate in the movable groove 8. When the two-way adjustment screw 12 rotates, the symmetrical connecting block 15 will pass through the front end The threaded holes 16 opened in the wall make opposite movement operations in the groove of the movable groove 8 along the two-way adjusting screw 12, and the sliding blocks 17 installed on both sides of the connecting block 15 will be opened on the left and right sides of the inner wall of the movable groove 8 At this time, because the second rotating rods 21 installed on both sides of the front and rear ends of the connecting rod 20 are respectively movably installed on the two side walls of the concave block 18 installed on the bottom end of the lifting rod 23 and the top surface of the connecting block 15 Therefore, when the connecting block 15 moves, the connecting rod 20 will be forced to change its inclination, and the second rotating rod 21 rotates in the second rotating hole 19. The concave position between the connecting rod 20 and the concave frame 7 The angle formed between the bottom surfaces in the mouth will gradually become larger, and the lifting rod 23 will be pushed upward during the change, so that the lifting rod 23 can be positioned on the left and right side walls of the notch of the concave frame 7 The inside of the side groove 11 moves upward. At the same time, the side plate 22 and the adjustment plate 24 installed on the top of the side plate 22 and the top plate 1 outside the adjustment plate 24 will move upward at the same time until the top plate 1 is pressed against the top surface of the tunnel so that the handwheel 14 cannot rotate, so as to support the upper part of the tunnel through the top plate 1 and the adjusting plates 24 extending from both sides, and the diagonal support rods 25 can improve the support strength and stability of the upper part of the tunnel, and the side plates 22 can support both sides of the tunnel, so that it can be quickly adjusted and built in the tunnel according to the width and height of the coal mining tunnel to form a temporary support structure, and can effectively support and protect the tunnel, and the construction operation is simple It is convenient and saves time and effort, thereby improving work efficiency and the progress of coal mining.

综上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,然而在不脱离本实用新型的范围的情况下,可以对其进行各种改进并且可以用等效物替换其中的部件,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,均应包含在本实用新型的保护范围之内。In summary, the above are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, without departing from the scope of the present utility model, Various improvements can be made to it and its components can be replaced with equivalents, or some of its technical features can be equivalently replaced. Everything within the spirit and principles of the utility model should be included in the protection scope of the utility model. within.

Claims (6)

1.一种煤矿采煤掘进用临时支护装置,包括顶板(1),其特征在于:所述顶板(1)的两侧下方分别设有支护机构(2),且支护机构(2)包括凹型架(7)、双向调节螺杆(12)、连接块(15)、凹型块(18)、连接杆(20)、侧板(22)、调节板(24)和斜撑杆(25),所述双向调节螺杆(12)通过两端的第一转动杆(13)活动连接在凹型架(7)的凹口内底面中,且两个连接块(15)分别通过前端壁上的螺纹孔(16)与双向调节螺杆(12)活动连接,所述侧板(22)通过底面两侧的顶升杆(23)活动连接在底板(5)的顶端,且顶升杆(23)的顶端和连接块(15)的顶面均固定连接有凹型块(18),所述连接杆(20)通过两端两侧的第二转动杆(21)分别与顶升杆(23)和连接块(15)上的凹型块(18)活动连接,所述调节板(24)固定连接在侧板(22)的顶端并活动连接在顶板(1)的侧壁内,且侧板(22)和调节板(24)之间还固定连接有对称的斜撑杆(25)。1. A temporary support device for coal mine excavation, including a roof (1), characterized in that: support mechanisms (2) are respectively provided below both sides of the roof (1), and the support mechanisms (2) ) includes concave frame (7), two-way adjusting screw (12), connecting block (15), concave block (18), connecting rod (20), side plate (22), adjusting plate (24) and diagonal support rod (25 ), the two-way adjusting screw (12) is movably connected to the inner bottom surface of the concave frame (7) through the first rotating rods (13) at both ends, and the two connecting blocks (15) pass through the threaded holes on the front wall respectively. (16) is movably connected to the two-way adjusting screw (12). The side plate (22) is movably connected to the top of the bottom plate (5) through the jacking rods (23) on both sides of the bottom surface, and the top of the jacking rod (23) The concave block (18) is fixedly connected to the top surface of the connecting block (15). The connecting rod (20) is connected to the lifting rod (23) and the connecting block respectively through the second rotating rods (21) on both ends. The concave block (18) on (15) is movably connected, the adjustment plate (24) is fixedly connected to the top of the side plate (22) and movably connected in the side wall of the top plate (1), and the side plate (22) and Symmetrical diagonal braces (25) are also fixedly connected between the adjusting plates (24). 2.根据权利要求1所述的一种煤矿采煤掘进用临时支护装置,其特征在于:所述顶板(1)的左右两侧壁上分别开设有内腔(3),且顶板(1)的底面左右两侧分别开设有一组对称的与内腔(3)连通的活动口(4)。2. A temporary support device for coal mine excavation according to claim 1, characterized in that: the left and right side walls of the roof (1) are respectively provided with inner cavities (3), and the roof (1) ) is provided with a set of symmetrical movable ports (4) connected to the inner cavity (3) on the left and right sides of the bottom surface. 3.根据权利要求2所述的一种煤矿采煤掘进用临时支护装置,其特征在于:所述凹型架(7)固定安装在底板(5)的顶面上,且底板(5)的底面固定安装有一组前后对称的万向轮(6),所述凹型架(7)的凹口内底面开设有活动槽(8),且活动槽(8)的槽内壁左右两侧分别开设有滑动口(9),所述活动槽(8)的槽内前后两端分别开设有第一转动孔(10),所述凹型架(7)的凹口内左右两侧壁上还分别开设有侧槽(11)。3. A temporary support device for coal mine excavation according to claim 2, characterized in that: the concave frame (7) is fixedly installed on the top surface of the bottom plate (5), and the bottom plate (5) A set of front-to-back symmetrical universal wheels (6) is fixedly installed on the bottom surface. A movable groove (8) is provided on the inner bottom surface of the notch of the concave frame (7), and sliding grooves (8) are provided on the left and right sides of the inner wall of the movable groove (8). The opening (9) is provided with first rotation holes (10) at the front and rear ends of the movable groove (8), and side grooves are provided on the left and right side walls of the recess of the recessed frame (7). (11). 4.根据权利要求3所述的一种煤矿采煤掘进用临时支护装置,其特征在于:所述双向调节螺杆(12)的前后两端分别固定安装有第一转动杆(13),且第一转动杆(13)活动安装在第一转动孔(10)内,前端所述第一转动杆(13)的端壁上还固定安装有手轮(14),两个所述连接块(15)的前端壁上分别开设有螺纹孔(16)并通过螺纹孔(16)与双向调节螺杆(12)螺纹连接,且连接块(15)的左右两侧壁上还分别固定安装有滑动块(17)并活动安装在滑动口(9)内。4. A temporary support device for coal mine excavation according to claim 3, characterized in that: the front and rear ends of the two-way adjustment screw (12) are respectively fixed with first rotating rods (13), and The first rotating rod (13) is movably installed in the first rotating hole (10). A handwheel (14) is also fixedly installed on the end wall of the first rotating rod (13) at the front end. The two connecting blocks ( Threaded holes (16) are respectively provided on the front wall of 15) and are threadedly connected to the two-way adjusting screw (12) through the threaded holes (16), and sliding blocks are fixedly installed on the left and right side walls of the connecting block (15). (17) and is movably installed in the sliding port (9). 5.根据权利要求4所述的一种煤矿采煤掘进用临时支护装置,其特征在于:所述侧板(22)的底面固定安装有一组对称的顶升杆(23)并插入安装在侧槽(11)内,且顶升杆(23)的底端和连接块(15)的顶面分别固定安装有凹型块(18),所述凹型块(18)的凹口内壁两侧分别开设有第二转动孔(19),所述连接杆(20)的前后端两侧分别固定安装有第二转动杆(21),且第二转动杆(21)活动安装在第二转动孔(19)内。5. A temporary support device for coal mine excavation according to claim 4, characterized in that: a set of symmetrical lifting rods (23) are fixedly installed on the bottom surface of the side plate (22) and inserted and installed on the bottom surface of the side plate (22). In the side groove (11), the bottom end of the lifting rod (23) and the top surface of the connecting block (15) are respectively fixed with concave blocks (18). The two sides of the concave inner wall of the concave block (18) are respectively A second rotation hole (19) is provided, and a second rotation rod (21) is fixedly installed on both sides of the front and rear ends of the connecting rod (20), and the second rotation rod (21) is movably installed in the second rotation hole (20). 19) within. 6.根据权利要求5所述的一种煤矿采煤掘进用临时支护装置,其特征在于:所述调节板(24)固定安装在侧板(22)的顶面,且调节板(24)活动安装在内腔(3)内,所述调节板(24)的底面和侧板(22)的内侧壁之间还固定安装有一组对称的斜撑杆(25),且斜撑杆(25)穿过活动口(4)。6. A temporary support device for coal mine excavation according to claim 5, characterized in that: the adjustment plate (24) is fixedly installed on the top surface of the side plate (22), and the adjustment plate (24) Movably installed in the inner cavity (3), a set of symmetrical diagonal braces (25) are also fixedly installed between the bottom surface of the adjustment plate (24) and the inner wall of the side plate (22), and the diagonal braces (25) ) through the movable opening (4).
CN202322078227.5U 2023-08-03 2023-08-03 Temporary support device for coal mining and tunneling of coal mine Expired - Fee Related CN220365610U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322078227.5U CN220365610U (en) 2023-08-03 2023-08-03 Temporary support device for coal mining and tunneling of coal mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322078227.5U CN220365610U (en) 2023-08-03 2023-08-03 Temporary support device for coal mining and tunneling of coal mine

Publications (1)

Publication Number Publication Date
CN220365610U true CN220365610U (en) 2024-01-19

Family

ID=89513797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322078227.5U Expired - Fee Related CN220365610U (en) 2023-08-03 2023-08-03 Temporary support device for coal mining and tunneling of coal mine

Country Status (1)

Country Link
CN (1) CN220365610U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120906603A (en) * 2025-10-11 2025-11-07 吕梁学院 Tunnel temporary reinforcement supporting structure for coal mine tunneling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120906603A (en) * 2025-10-11 2025-11-07 吕梁学院 Tunnel temporary reinforcement supporting structure for coal mine tunneling
CN120906603B (en) * 2025-10-11 2025-12-23 吕梁学院 Tunnel temporary reinforcement supporting structure for coal mine tunneling

Similar Documents

Publication Publication Date Title
CN220365610U (en) Temporary support device for coal mining and tunneling of coal mine
CN217300623U (en) Temporary support device for coal mine roadway excavation
CN207609434U (en) A rockburst protection trolley for tunnel construction
CN213573886U (en) Air drill fixing device for marble exploitation
CN219431855U (en) Combined jumbolter
WO2026025742A1 (en) Multifunctional tunneling and anchoring integrated machine
CN114961017B (en) Prefabricated component for assembled green building
CN115898498A (en) A tunnel mechanized semi-automatic support device
CN115898281A (en) A adjustable drilling equipment for building engineering
CN221703734U (en) Extensible type Loading mechanism of heading machine
CN110410006A (en) A Drilling Rig for Drilling Inclined Roofs in Special-shaped Roadways
CN211598717U (en) Supporting frame for coal mining tunneling roadway
CN212689917U (en) A support device for a hydraulic rock bolt drilling rig
CN209369833U (en) A kind of moveable tunneltron canopy operation platform
CN115853556A (en) A support device with deviation correction function for water-rich soft rock roadway
CN220247592U (en) A formwork reinforcement frame
CN115680690A (en) Cutting device of heading machine and cantilever type longitudinal shaft heading machine
CN220469957U (en) Rock pillar reinforced structure in small clear distance tunnel
CN220059608U (en) Mine tunnel supporting structure
CN224002658U (en) A device for oblique drilling of dewatering wells
CN220791257U (en) A tunnel support steel arch anti-sinking device based on soft soil strata
CN222045810U (en) Coal mine tunneling supporting device
CN220929427U (en) High-strength reinforcing and supporting device for roadway support
CN215854668U (en) Underground hydraulic support mounting platform
CN111945707A (en) Construction method of underground diaphragm wall in underground air-raid shelter area

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20240119

CF01 Termination of patent right due to non-payment of annual fee