CN220352815U - Piling equipment for construction of trestle steel pipe piles - Google Patents

Piling equipment for construction of trestle steel pipe piles Download PDF

Info

Publication number
CN220352815U
CN220352815U CN202321696734.9U CN202321696734U CN220352815U CN 220352815 U CN220352815 U CN 220352815U CN 202321696734 U CN202321696734 U CN 202321696734U CN 220352815 U CN220352815 U CN 220352815U
Authority
CN
China
Prior art keywords
fixedly connected
sliding
main pipe
plate
piling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321696734.9U
Other languages
Chinese (zh)
Inventor
蔡福
黄丹丹
要思侬
刘海龙
王姗姗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Roadbridge Group Co Ltd
Original Assignee
PowerChina Roadbridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Roadbridge Group Co Ltd filed Critical PowerChina Roadbridge Group Co Ltd
Priority to CN202321696734.9U priority Critical patent/CN220352815U/en
Application granted granted Critical
Publication of CN220352815U publication Critical patent/CN220352815U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the technical field of road bridge construction and discloses piling equipment for trestle steel pipe pile construction, which comprises a main pipe, wherein a convenient piling mechanism is arranged on the left side and the right side of the main pipe, an auxiliary pipe is arranged on the front side of the main pipe, the convenient piling mechanism comprises two sliding plates and a clamping block, a fixed plate is fixedly connected to the rear end of one side of the sliding plate far away from the main pipe, a mounting column is fixedly connected to the front side of the fixed plate, a spring is arranged outside the mounting column, a sliding sleeve is fixedly connected to the outside of the mounting column in a sliding manner, and a stabilizing plate is fixedly connected to the front side of the mounting column. According to the utility model, by means of the structure of the sliding plate, the fixed plate, the mounting plate, the spring, the sliding sleeve, the stabilizing plate and the like, the rapid splicing or the stable splicing is realized, so that a large amount of piling time can be saved, and the piling efficiency can be provided.

Description

Piling equipment for construction of trestle steel pipe piles
Technical Field
The utility model relates to the technical field of road and bridge construction, in particular to piling equipment for trestle steel pipe pile construction.
Background
With the rapid development of domestic bridge technology, the bridge beam rapidly develops across the river and the sea, and the steel trestle and the steel platform for auxiliary construction in road bridge construction are widely applied at home and abroad. The bridge construction on the river, lake and sea is generally carried out by adopting a construction scheme for erecting a steel trestle, the steel trestle is generally in the structure form that a door-type steel pipe pile foundation is adopted at the lower part, a Bailey beam or a section steel structure is adopted at the upper part, an adjusted trestle steel pipe pile is also one of the door-type steel pipe piles, and piling equipment is needed during the construction of the adjusted trestle steel pipe pile.
The steel pipe pile of the trestle needs to be spliced when piling in the prior art so as to conveniently pile, therefore, the spliced structure is also a part of piling equipment, the spliced structure is generally welded or flanged at present, but no matter welded or flanged is used for connection, the steel pipe pile needs to be butted firstly, so that a great deal of time is needed for butt joint and stable butt joint, and the piling efficiency is reduced.
Disclosure of Invention
In order to overcome the defects, the utility model provides piling equipment for construction of trestle steel pipe piles, which aims to solve the problem that a great deal of time is spent in butt joint and stable butt joint, so that the piling efficiency is reduced.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the piling equipment for construction of the trestle steel pipe piles comprises a main pipe, wherein a convenient piling mechanism is arranged on the left side and the right side of the main pipe, and a secondary pipe is arranged on the front side of the main pipe;
the convenient piling mechanism comprises two sliding plates and a clamping block, wherein the sliding plate is far away from a fixed plate fixedly connected with one side rear end of a main pipe, a mounting column is fixedly connected with the front side of the fixed plate, a spring is arranged outside the mounting column, a sliding sleeve is fixedly connected with the outside of the mounting column in a sliding manner, one end of the spring is fixedly connected with the front side of the fixed plate, the other end of the spring is fixedly connected with the rear side of the sliding sleeve, a stabilizing plate is fixedly connected with the front side of the mounting column, a clamping frame is rotatably connected with the outside of the sliding sleeve, a sliding groove is formed in the sliding plate, sliding grooves are formed in the sliding block, and sliding blocks are fixedly connected with the left side and the right side of the auxiliary pipe and are slidably connected with the sliding blocks.
As a further description of the above technical solution:
one side of stabilizing plate near being responsible for is fixedly connected with one side that the sliding plate kept away from being responsible for, the left and right sides that is responsible for all fixedly connected with draw runner, draw runner sliding connection is in the inside of spout.
As a further description of the above technical solution:
the both ends of being responsible for all are provided with the stable groove, the both ends of vice pipe all fixedly connected with stable circle, stable groove and stable circle looks block.
As a further description of the above technical solution:
the outside rotation of stabilizer board is connected with the spanner, the upper and lower both sides of spanner all are provided with the sliding tray, the upper and lower both sides of block frame are sliding connection respectively in the inside of two sliding trays.
As a further description of the above technical solution:
the utility model has the following beneficial effects:
according to the utility model, by means of the structure of the sliding plate, the fixed plate, the mounting plate, the spring, the sliding sleeve, the stabilizing plate and the like, the rapid splicing or the stable splicing is realized, so that a large amount of piling time can be saved, and the piling efficiency can be provided.
Drawings
Fig. 1 is a perspective view of piling equipment for construction of a trestle steel pipe pile;
FIG. 2 is an enlarged view of FIG. 1 at A;
fig. 3 is a schematic diagram of a stabilizing groove in piling equipment for construction of a trestle steel pipe pile;
fig. 4 is a schematic diagram of a chute in a piling device for construction of a trestle steel pipe pile according to the present utility model;
fig. 5 is a schematic diagram of a stabilizer ring in piling equipment for construction of a trestle steel pipe pile;
fig. 6 is a schematic diagram of a sliding groove of piling equipment for construction of a trestle steel pipe pile.
Legend description:
1. a main pipe; 2. the piling mechanism is convenient; 201. a sliding plate; 202. a fixing plate; 203. a mounting column; 204. a spring; 205. a sliding sleeve; 206. a stabilizing plate; 207. a wrench; 208. a clamping frame; 209. a sliding groove; 210. a chute; 211. a slide bar; 212. a slide block; 213. a clamping block; 214. a sliding groove; 3. a secondary pipe; 4. a stabilizing groove; 5. and (5) stabilizing the ring.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-6, one embodiment provided by the present utility model is: the piling equipment for construction of the trestle steel pipe piles comprises a main pipe 1, wherein a convenient piling mechanism 2 is arranged on the left side and the right side of the main pipe 1, and a secondary pipe 3 is arranged on the front side of the main pipe 1;
the main pipe 1 and the auxiliary pipe 3 can be conveniently spliced through the convenient piling mechanism 2, so that welding or flange connection can be conveniently performed, and the steel pipe pile height adjustment is realized by utilizing the splicing of the main pipe 1 and the auxiliary pipe 3.
Make things convenient for pile driving mechanism 2 to include two sliding plates 201 and fixture block 213, one side rear end fixedly connected with fixed plate 202 that sliding plate 201 kept away from person in charge 1, the front side fixedly connected with erection column 203 of fixed plate 202, the outside of erection column 203 is provided with spring 204, the outside fixedly sliding connection of erection column 203 has sliding sleeve 205, the front side fixedly connected with stabilizer plate 206 of erection column 203, the outside rotation of sliding sleeve 205 is connected with block frame 208, the inside of sliding plate 201 is provided with spout 210, the inside of fixture block 213 is provided with sliding groove 214, the left and right sides of accessory pipe 3 all fixedly connected with slider 212.
By pulling the wrench 207, the wrench 207 drives the clamping frame 208 to move towards the front side, the clamping frame 208 drives the sliding sleeve 205 to slide towards the front side, the spring 204 is driven to pull towards the front side when the sliding sleeve 205 slides towards the front side, at this time, the sliding sleeve 205 moves to be in contact with the stabilizing plate 206, at this time, the clamping frame 208 is rotated to clamp the clamping frame 208 with the clamping block 213, at this time, the wrench 207 is loosened, the sliding sleeve 205 is pulled backwards under the action of the spring 204, the sliding sleeve 205 can give a backward force to the sliding sleeve 205 after moving backwards, the sliding sleeve 205 has a backward force, so that the force can be transmitted to the clamping block 213 through the clamping frame 208, the clamping block 213 transmits the force to the sliding block 212, and the sliding block 212 transmits the force to the auxiliary pipe 3, so that the main pipe 1 and the auxiliary pipe 3 can be butted and stabilized, and the main pipe 1 and the auxiliary pipe 3 can be spliced conveniently, and the butting time can be saved.
One end fixed connection at fixed plate 202 of spring 204, the other end fixed connection at the rear side of slip cap 205 of spring 204, the one side fixed connection who is close to being responsible for 1 of stabilizer plate 206 is kept away from the one side of being responsible for 1 in the slip sheet 201, the left and right sides of being responsible for 1 all fixedly connected with draw runner 211, draw runner 211 sliding connection is in the inside of spout 210, slider 212 sliding connection is in the inside of spout 214, block frame 208 and fixture block 213 looks block, the both ends of being responsible for 1 all are provided with stabilizer tank 4, the both ends of accessory pipe 3 all fixedly connected with stabilizer ring 5, stabilizer tank 4 and stabilizer ring 5 looks block, the outside rotation of stabilizer plate 206 is connected with spanner 207, the upper and lower both sides of spanner 207 all are provided with the slide tank 209, the upper and lower both sides of block frame 208 sliding connection is in the inside of two slide tanks 209 respectively.
Can make things convenient for the sliding plate 201 to splice through the draw runner 211 to conveniently can the sliding plate 201 install on being responsible for 1, through the block of stable groove 4 and stable circle 5, can conveniently be responsible for 1 and vice pipe 3 to splice, thereby can save the time of concatenation.
Working principle: the main pipe 1 and the auxiliary pipe 3 are butted, the clamping block 213 is aligned with the clamping frame 208, at the moment, the spanner 207 is pulled, the spanner 207 drives the clamping frame 208 to move forwards, the clamping frame 208 drives the sliding sleeve 205 to slide forwards, the spring 204 is driven to pull forwards when the sliding sleeve 205 slides forwards, at the moment, the sliding sleeve 205 moves to be in contact with the stabilizing plate 206, at the moment, the clamping frame 208 is rotated to clamp the clamping frame 208 with the clamping block 213, at the moment, the spanner 207 is loosened, the sliding sleeve 205 is pulled backwards under the action of the spring 204, the sliding sleeve 205 can give a backward force to the sliding sleeve 205 after moving backwards, the sliding sleeve 205 has a backward force, the clamping frame 208 can transmit the force to the sliding block 213 through the clamping frame 208, the clamping block 213 can transmit the force to the sliding block 212, and the sliding block 212 can transmit the force to the auxiliary pipe 3, so that the main pipe 1 and the auxiliary pipe 3 can be butted and stabilized, welding or flange connection can be more conveniently performed, and the efficiency can be improved.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (4)

1. Piling equipment for construction of trestle steel pipe piles comprises a main pipe (1), and is characterized in that: the left side and the right side of the main pipe (1) are respectively provided with a convenient piling mechanism (2), and the front side of the main pipe (1) is provided with an auxiliary pipe (3);
make things convenient for pile mechanism (2) including two sliding plates (201) and fixture block (213), one side rear end fixedly connected with fixed plate (202) of being responsible for (1) is kept away from to sliding plate (201), the front side fixedly connected with erection column (203) of fixed plate (202), the outside of erection column (203) is provided with spring (204), the outside fixedly connected with slip cap (205) of erection column (203), the one end fixedly connected with of spring (204) is at the front side of fixed plate (202), the other end fixedly connected with of spring (204) is at the rear side of slip cap (205), the front side fixedly connected with stabilizer plate (206) of erection column (203), the outside rotation of slip cap (205) is connected with block frame (208), the inside of sliding plate (201) is provided with spout (210), the inside of fixture block (213) is provided with slide groove (214), the equal fixedly connected with slider (212) in the left and right sides of vice pipe (3), slide slider (212) sliding connection is at the inside of slide groove (208) and block frame (213).
2. The piling device for construction of trestle steel pipe piles according to claim 1, wherein: one side of stabilizing plate (206) near main pipe (1) is fixedly connected with one side that is kept away from main pipe (1) at sliding plate (201), the left and right sides of main pipe (1) all fixedly connected with draw runner (211), draw runner (211) sliding connection is in the inside of spout (210).
3. The piling device for construction of trestle steel pipe piles according to claim 1, wherein: the two ends of the main pipe (1) are provided with stabilizing grooves (4), the two ends of the auxiliary pipe (3) are fixedly connected with stabilizing rings (5), and the stabilizing grooves (4) are clamped with the stabilizing rings (5).
4. The piling device for construction of trestle steel pipe piles according to claim 1, wherein: the outside rotation of stabilizer board (206) is connected with spanner (207), the upper and lower both sides of spanner (207) all are provided with sliding tray (209), the inside at two sliding tray (209) is slided respectively to the upper and lower both sides of block frame (208).
CN202321696734.9U 2023-06-30 2023-06-30 Piling equipment for construction of trestle steel pipe piles Active CN220352815U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321696734.9U CN220352815U (en) 2023-06-30 2023-06-30 Piling equipment for construction of trestle steel pipe piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321696734.9U CN220352815U (en) 2023-06-30 2023-06-30 Piling equipment for construction of trestle steel pipe piles

Publications (1)

Publication Number Publication Date
CN220352815U true CN220352815U (en) 2024-01-16

Family

ID=89478383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321696734.9U Active CN220352815U (en) 2023-06-30 2023-06-30 Piling equipment for construction of trestle steel pipe piles

Country Status (1)

Country Link
CN (1) CN220352815U (en)

Similar Documents

Publication Publication Date Title
CN220352815U (en) Piling equipment for construction of trestle steel pipe piles
JP4949735B2 (en) Pile holding device and pile holding method
CN212131512U (en) Pipeline supporting and positioning device for drainage construction
CN215105276U (en) Lapping component convenient for butt joint of pipe pile heads
CN213897247U (en) Concrete sheet pile reinforcing apparatus for water conservancy construction
CN214363481U (en) Municipal works are with pile device
CN214171494U (en) Rainwater pipe butt joint device
CN220080014U (en) Tubular pile positioning device
CN210459342U (en) Trench excavation positioning device for municipal road construction
CN219026534U (en) Pipeline welding leveling device
CN113931437B (en) Building aluminum mould board shocks resistance
CN216865145U (en) Synchronous winding and unwinding devices of biax pneumatic cylinder based on hydraulic pressure is passed and is controlled
CN217452715U (en) Offshore wind power steel pipe pile splicing movable welding equipment
CN220396724U (en) Pipeline installation equipment for water conservancy and hydropower construction
CN210451626U (en) Welding device for outer ring weld of steel pipe pile
CN220621415U (en) Steel construction safety protection equipment
CN216948214U (en) Auxiliary device for quickly connecting steel sheet piles
CN221681820U (en) Low headroom side shift alignment connecting rod stirring pile device
CN219863199U (en) Pipeline supporting and positioning device for municipal construction
CN218148343U (en) Be used for building site stake to stabilize protection device
CN220622969U (en) Pipeline laying auxiliary device for hydraulic and hydroelectric engineering construction
CN218342050U (en) Steel-pipe pile centre gripping interfacing apparatus
CN215669509U (en) Movable steel sheet pile guiding device
CN217607402U (en) High-strength bridge
CN219219104U (en) Floating transportation auxiliary device applied to immersed tunnel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant