CN220336929U - Mining engineering is with stock of being convenient for installation - Google Patents

Mining engineering is with stock of being convenient for installation Download PDF

Info

Publication number
CN220336929U
CN220336929U CN202321127559.1U CN202321127559U CN220336929U CN 220336929 U CN220336929 U CN 220336929U CN 202321127559 U CN202321127559 U CN 202321127559U CN 220336929 U CN220336929 U CN 220336929U
Authority
CN
China
Prior art keywords
anchor rod
stock
main body
rotating shaft
rod main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321127559.1U
Other languages
Chinese (zh)
Inventor
朱伟杰
苗静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321127559.1U priority Critical patent/CN220336929U/en
Application granted granted Critical
Publication of CN220336929U publication Critical patent/CN220336929U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an anchor rod convenient to install for mining engineering, which comprises an anchor rod main body, wherein a plurality of triangular tooth plates are welded on the anchor rod main body, a sealing plate is detachably connected to the front half section of the anchor rod main body, the sealing plate is connected with the anchor rod main body through threads, a plurality of heightening seats are welded on the sealing plate, and each heightening seat is connected with a reinforcing mechanism, and the reinforcing mechanism comprises: the device comprises a first rotating shaft, swinging rods, a fixed substrate, a second rotating shaft and insertion holes, wherein the first rotating shaft is rotationally connected to a heightening seat, two swinging rods are fixedly arranged on the first rotating shaft, the lower ends of the two swinging rods are connected with the fixed substrate, the fixed substrate is rotationally connected with the two swinging rods through the second rotating shaft, and a plurality of insertion holes are formed in the fixed substrate. The utility model has the advantages of convenient installation, multiple reinforcement and high stability of connection with rock mass.

Description

Mining engineering is with stock of being convenient for installation
Technical Field
The utility model relates to the field of anchor rods, in particular to an anchor rod convenient to install for mining engineering.
Background
Anchor rod, english "Bolt"; "bolting (accurate title)"; "Anchor (early designation)" is the most basic component of roadway support in contemporary coal mines, and it reinforces the surrounding rock of the roadway together so that the surrounding rock supports itself. The anchor rod is not only used for mines, but also used for main reinforcement of slopes, tunnels and dam bodies in engineering technology.
The anchor rod is divided into: wood stock, reinforced mortar stock, fall wedge type metal stock, pipe seam formula stock, wherein reinforced mortar stock is comparatively extensive owing to simple to operate, however, current reinforced mortar stock is fixed with the rock mass only adopting cement mortar when the installation, the fixed mode is comparatively single, and the stock is rectangular shape, the direction of force that can bear is comparatively single, lead to the connection stability between stock and the rock mass not high enough, consequently, to above current situation, urgent need develop a multiple reinforcement, with the high stock of being convenient for install of mining engineering of connection stability of rock mass, in order to overcome the not enough in the current practical application, satisfy current demand.
Disclosure of Invention
The utility model aims to provide an anchor rod which is convenient to install and is used for mining engineering, so as to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a mining engineering is with stock of being convenient for installation, includes the stock main part, the welding has a plurality of triangle tooth pieces in the stock main part, the first half section of stock main part can be dismantled and be connected with the closing plate, the closing plate passes through the screw thread and links to each other with the stock main part, the welding has a plurality of seats that increase on the closing plate, every all be connected with a strengthening mechanism on the seat that increases, strengthening mechanism includes: the novel lifting device comprises a first rotating shaft, swinging rods, a fixed substrate, a second rotating shaft and insertion holes, wherein the first rotating shaft is rotationally connected to a height increasing seat, two swinging rods are fixedly arranged on the first rotating shaft, the lower ends of the two swinging rods are connected with the fixed substrate, the fixed substrate is rotationally connected with the two swinging rods through the second rotating shaft, and a plurality of insertion holes are formed in the fixed substrate.
As a further scheme of the utility model: the anchor rod main body is made of twisted steel bars.
As still further aspects of the utility model: the heightening seats are uniformly distributed on the sealing plate.
As still further aspects of the utility model: the anchor rod is characterized in that a pouring through hole is formed in the anchor rod main body, and an external thread is arranged at the front end of the anchor rod main body.
The beneficial effects are that: this mining engineering is with stock of being convenient for installation, during the installation, firstly punch on the rock mass, after the hole is beaten, and the diameter of hole is greater than the diameter of stock main part, insert the stock main part into downthehole for the closing plate laminating is to the rock mass, then, pour cement mortar from the front end of pouring the through-hole again, cement mortar flows the mounting hole on the rock mass from the rear end of pouring the through-hole, cement mortar fills up the mounting hole on the rock mass, fix the stock main part together with the rock mass through cement mortar, strengthen the joint strength of stock main part and cement mortar through a plurality of triangle tooth pieces outside the stock main part, and then improve the steadiness that stock main part and rock mass are connected, then, rotate swinging arms and fixed base plate, adjust fixed base plate's angle for fixed base plate laminating with the surface of rock mass, then, pass the jack with chemical bolt and fix the rock mass again, and then fix fixed base plate and rock mass together, and the stability that the stock main part and rock mass are connected. In conclusion, the utility model has the advantages of convenient installation, multiple reinforcement and high connection stability with the rock mass.
Drawings
Fig. 1 is a schematic perspective view of the present utility model.
Fig. 2 is a schematic view of a part of the structure of the present utility model.
Fig. 3 is a schematic view of the installation state of the present utility model.
In the figure: 1. an anchor body; 101. pouring the through hole; 102. an external thread; 2. triangular tooth plates; 3. a sealing plate; 4. a heightening seat; 5. a reinforcement mechanism; 501. a first rotating shaft; 502. a swinging rod; 503. fixing the substrate; 504. a second rotating shaft; 505. and a jack.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present utility model more apparent, the technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model, and it is apparent that the described embodiments are some embodiments of the present utility model, but not all embodiments of the present utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples
Referring to fig. 1 to 3, in the embodiment of the utility model, an anchor rod convenient to install for mining engineering comprises an anchor rod main body 1, wherein the anchor rod main body 1 is made of a twisted steel bar, so that the anchor rod main body 1 has good tensile strength, a plurality of triangular tooth plates 2 are welded on the anchor rod main body 1, a pouring through hole 101 is formed in the anchor rod main body 1, the pouring through hole 101 is used for cement mortar circulation, an external thread 102 is formed at the front end of the anchor rod main body 1, a sealing plate 3 is detachably connected to the front half section of the anchor rod main body 1, the sealing plate 3 is connected with the anchor rod main body 1 through threads, a plurality of heightening seats 4 are welded on the sealing plate 3, a plurality of heightening seats 4 are uniformly distributed on the sealing plate 3, each heightening seat 4 is connected with a reinforcing mechanism 5, when the anchor rod main body is used, after the anchor rod main body 1 is perforated, the diameter of the hole is larger than that of the anchor rod main body 1, the anchor rod main body 1 is inserted into the hole, so that the sealing plate 3 is connected to the rock body through the cement mortar circulation, the cement mortar is poured from the front end of the pouring through hole 101, the cement mortar is connected to the anchor rod main body 1 through the plurality of reinforcing mechanisms through the reinforcing mechanism 5, and the face layers are fixedly connected to the anchor rod main body 1 through the plurality of triangular tooth plates, and the face layers are fixedly connected to the anchor rod main body 1 through the face layers through the heightening seats, and the reinforcing mechanism 1.
The reinforcement mechanism 5 includes: the device comprises a first rotating shaft 501, swinging rods 502, a fixed substrate 503, a second rotating shaft 504 and an inserting hole 505, wherein the first rotating shaft 501 is rotationally connected to a heightening seat 4, two swinging rods 502 are fixed on the first rotating shaft 501, the lower ends of the two swinging rods 502 are connected with the fixed substrate 503, the fixed substrate 503 is rotationally connected with the two swinging rods 502 through the second rotating shaft 504, a plurality of inserting holes 505 are formed in the fixed substrate 503, and when the device is installed, the angle of the fixed substrate 503 is adjusted through rotating the swinging rods 502 and the fixed substrate 503, so that the fixed substrate 503 is attached to the surface of a rock body, then a chemical bolt penetrates through the inserting hole 505 to be fixed on the rock body, and the fixed substrate 503 and the rock body are fixed together.
The working principle of the utility model is as follows: this mining engineering is with stock of being convenient for installation, during the installation, firstly punch on the rock mass, after punching the hole, and the diameter of hole is greater than the diameter of stock main part 1, insert stock main part 1 again downthehole for sealing plate 3 laminating is to the rock mass, then, pour cement mortar from the front end of pouring through-hole 101 again, cement mortar flows the mounting hole on the rock mass from the rear end of pouring through-hole 101, cement mortar fills up the mounting hole on the rock mass, fix stock main part 1 together with the rock mass through cement mortar, strengthen the joint strength of stock main part 1 and cement mortar through a plurality of triangular tooth pieces 2 outside the stock main part 1, and then improve the steadiness that stock main part 1 is connected with the rock mass, then, rotate swinging arms 502 and fixed baseplate 503, adjust fixed baseplate 503's angle, make fixed baseplate 503 laminate with the surface of rock mass, then, pass the jack 505 with chemical bolt and fix the rock mass, and then fix fixed baseplate 503 together with the rock mass together, and then increase stock 1 and rock mass connection's stability.

Claims (4)

1. The utility model provides a mining engineering is with stock of being convenient for installation which characterized in that: including stock main part (1), the welding has a plurality of triangle tooth piece (2) on stock main part (1), the first half section of stock main part (1) can be dismantled and be connected with closing plate (3), closing plate (3) link to each other with stock main part (1) through the screw thread, the welding has a plurality of seat (4) that increase on closing plate (3), every all be connected with a strengthening mechanism (5) on increasing seat (4), strengthening mechanism (5) include: first pivot (501), swinging arms (502), fixed base plate (503), second pivot (504) and jack (505), first pivot (501) rotate and connect on increasing seat (4), be fixed with two swinging arms (502) on first pivot (501), two the lower extreme of swinging arms (502) is connected with fixed base plate (503), fixed base plate (503) rotate through second pivot (504) and two swinging arms (502) and are connected, be provided with a plurality of jacks (505) on fixed base plate (503).
2. The mine construction bolt for easy installation according to claim 1, wherein: the anchor rod main body (1) is made of a twisted steel bar.
3. The mine construction bolt for easy installation according to claim 1, wherein: the plurality of heightening seats (4) are uniformly distributed on the sealing plate (3).
4. The mine construction bolt for easy installation according to claim 1, wherein: pouring through holes (101) are formed in the anchor rod main body (1), and external threads (102) are formed in the front end of the anchor rod main body (1).
CN202321127559.1U 2023-05-11 2023-05-11 Mining engineering is with stock of being convenient for installation Active CN220336929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321127559.1U CN220336929U (en) 2023-05-11 2023-05-11 Mining engineering is with stock of being convenient for installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321127559.1U CN220336929U (en) 2023-05-11 2023-05-11 Mining engineering is with stock of being convenient for installation

Publications (1)

Publication Number Publication Date
CN220336929U true CN220336929U (en) 2024-01-12

Family

ID=89455238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321127559.1U Active CN220336929U (en) 2023-05-11 2023-05-11 Mining engineering is with stock of being convenient for installation

Country Status (1)

Country Link
CN (1) CN220336929U (en)

Similar Documents

Publication Publication Date Title
CN108643602B (en) Outsourcing anchor steel reinforced structure suitable for concrete beam column node
CN111485634B (en) Novel prefabricated part wall-column connecting structure and mounting method thereof
CN212294721U (en) Prestressed pipe pile foundation and connection structure of prestressed pipe pile foundation and 35KV power transmission line iron tower
CN113338365B (en) Reinforced structure of onshore fan expanded foundation pipe pile and construction method
CN108086471A (en) Detachable prefabricated assembled concrete-filled steel square tubular column and girder steel combined joint
CN220336929U (en) Mining engineering is with stock of being convenient for installation
CN108589716A (en) Reaming slip casting screw pile, pile foundation and pile construction method
CN110130485B (en) Prefabricated assembly type beam column node with toothed plates and assembly method thereof
CN208563658U (en) A kind of prefabricated lattice compound shear wall assembly monomer
CN215759003U (en) Anti-floating anchor pile
CN112459077B (en) Continuous foundation pit waist beam and construction method thereof
CN208831032U (en) High strength anchor bar is used in anchoring outside a kind of
CN216238488U (en) A precast pile structure for building engineering
CN205475207U (en) A construction equipment is pour to exposed basement rock or shallow overburden basement rock
CN221236053U (en) Reinforced foundation pit based on pile anchor supporting system
CN219491019U (en) Base structure of steel diagonal bracing
CN2627062Y (en) Foundation ditch support member
KR20010067001A (en) The connection structure between steel pile head and concrete footing using connector and thereof connector
CN213926287U (en) Continuity foundation ditch waist rail connection structure
CN219343228U (en) Double-row pile foundation pit supporting structure with web member beams arranged at rear part
CN217924231U (en) Prefabricated hole shear force wall of taking out of assembled and prefabricated hidden post connection structure of taking out hole
CN219909627U (en) Anchoring connection structure of steel plate shear wall and steel bars in concrete frame
CN218759975U (en) Anchor rod positioner
KR200194424Y1 (en) Precast retaining wall using high strength micro pile