CN220336426U - Outer scaffold wall connecting piece - Google Patents

Outer scaffold wall connecting piece Download PDF

Info

Publication number
CN220336426U
CN220336426U CN202322050276.8U CN202322050276U CN220336426U CN 220336426 U CN220336426 U CN 220336426U CN 202322050276 U CN202322050276 U CN 202322050276U CN 220336426 U CN220336426 U CN 220336426U
Authority
CN
China
Prior art keywords
threaded rod
scaffold
wall
wall body
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322050276.8U
Other languages
Chinese (zh)
Inventor
耿晨杰
杨小会
徐单青
卢润杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 3 Construction Group Co Ltd
Original Assignee
China Coal No 3 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 3 Construction Group Co Ltd filed Critical China Coal No 3 Construction Group Co Ltd
Priority to CN202322050276.8U priority Critical patent/CN220336426U/en
Application granted granted Critical
Publication of CN220336426U publication Critical patent/CN220336426U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of building engineering construction and discloses an outer scaffold wall connecting piece, which comprises a wall body, wherein a groove penetrating through the wall body is formed in the wall body, and a scaffold is arranged on the outer wall of the wall body; the wall body inside groove installs the decompression structure, and the decompression structure includes first threaded rod, and first threaded rod one end screw in is connected with first screw cap, and first threaded rod other end is connected with the fixed plate, and first threaded rod insert is connected with threaded rod rubber sleeve, and threaded rod rubber sleeve outer wall is equipped with a plurality of springs, and spring coupling has the buried pipe in advance of dismantling. According to the utility model, the groove penetrating the wall body is formed in the wall body, the decompression structure is arranged in the groove, so that bending deformation of internal parts of the wall connecting piece due to weight increase after connection of the scaffold is reduced, abrasion of the internal parts on the wall body can be effectively reduced by the detachable embedded pipe, the support structure is arranged at the main rod of the scaffold, and the underground embedded pipe is inserted and connected at the bottom of the main rod, so that the safety performance of the scaffold is greatly enhanced.

Description

Outer scaffold wall connecting piece
Technical Field
The utility model belongs to the technical field of building engineering construction, and particularly relates to an outer scaffold wall connecting piece.
Background
The wall connecting piece is a component for connecting the scaffold body with the main structure of the building and transmitting tensile force and pressure.
The wall connecting piece plays an important role in strengthening the overall stability of the scaffold, improving the stable bearing capacity of the scaffold and avoiding major accidents such as toppling or collapse. The wall connecting piece of the scaffold for the building construction is commonly formed by embedding a steel pipe in a structural boundary beam, inserting one end of a wall connecting rod into the steel pipe, and fastening the other end of the wall connecting rod with the scaffold through a fastener.
The utility model has the substantial characteristics and obvious technical progress, the wall connecting piece for the outer scaffold tie is convenient to install, the woodworker can be pre-buried after placing the outer side template, and only needs to open a hole on the first layer, and then the woodworker can turn over the upper layer through the template to use local open holes for adjustment; the construction speed is high, and the wall connecting piece can be installed immediately after the woodworking disassembles the side mould, so that the subsequent construction is not influenced due to slow installation; the method does not affect any work species, and does not affect the woodworking formwork and the secondary structure formwork, thereby avoiding being dismantled and destroyed. Meanwhile, the wall connecting pieces are consistent in length, the colors are red and are more striking, and the aesthetic feeling of the site is improved.
But the present inventors have found that this technical solution still has at least the following drawbacks:
the wall connecting piece of the outer scaffold tie is only provided with holes on the first layer, is only suitable for the installation of the middle-upper scaffold, and the bottom of the wall connecting piece can possibly cause the bending deformation of the full-thread stud due to the weight increase of the scaffold after the scaffold is connected; and the full-thread stud of the wall connecting piece of the outer scaffold tie can shake due to the work of workers, and the wall connecting piece falls off due to abrasion of the wall, so that safety accidents occur.
The present utility model has been made in view of this.
Disclosure of Invention
In order to solve the problem that the wall connecting piece of the outer scaffold tie is only provided with holes on the first layer, the wall connecting piece is only suitable for the installation of the middle-upper scaffold, and the bottom of the wall connecting piece can possibly cause the bending deformation of the full-thread stud due to the increase of weight; the full-thread stud of the wall connecting piece of the outer scaffold tie can shake due to the work of workers, the wall connecting piece falls off due to abrasion of the wall, and the technical problem of safety accidents occurs is that the basic conception of the technical scheme adopted by the utility model is as follows:
the outer scaffold wall connecting piece comprises a wall body, wherein a groove penetrating through the wall body is formed in the wall body, and a scaffold is arranged on the outer wall of the wall body; the wall body internal groove installs the decompression structure, the decompression structure includes first threaded rod, first threaded rod one end screw in is connected with first screw cap, first threaded rod other end is connected with the fixed plate, first threaded rod insert is connected with threaded rod rubber sleeve, threaded rod rubber sleeve outer wall is equipped with a plurality of springs, spring coupling has the detachable embedded pipe.
As a preferred implementation mode of the utility model, the bottom of the outer scaffold is inserted and connected with an underground embedded pipe, the middle parts of the main rods at two sides of the outer scaffold are provided with supporting structures, and the underground embedded pipe and the supporting structures are used for stabilizing the scaffold.
As a preferred embodiment of the present utility model, the support structure includes a scaffold fixing sleeve, one side of the scaffold fixing sleeve, which is close to the wall, is connected with one end of a support column, the other end of the support column is connected with a support plate, and the support plate and the support column fix the position of the scaffold fixing sleeve.
As a preferred implementation mode of the utility model, the scaffold fixing sleeve is formed by movably connecting two semi-ring sleeves, one side of the scaffold fixing sleeve is connected with a semi-ring sleeve connecting block, the inside of the semi-ring sleeve connecting block is connected with a second threaded rod, the second threaded rod is screwed into and connected with a second threaded cap, the scaffold fixing sleeve is formed by movably connecting two semi-ring sleeves so as to facilitate the disassembly and the installation of the scaffold, and the second threaded rod and the second threaded cap enable the scaffold fixing sleeve to be connected with the scaffold.
As a preferred implementation mode of the utility model, two grooves matched with the first threaded rod are formed in the support plate, the support plate is attached to the outer wall of the wall body, and the first threaded rod can penetrate through the grooves in the support plate to be convenient to detach and install.
As a preferable implementation mode of the utility model, the first threaded rod is matched with the threaded rod rubber sleeve, the detachable embedded pipe is matched with the groove of the wall body, the detachable embedded pipe is connected with the fixing plate, the inner walls of the threaded rod rubber sleeve and the detachable embedded pipe, which have the same thickness as the wall body, are larger than the outer wall in the first threaded rod wall body, and the inner wall of the groove of the wall body is larger than the outer wall of the detachable embedded pipe, so that the detachable embedded pipe can be conveniently detached and installed.
Compared with the prior art, the utility model has the following beneficial effects:
according to the utility model, the groove penetrating the wall body is formed in the wall body, the decompression structure is arranged in the groove, so that the bending deformation of the internal parts of the wall connecting piece caused by the weight increase after the scaffold is connected is reduced, and the abrasion of the internal parts to the wall body can be effectively reduced by the detachable embedded pipe.
According to the utility model, the support structure is arranged at the main rod of the scaffold, and the underground embedded pipe is inserted and connected at the bottom of the main rod, so that the safety performance of the scaffold is greatly enhanced.
The following describes the embodiments of the present utility model in further detail with reference to the accompanying drawings.
Drawings
In the drawings:
FIG. 1 is a schematic diagram of a main body of the present utility model;
FIG. 2 is a schematic view of a support structure according to the present utility model;
FIG. 3 is a schematic cross-sectional view of a pressure relief structure according to the present utility model;
fig. 4 is a schematic side view of the present utility model.
In the figure: 1. a wall body; 2. a scaffold; 3. scaffold fixing sleeve; 4. a support column; 5. a support plate; 6. a first threaded rod; 7. a first threaded cap; 8. a second threaded rod; 9. a second threaded cap; 10. a half-ring sleeve connecting block; 11. a fixing plate; 12. a threaded rod rubber sleeve; 13. a spring; 14. a detachable embedded pipe; 15. an underground embedded pipe.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present utility model more apparent, the technical solutions in the embodiments will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model, and the following embodiments are used to illustrate the present utility model.
As shown in fig. 1 to 4, an external scaffold wall connecting piece comprises a wall body 1, and is characterized in that a groove penetrating through the wall body is formed in the wall body, a scaffold 2 is arranged on the outer wall of the wall body 1, a decompression structure is mounted in the groove in the wall body 1 and comprises a first threaded rod 6, one end of the first threaded rod 6 is screwed into and connected with a first threaded cap 7, the other end of the first threaded rod 6 is connected with a fixing plate 11, the first threaded rod 6 is inserted and connected with a threaded rod rubber sleeve 12, a plurality of springs 13 are arranged on the outer wall of the threaded rod rubber sleeve 12, and the springs 13 are connected with a detachable embedded pipe 14.
As shown in fig. 1 to 4, in a specific embodiment, the bottom of the outer scaffold 2 is inserted and connected with an underground embedded pipe 15, and the middle parts of the main rods at two sides of the outer scaffold 2 are provided with supporting structures. In this arrangement, the underground pipe 15 and the support structure are used to stabilize the scaffold 2.
As shown in fig. 1 to 4, further, the support structure includes a scaffold fixing sleeve 3, one side of the scaffold fixing sleeve 3, which is close to the wall 1, is connected with one end of a support column 4, and the other end of the support column 4 is connected with a support plate 5. In this arrangement, the support plate 5 and the support column 4 fix the position of the scaffold fixing sleeve 3.
As shown in fig. 1 to 4, further, the scaffold fixing sleeve 3 is formed by movably connecting two semi-ring sleeves, one side of the scaffold fixing sleeve 3 is connected with a semi-ring sleeve connecting block 10, the inside of the semi-ring sleeve connecting block 10 is connected with a second threaded rod 8, and the second threaded rod 8 is screwed into and connected with a second threaded cap 9. In this setting, scaffold fixing sleeve 3 comprises two semi-ring sleeve swing joint and is convenient for scaffold 2 dismantles the installation, and second threaded rod 8 and second screw cap 9 make scaffold fixing sleeve 3 connect scaffold 2.
As shown in fig. 1 to 4, further, two grooves matched with the first threaded rod 6 are formed in the supporting plate 5, and the supporting plate 5 is attached to the outer wall of the wall body 1. In this setting, the inside recess easy dismounting of backup pad 5 is installed can pass to first threaded rod 6.
As shown in fig. 1 to 4, further, the first threaded rod 6 is matched with the threaded rod rubber sleeve 12, the detachable embedded pipe 14 is matched with the groove of the wall body 1, the detachable embedded pipe 14 is connected with the fixing plate 11, and the thickness of the threaded rod rubber sleeve 12 and the detachable embedded pipe 14 is the same as that of the wall body 1. In this setting, threaded rod rubber sleeve 12 inner wall is greater than the outer wall in the first threaded rod 6 wall body 1, and the recess inner wall of wall body 1 is greater than the outer wall of detachable embedded pipe 14 and convenient detachable embedded pipe 14 dismantles the installation.
The implementation principle of the outer scaffold wall connecting piece in the embodiment is as follows: the groove penetrating through the wall body is formed in the wall body 1, the detachable embedded pipe 14 can be effectively reduced in abrasion of internal parts to the wall body, the spring 13 and the threaded rod rubber sleeve 12 in the detachable embedded pipe 14 are reduced, the first threaded rod 6 is bent and deformed due to weight increase after connection of the scaffold, the ring opening of the threaded rod rubber sleeve 12 is smaller than the outer wall thread of the first threaded rod 6, when the first threaded rod 6 is detached, the first threaded cap 7 is unscrewed, the fixing plate 11 is pulled, the fixing plate 11 drives the first threaded rod 6 to move with the detachable embedded pipe 14, the threaded rod rubber sleeve 12 is driven by the thread of the first threaded rod 6 to move together, the underground embedded pipe 15 and the supporting structure are used for stabilizing the scaffold 2, the supporting plate 5 and the supporting column 4 are fixed at the position of the scaffold fixing sleeve 3, the scaffold fixing sleeve 3 is formed by two semi-ring sleeve movable connections, the scaffold fixing sleeve 2 is convenient to detach and install, the second threaded rod 8 and the second threaded rod 9 are convenient to detach and install by penetrating through the groove in the supporting plate 5, the inner wall of the first threaded rod 6 is larger than the outer wall of the first threaded rod 6, the inner wall of the threaded rod 12 is larger than the outer wall of the first threaded rod 6, the inner wall of the pre-embedded pipe 1 is driven by the groove of the pre-embedded pipe 14 is larger than the detachable embedded pipe 14.

Claims (6)

1. The outer scaffold wall connecting piece comprises a wall body (1) and is characterized in that a groove penetrating through the wall body is formed in the wall body, and a scaffold (2) is arranged on the outer wall of the wall body (1);
the wall body (1) inside groove installs the decompression structure, the decompression structure includes first threaded rod (6), first threaded rod (6) one end screw in is connected with first screw cap (7), first threaded rod (6) other end is connected with fixed plate (11), first threaded rod (6) insert is connected with threaded rod rubber sleeve (12), threaded rod rubber sleeve (12) outer wall is equipped with a plurality of springs (13), spring (13) are connected with detachable buried pipe (14).
2. The wall connecting piece of the outer scaffold according to claim 1, wherein the underground embedded pipes (15) are inserted and connected to the bottom of the outer scaffold (2), and the middle parts of the main rods at two sides of the outer scaffold (2) are provided with supporting structures.
3. An external scaffold wall connecting piece according to claim 2, wherein the supporting structure comprises a scaffold fixing sleeve (3), one side of the scaffold fixing sleeve (3) close to the wall body (1) is connected with one end of a supporting column (4), and the other end of the supporting column (4) is connected with a supporting plate (5).
4. An external scaffold wall connecting piece according to claim 3, wherein the scaffold fixing sleeve (3) is formed by movably connecting two semi-ring sleeves, one side of the scaffold fixing sleeve (3) is connected with a semi-ring sleeve connecting block (10), the inside of the semi-ring sleeve connecting block (10) is connected with a second threaded rod (8), and the second threaded rod (8) is screwed into a second threaded cap (9).
5. An external scaffold wall connecting piece according to claim 3, wherein two grooves matched with the first threaded rod (6) are formed in the supporting plate (5), and the supporting plate (5) is attached to the external wall of the wall body (1).
6. An external scaffold wall connecting piece according to claim 1, wherein the first threaded rod (6) is matched with the threaded rod rubber sleeve (12), the detachable embedded pipe (14) is matched with the groove of the wall body (1), the detachable embedded pipe (14) is connected with the fixing plate (11), and the thickness of the threaded rod rubber sleeve (12) and the detachable embedded pipe (14) is the same as that of the wall body (1).
CN202322050276.8U 2023-08-01 2023-08-01 Outer scaffold wall connecting piece Active CN220336426U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322050276.8U CN220336426U (en) 2023-08-01 2023-08-01 Outer scaffold wall connecting piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322050276.8U CN220336426U (en) 2023-08-01 2023-08-01 Outer scaffold wall connecting piece

Publications (1)

Publication Number Publication Date
CN220336426U true CN220336426U (en) 2024-01-12

Family

ID=89451120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322050276.8U Active CN220336426U (en) 2023-08-01 2023-08-01 Outer scaffold wall connecting piece

Country Status (1)

Country Link
CN (1) CN220336426U (en)

Similar Documents

Publication Publication Date Title
CN203531365U (en) Bolt anchor stiffness wall connecting piece
CN220336426U (en) Outer scaffold wall connecting piece
CN110206291A (en) It is not through walls to have enough to meet the need assembled overhanging beam
CN107762135B (en) Construction method of scaffold wall connecting piece of building outer wall
CN102927100B (en) Expansion bolt and temporary fastening method before pushing equipment applying same to place
CN104675101A (en) Wall-linking element of scaffold and construction method of wall-linking element
CN101798896A (en) Method for arranging door frame and matched parts and tools
CN112609963B (en) Installation anchoring device of composite heat-insulation template and use method thereof
CN201588369U (en) Hanging device for hang ceiling
CN204435835U (en) Scaffold wall connecting piece
CN211447018U (en) A back of body pastes formula waterstop positioner for city piping lane lining cutting
CN207122478U (en) A kind of repeatable expansion bolt utilized
KR101424347B1 (en) Shear anchor for joing new and old concrete and method for joining new and old concrete
CN215519885U (en) Scaffold wall connecting piece
CN220978799U (en) Wall post mistake proofing platform leakage subassembly
CN213626623U (en) Supporting structure for building assembly
CN215631687U (en) Heat-proof bridge split bolt capable of reducing building energy consumption
CN220848664U (en) Wall connecting piece
CN218912212U (en) Embedded type quick dismounting pull node assembly of outer scaffold
CN220080806U (en) Opposite pull rod convenient to disassemble and assemble and aluminum alloy template
CN220226199U (en) Wall connecting piece capable of being recycled
CN219794614U (en) Easily-installed outer scaffold wall connecting piece
CN117166736A (en) Rigid combined wall connecting piece and construction method thereof
CN221703263U (en) Built-in connecting piece for building engineering new and old wall body masonry
CN219840244U (en) Cast-in-place concrete structure free of demolding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant