CN220300934U - Carding machine vestibule - Google Patents
Carding machine vestibule Download PDFInfo
- Publication number
- CN220300934U CN220300934U CN202321734540.3U CN202321734540U CN220300934U CN 220300934 U CN220300934 U CN 220300934U CN 202321734540 U CN202321734540 U CN 202321734540U CN 220300934 U CN220300934 U CN 220300934U
- Authority
- CN
- China
- Prior art keywords
- steel
- iron
- carding machine
- triangular
- triangular iron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009960 carding Methods 0.000 title claims abstract description 32
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 154
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 94
- 239000010959 steel Substances 0.000 claims abstract description 94
- 229910052742 iron Inorganic materials 0.000 claims abstract description 77
- 238000009987 spinning Methods 0.000 abstract description 10
- 238000004140 cleaning Methods 0.000 abstract description 7
- 230000009194 climbing Effects 0.000 abstract description 4
- 239000004753 textile Substances 0.000 description 2
- 229920000742 Cotton Polymers 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Preliminary Treatment Of Fibers (AREA)
Abstract
The utility model relates to the technical field of corridors, and particularly discloses a carding machine corridor, which aims to solve the problems that the distance between adjacent carding machines arranged side by side is relatively wide, cleaning and the like are needed to be carried out by climbing a carding machine roof cleaning hopper in the spinning or trial spinning process, the labor intensity is increased, and serious potential safety hazards exist. The technical key point scheme is as follows: the gallery is made of the triangular iron steel, the square steel, the iron plates and the steel pipes, the distance between equipment is connected, the labor intensity increased by climbing equipment is avoided, the working efficiency is improved, and meanwhile, the occurrence of potential safety hazards is reduced.
Description
Technical Field
The utility model belongs to the technical field of corridors, and particularly relates to a carding machine corridor.
Background
The carding machine is a heart of a textile mill, and the carding machine needs to be frequently changed into a spinning or trial spinning process due to variety adjustment, and the carding machine needs to be lifted on a top cleaning box of the carding machine to clean and the like. However, most of carding machines in the existing textile mill are arranged side by side, the distance between every two adjacent carding machines is wider, and at least a distance of more than 1.5 meters exists between every two adjacent carding machines, so that the carding machines cannot directly cross during working, only one trolley can climb up to operate, the labor intensity is increased, and serious potential safety hazards exist. If the vehicle is wound, the working efficiency is reduced, and then staff go on and off equipment, besides the labor intensity is increased, the working efficiency is also reduced, potential safety hazards exist, and the working is not facilitated.
Therefore, a new technical solution needs to be proposed to avoid the above situation.
Disclosure of Invention
Aiming at the defects in the prior art, the utility model provides a carding machine corridor, which aims to solve the problems that the distance between adjacent carding machines arranged side by side is wider, the cleaning and other works of boarding a carding machine roof cleaning box in the spinning or trial spinning process are not convenient to change, the labor intensity is increased, and serious potential safety hazards exist. Through the installation of this device, connected the distance between the adjacent equipment, stopped the intensity of labour that increases because of climbing equipment, promoted work efficiency, also reduced the emergence of potential safety hazard simultaneously.
The technical aim of the utility model is realized by the following technical scheme: the carding machine corridor comprises triangular iron steel, square steel, iron plates and steel pipes, wherein the triangular iron steel at least comprises two triangular iron steels, the triangular iron steel comprises left triangular iron steel and right triangular iron steel, square steel is arranged between the left triangular iron steel and the right triangular iron steel, and two ends of the left triangular iron steel and the right triangular iron steel are welded with the square steel to form I-shaped plane keels, so that adjacent carding machines are connected;
the square steel comprises at least two iron plates serving as a corridor and the leveling of the corridor is increased;
steel pipes are welded on the square steel trend at the edges of the two sides above the iron plate, so that handrails and guardrails of the corridor are formed, and the safety of the corridor is improved.
Further, right angle buckles of the left triangle steel and the right triangle steel are arranged at the top edge of the carding machine and used for supporting the whole corridor.
Further, the space between the left triangular iron steel and the right triangular iron steel is at least 1.5m;
the thickness of the iron plate is 0.5mm.
Further, the steel pipes on the two sides above the iron plate are parallel and are perpendicular to the iron plate.
Further, the length of the iron plate is larger than that of the square steel, and the width of the iron plate is smaller than that of the triangular steel.
Compared with the prior art, the utility model has the following beneficial effects: the utility model has simple structure, practicality and convenience, reduces frequent upper and lower equipment during working, and improves the working efficiency. Specifically, triangular iron steel, square steel, iron plates, steel pipes and the like are erected into a corridor between the equipment, so that 2 vehicles are connected to form a corridor, and under the condition that spinning is needed to be changed and test spinning is needed to be carried out, continuous cleaning of a roof can be realized at one time, frequent equipment loading and unloading during working are avoided, and safety accidents are avoided.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic structural view of a carding machine gallery provided in embodiment 1 of the present utility model;
fig. 2 is a schematic side view of a carding machine gallery according to embodiment 1 of the present utility model.
In the figure, 1, triangular iron steel, 2, square steel, 3, iron plate, 4 and steel pipe;
11. left triangular iron steel, 12 and right triangular iron steel.
Detailed Description
The utility model is described below with reference to specific examples. It will be appreciated by those skilled in the art that these examples are for illustration of the utility model only and are not intended to limit the scope of the utility model in any way.
It will be understood that when an element is referred to as being "fixed to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this utility model belongs. The terminology used herein in the description of the utility model is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model. The term "and/or" as used herein includes any and all combinations of one or more of the associated listed items.
As shown in fig. 1 and 2, one embodiment of the present utility model discloses a carding machine corridor, which comprises a set angle steel 1, square steel 2, an iron plate 3 and a steel pipe 4, wherein the set angle steel 1 at least comprises two pieces, the set angle steel 1 comprises a left set angle steel 11 and a right set angle steel 12, and right angle buckles of the left set angle steel 11 and the right set angle steel 12 are arranged at the top edge of the carding machine and are used for supporting fixing points of the whole corridor; square steel 2 is further arranged between the left triangular iron steel 11 and the right triangular iron steel 12, and two ends of the left triangular iron steel 11 and the right triangular iron steel 12 are welded with the square steel 2 to form an I-shaped plane keel, so that adjacent carding machines are connected to form a basic supporting mechanism of the corridor.
Wherein, square steel 2 includes two at least, square steel 2 top has still laid the iron plate 3 that is used as the vestibule pavement, the both sides border square steel 2 trend of iron plate 3 top all welds steel pipe 4, and the steel pipe 4 of every side erects the welding with four on iron plate 3, one transversely welds on the other end of four steel pipes of erectting to form the handrail and the guardrail of vestibule, increased the security of vestibule, guaranteed walking on the roof that personnel can be safe, clear the cotton case of drawing.
In this embodiment, the steel pipes 4 on two sides above the iron plate 3 are parallel and are perpendicular to the iron plate 3; the left triangular iron steel 11 and the right triangular iron steel 12 are arranged in parallel, the left triangular iron steel 11 and the right triangular iron steel 12 are all arranged vertically to the square steel 2, and the triangular iron steel 1, the square steel 2, the iron plate 3, the steel pipe 4 and the like are erected into a corridor to enable 2 vehicles to be connected to form a corridor, and the device is arranged on a roof at one time under the condition that spinning and trial spinning are required to be carried out, walks on the roof, realizes continuous cleaning work, avoids frequent equipment loading and unloading in work, and avoids safety accidents caused by climbing equipment.
In this embodiment, the interval between left side triangular iron 11, right side triangular iron 12 is 1.5m at least, the thickness of iron plate 3 is 0.5mm at least, the length of iron plate 3 is greater than the interval between left side triangular iron 11, right side triangular iron 12 or the length of square steel 2, the width of iron plate 3 is less than the length of triangular iron 1, guarantees that the length of vestibule is greater than two car intervals, is unlikely to on increasing the triangular iron 1 at both ends with the weight of whole vestibule, has improved the smooth row of vestibule, stability and security.
It is noted that the triangular iron steel 1, the square steel 2, the iron plate 3, the steel pipe 4 and the like are all available steel materials which are selected from the prior art.
The above description is only a preferred embodiment of the present utility model, and the protection scope of the present utility model is not limited to the above examples, and all technical solutions belonging to the concept of the present utility model belong to the protection scope of the present utility model. It should be noted that modifications and adaptations to the present utility model may occur to one skilled in the art without departing from the principles of the present utility model and are intended to be within the scope of the present utility model.
Claims (5)
1. The utility model provides a carding machine vestibule, includes triangular iron steel, square steel, iron plate, steel pipe, its characterized in that: the triangular iron steel comprises at least two triangular iron steels, wherein the triangular iron steels comprise left triangular iron steel and right triangular iron steel, square steel is arranged between the left triangular iron steel and the right triangular iron steel, and two ends of the left triangular iron steel and the right triangular iron steel are welded with the square steel to form an I-shaped plane keel, so that adjacent carding machines are connected;
the square steel comprises at least two iron plates serving as a corridor and the leveling of the corridor is increased;
steel pipes are welded on the square steel trend at the edges of the two sides above the iron plate, so that handrails and guardrails of the corridor are formed, and the safety of the corridor is improved.
2. A carding machine gallery according to claim 1, wherein: the right angle buckles of the left triangular iron steel and the right triangular iron steel are arranged at the top edge of the carding machine and used for supporting the whole corridor.
3. A carding machine gallery according to claim 1, wherein: the space between the left triangular iron steel and the right triangular iron steel is at least 1.5m;
the thickness of the iron plate is 0.5mm.
4. A carding machine gallery according to claim 1, wherein: the steel pipes on the two sides above the iron plate are parallel and are perpendicular to the iron plate.
5. A carding machine gallery according to claim 1, wherein: the length of the iron plate is larger than that of the square steel, and the width of the iron plate is smaller than that of the triangular steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321734540.3U CN220300934U (en) | 2023-07-04 | 2023-07-04 | Carding machine vestibule |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321734540.3U CN220300934U (en) | 2023-07-04 | 2023-07-04 | Carding machine vestibule |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220300934U true CN220300934U (en) | 2024-01-05 |
Family
ID=89352606
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321734540.3U Active CN220300934U (en) | 2023-07-04 | 2023-07-04 | Carding machine vestibule |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220300934U (en) |
-
2023
- 2023-07-04 CN CN202321734540.3U patent/CN220300934U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205152788U (en) | But telescopic bridge testing platform of antihunting | |
CN220300934U (en) | Carding machine vestibule | |
CN213896722U (en) | Modular assembling protection pocket bottom platform for front supporting point guyed cradle | |
CN208918004U (en) | A kind of movable type awning | |
CN208299744U (en) | Factory roof photovoltaic battery panel cleaning platform | |
CN111236610A (en) | Lower hanging type mobile operation platform | |
CN206438395U (en) | One kind can cross the double girders of pier formula railway and check dolly | |
CN113944323B (en) | Ultra-high concrete roof template support and construction system | |
CN211775632U (en) | Movable operating platform for roof structure | |
CN212296237U (en) | Side slope drilling trolley | |
CN213653209U (en) | Integrated construction movable platform for bridge flange plate | |
CN211687992U (en) | Movable shield tunnel construction operation platform with lifting equipment | |
CN217581303U (en) | Walkable discharging platform | |
CN108824792A (en) | A kind of elevator combination lifting device | |
KR200298436Y1 (en) | Moveable Vehicle for Disposition of form in Cantilever of Bridge Deck | |
CN206858000U (en) | A kind of reliable and stable high-performance electric block gantry crane | |
CN207121322U (en) | Cage lifting balance device and jacking equipment | |
CN205348720U (en) | Take hoisting device's removal scaffold | |
CN220150818U (en) | Steel truss type movable operation platform structure | |
CN220847087U (en) | Movable scaffold work platform suitable for bridge overhauls | |
CN209891060U (en) | Traveling device for detecting bottom plate of continuous rigid frame bridge | |
CN212865606U (en) | Aerial working safety platform for box girder construction | |
CN212670297U (en) | Movable hanging basket device for decorating and repairing guardrails | |
CN217599558U (en) | Vertical tensioning device of fixed adhesive tape machine belt maintenance platform | |
CN209869563U (en) | Paper rolling mill with cross platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |