CN220289683U CN202321776490.5U CN202321776490U CN220289683U CN 220289683 U CN220289683 U CN 220289683U CN 202321776490 U CN202321776490 U CN 202321776490U CN 220289683 U CN220289683 U CN 220289683U
Authority
CN
China
Prior art keywords
debugging
power distribution
distribution cabinet
installation
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321776490.5U
Other languages
Chinese (zh)
Inventor
盈豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Fuli Electromechanical Equipment Installation Co ltd
Original Assignee
Chongqing Fuli Electromechanical Equipment Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Fuli Electromechanical Equipment Installation Co ltd filed Critical Chongqing Fuli Electromechanical Equipment Installation Co ltd
Priority to CN202321776490.5U priority Critical patent/CN220289683U/en
Application granted granted Critical
Publication of CN220289683U publication Critical patent/CN220289683U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model discloses equipment for installing and debugging a power distribution cabinet, which relates to the technical field of power distribution cabinet installation and comprises a placing box, wherein a cabinet body is arranged on the left side of the front end of the placing box, a plurality of drawers are arranged on the right side of the cabinet body, a moving mechanism is arranged at the bottom of the placing box, a winding mechanism is arranged on the left side of the placing box, a push-pull rod is fixedly arranged at the upper end of the right side of the placing box, a tester body is arranged at the middle of the top of the placing box, a socket is arranged on the left side of the tester body, and a placing box is arranged on the right side of the tester body. Through setting up cabinet body, drawer and placing the box and dividing the debugging instrument layer upon layer and accomodating, it is more reasonable to make the debugging instrument place, and convenient and fast more makes it have flexibility and practicality more through setting up moving mechanism and push-and-pull rod during the use, accomodates and transport the debugging connecting wire through wire winding mechanism, improves the portability and the work efficiency of installation debugging.

Description

Equipment for installing and debugging power distribution cabinet
Technical Field
The utility model relates to the technical field of power distribution cabinet installation, in particular to equipment for power distribution cabinet installation and debugging.
Background
The power distribution cabinet is a final-stage device of a power distribution system, is a generic name of a motor control center, and is used in occasions with scattered load and fewer loops; motor control centers are used in load-concentrating, more circuit-rich applications to distribute power from a circuit of a higher-level power distribution unit to nearby loads, where the unit should provide protection, monitoring and control of the load.
After the power distribution cabinet is produced, the power distribution cabinet needs to be installed and debugged, the power distribution cabinet needs to be moved due to the fact that dead weight is large and inconvenient, debugging equipment needs to be carried beside the power distribution cabinet for detection, labor and effort are wasted, efficiency is low, debugging tools such as wires used for connection and spanner screws are needed to be used in the debugging process, the tools are not stored, workers are not convenient to debug and use, and therefore the equipment used for installing and debugging the power distribution cabinet needs to be designed.
Disclosure of Invention
For solving the technical problem, provide a device for switch board installation debugging, the needs that present among the above-mentioned prior art are carried debugging equipment and are detected by the switch board to the side, and it is hard and difficult and inefficiency to take care of to take in the debugging instrument can not accomodate the problem that is inconvenient for staff to take in a flexible way.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a device for switch board installation and debugging, is including placing the case, the front end left side of placing the case is provided with the cabinet body, the fixed surface of the cabinet body is connected with the handle, the right side of the cabinet body is provided with a plurality of drawer, a plurality of the equal fixedly connected with handle in surface of drawer, the bottom of placing the case is provided with moving mechanism, the left side of placing the case is provided with wire winding mechanism, the right side upper end fixed mounting of placing the case has the push-and-pull rod, the top of placing the case is provided with the tester body placed in the middle, the left side of tester body is provided with the socket, be provided with a plurality of jack on the socket and supply different substation equipment to connect, the right side of tester body is provided with places the box, just the equal fixedly connected on placing the case of socket and placing the box.
Preferably, the moving mechanism comprises a fixed plate, a mounting frame and wheels, wherein the fixed plate is fixedly connected to four corners of the bottom of the placement box, the mounting frame is fixedly connected to the bottom of the fixed plate, and the wheels are rotationally connected to the mounting frame.
Preferably, the winding mechanism comprises a fixed shaft, a rotating shaft and a debugging connecting wire, wherein the fixed shaft is fixedly connected to the left side wall of the placement box, the rotating shaft is rotatably connected to the fixed shaft, and the debugging connecting wire is sleeved on the rotating shaft.
Preferably, the upper end of the push-pull rod is sleeved with an anti-skid sleeve.
Preferably, the tester is internally provided with power transformation equipment for converting external commercial power into output voltage required by debugging of a power distribution cabinet, the output voltage of the power distribution cabinet is respectively three-phase 380V and single-phase 220V, and the output ends of the power transformation equipment are respectively connected with corresponding jacks.
Preferably, the tester body comprises a control panel, a display, a voltmeter and a switch, wherein the display for debugging data display is arranged on the left side of the upper end of the control panel, the voltmeter for detecting output current is arranged on the right side of the display, and the switch for controlling the start and stop of output voltage is arranged at the lower ends of the display and the voltmeter.
Preferably, the cylinder is fixedly connected with the rear side of the top of the placement box, and a plurality of placement grooves are formed in the front side of the top of the placement box.
Compared with the prior art, the utility model has the beneficial effects that: this a device for switch board installation debugging divides the debugging instrument layer upon layer and accomodates through setting up the cabinet body, the drawer with place the box, make the debugging instrument place more reasonable, convenient and fast more during the use, through setting up moving mechanism and push-and-pull rod mutually support, make it can be better the pulling place case to appointed position department, increased flexibility and practicality of this installation debugging device, coil the debugging connecting wire that is used for plugging into through wire winding mechanism and accomodate and transport on placing the case, the staff can take more convenient to the debugging connecting wire simultaneously, thereby improve the work efficiency of installation debugging.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a front view of the present utility model;
fig. 3 is a top view of the present utility model.
The reference numerals in the figures are:
1. placing a box; 2. a cabinet body; 201. a handle; 3. a drawer; 301. a handle; 4. a moving mechanism; 401. a fixing plate; 402. a mounting frame; 403. a wheel; 5. a winding mechanism; 501. a fixed shaft; 502. a rotating shaft; 503. debugging the connecting wire; 6. a push-pull rod; 601. an anti-skid sleeve; 7. a tester body; 701. a control panel; 702. a display; 703. a voltmeter; 704. a switch; 8. a socket; 801. a jack; 9. placing a box; 901. a cylinder; 902. and (5) placing a groove.
Detailed Description
The following description is presented to enable one of ordinary skill in the art to make and use the utility model. The preferred embodiments in the following description are by way of example only and other obvious variations will occur to those skilled in the art.
Referring to fig. 1-3, a device for installing and debugging a power distribution cabinet is shown, including placing case 1, the front end left side of placing case 1 is provided with cabinet body 2, the fixed surface of cabinet body 2 is connected with handle 201, and pulling handle 201 can open cabinet body 2, can place some great debugging work pieces in the cabinet body 2, the right side of cabinet body 2 is provided with a plurality of drawer 3, a plurality of the equal fixedly connected with handle 301 in surface of drawer 3, and drawer 3 can be opened to pulling handle 301, can place some small-size debugging work pieces of lower usage through a plurality of drawer 3, accomodates different debugging work pieces through setting up cabinet body 2 and drawer 3, and can place the debugging work piece in debugging device, and the system area is to the position that needs to debug, and convenient staff can take in a flexible way, thereby improve the work efficiency of installation and debugging, the bottom of placing case 1 is provided with mobile mechanism 4, the left side of placing case 1 is provided with push-and-pull wire winding mechanism 5, the right side upper end fixed connection of placing case 1 has pull rod 6, and the setting up instrument 8 is equipped with the jack box 6 and is provided with the jack box 7 through setting up the jack box 6 and is better in the position of setting up instrument 8, and is provided with the jack box 601 and is better to be connected with the jack box 1 through setting up instrument 8 on the jack box 1, and is equipped with the jack box 1.
The moving mechanism 4 comprises a fixed plate 401, a mounting frame 402 and wheels 403, the fixed plate 401 is fixedly connected to four corners of the bottom of the placing box 1, the mounting frame 402 is fixedly connected to the bottom of the fixed plate 401, the wheels 403 are rotationally connected to the mounting frame 402, and the placing box 1 can be moved to the distribution box to be installed and debugged more easily by arranging the moving mechanism 4, so that the flexibility and the practicability of the installation and debugging equipment are improved.
The winding mechanism 5 comprises a fixing shaft 501, a rotating shaft 502 and a debugging connecting wire 503, the fixing shaft 501 is fixedly connected to the left side wall of the placement box 1, the rotating shaft 502 is rotationally connected to the fixing shaft 501, the debugging connecting wire 503 is sleeved on the rotating shaft 502, the debugging connecting wire 503 can be wound on the placement box 1 to be stored and transported through the winding mechanism 5, and meanwhile workers can take the debugging connecting wire 503 more conveniently.
The tester body 7 is internally provided with power transformation equipment for converting external commercial power into output voltage required by debugging of a power distribution cabinet, the output voltage of the power distribution cabinet is respectively three-phase 380V and single-phase 220V, and the output ends of the power transformation equipment are respectively connected with corresponding jacks 801.
The tester body 7 comprises a control panel 701, a display 702, a voltmeter 703 and a switch 704, wherein the display 702 for debugging data display is arranged on the left side of the upper end of the control panel 701, the voltmeter 703 for detecting output current is arranged on the right side of the display 702, the switch 704 for controlling the start and stop of output voltage is arranged at the lower ends of the display 702 and the voltmeter 703, when the tester body 7 performs installation and debugging work, the switch 704 of corresponding output voltage is opened, a power distribution cabinet to be installed and debugged is connected to a corresponding jack 801, the output voltage is finely adjusted, and the running condition of the power distribution cabinet in different states is observed through the display 702.
The top rear side fixedly connected with drum 901 of placing box 9, a plurality of standing groove 902 has been seted up to the top front side of placing box 9, and some debugging instrument commonly used can be placed to placing box 9 through setting up, and set up and use that can be more convenient on placing box 1, set up drum 901 and standing groove 902 and can divide according to attribute such as instrument size and length and refine, divide the debugging instrument layer upon layer and accomodate under cabinet body 2, drawer 3 and the cooperation of placing box 9, make the more reasonable that the debugging instrument was placed, more convenient and fast during the use, and then improve the efficiency of installation debugging.
Working principle: this a equipment for switch board installation debugging is when using, staff pulls push-and-pull rod 6, and can make under the effect of moving mechanism 4 place case 1 more light removal to the switch board department of waiting to install the debugging, can coil debugging connecting wire 503 and accomodate and transport on placing case 1 through wire winding mechanism 5, staff can take the debugging connecting wire 503 more convenient simultaneously, divide the debugging instrument layer upon layer under the cooperation of cabinet body 2, drawer 3 and placing box 9 and accomodate, make the debugging instrument more reasonable that places, more convenient and fast during the use, and then improve the efficiency of installation debugging, start simultaneously and install the debugging work at tester body 7, open corresponding output voltage's switch 704, connect the switch board of waiting to install the debugging on corresponding jack 801, fine setting output voltage and observe the running condition of switch board under different states through display 702.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made therein without departing from the spirit and scope of the utility model, which is defined by the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a device for switch board installation and debugging, its characterized in that, including placing case (1), the front end left side of placing case (1) is provided with cabinet body (2), the fixed surface of cabinet body (2) is connected with handle (201), the right side of cabinet body (2) is provided with a plurality of drawer (3), a plurality of equal fixedly connected with handle (301) in surface of drawer (3), the bottom of placing case (1) is provided with mobile mechanism (4), the left side of placing case (1) is provided with wire winding mechanism (5), the right side upper end fixed mounting of placing case (1) has push-and-pull rod (6), the top of placing case (1) is provided with tester body (7) in the middle, the left side of tester body (7) is provided with socket (8), be provided with a plurality of jack (801) on socket (8) and supply different substation equipment to connect, the right side of tester body (7) is provided with places box (9), just socket (8) and places box (9) and places on equal fixed connection of case (1).
2. An apparatus for installation and commissioning of a power distribution cabinet according to claim 1, wherein: the moving mechanism (4) comprises a fixed plate (401), a mounting frame (402) and wheels (403), wherein the fixed plate (401) is fixedly connected to four corners of the bottom of the placement box (1), the bottom of the fixed plate (401) is fixedly connected with the mounting frame (402), and the wheels (403) are rotationally connected to the mounting frame (402).
3. An apparatus for installation and commissioning of a power distribution cabinet according to claim 1, wherein: the winding mechanism (5) comprises a fixed shaft (501), a rotating shaft (502) and a debugging connecting wire (503), wherein the fixed shaft (501) is fixedly connected to the left side wall of the placement box (1), the rotating shaft (502) is rotatably connected to the fixed shaft (501), and the debugging connecting wire (503) is sleeved on the rotating shaft (502).
4. An apparatus for installation and commissioning of a power distribution cabinet according to claim 1, wherein: an anti-skid sleeve (601) is sleeved at the upper end of the push-pull rod (6).
5. An apparatus for installation and commissioning of a power distribution cabinet according to claim 1, wherein: the tester is characterized in that power transformation equipment for converting external commercial power into output voltage required by debugging of a power distribution cabinet is arranged in the tester body (7), the output voltage of the power distribution cabinet is respectively three-phase 380V and single-phase 220V, and the output ends of the power transformation equipment are respectively connected with corresponding jacks (801).
6. An apparatus for installation and commissioning of a power distribution cabinet of claim 5, wherein: the tester body (7) comprises a control panel (701), a display (702), a voltmeter (703) and a switch (704), wherein the display (702) for debugging data display is arranged on the left side of the upper end of the control panel (701), the voltmeter (703) for detecting output current is arranged on the right side of the display (702), and the switch (704) for controlling the start and stop of output voltage is arranged at the lower ends of the display (702) and the voltmeter (703).
7. An apparatus for installation and commissioning of a power distribution cabinet according to claim 1, wherein: the top rear side of placing box (9) fixedly connected with drum (901), a plurality of standing groove (902) have been seted up to the top front side of placing box (9).
CN202321776490.5U 2023-07-07 2023-07-07 Equipment for installing and debugging power distribution cabinet Active CN220289683U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321776490.5U CN220289683U (en) 2023-07-07 2023-07-07 Equipment for installing and debugging power distribution cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321776490.5U CN220289683U (en) 2023-07-07 2023-07-07 Equipment for installing and debugging power distribution cabinet

Publications (1)

Publication Number Publication Date
CN220289683U true CN220289683U (en) 2024-01-02

Family

ID=89339213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321776490.5U Active CN220289683U (en) 2023-07-07 2023-07-07 Equipment for installing and debugging power distribution cabinet

Country Status (1)

Country Link
CN (1) CN220289683U (en)

Similar Documents

Publication Publication Date Title
CN207585873U (en) A kind of power supply adaptor shake table
CN220289683U (en) Equipment for installing and debugging power distribution cabinet
CN210454868U (en) Transformer substation operation and maintenance integrated system
CN206524568U (en) A kind of maintenance frock applied to high-tension switch cabinet
CN215419317U (en) Can carry multi-functional auxiliary device of relay protection debugging appearance
CN213337830U (en) Electronic device installation operation platform with checking function
CN214653133U (en) Mutual inductor handling device for electric power
CN208207176U (en) Power supply device for fast detecting under vehicle
CN203660346U (en) Mobile multifunctional low-voltage distribution box
CN112952640A (en) Multifunctional substation secondary cable construction tool chair
CN112952599A (en) Power distribution cabinet control system
CN207320623U (en) Electrical engineering experimental bench
CN207664470U (en) A kind of plug-type electrical power control cabinet of large size
CN221364704U (en) Platform is used in converter maintenance
CN220268896U (en) Detection device is used in production of high low pressure complete sets
CN215498425U (en) Multifunctional monitoring device for power dispatching
CN221263123U (en) Bury prefabricated substation
CN214207568U (en) BIM technology-based workbench for construction engineering cost management
CN212011808U (en) Modular cubical switchboard for photovoltaic little electric wire netting
CN210757581U (en) Electronic and electrician operating platform
CN213023392U (en) Multi-load combined type burning trolley
CN215185313U (en) Emergency cart for emergency repair of power supply of automatic equipment of centralized control station and transformer substation
CN208043972U (en) A kind of status of electric power on-Line Monitor Device
CN204741281U (en) Portable reactive compensation disposes device
CN217225335U (en) Electrical engineering and automatic positioning and mounting device thereof