CN220284928U - Assembled excavator bucket - Google Patents

Assembled excavator bucket Download PDF

Info

Publication number
CN220284928U
CN220284928U CN202322200211.7U CN202322200211U CN220284928U CN 220284928 U CN220284928 U CN 220284928U CN 202322200211 U CN202322200211 U CN 202322200211U CN 220284928 U CN220284928 U CN 220284928U
Authority
CN
China
Prior art keywords
bucket
plate
threaded rod
excavator
threaded rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322200211.7U
Other languages
Chinese (zh)
Inventor
史先忠
朱飞跃
孙天永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Ruili Machinery Technology Co ltd
Original Assignee
Xuzhou Ruili Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Ruili Machinery Technology Co ltd filed Critical Xuzhou Ruili Machinery Technology Co ltd
Priority to CN202322200211.7U priority Critical patent/CN220284928U/en
Application granted granted Critical
Publication of CN220284928U publication Critical patent/CN220284928U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Shovels (AREA)

Abstract

The utility model discloses an assembled excavator bucket, which comprises a bucket structure used for excavating, wherein the bucket structure comprises a bucket plate with bearing lifting lugs, a plurality of threaded rods and clamping columns which are connected with bucket side plates are arranged on two sides of the bucket plate, meanwhile, the threaded rods and the clamping columns are connected with the bucket side plates through first through holes, the bucket side plates are also arranged through the threaded rods and the clamping columns in an installation manner with a reinforcing plate, the reinforcing plate is also provided with second through holes which are convenient for the threaded rods and the clamping columns to penetrate, lifting lugs which penetrate through a connecting threaded rod group are arranged above the reinforcing plate, and the assembled excavator bucket is arranged in the bucket structure through the following steps: bucket plate, threaded rod and card post to solve and pass through welded fastening between each subassembly of current bucket, wherein after a certain part damages, be difficult to dismantle alone and change, need change whole bucket, very uneconomical environmental protection, the condition that the practicality is relatively poor.

Description

Assembled excavator bucket
Technical Field
The utility model relates to the technical field of excavator buckets, in particular to an assembled excavator bucket.
Background
An excavator, also called an excavating machine, is an earth moving machine that excavates material above or below a deck with a bucket and loads the material into a transport vehicle or unloads the material to a storage yard. The materials of the excavator bucket mainly comprise soil, coal, silt and soil and rock after pre-loosening. In recent years, development of engineering machinery is relatively fast, and the excavator has become one of the most important engineering machinery in engineering construction, and three most important parameters of the excavator are as follows: the operation weight (quality), engine power and bucket capacity, the bucket refers to the bucket installed on the excavator and used, also called the bucket, is divided into a backhoe bucket and a front shovel bucket according to the working mode, the backhoe bucket is commonly used, the backhoe bucket is an indispensable structure for the excavator operation, the components of the existing bucket are fixed through welding, after a certain component is damaged, the whole bucket is difficult to detach and replace independently, the whole bucket is required to be replaced, and the excavator is quite uneconomical and environment-friendly and has poor practicability.
Disclosure of Invention
The utility model aims at overcoming the defects of the prior art, and provides an assembled excavator bucket, so that the problems that the prior bucket components are fixed by welding in many ways, one component is difficult to be detached and replaced independently after being damaged, the whole bucket needs to be replaced, and the assembled excavator bucket is quite uneconomical, environment-friendly and poor in practicability are solved.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides an assembled excavator bucket, includes the bucket structure that is the excavation, the bucket structure includes the bucket board that has the bearing lug, and the bucket board both sides are equipped with many threaded rods and the card post that are connected with the bucket curb plate and set up, and threaded rod and card post are all connected through first through-hole and bucket curb plate and are set up simultaneously;
the side plate of the excavator bucket is installed and arranged with the reinforcing plate through the threaded rod and the clamping column, and the reinforcing plate is also provided with a second through hole which is convenient for the threaded rod and the clamping column to penetrate through.
Through adopting above-mentioned technical scheme, thereby play and set up supporting connection effect through the bucket curb plate that sets up.
Preferably, the lifting lugs penetrating through the connecting threaded rod groups are arranged above the reinforcing plates, and the reinforcing plates are adjusted through the lifting lugs and the connecting threaded rod groups.
Through adopting above-mentioned technical scheme, thereby through the connection threaded rod group that sets up play run through threaded connection setting effect.
Preferably, the threaded rods are provided with 4 groups, and the threaded rods are symmetrically arranged about the center line of the bucket plate.
Through adopting above-mentioned technical scheme, thereby play the three-dimensional through the bucket plate that sets up and connect the setting effect.
Preferably, the connection shape of the clamping column and the second through hole is in a concentric circle structure, and the ratio of the diameter of the outer ring of the clamping column to the diameter of the inner ring of the second through hole is 1.5:1.4.
Through adopting above-mentioned technical scheme, thereby through the card post that sets up play run through the supporting effect of connecting of block.
Preferably, the reinforcing plates are provided with 1 group, and the overall shape of the reinforcing plates is in a 'meniscus' structure.
Through adopting above-mentioned technical scheme, thereby play the installation through the gusset plate that sets up and consolidate the effect to the bucket curb plate.
Compared with the prior art, the utility model has the beneficial effects that: the excavator bucket of the assembled excavator,
(1) This case is through setting up in the bucket structure: the bucket plate, the threaded rod and the clamping column are welded and fixed, so that the problem that the whole bucket is required to be replaced after a certain component is damaged is solved, the whole bucket is quite uneconomical and environment-friendly, the practicability is poor, the threaded rod and the clamping column are utilized to achieve the effects of quickly assembling and disassembling the whole bucket when the bucket side plate and the reinforcing plate are penetrated and arranged, and the bucket plate, the threaded rod and the clamping column are utilized to achieve the effects of supporting, connecting and fixing all the components and avoiding the conditions;
(2) Through setting up in the bucket structure: the excavator bucket side plate and the first through hole are also solved, when the excavator bucket needs to be assembled quickly, an operator manually holds the excavator bucket side plate to enable the first through hole to penetrate through the threaded rod and the clamping column, so that the excavator bucket side plate is connected with two sides of the excavator bucket plate in a quick matching mode, the arranged excavator bucket side plate and the first through hole are utilized to facilitate the rapid assembling and disassembling effect between the excavator bucket side plate and the excavator bucket plate, and the situations are avoided in sequence;
(3) Through setting up in the bucket structure: reinforcing plate, second through-hole, lug and connecting threaded rod group to solve the bucket curb plate and the bucket board and appear the unstable condition of connection easily after being connected, thereby influence the normal use operation of bucket, with the reinforcing plate through second through-hole and threaded rod and card post through connection setting after bucket curb plate and bucket board are connected, make connecting nut and threaded rod threaded connection back with connecting threaded rod group run through the lug again to the reinforcing plate multiple reinforcement simultaneously, utilize the aforesaid spare part of setting to avoid foretell condition again.
Drawings
FIG. 1 is a schematic view of the structure of a bucket of the present utility model;
FIG. 2 is a schematic view of the structure of the bucket plate, bearing lugs, threaded rods and clamping posts of the present utility model;
FIG. 3 is a schematic view of the side plate and first through hole structure of the bucket of the present utility model;
fig. 4 is a schematic structural view of the reinforcement plate, the second through hole, the connecting threaded rod set and the lifting lug according to the present utility model.
In the figure: 1. bucket structure, 101, bucket plate, 102, bearing lug, 103, threaded rod, 104, clip post, 105, bucket curb plate, 106, first through-hole, 107, gusset plate, 108, second through-hole, 109, connection threaded rod group, 1010, lug.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the present utility model provides a technical solution: the utility model provides an assembled excavator bucket, as shown in fig. 1, fig. 2, fig. 3 and fig. 4, including bucket structure 1 as the excavation, bucket structure 1 is including the bucket board 101 that has bearing lug 102, and bucket board 101 both sides are equipped with many threaded rods 103 and the card post 104 that are connected with bucket curb plate 105 and set up, threaded rod 103 and card post 104 all are connected with bucket curb plate 105 through first through-hole 106 simultaneously, threaded rod 103 is provided with 4 groups, and threaded rod 103 sets up with bucket board 101 central line symmetry, when being provided with 4 through-hole 8 with above-mentioned spare part, so not only embody the connectivity that above-mentioned spare part installation set up, still embody the connectivity that above-mentioned spare part installation set up and to the threaded connection spacing effect between bucket curb plate 105 and the gusset plate 107, and when being provided with 4 groups 8 through above-mentioned spare part, embody the installation spacing and the connection fixity effect of above-mentioned spare part to bucket curb plate 105 and gusset plate 107 upper and lower both ends simultaneously, take smooth run through mode between above-mentioned structure and first through-hole 106 and second through-hole 108 in proper order and take between the two ends and consolidate and connect with the gusset plate 107 again and dismantle convenient effect of installing and the two ends of gusset plate 107.
According to the scheme, the bucket side plate 105 is installed and arranged with the reinforcing plate 107 through the threaded rod 103 and the clamping column 104, the reinforcing plate 107 is also provided with the second through hole 108 which is convenient for the threaded rod 103 and the clamping column 104 to penetrate and be arranged, the connection shape of the clamping column 104 and the second through hole 108 is arranged in a concentric circle structure, and the ratio of the outer ring diameter of the clamping column 104 to the inner ring diameter of the second through hole 108 is 1.5:1.4.
Above-mentioned scheme is further in proper order, gusset plate 107 top is equipped with and connects lug 1010 that threaded rod group 109 runs through the setting, and all adjust the setting through lug 1010 and connecting threaded rod group 109 between the gusset plate 107, gusset plate 107 is provided with 1 group, and gusset plate 107 overall shape is "crescent" structure setting, when being provided with 1 group two through above-mentioned spare part, not only embody the symmetry that above-mentioned spare part installed the setting like this, still embody the spacing nature and the reinforcement effect that above-mentioned spare part set up to being connected to the bucket plate 101 both sides, and when above-mentioned spare part overall shape is "crescent" structure setting, embody simultaneously that above-mentioned spare part all with the laminating connectivity and the bulk connection aesthetic property and the wholeness effect of bucket plate 101 and bucket curb plate 105.
In the above scheme, when the bucket needs to be assembled and used, an operator manually holds the bucket side plate 105, penetrates through the threaded rod 103 and the clamping column 104 through the first through hole 106 and contacts with the bucket plate 101 in a fitting manner, then holds the reinforcing plate 107 again to enable the second through hole 108 to be in contact with the threaded rod 103 and the clamping column 104, at the moment, the operator uses the knocking member to knock the reinforcing plate 107 to enable the reinforcing plate 107 to contact with the bucket side plate 105 in a fitting manner, when the two are in contact with each other, the operator is connected with the threaded rod 103 through nuts, then penetrates through the connecting threaded rod group 109 and carries out secondary reinforcing connection on the reinforcing plate 107 through the lifting lug 1010, and after the integral bucket is assembled, the integral bucket is driven to work through the bearing lifting lug 102 through excavation.
The terms "center," "longitudinal," "transverse," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used for descriptive simplicity and convenience only and not as an indication or implying that the apparatus or element being referred to must have a particular orientation, be constructed and operated for a particular orientation, based on the orientation or positional relationship illustrated in the drawings, and thus should not be construed as limiting the scope of the present utility model.
Although the present utility model has been described with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements and changes may be made without departing from the spirit and principles of the present utility model.

Claims (5)

1. The utility model provides an assembled excavator bucket, is including the bucket structure (1) that is excavated, its characterized in that: the bucket structure (1) comprises a bucket plate (101) with bearing lifting lugs (102), a plurality of threaded rods (103) and clamping columns (104) which are connected with bucket side plates (105) are arranged on two sides of the bucket plate (101), and meanwhile, the threaded rods (103) and the clamping columns (104) are connected with the bucket side plates (105) through first through holes (106);
the bucket side plate (105) is installed and arranged with the reinforcing plate (107) through the threaded rod (103) and the clamping column (104), and the reinforcing plate (107) is also provided with a second through hole (108) which is convenient for the threaded rod (103) and the clamping column (104) to penetrate through.
2. The modular excavator bucket of claim 1 wherein: lifting lugs (1010) penetrating through the connecting threaded rod groups (109) are arranged above the reinforcing plates (107), and the reinforcing plates (107) are adjusted through the lifting lugs (1010) and the connecting threaded rod groups (109).
3. The modular excavator bucket of claim 1 wherein: the threaded rods (103) are provided with 4 groups, and the threaded rods (103) are symmetrically arranged about the center line of the bucket plate (101).
4. The modular excavator bucket of claim 1 wherein: the connection shape of the clamping column (104) and the second through hole (108) is in a concentric circle structure, and the ratio of the outer ring diameter of the clamping column (104) to the inner ring diameter of the second through hole (108) is 1.5:1.4.
5. The modular excavator bucket of claim 2 wherein: the reinforcing plates (107) are provided with 1 group, and the overall shape of the reinforcing plates (107) is in a crescent structure.
CN202322200211.7U 2023-08-16 2023-08-16 Assembled excavator bucket Active CN220284928U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322200211.7U CN220284928U (en) 2023-08-16 2023-08-16 Assembled excavator bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322200211.7U CN220284928U (en) 2023-08-16 2023-08-16 Assembled excavator bucket

Publications (1)

Publication Number Publication Date
CN220284928U true CN220284928U (en) 2024-01-02

Family

ID=89335952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322200211.7U Active CN220284928U (en) 2023-08-16 2023-08-16 Assembled excavator bucket

Country Status (1)

Country Link
CN (1) CN220284928U (en)

Similar Documents

Publication Publication Date Title
CN202787660U (en) Embedded column base connecting structure of H-shaped steel column
CN220284928U (en) Assembled excavator bucket
JP2888800B2 (en) Construction work execution system and construction machinery in remote areas
CN111980085A (en) Conveniently-replaced digging shovel and loader-digger with same
CN212359783U (en) TBM first ring segment lining pin-connected panel box locking device
CN113152300A (en) Working platform unit, working platform and construction method for ultra-long large-diameter pile foundation in water
CN217105314U (en) Load-sensitive gear pump driving type walking motor for small excavator
CN217811309U (en) Layered assembly type battery mounting rack
CN201434768Y (en) General counter-force frame
CN212506461U (en) Internal structural member of large arm base
CN214221102U (en) Quick-change frame of integrated drilling system
CN213805530U (en) High-strength connecting type bucket structure for excavator
CN221256377U (en) Building earthwork excavation earthwork pile up protector
CN220352842U (en) Box-type supporting structure for inspection well construction
CN221142874U (en) Bulldozer blade for engineering machinery
CN215358322U (en) Movable arm assembling tool for horizontal double-sided excavator
CN220927778U (en) Large-diameter pile foundation operation platform for deep water karst geology
CN220791254U (en) Arch shoulder bracing structure suitable for tunnel subsection excavation
CN212866135U (en) Oil tank mounting seat, oil tank structure, oil tank mounting assembly and engineering machinery
CN218623466U (en) Reinforced structure of reinforced concrete cantilever beam
CN217460744U (en) Bucket tooth convenient to remove and change excavator bucket tooth point
CN218597236U (en) Loader bucket
CN209816819U (en) Air compression wheel
CN217840163U (en) Rotary platform and engineering machinery
CN220978125U (en) Quick connecting device for anti-pulling static load test

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant